POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 15items · current page 1–15 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 과천#2 분기 전력구 전력구 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-bcc6f3b1155521cd9bc60e55
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_021b903aceee3825
stable_project_keyprjtDef:234642:ESB
project_definition234642
first_region_codeESB
manual_source_formatfalse
project_name154kV 과천#2 분기 전력구 전력구 건설사업
project_name_list과천지역 전기공급시설 전력구공사(북과천분기)
purpose과천지구 부하해소
project_region_detail경기도 과천시
project_period_raw2024.01~2027.04
project_scale_raw전력구 1KM
responsible_office_raw경인건설본부/직할
equipment_type전력구
headquarters경인건설본부
office직할
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_f95377484bf60705
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_021b903aceee3825

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_021b903aceee3825

Sources EV-bcc6f3b1155521cd9bc60e55
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 5c28c2f9b01cec818be3b6719fef37003c8b6264649b314367f487587f3908ac
Source schedule candidates · KOR · kepco_planned

154kV 과천#2 분기 전력구 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234642|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_f95377484bf60705

Sources EV-b94a57e5bca58e5e0c6133d5
Evidence SHA-256 a7886f9d3f5930edeaed5b8ed3ed6bc97ab3aaa8931700a5bd8ac0dd84c824f4
행 SHA-256 21688e5d282bf96fe6617f964e161e89c1a2df98154e72ae6cc79346a022020c
Source schedule candidates · KOR · kepco_planned

154kV 과천#2 분기 전력구 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234642|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_f95377484bf60705

Sources EV-b94a57e5bca58e5e0c6133d5
Evidence SHA-256 a7886f9d3f5930edeaed5b8ed3ed6bc97ab3aaa8931700a5bd8ac0dd84c824f4
행 SHA-256 21688e5d282bf96fe6617f964e161e89c1a2df98154e72ae6cc79346a022020c
Source schedule candidates · KOR · kepco_planned

154kV 과천#2 분기 전력구 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-09
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234642|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_f95377484bf60705

Sources EV-b94a57e5bca58e5e0c6133d5
Evidence SHA-256 a7886f9d3f5930edeaed5b8ed3ed6bc97ab3aaa8931700a5bd8ac0dd84c824f4
행 SHA-256 21688e5d282bf96fe6617f964e161e89c1a2df98154e72ae6cc79346a022020c
Source schedule candidates · KOR · kepco_planned

154kV 과천#2 분기 전력구 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-09
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234642|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_f95377484bf60705

Sources EV-b94a57e5bca58e5e0c6133d5
Evidence SHA-256 a7886f9d3f5930edeaed5b8ed3ed6bc97ab3aaa8931700a5bd8ac0dd84c824f4
행 SHA-256 21688e5d282bf96fe6617f964e161e89c1a2df98154e72ae6cc79346a022020c
Source schedule candidates · KOR · kepco_planned

154kV 과천#2 분기 전력구 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_start
date2024-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234642|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_f95377484bf60705

Sources EV-b94a57e5bca58e5e0c6133d5
Evidence SHA-256 a7886f9d3f5930edeaed5b8ed3ed6bc97ab3aaa8931700a5bd8ac0dd84c824f4
행 SHA-256 21688e5d282bf96fe6617f964e161e89c1a2df98154e72ae6cc79346a022020c
Source schedule candidates · KOR · kepco_planned

154kV 과천#2 분기 전력구 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-03
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234642|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_f95377484bf60705

Sources EV-b94a57e5bca58e5e0c6133d5
Evidence SHA-256 a7886f9d3f5930edeaed5b8ed3ed6bc97ab3aaa8931700a5bd8ac0dd84c824f4
행 SHA-256 21688e5d282bf96fe6617f964e161e89c1a2df98154e72ae6cc79346a022020c
Source schedule candidates · KOR · kepco_planned

154kV 과천#2 분기 전력구 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-03
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234642|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_f95377484bf60705

Sources EV-b94a57e5bca58e5e0c6133d5
Evidence SHA-256 a7886f9d3f5930edeaed5b8ed3ed6bc97ab3aaa8931700a5bd8ac0dd84c824f4
행 SHA-256 21688e5d282bf96fe6617f964e161e89c1a2df98154e72ae6cc79346a022020c
Source schedule candidates · KOR · kepco_planned

154kV 과천#2 분기 전력구 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2024-01
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|234642|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_f95377484bf60705

Sources EV-b94a57e5bca58e5e0c6133d5
Evidence SHA-256 a7886f9d3f5930edeaed5b8ed3ed6bc97ab3aaa8931700a5bd8ac0dd84c824f4
행 SHA-256 21688e5d282bf96fe6617f964e161e89c1a2df98154e72ae6cc79346a022020c
Source schedule candidates · KOR · kepco_planned

154kV 과천#2 분기 전력구 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234642|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_f95377484bf60705

Sources EV-b94a57e5bca58e5e0c6133d5
Evidence SHA-256 a7886f9d3f5930edeaed5b8ed3ed6bc97ab3aaa8931700a5bd8ac0dd84c824f4
행 SHA-256 21688e5d282bf96fe6617f964e161e89c1a2df98154e72ae6cc79346a022020c
Source schedule candidates · KOR · kepco_planned

154kV 과천#2 분기 전력구 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234642|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_f95377484bf60705

Sources EV-b94a57e5bca58e5e0c6133d5
Evidence SHA-256 a7886f9d3f5930edeaed5b8ed3ed6bc97ab3aaa8931700a5bd8ac0dd84c824f4
행 SHA-256 21688e5d282bf96fe6617f964e161e89c1a2df98154e72ae6cc79346a022020c
Source schedule candidates · KOR · kepco_planned

154kV 과천#2 분기 전력구 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2027-04
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|234642|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_f95377484bf60705

Sources EV-b94a57e5bca58e5e0c6133d5
Evidence SHA-256 a7886f9d3f5930edeaed5b8ed3ed6bc97ab3aaa8931700a5bd8ac0dd84c824f4
행 SHA-256 21688e5d282bf96fe6617f964e161e89c1a2df98154e72ae6cc79346a022020c
Source schedule candidates · KOR · kepco_planned

154kV 과천#2 분기 전력구 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234642|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_f95377484bf60705

Sources EV-b94a57e5bca58e5e0c6133d5
Evidence SHA-256 a7886f9d3f5930edeaed5b8ed3ed6bc97ab3aaa8931700a5bd8ac0dd84c824f4
행 SHA-256 21688e5d282bf96fe6617f964e161e89c1a2df98154e72ae6cc79346a022020c
Source snapshots by date · KOR · kepco_planned

154kV 과천#2 분기 전력구 전력구 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_f95377484bf60705
stable_project_idkproj_021b903aceee3825
source_key202609|234642|ESB
basic_ym202609
source_stage_raw사업승인-공사착수전
project_name_list과천지역 전기공급시설 전력구공사(북과천분기)
project_name_detail154kV 과천#2 분기 전력구 전력구 건설사업
region_summary_raw경기도 과천시등 1 지역
equipment_type_raw전력구
headquarters_raw경인건설본부
office_raw직할
section_fields
Project purpose
  • 과천지구 부하해소
Project region
  • 경기도 과천시
Project period
  • 2024.01~2027.04
사업 규모
  • 전력구 1KM
담당 사업소
  • 경인건설본부/직할
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 2024.04 ~ 2025.03 기본설계: 2024.04 ~ 2024.09 실시설계: 2024.09 ~ 2025.03 설계담당자: [redacted]
line ○ 24.05 : 전력구 경과지 기본설계 착수 ○ 24.07 : 변전소 입지확정 위원회 준비중 ○ 24.09 : 입지 확정 후 기본설계심의 준비 ○ 25.05 : 기본설계심의 시
future_plan_redactedline □ 향후계획 ○ 24.05 : 전력구 경과지 기본설계 착수 ○ 24.07 : 변전소 입지확정 위원회 준비중 ○ 24.09 : 입지 확정 후 기본설계심의 준비 ○ 25.05 : 기본설계심의 시
attachment_count0
source_detail_sha256a7886f9d3f5930edeaed5b8ed3ed6bc97ab3aaa8931700a5bd8ac0dd84c824f4
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|234642|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_f95377484bf60705

Sources EV-b94a57e5bca58e5e0c6133d5
Evidence SHA-256 a7886f9d3f5930edeaed5b8ed3ed6bc97ab3aaa8931700a5bd8ac0dd84c824f4
행 SHA-256 21688e5d282bf96fe6617f964e161e89c1a2df98154e72ae6cc79346a022020c
Source snapshots by date · KOR · kepco_planned

154kV 과천#2 분기 전력구 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_021b903aceee3825
stable_project_keyprjtDef:234642:ESB
project_definition234642
first_region_codeESB
manual_source_formatfalse
project_name154kV 과천#2 분기 전력구 전력구 건설사업
project_name_list과천지역 전기공급시설 전력구공사(북과천분기)
purpose과천지구 부하해소
project_region_detail경기도 과천시
project_period_raw2024.01~2027.04
project_scale_raw전력구 1KM
responsible_office_raw경인건설본부/직할
equipment_type전력구
headquarters경인건설본부
office직할
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_f95377484bf60705
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_021b903aceee3825

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_021b903aceee3825

Sources EV-bcc6f3b1155521cd9bc60e55
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 5c28c2f9b01cec818be3b6719fef37003c8b6264649b314367f487587f3908ac

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel