POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 201,406items · current page 601–700 · Source records, not unique facilities.

Source snapshots by date · KOR · kepco_planned

154kV 고흥-포두T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_3bc73ca0dbeb72f5
stable_project_idkproj_288ea2091f47e097
source_key202609|232444|ESB
basic_ym202609
source_stage_raw공사착수-사업완료전
project_name_list154kV 고흥-포두T/L 건설사업
project_name_detail154kV 고흥-포두T/L 건설사업
region_summary_raw전남광주통합특별시 고흥군등 1 지역
equipment_type_raw가공송전
headquarters_raw중부건설본부
office_raw광주전남건설지사
section_fields
Project purpose
  • 고흥S/S 신재생E 접속대기 해소
Project region
  • 전남광주통합특별시 고흥군
Project period
  • 2018.05~2027.03
사업 규모
  • ACSR 410㎟×2B×2C, 선로길이 : 10.4KM, 철탑 : 25기
담당 사업소
  • 중부건설본부/광주전남건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 2018.05 입지선정위원회 구성시기: 2021.04 참여 위원 수 : 12 지장유무 조회: 2021.04~2021.09 경과지(부지) 확정: 2021.07
환경/재해 영향평가
  • 환경영향평가: 2021.11 ~ 2023.03 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 2023.03 ~ 2023.03 설명회·공청회: 자체설명회: 2021.05 ~ 2021.08
입지선정 및 주민의견 수렴 주요 내용
  • ○ '20.11 : 입지선정위원회 착수회의 시행(위원회 구성 및 위원장 선출, 운영규범 확정 2차 회의로 순연) ○ '20.12 : 입지선정위원회 2차회의 시행(위원장 선출, 운영규범 확정, 경과지 선정기준 수립, 선호도 설문조사 등) ○ '21.02 : 입지선정위원회 3차회의 시행(후보경과대역 4개 안 중 최적경과대역 선정) ○ '21.04 : 입지선정위원회 4차회의 시행(최적경과지 추천) ○ '21.06 : 입지선정위원회 5차회의 시행(최적경과지 확정)
전원개발사업 실시계획 승인
  • 2024.08
사업설계
  • 설계용역: 기본설계: 2024.04 ~ 2024.06 실시설계: 2024.06 ~ 2025.01 설계담당자: [redacted]
건설공사 개요
  • 공사 착공: 2025.09 공사 기간: 2025.09 ~ 2027.10 감독자: [redacted], 실적): 98, 39
[추진실적] ○ '18.05 : 전력영향평가 및 경과지 설계 용역착수 ○ '20.11~21.06 : 입지선정위원회 시행(5회) ○ '21.05~08 : 최적경과지 사전 주민의견청취 ○ '21.09 : 지장유무조회(지자체, 관계기관) ○ '23.03 : 사업시행계획 열람 및 주민설명회 시행 ○ '24.08 : 전원개발사업 실시계획 승인 ○ '25.01 : 실시설계 완료 ○ '25.06 : 공사계약 공고 ○ '25.09 : 공사 착공 ○ '25.11 : 공사 측량 ○ '26.03 : 진입로 및 작업장 부지 개설(No.20, 21) ○ '26.04 : 기초공사 시행(No.20, 21) ○ '26.05 : 기초공사 완료(No.20, 21), 기초공사 시행(No.22) 철탑 도면 승인(설계도, 기초재?상부재 제작도 및 재료조서 등) ○ '26.06 : 기초공사 완료(No.22). 삭도하부장 조성(No.6,7) 철탑 도면 승인(산형강 철탑 5기 재료조서) 자재발주(애자, 금구류 등 23개 사급자재) ○ '26.07 : No.6 삭도 설치, 실시계획 변경승인 신청 특별지원사업비 지급(고당, 금사, 지정) 상부재 재료조서 승인(5기) ○ '26.08 : No.7, 8 삭도 하부장 조성 철탑 기초재 제작도 및 재료조서 승인(12기) 특별지원사업 협의 시행(척치, 원세동, 덕촌) [향후계획] ○ '26.09 : 실시계획 변경승인 신청 의견조회 조치 시행. 철탑 설계도 및 제작 승인
future_plan_redacted□ 향후계획 [추진실적] ○ '18.05 : 전력영향평가 및 경과지 설계 용역착수 ○ '20.11~21.06 : 입지선정위원회 시행(5회) ○ '21.05~08 : 최적경과지 사전 주민의견청취 ○ '21.09 : 지장유무조회(지자체, 관계기관) ○ '23.03 : 사업시행계획 열람 및 주민설명회 시행 ○ '24.08 : 전원개발사업 실시계획 승인 ○ '25.01 : 실시설계 완료 ○ '25.06 : 공사계약 공고 ○ '25.09 : 공사 착공 ○ '25.11 : 공사 측량 ○ '26.03 : 진입로 및 작업장 부지 개설(No.20, 21) ○ '26.04 : 기초공사 시행(No.20, 21) ○ '26.05 : 기초공사 완료(No.20, 21), 기초공사 시행(No.22) 철탑 도면 승인(설계도, 기초재?상부재 제작도 및 재료조서 등) ○ '26.06 : 기초공사 완료(No.22). 삭도하부장 조성(No.6,7) 철탑 도면 승인(산형강 철탑 5기 재료조서) 자재발주(애자, 금구류 등 23개 사급자재) ○ '26.07 : No.6 삭도 설치, 실시계획 변경승인 신청 특별지원사업비 지급(고당, 금사, 지정) 상부재 재료조서 승인(5기) ○ '26.08 : No.7, 8 삭도 하부장 조성 철탑 기초재 제작도 및 재료조서 승인(12기) 특별지원사업 협의 시행(척치, 원세동, 덕촌) [향후계획] ○ '26.09 : 실시계획 변경승인 신청 의견조회 조치 시행. 철탑 설계도 및 제작 승인
attachment_count0
source_detail_sha2566fac557dbfdebc33430022e9e69573667ca1e1268fa605e64648a3149101ceb4
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|232444|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_3bc73ca0dbeb72f5

Sources EV-e434c13dcddcb8eee0df530d
Evidence SHA-256 6fac557dbfdebc33430022e9e69573667ca1e1268fa605e64648a3149101ceb4
행 SHA-256 634938c8f6be5db9a64a83b708c78538e313f1d0e460124c89d249c66920dbd6
Source snapshots by date · KOR · kepco_planned

154kV 고흥-포두T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_288ea2091f47e097
stable_project_keyprjtDef:232444:ESB
project_definition232444
first_region_codeESB
manual_source_formatfalse
project_name154kV 고흥-포두T/L 건설사업
project_name_list154kV 고흥-포두T/L 건설사업
purpose고흥S/S 신재생E 접속대기 해소
project_region_detail전남광주통합특별시 고흥군
project_period_raw2018.05~2027.03
project_scale_rawACSR 410㎟×2B×2C, 선로길이 : 10.4KM, 철탑 : 25기
responsible_office_raw중부건설본부/광주전남건설지사
equipment_type가공송전
headquarters중부건설본부
office광주전남건설지사
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_3bc73ca0dbeb72f5
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_288ea2091f47e097

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_288ea2091f47e097

Sources EV-c54b13ca411999958d4b49db
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 d997e3454bda5eb5913be766eaeadb537f47c2cdd17cdbcdce883ddafaf2881a
Power assets and projects · KOR · kepco_planned

154kV 곡성#2S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-7279418fec6814610b620c8c
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_e732f6d65f803954
stable_project_keyprjtDef:231598:ESB
project_definition231598
first_region_codeESB
manual_source_formatfalse
project_name154kV 곡성#2S/S 건설사업
project_name_list154kV 곡성#2S/S 건설사업
purpose곡성지역 재생E 계통연계
project_region_detail전남광주통합특별시 곡성군
project_period_raw2023.05~2030.12
project_scale_raw154KV M.TR 2BANK(최종 4BANK)
responsible_office_raw중부건설본부/광주전남건설지사
equipment_type변전
headquarters중부건설본부
office광주전남건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_678c83ae8809e62d
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_e732f6d65f803954

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_e732f6d65f803954

Sources EV-7279418fec6814610b620c8c
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 7cd5ddbedc5a6f13fb1e7c470167b8ab06e9f729820d0429f33aef402c34c465
Source schedule candidates · KOR · kepco_planned

154kV 곡성#2S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2023-05
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231598|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_678c83ae8809e62d

Sources EV-356a3e47c63f3eac54651c76
Evidence SHA-256 b0c3cfa2e613e9872097b7b70ba8aa56f44ca7ec165183276b21607cfe86e846
행 SHA-256 5b08e086375f95452e7289dfcc4b3526620d3e66043e7d9336e1b9f0dc877f81
Source schedule candidates · KOR · kepco_planned

154kV 곡성#2S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2030-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231598|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_678c83ae8809e62d

Sources EV-356a3e47c63f3eac54651c76
Evidence SHA-256 b0c3cfa2e613e9872097b7b70ba8aa56f44ca7ec165183276b21607cfe86e846
행 SHA-256 5b08e086375f95452e7289dfcc4b3526620d3e66043e7d9336e1b9f0dc877f81
Source snapshots by date · KOR · kepco_planned

154kV 곡성#2S/S 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_678c83ae8809e62d
stable_project_idkproj_e732f6d65f803954
source_key202609|231598|ESB
basic_ym202609
source_stage_raw계획확정-사업승인전
project_name_list154kV 곡성#2S/S 건설사업
project_name_detail154kV 곡성#2S/S 건설사업
region_summary_raw전남광주통합특별시 곡성군등 1 지역
equipment_type_raw변전
headquarters_raw중부건설본부
office_raw광주전남건설지사
section_fields
Project purpose
  • 곡성지역 재생E 계통연계
Project region
  • 전남광주통합특별시 곡성군
Project period
  • 2023.05~2030.12
사업 규모
  • 154KV M.TR 2BANK(최종 4BANK)
담당 사업소
  • 중부건설본부/광주전남건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 2024.08 입지선정위원회 구성시기: 2025.05 참여 위원 수 : 16 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
[계획확정~사업승인전 추진실적] ○'23.05 : 제10차 장기송변전설비계획 반영 ○'24.07 : 전력영향평가용역 발주 시행 ○'24.08 : 전력영향평가 용역 착수(진화기술공사) ○'24.09 : 전력영향평가 용역 착수회의 시행 ○'24.11~'25.02 : 지자체 및 주민 사업설명회 및 입지선정위원 추천 요청 ○'25.05 : 입지선정위원회 구성 및 착수회의(위원장 선출) ○'25.06 : 입지선정위원회 2차회의(입지선정위원회 운영기준 확정) ○'26.01 : 입지선정위원회 3차회의(후보지역 선정) ○'26.04 : 입지선정위원회 4차회의(면별 위원 동수 구성) ○'26.04 : 입지선정위원회 5차회의(면별 위원 동수(2명) 구성) ○'26.05 : 입지선정위원회 서면심의 시행(운영기간 연장 심의 부결) ○'26.06 : 입지선정위원회 생략공고 신문 게재 ○'26.06 : 대안위원회 구성 완료 ○'26.07 : 대안위원회 착수회의 시행(후보부지 선정) ○'26.08 : 대안위원회 2차회의 시행(대안평가 기준 수립) ○'26.09 : 대안위원회 3차회의 시행(변전소 최적부지 선정) [향후계획] ○'26.10 : 송전선로 경과지 확정
future_plan_redacted□ 향후계획 [계획확정~사업승인전 추진실적] ○'23.05 : 제10차 장기송변전설비계획 반영 ○'24.07 : 전력영향평가용역 발주 시행 ○'24.08 : 전력영향평가 용역 착수(진화기술공사) ○'24.09 : 전력영향평가 용역 착수회의 시행 ○'24.11~'25.02 : 지자체 및 주민 사업설명회 및 입지선정위원 추천 요청 ○'25.05 : 입지선정위원회 구성 및 착수회의(위원장 선출) ○'25.06 : 입지선정위원회 2차회의(입지선정위원회 운영기준 확정) ○'26.01 : 입지선정위원회 3차회의(후보지역 선정) ○'26.04 : 입지선정위원회 4차회의(면별 위원 동수 구성) ○'26.04 : 입지선정위원회 5차회의(면별 위원 동수(2명) 구성) ○'26.05 : 입지선정위원회 서면심의 시행(운영기간 연장 심의 부결) ○'26.06 : 입지선정위원회 생략공고 신문 게재 ○'26.06 : 대안위원회 구성 완료 ○'26.07 : 대안위원회 착수회의 시행(후보부지 선정) ○'26.08 : 대안위원회 2차회의 시행(대안평가 기준 수립) ○'26.09 : 대안위원회 3차회의 시행(변전소 최적부지 선정) [향후계획] ○'26.10 : 송전선로 경과지 확정
attachment_count2
source_detail_sha256b0c3cfa2e613e9872097b7b70ba8aa56f44ca7ec165183276b21607cfe86e846
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231598|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_678c83ae8809e62d

Sources EV-356a3e47c63f3eac54651c76
Evidence SHA-256 b0c3cfa2e613e9872097b7b70ba8aa56f44ca7ec165183276b21607cfe86e846
행 SHA-256 5b08e086375f95452e7289dfcc4b3526620d3e66043e7d9336e1b9f0dc877f81
Source snapshots by date · KOR · kepco_planned

154kV 곡성#2S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_e732f6d65f803954
stable_project_keyprjtDef:231598:ESB
project_definition231598
first_region_codeESB
manual_source_formatfalse
project_name154kV 곡성#2S/S 건설사업
project_name_list154kV 곡성#2S/S 건설사업
purpose곡성지역 재생E 계통연계
project_region_detail전남광주통합특별시 곡성군
project_period_raw2023.05~2030.12
project_scale_raw154KV M.TR 2BANK(최종 4BANK)
responsible_office_raw중부건설본부/광주전남건설지사
equipment_type변전
headquarters중부건설본부
office광주전남건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_678c83ae8809e62d
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_e732f6d65f803954

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_e732f6d65f803954

Sources EV-7279418fec6814610b620c8c
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 7cd5ddbedc5a6f13fb1e7c470167b8ab06e9f729820d0429f33aef402c34c465
Power assets and projects · KOR · kepco_planned

154kV 곡성#2분기T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-0472560eef9f823d61f74472
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_d93157336fc36034
stable_project_keyprjtDef:232670:ESB
project_definition232670
first_region_codeESB
manual_source_formatfalse
project_name154kV 곡성#2분기T/L 건설사업
project_name_list154kV 곡성#2분기 송전선로 건설사업
purpose곡성지역 재생E 계통 연계 및 보강
project_region_detail전남광주통합특별시 곡성군
project_period_raw2023.06~2030.12
project_scale_rawACSR 410㎟×S×4C
responsible_office_raw중부건설본부/광주전남건설지사
equipment_type가공송전
headquarters중부건설본부
office광주전남건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_b7af44fc0fcad228
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_d93157336fc36034

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_d93157336fc36034

Sources EV-0472560eef9f823d61f74472
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 6143e5c1f37ccdeb6917c4f14e25dcb967e7cb210ea3a41069ae528ad7afcf43
Source schedule candidates · KOR · kepco_planned

154kV 곡성#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-05
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232670|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7af44fc0fcad228

Sources EV-d00f80a7a3161ef1398ae636
Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62
행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9
Source schedule candidates · KOR · kepco_planned

154kV 곡성#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2030-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232670|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7af44fc0fcad228

Sources EV-d00f80a7a3161ef1398ae636
Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62
행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9
Source schedule candidates · KOR · kepco_planned

154kV 곡성#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-05
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232670|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7af44fc0fcad228

Sources EV-d00f80a7a3161ef1398ae636
Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62
행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9
Source schedule candidates · KOR · kepco_planned

154kV 곡성#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-08
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232670|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7af44fc0fcad228

Sources EV-d00f80a7a3161ef1398ae636
Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62
행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9
Source schedule candidates · KOR · kepco_planned

154kV 곡성#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232670|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7af44fc0fcad228

Sources EV-d00f80a7a3161ef1398ae636
Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62
행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9
Source schedule candidates · KOR · kepco_planned

154kV 곡성#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232670|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7af44fc0fcad228

Sources EV-d00f80a7a3161ef1398ae636
Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62
행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9
Source schedule candidates · KOR · kepco_planned

154kV 곡성#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-10
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232670|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7af44fc0fcad228

Sources EV-d00f80a7a3161ef1398ae636
Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62
행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9
Source schedule candidates · KOR · kepco_planned

154kV 곡성#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-07
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232670|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7af44fc0fcad228

Sources EV-d00f80a7a3161ef1398ae636
Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62
행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9
Source schedule candidates · KOR · kepco_planned

154kV 곡성#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-06
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232670|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7af44fc0fcad228

Sources EV-d00f80a7a3161ef1398ae636
Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62
행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9
Source schedule candidates · KOR · kepco_planned

154kV 곡성#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-01
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232670|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7af44fc0fcad228

Sources EV-d00f80a7a3161ef1398ae636
Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62
행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9
Source schedule candidates · KOR · kepco_planned

154kV 곡성#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232670|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7af44fc0fcad228

Sources EV-d00f80a7a3161ef1398ae636
Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62
행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9
Source schedule candidates · KOR · kepco_planned

154kV 곡성#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232670|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7af44fc0fcad228

Sources EV-d00f80a7a3161ef1398ae636
Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62
행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9
Source schedule candidates · KOR · kepco_planned

154kV 곡성#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-10
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232670|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7af44fc0fcad228

Sources EV-d00f80a7a3161ef1398ae636
Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62
행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9
Source schedule candidates · KOR · kepco_planned

154kV 곡성#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-01
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232670|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7af44fc0fcad228

Sources EV-d00f80a7a3161ef1398ae636
Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62
행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9
Source schedule candidates · KOR · kepco_planned

154kV 곡성#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2023-06
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232670|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7af44fc0fcad228

Sources EV-d00f80a7a3161ef1398ae636
Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62
행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9
Source schedule candidates · KOR · kepco_planned

154kV 곡성#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232670|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7af44fc0fcad228

Sources EV-d00f80a7a3161ef1398ae636
Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62
행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9
Source schedule candidates · KOR · kepco_planned

154kV 곡성#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2025-05
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232670|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7af44fc0fcad228

Sources EV-d00f80a7a3161ef1398ae636
Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62
행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9
Source schedule candidates · KOR · kepco_planned

154kV 곡성#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-08
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232670|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7af44fc0fcad228

Sources EV-d00f80a7a3161ef1398ae636
Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62
행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9
Source schedule candidates · KOR · kepco_planned

154kV 곡성#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-08
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232670|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7af44fc0fcad228

Sources EV-d00f80a7a3161ef1398ae636
Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62
행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9
Source schedule candidates · KOR · kepco_planned

154kV 곡성#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-06
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232670|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7af44fc0fcad228

Sources EV-d00f80a7a3161ef1398ae636
Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62
행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9
Source schedule candidates · KOR · kepco_planned

154kV 곡성#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-05
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232670|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7af44fc0fcad228

Sources EV-d00f80a7a3161ef1398ae636
Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62
행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9
Source schedule candidates · KOR · kepco_planned

154kV 곡성#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-02
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232670|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7af44fc0fcad228

Sources EV-d00f80a7a3161ef1398ae636
Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62
행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9
Source snapshots by date · KOR · kepco_planned

154kV 곡성#2분기T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_b7af44fc0fcad228
stable_project_idkproj_d93157336fc36034
source_key202609|232670|ESB
basic_ym202609
source_stage_raw계획확정-사업승인전
project_name_list154kV 곡성#2분기 송전선로 건설사업
project_name_detail154kV 곡성#2분기T/L 건설사업
region_summary_raw전남광주통합특별시 곡성군등 1 지역
equipment_type_raw가공송전
headquarters_raw중부건설본부
office_raw광주전남건설지사
section_fields
Project purpose
  • 곡성지역 재생E 계통 연계 및 보강
Project region
  • 전남광주통합특별시 곡성군
Project period
  • 2023.06~2030.12
사업 규모
  • ACSR 410㎟×S×4C
담당 사업소
  • 중부건설본부/광주전남건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 2024.08 입지선정위원회 구성시기: 2025.05 참여 위원 수 : 16 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
  • ○ 추진실적 - '23.04 : 제10차 전력수급기본계획 장기 송변전설비계획 반영 - '24.10 : 전력영향평가 및 경과지설계 용역 착수 - '25.01 : 입지선정위원회 위원 추천 요청(→곡성군) - '25.02 : 이장단(곡성군) 대상 사업설명 - '25.04 : 입지선정위원회 위원 추천 명단 회신(←곡성군) - '25.05 : 입지선정위원 구성 완료 및 착수 회의(5/27) - '25.06 : 입지선정위원회 2차회의 - '25.08 : 입지선정위원회 3차회의(회의 무산) - '25.10 : 입지선정위원회 3차회의(회의 무산) - '26.01 : 입지선정위원회 3차 회의 - '26.04 : 입지선정위원회 4차 회의(4/8) - '26.04 : 입지선정위원회 5차 회의(4/22) - '26.05 : 입지선정위원회 6차(서면) 회의(5/21~5/22) - '26.06 : 입지선정위원회 생략공고(6/9~6/10) - '26.07 : 입지선정 대안위원회 착수회의(7/6) - '26.08 : 입지선정 대안위원회 2차회의(8/10)
[향후계획] - `26.09 : 입지선정 대안위원회 3차회의(9/8)
future_plan_redacted□ 향후계획 [향후계획] - `26.09 : 입지선정 대안위원회 3차회의(9/8)
attachment_count0
source_detail_sha256db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|232670|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7af44fc0fcad228

Sources EV-d00f80a7a3161ef1398ae636
Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62
행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9
Source snapshots by date · KOR · kepco_planned

154kV 곡성#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_d93157336fc36034
stable_project_keyprjtDef:232670:ESB
project_definition232670
first_region_codeESB
manual_source_formatfalse
project_name154kV 곡성#2분기T/L 건설사업
project_name_list154kV 곡성#2분기 송전선로 건설사업
purpose곡성지역 재생E 계통 연계 및 보강
project_region_detail전남광주통합특별시 곡성군
project_period_raw2023.06~2030.12
project_scale_rawACSR 410㎟×S×4C
responsible_office_raw중부건설본부/광주전남건설지사
equipment_type가공송전
headquarters중부건설본부
office광주전남건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_b7af44fc0fcad228
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_d93157336fc36034

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_d93157336fc36034

Sources EV-0472560eef9f823d61f74472
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 6143e5c1f37ccdeb6917c4f14e25dcb967e7cb210ea3a41069ae528ad7afcf43
Power assets and projects · KOR · kepco_planned

154kV 과림S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-f2395deb8f39ecfff1f90c7c
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_1f6282dff3ff0447
stable_project_keyprjtDef:231540:ESB
project_definition231540
first_region_codeESB
manual_source_formatfalse
project_name154kV 과림S/S 건설사업
project_name_list154,000V 과림변전소 건설사업
purpose수도권 3기 신도시(광명시흥지구) 전력 공급
project_region_detail경기도 시흥시
project_period_raw2026.09~2032.04
project_scale_raw154KV M.TR 60MVA X 2BANK(최종 4BANK)
responsible_office_raw경인건설본부/남서울인천건설지사
equipment_type변전
headquarters경인건설본부
office남서울인천건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_61f4d0648e4ad778
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_1f6282dff3ff0447

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_1f6282dff3ff0447

Sources EV-f2395deb8f39ecfff1f90c7c
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 1c538dcbfe74445fda895f08bdba5005d2ec3fe83d6efbd66a34c2cdd6c5d439
Source schedule candidates · KOR · kepco_planned

154kV 과림S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2032-04
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231540|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_61f4d0648e4ad778

Sources EV-f946261de5fb15db35e26b27
Evidence SHA-256 f7a27d361401372eccc403c6fa03585097e317d7e4a60bb152e3558a913bfb17
행 SHA-256 1d3c57b1546d6094385019fd3ebe079654b55a4f96081f341bf1e46d5e051926
Source schedule candidates · KOR · kepco_planned

154kV 과림S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2026-09
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231540|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_61f4d0648e4ad778

Sources EV-f946261de5fb15db35e26b27
Evidence SHA-256 f7a27d361401372eccc403c6fa03585097e317d7e4a60bb152e3558a913bfb17
행 SHA-256 1d3c57b1546d6094385019fd3ebe079654b55a4f96081f341bf1e46d5e051926
Source schedule candidates · KOR · kepco_planned

154kV 과림S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-05
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231540|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_61f4d0648e4ad778

Sources EV-f946261de5fb15db35e26b27
Evidence SHA-256 f7a27d361401372eccc403c6fa03585097e317d7e4a60bb152e3558a913bfb17
행 SHA-256 1d3c57b1546d6094385019fd3ebe079654b55a4f96081f341bf1e46d5e051926
Source snapshots by date · KOR · kepco_planned

154kV 과림S/S 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_61f4d0648e4ad778
stable_project_idkproj_1f6282dff3ff0447
source_key202609|231540|ESB
basic_ym202609
source_stage_raw계획확정-사업승인전
project_name_list154,000V 과림변전소 건설사업
project_name_detail154kV 과림S/S 건설사업
region_summary_raw경기도 시흥시등 1 지역
equipment_type_raw변전
headquarters_raw경인건설본부
office_raw남서울인천건설지사
section_fields
Project purpose
  • 수도권 3기 신도시(광명시흥지구) 전력 공급
Project region
  • 경기도 시흥시
Project period
  • 2026.09~2032.04
사업 규모
  • 154KV M.TR 60MVA X 2BANK(최종 4BANK)
담당 사업소
  • 경인건설본부/남서울인천건설지사
계획확정
  • 제11차 장기송변전설비계획 반영(2025.05)
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
○ '30. 5 : 공사 착공 ○ '32. 4 : 공사 준공 및 변전소 가압
future_plan_redacted□ 향후계획 ○ '30. 5 : 공사 착공 ○ '32. 4 : 공사 준공 및 변전소 가압
attachment_count0
source_detail_sha256f7a27d361401372eccc403c6fa03585097e317d7e4a60bb152e3558a913bfb17
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231540|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_61f4d0648e4ad778

Sources EV-f946261de5fb15db35e26b27
Evidence SHA-256 f7a27d361401372eccc403c6fa03585097e317d7e4a60bb152e3558a913bfb17
행 SHA-256 1d3c57b1546d6094385019fd3ebe079654b55a4f96081f341bf1e46d5e051926
Source snapshots by date · KOR · kepco_planned

154kV 과림S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_1f6282dff3ff0447
stable_project_keyprjtDef:231540:ESB
project_definition231540
first_region_codeESB
manual_source_formatfalse
project_name154kV 과림S/S 건설사업
project_name_list154,000V 과림변전소 건설사업
purpose수도권 3기 신도시(광명시흥지구) 전력 공급
project_region_detail경기도 시흥시
project_period_raw2026.09~2032.04
project_scale_raw154KV M.TR 60MVA X 2BANK(최종 4BANK)
responsible_office_raw경인건설본부/남서울인천건설지사
equipment_type변전
headquarters경인건설본부
office남서울인천건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_61f4d0648e4ad778
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_1f6282dff3ff0447

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_1f6282dff3ff0447

Sources EV-f2395deb8f39ecfff1f90c7c
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 1c538dcbfe74445fda895f08bdba5005d2ec3fe83d6efbd66a34c2cdd6c5d439
Power assets and projects · KOR · kepco_planned

154kV 과천#2 분기 전력구 전력구 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-bcc6f3b1155521cd9bc60e55
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_021b903aceee3825
stable_project_keyprjtDef:234642:ESB
project_definition234642
first_region_codeESB
manual_source_formatfalse
project_name154kV 과천#2 분기 전력구 전력구 건설사업
project_name_list과천지역 전기공급시설 전력구공사(북과천분기)
purpose과천지구 부하해소
project_region_detail경기도 과천시
project_period_raw2024.01~2027.04
project_scale_raw전력구 1KM
responsible_office_raw경인건설본부/직할
equipment_type전력구
headquarters경인건설본부
office직할
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_f95377484bf60705
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_021b903aceee3825

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_021b903aceee3825

Sources EV-bcc6f3b1155521cd9bc60e55
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 5c28c2f9b01cec818be3b6719fef37003c8b6264649b314367f487587f3908ac
Source schedule candidates · KOR · kepco_planned

154kV 과천#2 분기 전력구 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234642|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_f95377484bf60705

Sources EV-b94a57e5bca58e5e0c6133d5
Evidence SHA-256 a7886f9d3f5930edeaed5b8ed3ed6bc97ab3aaa8931700a5bd8ac0dd84c824f4
행 SHA-256 21688e5d282bf96fe6617f964e161e89c1a2df98154e72ae6cc79346a022020c
Source schedule candidates · KOR · kepco_planned

154kV 과천#2 분기 전력구 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234642|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_f95377484bf60705

Sources EV-b94a57e5bca58e5e0c6133d5
Evidence SHA-256 a7886f9d3f5930edeaed5b8ed3ed6bc97ab3aaa8931700a5bd8ac0dd84c824f4
행 SHA-256 21688e5d282bf96fe6617f964e161e89c1a2df98154e72ae6cc79346a022020c
Source schedule candidates · KOR · kepco_planned

154kV 과천#2 분기 전력구 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-09
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234642|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_f95377484bf60705

Sources EV-b94a57e5bca58e5e0c6133d5
Evidence SHA-256 a7886f9d3f5930edeaed5b8ed3ed6bc97ab3aaa8931700a5bd8ac0dd84c824f4
행 SHA-256 21688e5d282bf96fe6617f964e161e89c1a2df98154e72ae6cc79346a022020c
Source schedule candidates · KOR · kepco_planned

154kV 과천#2 분기 전력구 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-09
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234642|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_f95377484bf60705

Sources EV-b94a57e5bca58e5e0c6133d5
Evidence SHA-256 a7886f9d3f5930edeaed5b8ed3ed6bc97ab3aaa8931700a5bd8ac0dd84c824f4
행 SHA-256 21688e5d282bf96fe6617f964e161e89c1a2df98154e72ae6cc79346a022020c
Source schedule candidates · KOR · kepco_planned

154kV 과천#2 분기 전력구 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_start
date2024-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234642|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_f95377484bf60705

Sources EV-b94a57e5bca58e5e0c6133d5
Evidence SHA-256 a7886f9d3f5930edeaed5b8ed3ed6bc97ab3aaa8931700a5bd8ac0dd84c824f4
행 SHA-256 21688e5d282bf96fe6617f964e161e89c1a2df98154e72ae6cc79346a022020c
Source schedule candidates · KOR · kepco_planned

154kV 과천#2 분기 전력구 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-03
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234642|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_f95377484bf60705

Sources EV-b94a57e5bca58e5e0c6133d5
Evidence SHA-256 a7886f9d3f5930edeaed5b8ed3ed6bc97ab3aaa8931700a5bd8ac0dd84c824f4
행 SHA-256 21688e5d282bf96fe6617f964e161e89c1a2df98154e72ae6cc79346a022020c
Source schedule candidates · KOR · kepco_planned

154kV 과천#2 분기 전력구 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-03
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234642|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_f95377484bf60705

Sources EV-b94a57e5bca58e5e0c6133d5
Evidence SHA-256 a7886f9d3f5930edeaed5b8ed3ed6bc97ab3aaa8931700a5bd8ac0dd84c824f4
행 SHA-256 21688e5d282bf96fe6617f964e161e89c1a2df98154e72ae6cc79346a022020c
Source schedule candidates · KOR · kepco_planned

154kV 과천#2 분기 전력구 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2024-01
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|234642|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_f95377484bf60705

Sources EV-b94a57e5bca58e5e0c6133d5
Evidence SHA-256 a7886f9d3f5930edeaed5b8ed3ed6bc97ab3aaa8931700a5bd8ac0dd84c824f4
행 SHA-256 21688e5d282bf96fe6617f964e161e89c1a2df98154e72ae6cc79346a022020c
Source schedule candidates · KOR · kepco_planned

154kV 과천#2 분기 전력구 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234642|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_f95377484bf60705

Sources EV-b94a57e5bca58e5e0c6133d5
Evidence SHA-256 a7886f9d3f5930edeaed5b8ed3ed6bc97ab3aaa8931700a5bd8ac0dd84c824f4
행 SHA-256 21688e5d282bf96fe6617f964e161e89c1a2df98154e72ae6cc79346a022020c
Source schedule candidates · KOR · kepco_planned

154kV 과천#2 분기 전력구 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234642|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_f95377484bf60705

Sources EV-b94a57e5bca58e5e0c6133d5
Evidence SHA-256 a7886f9d3f5930edeaed5b8ed3ed6bc97ab3aaa8931700a5bd8ac0dd84c824f4
행 SHA-256 21688e5d282bf96fe6617f964e161e89c1a2df98154e72ae6cc79346a022020c
Source schedule candidates · KOR · kepco_planned

154kV 과천#2 분기 전력구 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2027-04
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|234642|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_f95377484bf60705

Sources EV-b94a57e5bca58e5e0c6133d5
Evidence SHA-256 a7886f9d3f5930edeaed5b8ed3ed6bc97ab3aaa8931700a5bd8ac0dd84c824f4
행 SHA-256 21688e5d282bf96fe6617f964e161e89c1a2df98154e72ae6cc79346a022020c
Source schedule candidates · KOR · kepco_planned

154kV 과천#2 분기 전력구 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234642|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_f95377484bf60705

Sources EV-b94a57e5bca58e5e0c6133d5
Evidence SHA-256 a7886f9d3f5930edeaed5b8ed3ed6bc97ab3aaa8931700a5bd8ac0dd84c824f4
행 SHA-256 21688e5d282bf96fe6617f964e161e89c1a2df98154e72ae6cc79346a022020c
Source snapshots by date · KOR · kepco_planned

154kV 과천#2 분기 전력구 전력구 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_f95377484bf60705
stable_project_idkproj_021b903aceee3825
source_key202609|234642|ESB
basic_ym202609
source_stage_raw사업승인-공사착수전
project_name_list과천지역 전기공급시설 전력구공사(북과천분기)
project_name_detail154kV 과천#2 분기 전력구 전력구 건설사업
region_summary_raw경기도 과천시등 1 지역
equipment_type_raw전력구
headquarters_raw경인건설본부
office_raw직할
section_fields
Project purpose
  • 과천지구 부하해소
Project region
  • 경기도 과천시
Project period
  • 2024.01~2027.04
사업 규모
  • 전력구 1KM
담당 사업소
  • 경인건설본부/직할
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 2024.04 ~ 2025.03 기본설계: 2024.04 ~ 2024.09 실시설계: 2024.09 ~ 2025.03 설계담당자: [redacted]
line ○ 24.05 : 전력구 경과지 기본설계 착수 ○ 24.07 : 변전소 입지확정 위원회 준비중 ○ 24.09 : 입지 확정 후 기본설계심의 준비 ○ 25.05 : 기본설계심의 시
future_plan_redactedline □ 향후계획 ○ 24.05 : 전력구 경과지 기본설계 착수 ○ 24.07 : 변전소 입지확정 위원회 준비중 ○ 24.09 : 입지 확정 후 기본설계심의 준비 ○ 25.05 : 기본설계심의 시
attachment_count0
source_detail_sha256a7886f9d3f5930edeaed5b8ed3ed6bc97ab3aaa8931700a5bd8ac0dd84c824f4
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|234642|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_f95377484bf60705

Sources EV-b94a57e5bca58e5e0c6133d5
Evidence SHA-256 a7886f9d3f5930edeaed5b8ed3ed6bc97ab3aaa8931700a5bd8ac0dd84c824f4
행 SHA-256 21688e5d282bf96fe6617f964e161e89c1a2df98154e72ae6cc79346a022020c
Source snapshots by date · KOR · kepco_planned

154kV 과천#2 분기 전력구 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_021b903aceee3825
stable_project_keyprjtDef:234642:ESB
project_definition234642
first_region_codeESB
manual_source_formatfalse
project_name154kV 과천#2 분기 전력구 전력구 건설사업
project_name_list과천지역 전기공급시설 전력구공사(북과천분기)
purpose과천지구 부하해소
project_region_detail경기도 과천시
project_period_raw2024.01~2027.04
project_scale_raw전력구 1KM
responsible_office_raw경인건설본부/직할
equipment_type전력구
headquarters경인건설본부
office직할
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_f95377484bf60705
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_021b903aceee3825

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_021b903aceee3825

Sources EV-bcc6f3b1155521cd9bc60e55
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 5c28c2f9b01cec818be3b6719fef37003c8b6264649b314367f487587f3908ac
Power assets and projects · KOR · kepco_planned

154kV 관교-구월 전력구 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-9c3fd9ca9e8510dc983519ff
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_741dbd3654c5448a
stable_project_keyprjtDef:234857:ESB
project_definition234857
first_region_codeESB
manual_source_formatfalse
project_name154kV 관교-구월 전력구 건설사업
project_name_list154kV 관교-구월 전력구 건설사업
purpose구월2지구 등 신규부하 공급능력 확보
project_region_detail인천광역시 남동구,연수구
project_period_raw
project_scale_raw개착식전력구 600M (2,000㎟X2C)
responsible_office_raw경인건설본부/직할
equipment_type전력구
headquarters경인건설본부
office직할
current_stage_raw
snapshot_count1
active_snapshot_count0
snapshot_ids
  • ksnap_5022a7f5cfb2dbd6
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text
source_record_idstable_project_id:kproj_741dbd3654c5448a

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_741dbd3654c5448a

Sources EV-9c3fd9ca9e8510dc983519ff
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 c4d2e14692fdbfbcb85eaddbfed3bd595b69995d34d5ce347f10600eaa8075c3
Source snapshots by date · KOR · kepco_planned

154kV 관교-구월 전력구 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_5022a7f5cfb2dbd6
stable_project_idkproj_741dbd3654c5448a
source_key202609|234857|ESB
basic_ym202609
source_stage_raw
project_name_list154kV 관교-구월 전력구 건설사업
project_name_detail154kV 관교-구월 전력구 건설사업
region_summary_raw인천광역시 남동구등 2 지역
equipment_type_raw전력구
headquarters_raw경인건설본부
office_raw직할
section_fields
Project purpose
  • 구월2지구 등 신규부하 공급능력 확보
Project region
  • 인천광역시 남동구,연수구
Project period
사업 규모
  • 개착식전력구 600M (2,000㎟X2C)
담당 사업소
  • 경인건설본부/직할
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
future_plan_redacted□ 향후계획
attachment_count0
source_detail_sha2568bcd188bff5876d058d178df2cb2099818f9f27531580be8de6b077fa365081e
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|234857|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_5022a7f5cfb2dbd6

Sources EV-4a85ebd05a4e87f056c2fc32
Evidence SHA-256 8bcd188bff5876d058d178df2cb2099818f9f27531580be8de6b077fa365081e
행 SHA-256 cc44f67482b8f54a46d9cef0a2778fbfdea620f9569b46f2e64a382ac78f74cf
Source snapshots by date · KOR · kepco_planned

154kV 관교-구월 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_741dbd3654c5448a
stable_project_keyprjtDef:234857:ESB
project_definition234857
first_region_codeESB
manual_source_formatfalse
project_name154kV 관교-구월 전력구 건설사업
project_name_list154kV 관교-구월 전력구 건설사업
purpose구월2지구 등 신규부하 공급능력 확보
project_region_detail인천광역시 남동구,연수구
project_period_raw
project_scale_raw개착식전력구 600M (2,000㎟X2C)
responsible_office_raw경인건설본부/직할
equipment_type전력구
headquarters경인건설본부
office직할
current_stage_raw
snapshot_count1
active_snapshot_count0
snapshot_ids
  • ksnap_5022a7f5cfb2dbd6
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text
source_record_idstable_project_id:kproj_741dbd3654c5448a

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_741dbd3654c5448a

Sources EV-9c3fd9ca9e8510dc983519ff
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 c4d2e14692fdbfbcb85eaddbfed3bd595b69995d34d5ce347f10600eaa8075c3
Power assets and projects · KOR · kepco_planned

154kV 광석(물왕)S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-eab8001f13ba914cbeb0a08d
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_8b9d96c0e45f45f7
stable_project_keyprjtDef:231302:ESB
project_definition231302
first_region_codeESB
manual_source_formatfalse
project_name154kV 광석(물왕)S/S 건설사업
project_name_list154kV 광석S/S 건설사업
purpose시흥시 장현,목감택지개발지구내 전력공급
project_region_detail경기도 시흥시
project_period_raw2017.01~2027.12
project_scale_raw154KV MTR 60MVA×2BANK, 170KV GIS×10CCT
responsible_office_raw경인건설본부/남서울인천건설지사
equipment_type변전
headquarters경인건설본부
office남서울인천건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_152c962a53f5f57b
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_8b9d96c0e45f45f7

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_8b9d96c0e45f45f7

Sources EV-eab8001f13ba914cbeb0a08d
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 2fb4a3eaef3a4c061a023976f378bd5c4865f4d70b167ef628420ab54c3c8419
Source schedule candidates · KOR · kepco_planned

154kV 광석(물왕)S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2027-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231302|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_152c962a53f5f57b

Sources EV-9c62393f18d4121cd7a89819
Evidence SHA-256 f89c193baf228f2d17ddc1922a274204e49fe0c5bbb077cd1d21de3b1e61dc95
행 SHA-256 4d9d69b6603f1dc0fe47b2cb34fc6cd7f352b5b2be08ce4885341f5cec39e44d
Source schedule candidates · KOR · kepco_planned

154kV 광석(물왕)S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2017-01
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231302|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_152c962a53f5f57b

Sources EV-9c62393f18d4121cd7a89819
Evidence SHA-256 f89c193baf228f2d17ddc1922a274204e49fe0c5bbb077cd1d21de3b1e61dc95
행 SHA-256 4d9d69b6603f1dc0fe47b2cb34fc6cd7f352b5b2be08ce4885341f5cec39e44d
Source snapshots by date · KOR · kepco_planned

154kV 광석(물왕)S/S 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_152c962a53f5f57b
stable_project_idkproj_8b9d96c0e45f45f7
source_key202609|231302|ESB
basic_ym202609
source_stage_raw사업승인-공사착수전
project_name_list154kV 광석S/S 건설사업
project_name_detail154kV 광석(물왕)S/S 건설사업
region_summary_raw경기도 시흥시등 1 지역
equipment_type_raw변전
headquarters_raw경인건설본부
office_raw남서울인천건설지사
section_fields
Project purpose
  • 시흥시 장현,목감택지개발지구내 전력공급
Project region
  • 경기도 시흥시
Project period
  • 2017.01~2027.12
사업 규모
  • 154KV MTR 60MVA×2BANK, 170KV GIS×10CCT
담당 사업소
  • 경인건설본부/남서울인천건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 2024.01 ~ 2024.07 실시설계: 설계담당자: [redacted]
○'17.04 : 시흥장현 택지지구 변경협의요청(국토부→관련기관) ○'17.05 : 시흥장현 택지지구 협의완료(국토부) ○'17.06 : 실시계획 승인(국토부제2017-381호) ○'17.12 : 토지매매계약 ○'26.10 : 공사착공 ○'28.09 : 준공
future_plan_redacted□ 향후계획 ○'17.04 : 시흥장현 택지지구 변경협의요청(국토부→관련기관) ○'17.05 : 시흥장현 택지지구 협의완료(국토부) ○'17.06 : 실시계획 승인(국토부제2017-381호) ○'17.12 : 토지매매계약 ○'26.10 : 공사착공 ○'28.09 : 준공
attachment_count0
source_detail_sha256f89c193baf228f2d17ddc1922a274204e49fe0c5bbb077cd1d21de3b1e61dc95
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231302|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_152c962a53f5f57b

Sources EV-9c62393f18d4121cd7a89819
Evidence SHA-256 f89c193baf228f2d17ddc1922a274204e49fe0c5bbb077cd1d21de3b1e61dc95
행 SHA-256 4d9d69b6603f1dc0fe47b2cb34fc6cd7f352b5b2be08ce4885341f5cec39e44d
Source snapshots by date · KOR · kepco_planned

154kV 광석(물왕)S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_8b9d96c0e45f45f7
stable_project_keyprjtDef:231302:ESB
project_definition231302
first_region_codeESB
manual_source_formatfalse
project_name154kV 광석(물왕)S/S 건설사업
project_name_list154kV 광석S/S 건설사업
purpose시흥시 장현,목감택지개발지구내 전력공급
project_region_detail경기도 시흥시
project_period_raw2017.01~2027.12
project_scale_raw154KV MTR 60MVA×2BANK, 170KV GIS×10CCT
responsible_office_raw경인건설본부/남서울인천건설지사
equipment_type변전
headquarters경인건설본부
office남서울인천건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_152c962a53f5f57b
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_8b9d96c0e45f45f7

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_8b9d96c0e45f45f7

Sources EV-eab8001f13ba914cbeb0a08d
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 2fb4a3eaef3a4c061a023976f378bd5c4865f4d70b167ef628420ab54c3c8419
Power assets and projects · KOR · kepco_planned

154kV 광석분기 전력구 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-1a951e8b81e27ba2184c1c9c
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_0d9f06b93d463957
stable_project_keyprjtDef:234157:ESB
project_definition234157
first_region_codeESB
manual_source_formatfalse
project_name154kV 광석분기 전력구 건설사업
project_name_list시흥-안산지역 전기공급시설 전력구공사(광석분기)
purpose시흥,안산지역 신규부하 및 안정적 전력공급
project_region_detail경기도 시흥시
project_period_raw2022.03~2026.12
project_scale_raw개착식 전력구 42M, 터널식 전력구 4,019M
responsible_office_raw경인건설본부/남서울인천건설지사
equipment_type전력구
headquarters경인건설본부
office남서울인천건설지사
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_1addb4b7ce350c3c
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_0d9f06b93d463957

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_0d9f06b93d463957

Sources EV-1a951e8b81e27ba2184c1c9c
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 4e654bd452638a5148c5a2aca3b4f9bb1c10c85dda7a21047987ac1a57b75dd6
Source schedule candidates · KOR · kepco_planned

154kV 광석분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2022-03
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|234157|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_1addb4b7ce350c3c

Sources EV-0fefc8ba03c83ba108ebd50b
Evidence SHA-256 402a40cc4b2b7030bb7fee86d2bd3428acf72db5ff326f31f9a709f2a7f7a5da
행 SHA-256 95c69d3589559ce45c1f33cc9a33c8750b92ca8dd4cf912a69e3c151bfb32096
Source schedule candidates · KOR · kepco_planned

154kV 광석분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2026-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|234157|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_1addb4b7ce350c3c

Sources EV-0fefc8ba03c83ba108ebd50b
Evidence SHA-256 402a40cc4b2b7030bb7fee86d2bd3428acf72db5ff326f31f9a709f2a7f7a5da
행 SHA-256 95c69d3589559ce45c1f33cc9a33c8750b92ca8dd4cf912a69e3c151bfb32096
Source snapshots by date · KOR · kepco_planned

154kV 광석분기 전력구 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_1addb4b7ce350c3c
stable_project_idkproj_0d9f06b93d463957
source_key202609|234157|ESB
basic_ym202609
source_stage_raw공사착수-사업완료전
project_name_list시흥-안산지역 전기공급시설 전력구공사(광석분기)
project_name_detail154kV 광석분기 전력구 건설사업
region_summary_raw경기도 시흥시등 1 지역
equipment_type_raw전력구
headquarters_raw경인건설본부
office_raw남서울인천건설지사
section_fields
Project purpose
  • 시흥,안산지역 신규부하 및 안정적 전력공급
Project region
  • 경기도 시흥시
Project period
  • 2022.03~2026.12
사업 규모
  • 개착식 전력구 42M, 터널식 전력구 4,019M
담당 사업소
  • 경인건설본부/남서울인천건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회: 2022.08 ~ 2022.09
입지선정 및 주민의견 수렴 주요 내용
  • ○ '19.02.15 : 전력구 설계용역 착수 ○ '22.03.22 : 전력구공사 착공(도급계약자 : 코오롱글로벌(주)) ○ '22.09.27 : 건설사업관리단 착수(도급계약자 : (주)대한콘설탄트) ○ '27.07.24 : 전력구공사 준공예정
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 2019.02 ~ 2021.10 기본설계: 2019.02 ~ 2020.06 실시설계: 2020.06 ~ 2021.06 설계담당자: [redacted]
건설공사 개요
  • 공사 착공: 2022.03 공사 기간: 2022.03 ~ 2027.07 감독자: [redacted], 실적): 96, 79
- '19.02 : 설계용역 착수 - '21.10 : 설계용역 준공 - '22.03 : 공사 착공 - '26.04 : 수직구#1 시험발파 - '26.06 : 공사금액 및 기간 설계변경 완료(2차) - '26.08 : 수직구#1, #2 장비반출 완료 - '27. 7 : 공사 준공
future_plan_redacted□ 향후계획 - '19.02 : 설계용역 착수 - '21.10 : 설계용역 준공 - '22.03 : 공사 착공 - '26.04 : 수직구#1 시험발파 - '26.06 : 공사금액 및 기간 설계변경 완료(2차) - '26.08 : 수직구#1, #2 장비반출 완료 - '27. 7 : 공사 준공
attachment_count0
source_detail_sha256402a40cc4b2b7030bb7fee86d2bd3428acf72db5ff326f31f9a709f2a7f7a5da
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|234157|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_1addb4b7ce350c3c

Sources EV-0fefc8ba03c83ba108ebd50b
Evidence SHA-256 402a40cc4b2b7030bb7fee86d2bd3428acf72db5ff326f31f9a709f2a7f7a5da
행 SHA-256 95c69d3589559ce45c1f33cc9a33c8750b92ca8dd4cf912a69e3c151bfb32096
Source snapshots by date · KOR · kepco_planned

154kV 광석분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_0d9f06b93d463957
stable_project_keyprjtDef:234157:ESB
project_definition234157
first_region_codeESB
manual_source_formatfalse
project_name154kV 광석분기 전력구 건설사업
project_name_list시흥-안산지역 전기공급시설 전력구공사(광석분기)
purpose시흥,안산지역 신규부하 및 안정적 전력공급
project_region_detail경기도 시흥시
project_period_raw2022.03~2026.12
project_scale_raw개착식 전력구 42M, 터널식 전력구 4,019M
responsible_office_raw경인건설본부/남서울인천건설지사
equipment_type전력구
headquarters경인건설본부
office남서울인천건설지사
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_1addb4b7ce350c3c
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_0d9f06b93d463957

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_0d9f06b93d463957

Sources EV-1a951e8b81e27ba2184c1c9c
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 4e654bd452638a5148c5a2aca3b4f9bb1c10c85dda7a21047987ac1a57b75dd6
Power assets and projects · KOR · kepco_planned

154kV 광석분기 지중T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-881372524143dfea0b8e5e48
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_5a9eb91d4ca33f32
stable_project_keyprjtDef:233172:ESB
project_definition233172
first_region_codeESB
manual_source_formatfalse
project_name154kV 광석분기 지중T/L 건설사업
project_name_list154kV 광석분기 지중송전선로 건설사업
purpose신설 154KV 광석변전소 전력공급
project_region_detail경기도 시흥시
project_period_raw2025.06~2027.12
project_scale_rawXLPE2000, 4C-5.1KM
responsible_office_raw경인건설본부/남서울인천건설지사
equipment_type지중송전
headquarters경인건설본부
office남서울인천건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_43d3eb818a02b070
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_5a9eb91d4ca33f32

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_5a9eb91d4ca33f32

Sources EV-881372524143dfea0b8e5e48
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 c903c2fa9c8c2549ec4761be6d99f050946f096e6759d2114d9e34ff8ca968dd
Source schedule candidates · KOR · kepco_planned

154kV 광석분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2027-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|233172|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_43d3eb818a02b070

Sources EV-3fcdbbd46e2cb9c9274d3d9c
Evidence SHA-256 d0961f182b9d7ea53dcd6838f7fda8f1866ec896fe92f846366adce3974f69e4
행 SHA-256 f39639e32d8249451261d5d7709078c1b581084660a0feae29689ecc5fc55118
Source schedule candidates · KOR · kepco_planned

154kV 광석분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2025-06
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|233172|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_43d3eb818a02b070

Sources EV-3fcdbbd46e2cb9c9274d3d9c
Evidence SHA-256 d0961f182b9d7ea53dcd6838f7fda8f1866ec896fe92f846366adce3974f69e4
행 SHA-256 f39639e32d8249451261d5d7709078c1b581084660a0feae29689ecc5fc55118
Source snapshots by date · KOR · kepco_planned

154kV 광석분기 지중T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_43d3eb818a02b070
stable_project_idkproj_5a9eb91d4ca33f32
source_key202609|233172|ESB
basic_ym202609
source_stage_raw계획확정-사업승인전
project_name_list154kV 광석분기 지중송전선로 건설사업
project_name_detail154kV 광석분기 지중T/L 건설사업
region_summary_raw경기도 시흥시등 1 지역
equipment_type_raw지중송전
headquarters_raw경인건설본부
office_raw남서울인천건설지사
section_fields
Project purpose
  • 신설 154KV 광석변전소 전력공급
Project region
  • 경기도 시흥시
Project period
  • 2025.06~2027.12
사업 규모
  • XLPE2000, 4C-5.1KM
담당 사업소
  • 경인건설본부/남서울인천건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
[추진실적] -‘16.05 : 제7차 장기 송변전설비계획 반영 [향후계획] -‘26.06 : 공사착공 -‘27.12 : 설비가압
future_plan_redacted□ 향후계획 [추진실적] -‘16.05 : 제7차 장기 송변전설비계획 반영 [향후계획] -‘26.06 : 공사착공 -‘27.12 : 설비가압
attachment_count0
source_detail_sha256d0961f182b9d7ea53dcd6838f7fda8f1866ec896fe92f846366adce3974f69e4
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|233172|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_43d3eb818a02b070

Sources EV-3fcdbbd46e2cb9c9274d3d9c
Evidence SHA-256 d0961f182b9d7ea53dcd6838f7fda8f1866ec896fe92f846366adce3974f69e4
행 SHA-256 f39639e32d8249451261d5d7709078c1b581084660a0feae29689ecc5fc55118
Source snapshots by date · KOR · kepco_planned

154kV 광석분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_5a9eb91d4ca33f32
stable_project_keyprjtDef:233172:ESB
project_definition233172
first_region_codeESB
manual_source_formatfalse
project_name154kV 광석분기 지중T/L 건설사업
project_name_list154kV 광석분기 지중송전선로 건설사업
purpose신설 154KV 광석변전소 전력공급
project_region_detail경기도 시흥시
project_period_raw2025.06~2027.12
project_scale_rawXLPE2000, 4C-5.1KM
responsible_office_raw경인건설본부/남서울인천건설지사
equipment_type지중송전
headquarters경인건설본부
office남서울인천건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_43d3eb818a02b070
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_5a9eb91d4ca33f32

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_5a9eb91d4ca33f32

Sources EV-881372524143dfea0b8e5e48
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 c903c2fa9c8c2549ec4761be6d99f050946f096e6759d2114d9e34ff8ca968dd
Power assets and projects · KOR · kepco_planned

154kV 광석분기T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-f4e2b70b524d48075768f9e1
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_ff6607f089c15aee
stable_project_keyprjtDef:232554:ESB
project_definition232554
first_region_codeESB
manual_source_formatfalse
project_name154kV 광석분기T/L 건설사업
project_name_list154kV 광석분기T/L 건설사업
purpose신설 광석S/S 신규부하 공급
project_region_detail경기도 안산시 단원구
project_period_raw2023.08~2027.12
project_scale_rawC/H철탑 1기,선로길이 0.555KM
responsible_office_raw경인건설본부/직할
equipment_type가공송전
headquarters경인건설본부
office직할
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_ee56c909e88c8c2d
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_ff6607f089c15aee

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_ff6607f089c15aee

Sources EV-f4e2b70b524d48075768f9e1
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 4c7319445d7d4bd50b6441c36dbd7879786191c0096c046f83016cf0eb46863b
Source schedule candidates · KOR · kepco_planned

154kV 광석분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2027-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232554|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_ee56c909e88c8c2d

Sources EV-dd755a7f27468f4c2f5f61dd
Evidence SHA-256 366c73e9a43ab1d016f2f0a69f42864b7231c1390eeb3411348e34420c8afed6
행 SHA-256 16e43d491fd5b8b1152872a41ccfc4de8dc629ccbc0ac762b1dcd5092b8da2f0
Source schedule candidates · KOR · kepco_planned

154kV 광석분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2023-08
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232554|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_ee56c909e88c8c2d

Sources EV-dd755a7f27468f4c2f5f61dd
Evidence SHA-256 366c73e9a43ab1d016f2f0a69f42864b7231c1390eeb3411348e34420c8afed6
행 SHA-256 16e43d491fd5b8b1152872a41ccfc4de8dc629ccbc0ac762b1dcd5092b8da2f0
Source snapshots by date · KOR · kepco_planned

154kV 광석분기T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_ee56c909e88c8c2d
stable_project_idkproj_ff6607f089c15aee
source_key202609|232554|ESB
basic_ym202609
source_stage_raw사업승인-공사착수전
project_name_list154kV 광석분기T/L 건설사업
project_name_detail154kV 광석분기T/L 건설사업
region_summary_raw경기도 안산시 단원구등 1 지역
equipment_type_raw가공송전
headquarters_raw경인건설본부
office_raw직할
section_fields
Project purpose
  • 신설 광석S/S 신규부하 공급
Project region
  • 경기도 안산시 단원구
Project period
  • 2023.08~2027.12
사업 규모
  • C/H철탑 1기,선로길이 0.555KM
담당 사업소
  • 경인건설본부/직할
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 지장유무 조회: 2023.05~2023.06 경과지(부지) 확정: 2023.06
환경/재해 영향평가
  • 환경영향평가: 2022.11 ~ 2024.03 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 2023.07 ~ 2023.08 설명회·공청회: 2023.08 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 실시설계: 2025.01 ~ 설계담당자: [redacted]
[추진실적] □‘18.08. : 제8차 장기 송변전설비계획 반영 □‘23.06. : 경과지 확정 □‘23.06. : 지장유무조회 □‘23.08. : 사업시행계획 열람 및 주민설명회 개최 □‘24.03. : 사업시행계획서 제출 □‘24.04. : 실시계획승인 신청 □‘24.12. : 전원개발사업 실시계획승인(산업부) □‘25.12. : 용지매수 완료 □‘26.04. : 실시설계 진행중 [향후계획] □‘27.06. : 공사착공 □‘28.12. : 공사준공
future_plan_redacted□ 향후계획 [추진실적] □‘18.08. : 제8차 장기 송변전설비계획 반영 □‘23.06. : 경과지 확정 □‘23.06. : 지장유무조회 □‘23.08. : 사업시행계획 열람 및 주민설명회 개최 □‘24.03. : 사업시행계획서 제출 □‘24.04. : 실시계획승인 신청 □‘24.12. : 전원개발사업 실시계획승인(산업부) □‘25.12. : 용지매수 완료 □‘26.04. : 실시설계 진행중 [향후계획] □‘27.06. : 공사착공 □‘28.12. : 공사준공
attachment_count0
source_detail_sha256366c73e9a43ab1d016f2f0a69f42864b7231c1390eeb3411348e34420c8afed6
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|232554|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_ee56c909e88c8c2d

Sources EV-dd755a7f27468f4c2f5f61dd
Evidence SHA-256 366c73e9a43ab1d016f2f0a69f42864b7231c1390eeb3411348e34420c8afed6
행 SHA-256 16e43d491fd5b8b1152872a41ccfc4de8dc629ccbc0ac762b1dcd5092b8da2f0
Source snapshots by date · KOR · kepco_planned

154kV 광석분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_ff6607f089c15aee
stable_project_keyprjtDef:232554:ESB
project_definition232554
first_region_codeESB
manual_source_formatfalse
project_name154kV 광석분기T/L 건설사업
project_name_list154kV 광석분기T/L 건설사업
purpose신설 광석S/S 신규부하 공급
project_region_detail경기도 안산시 단원구
project_period_raw2023.08~2027.12
project_scale_rawC/H철탑 1기,선로길이 0.555KM
responsible_office_raw경인건설본부/직할
equipment_type가공송전
headquarters경인건설본부
office직할
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_ee56c909e88c8c2d
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_ff6607f089c15aee

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_ff6607f089c15aee

Sources EV-f4e2b70b524d48075768f9e1
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 4c7319445d7d4bd50b6441c36dbd7879786191c0096c046f83016cf0eb46863b
Power assets and projects · KOR · kepco_planned

154kV 광양-세풍 전력구 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-eb2c4c3dd81bf00228042fd8
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_484ab06e5fdefa8c
stable_project_keyprjtDef:234736:ESB
project_definition234736
first_region_codeESB
manual_source_formatfalse
project_name154kV 광양-세풍 전력구 건설사업
project_name_list154kV 광양-세풍 전력구 건설사업
purpose표본
project_region_detail전남광주통합특별시 광양시
project_period_raw2023.05~2030.12
project_scale_rawTo be determined
responsible_office_raw중부건설본부/광주전남건설지사
equipment_type전력구
headquarters중부건설본부
office광주전남건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_106fcabbf5feff36
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_484ab06e5fdefa8c

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_484ab06e5fdefa8c

Sources EV-eb2c4c3dd81bf00228042fd8
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 5e85b2a86a242a63c927f65d6aad927c8b35cf508af6fd8d5f715473415ecd51
Source schedule candidates · KOR · kepco_planned

154kV 광양-세풍 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2030-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|234736|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_106fcabbf5feff36

Sources EV-157739784779d6dacb58cdca
Evidence SHA-256 8397d790e607afcc15fe85db15691bbdb62c03e8898924d446cb56850ecbfeac
행 SHA-256 28e9126035f7d6514212273bd103c33c73dfc211886269e964af5510b82ff860
Source schedule candidates · KOR · kepco_planned

154kV 광양-세풍 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2023-05
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|234736|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_106fcabbf5feff36

Sources EV-157739784779d6dacb58cdca
Evidence SHA-256 8397d790e607afcc15fe85db15691bbdb62c03e8898924d446cb56850ecbfeac
행 SHA-256 28e9126035f7d6514212273bd103c33c73dfc211886269e964af5510b82ff860
Source snapshots by date · KOR · kepco_planned

154kV 광양-세풍 전력구 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_106fcabbf5feff36
stable_project_idkproj_484ab06e5fdefa8c
source_key202609|234736|ESB
basic_ym202609
source_stage_raw계획확정-사업승인전
project_name_list154kV 광양-세풍 전력구 건설사업
project_name_detail154kV 광양-세풍 전력구 건설사업
region_summary_raw전남광주통합특별시 광양시등 1 지역
equipment_type_raw전력구
headquarters_raw중부건설본부
office_raw광주전남건설지사
section_fields
Project purpose
  • 표본
Project region
  • 전남광주통합특별시 광양시
Project period
  • 2023.05~2030.12
사업 규모
  • To be determined
담당 사업소
  • 중부건설본부/광주전남건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
1. 진행경과 □ 현장답사 분석 보고서 작성 중 2. 향후계획 □ 현장답사 분석 보고서 작성완료 후 보고(→송변전건설단)
future_plan_redacted□ 향후계획 1. 진행경과 □ 현장답사 분석 보고서 작성 중 2. 향후계획 □ 현장답사 분석 보고서 작성완료 후 보고(→송변전건설단)
attachment_count0
source_detail_sha2568397d790e607afcc15fe85db15691bbdb62c03e8898924d446cb56850ecbfeac
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|234736|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_106fcabbf5feff36

Sources EV-157739784779d6dacb58cdca
Evidence SHA-256 8397d790e607afcc15fe85db15691bbdb62c03e8898924d446cb56850ecbfeac
행 SHA-256 28e9126035f7d6514212273bd103c33c73dfc211886269e964af5510b82ff860
Source snapshots by date · KOR · kepco_planned

154kV 광양-세풍 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_484ab06e5fdefa8c
stable_project_keyprjtDef:234736:ESB
project_definition234736
first_region_codeESB
manual_source_formatfalse
project_name154kV 광양-세풍 전력구 건설사업
project_name_list154kV 광양-세풍 전력구 건설사업
purpose표본
project_region_detail전남광주통합특별시 광양시
project_period_raw2023.05~2030.12
project_scale_rawTo be determined
responsible_office_raw중부건설본부/광주전남건설지사
equipment_type전력구
headquarters중부건설본부
office광주전남건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_106fcabbf5feff36
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_484ab06e5fdefa8c

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_484ab06e5fdefa8c

Sources EV-eb2c4c3dd81bf00228042fd8
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 5e85b2a86a242a63c927f65d6aad927c8b35cf508af6fd8d5f715473415ecd51
Power assets and projects · KOR · kepco_planned

154kV 광양-세풍 지중T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-d93f26dfd0cad6890611f882
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_2a6407a7a87aef0b
stable_project_keyprjtDef:233796:ESB
project_definition233796
first_region_codeESB
manual_source_formatfalse
project_name154kV 광양-세풍 지중T/L 건설사업
project_name_list154kV 광양-세풍 지중T/L 건설사업
purpose광양 인근 지역 재생E 전망 예측 시 송전선로 과부하 발생 예상
project_region_detail전남광주통합특별시 광양시
project_period_raw2023.06~2030.12
project_scale_rawXLPE 2,000 * 2C * 8KM
responsible_office_raw중부건설본부/광주전남건설지사
equipment_type지중송전
headquarters중부건설본부
office광주전남건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_d5962f5fcaa28c9a
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_2a6407a7a87aef0b

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_2a6407a7a87aef0b

Sources EV-d93f26dfd0cad6890611f882
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 39a16ca3a6e9099b46decdec6f8f7cfe093896c718fed6774f6e565f1ae7e178
Source schedule candidates · KOR · kepco_planned

154kV 광양-세풍 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeenergization
date2030-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233796|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d5962f5fcaa28c9a

Sources EV-f295e94079e00d6b6cdde0d7
Evidence SHA-256 af2bb036d3054e5a06e2a373c86cbdd9edc757ea325a1d52475b580664163c14
행 SHA-256 8c922ff670e6b4038032c3723237b86bccf644c0b5f25aafdc7f867a7cbee026
Source schedule candidates · KOR · kepco_planned

154kV 광양-세풍 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2030-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|233796|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d5962f5fcaa28c9a

Sources EV-f295e94079e00d6b6cdde0d7
Evidence SHA-256 af2bb036d3054e5a06e2a373c86cbdd9edc757ea325a1d52475b580664163c14
행 SHA-256 8c922ff670e6b4038032c3723237b86bccf644c0b5f25aafdc7f867a7cbee026
Source schedule candidates · KOR · kepco_planned

154kV 광양-세풍 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2023-06
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|233796|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d5962f5fcaa28c9a

Sources EV-f295e94079e00d6b6cdde0d7
Evidence SHA-256 af2bb036d3054e5a06e2a373c86cbdd9edc757ea325a1d52475b580664163c14
행 SHA-256 8c922ff670e6b4038032c3723237b86bccf644c0b5f25aafdc7f867a7cbee026
Source snapshots by date · KOR · kepco_planned

154kV 광양-세풍 지중T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_d5962f5fcaa28c9a
stable_project_idkproj_2a6407a7a87aef0b
source_key202609|233796|ESB
basic_ym202609
source_stage_raw계획확정-사업승인전
project_name_list154kV 광양-세풍 지중T/L 건설사업
project_name_detail154kV 광양-세풍 지중T/L 건설사업
region_summary_raw전남광주통합특별시 광양시등 1 지역
equipment_type_raw지중송전
headquarters_raw중부건설본부
office_raw광주전남건설지사
section_fields
Project purpose
  • 광양 인근 지역 재생E 전망 예측 시 송전선로 과부하 발생 예상
Project region
  • 전남광주통합특별시 광양시
Project period
  • 2023.06~2030.12
사업 규모
  • XLPE 2,000 * 2C * 8KM
담당 사업소
  • 중부건설본부/광주전남건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
○ 28. 9 : 기본설계 완료 ○ 29. 2 : 실시설계 완료 ○ 29. 6 : 착공 ○ 30.12 : 가압
future_plan_redacted□ 향후계획 ○ 28. 9 : 기본설계 완료 ○ 29. 2 : 실시설계 완료 ○ 29. 6 : 착공 ○ 30.12 : 가압
attachment_count0
source_detail_sha256af2bb036d3054e5a06e2a373c86cbdd9edc757ea325a1d52475b580664163c14
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|233796|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d5962f5fcaa28c9a

Sources EV-f295e94079e00d6b6cdde0d7
Evidence SHA-256 af2bb036d3054e5a06e2a373c86cbdd9edc757ea325a1d52475b580664163c14
행 SHA-256 8c922ff670e6b4038032c3723237b86bccf644c0b5f25aafdc7f867a7cbee026
Source snapshots by date · KOR · kepco_planned

154kV 광양-세풍 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_2a6407a7a87aef0b
stable_project_keyprjtDef:233796:ESB
project_definition233796
first_region_codeESB
manual_source_formatfalse
project_name154kV 광양-세풍 지중T/L 건설사업
project_name_list154kV 광양-세풍 지중T/L 건설사업
purpose광양 인근 지역 재생E 전망 예측 시 송전선로 과부하 발생 예상
project_region_detail전남광주통합특별시 광양시
project_period_raw2023.06~2030.12
project_scale_rawXLPE 2,000 * 2C * 8KM
responsible_office_raw중부건설본부/광주전남건설지사
equipment_type지중송전
headquarters중부건설본부
office광주전남건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_d5962f5fcaa28c9a
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_2a6407a7a87aef0b

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_2a6407a7a87aef0b

Sources EV-d93f26dfd0cad6890611f882
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 39a16ca3a6e9099b46decdec6f8f7cfe093896c718fed6774f6e565f1ae7e178
Power assets and projects · KOR · kepco_planned

154kV 광양-세풍T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-c03698786d2cff5e829797f8
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_e205922a61907d20
stable_project_keyprjtDef:232555:ESB
project_definition232555
first_region_codeESB
manual_source_formatfalse
project_name154kV 광양-세풍T/L 건설사업
project_name_list154kV 광양-세풍T/L 건설사업
purpose광양지역 전력공급
project_region_detail전남광주통합특별시 광양시
project_period_raw2024.07~2033.12
project_scale_rawACSR 410㎟×2B×2C×9.7KM
responsible_office_raw중부건설본부/광주전남건설지사
equipment_type가공송전
headquarters중부건설본부
office광주전남건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_709652461081b4d4
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_e205922a61907d20

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_e205922a61907d20

Sources EV-c03698786d2cff5e829797f8
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 18d92abdba7636350e8fa4d7ff8e881fd6804c9f7569c61ca22bbf3817ed3bf6
Source schedule candidates · KOR · kepco_planned

154kV 광양-세풍T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2033-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232555|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_709652461081b4d4

Sources EV-9d073123b5abfe3fd8cd14e1
Evidence SHA-256 d27b3f1094e6823b083612b921e20b486ac83c5ae1a9d4a5d710b39b92a56ee4
행 SHA-256 164338bacb490d764f68abdcc03c44f7e876716f8275a49f1ecc8251371ac050
Source schedule candidates · KOR · kepco_planned

154kV 광양-세풍T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2024-07
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232555|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_709652461081b4d4

Sources EV-9d073123b5abfe3fd8cd14e1
Evidence SHA-256 d27b3f1094e6823b083612b921e20b486ac83c5ae1a9d4a5d710b39b92a56ee4
행 SHA-256 164338bacb490d764f68abdcc03c44f7e876716f8275a49f1ecc8251371ac050
Source snapshots by date · KOR · kepco_planned

154kV 광양-세풍T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_709652461081b4d4
stable_project_idkproj_e205922a61907d20
source_key202609|232555|ESB
basic_ym202609
source_stage_raw계획확정-사업승인전
project_name_list154kV 광양-세풍T/L 건설사업
project_name_detail154kV 광양-세풍T/L 건설사업
region_summary_raw전남광주통합특별시 광양시등 1 지역
equipment_type_raw가공송전
headquarters_raw중부건설본부
office_raw광주전남건설지사
section_fields
Project purpose
  • 광양지역 전력공급
Project region
  • 전남광주통합특별시 광양시
Project period
  • 2024.07~2033.12
사업 규모
  • ACSR 410㎟×2B×2C×9.7KM
담당 사업소
  • 중부건설본부/광주전남건설지사
계획확정
  • 제10차 장기송변전설비계획 반영()
입지선정
  • 전력입지영향평가 용역 착수: 2024.08 입지선정위원회 구성시기: 2026.04 참여 위원 수 : 13 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
  • line □ ’23.06 : 제10차 장기 송·배전설비계획 신규 반영(송전선로) □ ’24.07 :전력영향평가 및 경과지설계 용역 계약 □ ’24.11 : 지자체(광양시) 대상 사업설명 □ ’25.05~11 : 사업대상지역 내 광양읍 9개리 별 이장 대상 사업설명 □ ’26.03 : 입지선정위 구성 완료 및 착수회의 시행 □ ’26.04~06 : 입지선정위 2~3차회의 시행 □ ’26.07 : 최적경과대역 주민설명회 시행 □ ’26.08 : 입지선정위 4차회의 시행(후보경과지 선정) 및 현장답사 시행 □ ’26.09 : 후보경과지 인근마을 대상 사업설명회 시
line ○ 추진실적 - '23. 4 : 제 10차 장기 송변전설비계획 신규반영 - '24. 11 : 광양시 사업설명 - '25. 2 : 광양읍 사업설명 - '25. 4~ 5 : 사업대상지역 내 리별 이장 대상 사업설명 - '26. 3 : 송전선로 건설사업 입지선정위원회 구성완료 - '26. 4 : 입지선정위 착수회의 시행 - '26. 4 : 입지선정위 2차회의 시행 - '26. 6 : 입지선정위 3차회의 시행 - '26. 7 : 최적경과대역 사업설명회 시행 ○ 향후계획 - '26. 8 : 입지선정위 4차회의 시
future_plan_redactedline □ 향후계획 ○ 추진실적 - '23. 4 : 제 10차 장기 송변전설비계획 신규반영 - '24. 11 : 광양시 사업설명 - '25. 2 : 광양읍 사업설명 - '25. 4~ 5 : 사업대상지역 내 리별 이장 대상 사업설명 - '26. 3 : 송전선로 건설사업 입지선정위원회 구성완료 - '26. 4 : 입지선정위 착수회의 시행 - '26. 4 : 입지선정위 2차회의 시행 - '26. 6 : 입지선정위 3차회의 시행 - '26. 7 : 최적경과대역 사업설명회 시행 ○ 향후계획 - '26. 8 : 입지선정위 4차회의 시
attachment_count0
source_detail_sha256d27b3f1094e6823b083612b921e20b486ac83c5ae1a9d4a5d710b39b92a56ee4
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|232555|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_709652461081b4d4

Sources EV-9d073123b5abfe3fd8cd14e1
Evidence SHA-256 d27b3f1094e6823b083612b921e20b486ac83c5ae1a9d4a5d710b39b92a56ee4
행 SHA-256 164338bacb490d764f68abdcc03c44f7e876716f8275a49f1ecc8251371ac050
Source snapshots by date · KOR · kepco_planned

154kV 광양-세풍T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_e205922a61907d20
stable_project_keyprjtDef:232555:ESB
project_definition232555
first_region_codeESB
manual_source_formatfalse
project_name154kV 광양-세풍T/L 건설사업
project_name_list154kV 광양-세풍T/L 건설사업
purpose광양지역 전력공급
project_region_detail전남광주통합특별시 광양시
project_period_raw2024.07~2033.12
project_scale_rawACSR 410㎟×2B×2C×9.7KM
responsible_office_raw중부건설본부/광주전남건설지사
equipment_type가공송전
headquarters중부건설본부
office광주전남건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_709652461081b4d4
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_e205922a61907d20

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_e205922a61907d20

Sources EV-c03698786d2cff5e829797f8
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 18d92abdba7636350e8fa4d7ff8e881fd6804c9f7569c61ca22bbf3817ed3bf6
Power assets and projects · KOR · kepco_planned

154kV 광양항S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-96ac34aa54fe8e3f856daf79
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_24deb098bef4b822
stable_project_keyprjtDef:231486:ESB
project_definition231486
first_region_codeESB
manual_source_formatfalse
project_name154kV 광양항S/S 건설사업
project_name_list154kV 광양항S/S 건설사업
purpose변전설비 적기확충으로 안정적 전력공급
project_region_detail전남광주통합특별시 광양시
project_period_raw2018.02~2025.12
project_scale_raw154KV M.TR 60MVA X 2BANK (최종규모 4BANK)
responsible_office_raw중부건설본부/광주전남건설지사
equipment_type변전
headquarters중부건설본부
office광주전남건설지사
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_52629799ba267c43
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_24deb098bef4b822

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_24deb098bef4b822

Sources EV-96ac34aa54fe8e3f856daf79
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 b2cf6d06dc7f4842247089beafce4981b89a956cdc80545fc6a3ef557421fe1d
Source schedule candidates · KOR · kepco_planned

154kV 광양항S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-02
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231486|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52629799ba267c43

Sources EV-dff466a127d4000ab67e93f2
Evidence SHA-256 2d14ec519c7ce130e2ad13e732551936125c1d13314260284f869b4c2501912d
행 SHA-256 01c3c46a997ee20bd3b4c1651e73372f476e9e82b12aff95f63bae5759809bcd
Source schedule candidates · KOR · kepco_planned

154kV 광양항S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-10
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231486|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52629799ba267c43

Sources EV-dff466a127d4000ab67e93f2
Evidence SHA-256 2d14ec519c7ce130e2ad13e732551936125c1d13314260284f869b4c2501912d
행 SHA-256 01c3c46a997ee20bd3b4c1651e73372f476e9e82b12aff95f63bae5759809bcd
Source schedule candidates · KOR · kepco_planned

154kV 광양항S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-10
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231486|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52629799ba267c43

Sources EV-dff466a127d4000ab67e93f2
Evidence SHA-256 2d14ec519c7ce130e2ad13e732551936125c1d13314260284f869b4c2501912d
행 SHA-256 01c3c46a997ee20bd3b4c1651e73372f476e9e82b12aff95f63bae5759809bcd
Source schedule candidates · KOR · kepco_planned

154kV 광양항S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2024-02
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231486|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52629799ba267c43

Sources EV-dff466a127d4000ab67e93f2
Evidence SHA-256 2d14ec519c7ce130e2ad13e732551936125c1d13314260284f869b4c2501912d
행 SHA-256 01c3c46a997ee20bd3b4c1651e73372f476e9e82b12aff95f63bae5759809bcd
Source schedule candidates · KOR · kepco_planned

154kV 광양항S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_completion
date2023-02
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231486|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52629799ba267c43

Sources EV-dff466a127d4000ab67e93f2
Evidence SHA-256 2d14ec519c7ce130e2ad13e732551936125c1d13314260284f869b4c2501912d
행 SHA-256 01c3c46a997ee20bd3b4c1651e73372f476e9e82b12aff95f63bae5759809bcd
Source schedule candidates · KOR · kepco_planned

154kV 광양항S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231486|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52629799ba267c43

Sources EV-dff466a127d4000ab67e93f2
Evidence SHA-256 2d14ec519c7ce130e2ad13e732551936125c1d13314260284f869b4c2501912d
행 SHA-256 01c3c46a997ee20bd3b4c1651e73372f476e9e82b12aff95f63bae5759809bcd
Source schedule candidates · KOR · kepco_planned

154kV 광양항S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2024-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231486|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52629799ba267c43

Sources EV-dff466a127d4000ab67e93f2
Evidence SHA-256 2d14ec519c7ce130e2ad13e732551936125c1d13314260284f869b4c2501912d
행 SHA-256 01c3c46a997ee20bd3b4c1651e73372f476e9e82b12aff95f63bae5759809bcd

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel