POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 15items · current page 1–15 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-bcc6f3b1155521cd9bc60e55
Detailed source fields Original source field Published value or condition stable_project_id kproj_021b903aceee3825 stable_project_key prjtDef:234642:ESB project_definition 234642 first_region_code ESB manual_source_format false project_name 154kV 과천#2 분기 전력구 전력구 건설사업 project_name_list 과천지역 전기공급시설 전력구공사(북과천분기) purpose 과천지구 부하해소 project_region_detail 경기도 과천시 project_period_raw 2024.01~2027.04 project_scale_raw 전력구 1KM responsible_office_raw 경인건설본부/직할 equipment_type 전력구 headquarters 경인건설본부 office 직할 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_021b903aceee3825
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_021b903aceee3825
Sources EV-bcc6f3b1155521cd9bc60e55 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 5c28c2f9b01cec818be3b6719fef37003c8b6264649b314367f487587f3908ac Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|234642|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_f95377484bf60705
Sources EV-b94a57e5bca58e5e0c6133d5 Evidence SHA-256 a7886f9d3f5930edeaed5b8ed3ed6bc97ab3aaa8931700a5bd8ac0dd84c824f4 행 SHA-256 21688e5d282bf96fe6617f964e161e89c1a2df98154e72ae6cc79346a022020c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-09 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|234642|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_f95377484bf60705
Sources EV-b94a57e5bca58e5e0c6133d5 Evidence SHA-256 a7886f9d3f5930edeaed5b8ed3ed6bc97ab3aaa8931700a5bd8ac0dd84c824f4 행 SHA-256 21688e5d282bf96fe6617f964e161e89c1a2df98154e72ae6cc79346a022020c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-09 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|234642|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_f95377484bf60705
Sources EV-b94a57e5bca58e5e0c6133d5 Evidence SHA-256 a7886f9d3f5930edeaed5b8ed3ed6bc97ab3aaa8931700a5bd8ac0dd84c824f4 행 SHA-256 21688e5d282bf96fe6617f964e161e89c1a2df98154e72ae6cc79346a022020c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-09 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|234642|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_f95377484bf60705
Sources EV-b94a57e5bca58e5e0c6133d5 Evidence SHA-256 a7886f9d3f5930edeaed5b8ed3ed6bc97ab3aaa8931700a5bd8ac0dd84c824f4 행 SHA-256 21688e5d282bf96fe6617f964e161e89c1a2df98154e72ae6cc79346a022020c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type design_start date 2024-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|234642|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_f95377484bf60705
Sources EV-b94a57e5bca58e5e0c6133d5 Evidence SHA-256 a7886f9d3f5930edeaed5b8ed3ed6bc97ab3aaa8931700a5bd8ac0dd84c824f4 행 SHA-256 21688e5d282bf96fe6617f964e161e89c1a2df98154e72ae6cc79346a022020c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-03 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|234642|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_f95377484bf60705
Sources EV-b94a57e5bca58e5e0c6133d5 Evidence SHA-256 a7886f9d3f5930edeaed5b8ed3ed6bc97ab3aaa8931700a5bd8ac0dd84c824f4 행 SHA-256 21688e5d282bf96fe6617f964e161e89c1a2df98154e72ae6cc79346a022020c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-03 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|234642|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_f95377484bf60705
Sources EV-b94a57e5bca58e5e0c6133d5 Evidence SHA-256 a7886f9d3f5930edeaed5b8ed3ed6bc97ab3aaa8931700a5bd8ac0dd84c824f4 행 SHA-256 21688e5d282bf96fe6617f964e161e89c1a2df98154e72ae6cc79346a022020c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2024-01 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234642|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_f95377484bf60705
Sources EV-b94a57e5bca58e5e0c6133d5 Evidence SHA-256 a7886f9d3f5930edeaed5b8ed3ed6bc97ab3aaa8931700a5bd8ac0dd84c824f4 행 SHA-256 21688e5d282bf96fe6617f964e161e89c1a2df98154e72ae6cc79346a022020c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|234642|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_f95377484bf60705
Sources EV-b94a57e5bca58e5e0c6133d5 Evidence SHA-256 a7886f9d3f5930edeaed5b8ed3ed6bc97ab3aaa8931700a5bd8ac0dd84c824f4 행 SHA-256 21688e5d282bf96fe6617f964e161e89c1a2df98154e72ae6cc79346a022020c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|234642|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_f95377484bf60705
Sources EV-b94a57e5bca58e5e0c6133d5 Evidence SHA-256 a7886f9d3f5930edeaed5b8ed3ed6bc97ab3aaa8931700a5bd8ac0dd84c824f4 행 SHA-256 21688e5d282bf96fe6617f964e161e89c1a2df98154e72ae6cc79346a022020c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2027-04 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234642|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_f95377484bf60705
Sources EV-b94a57e5bca58e5e0c6133d5 Evidence SHA-256 a7886f9d3f5930edeaed5b8ed3ed6bc97ab3aaa8931700a5bd8ac0dd84c824f4 행 SHA-256 21688e5d282bf96fe6617f964e161e89c1a2df98154e72ae6cc79346a022020c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-07 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|234642|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_f95377484bf60705
Sources EV-b94a57e5bca58e5e0c6133d5 Evidence SHA-256 a7886f9d3f5930edeaed5b8ed3ed6bc97ab3aaa8931700a5bd8ac0dd84c824f4 행 SHA-256 21688e5d282bf96fe6617f964e161e89c1a2df98154e72ae6cc79346a022020c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_f95377484bf60705 stable_project_id kproj_021b903aceee3825 source_key 202609|234642|ESB basic_ym 202609 source_stage_raw 사업승인-공사착수전 project_name_list 과천지역 전기공급시설 전력구공사(북과천분기) project_name_detail 154kV 과천#2 분기 전력구 전력구 건설사업 region_summary_raw 경기도 과천시등 1 지역 equipment_type_raw 전력구 headquarters_raw 경인건설본부 office_raw 직할 section_fields 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 2024.04 ~ 2025.03 기본설계: 2024.04 ~ 2024.09 실시설계: 2024.09 ~ 2025.03 설계담당자: [redacted] line ○ 24.05 : 전력구 경과지 기본설계 착수 ○ 24.07 : 변전소 입지확정 위원회 준비중 ○ 24.09 : 입지 확정 후 기본설계심의 준비 ○ 25.05 : 기본설계심의 시 future_plan_redacted line □ 향후계획 ○ 24.05 : 전력구 경과지 기본설계 착수 ○ 24.07 : 변전소 입지확정 위원회 준비중 ○ 24.09 : 입지 확정 후 기본설계심의 준비 ○ 25.05 : 기본설계심의 시 attachment_count 0 source_detail_sha256 a7886f9d3f5930edeaed5b8ed3ed6bc97ab3aaa8931700a5bd8ac0dd84c824f4 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|234642|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_f95377484bf60705
Sources EV-b94a57e5bca58e5e0c6133d5 Evidence SHA-256 a7886f9d3f5930edeaed5b8ed3ed6bc97ab3aaa8931700a5bd8ac0dd84c824f4 행 SHA-256 21688e5d282bf96fe6617f964e161e89c1a2df98154e72ae6cc79346a022020c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_021b903aceee3825 stable_project_key prjtDef:234642:ESB project_definition 234642 first_region_code ESB manual_source_format false project_name 154kV 과천#2 분기 전력구 전력구 건설사업 project_name_list 과천지역 전기공급시설 전력구공사(북과천분기) purpose 과천지구 부하해소 project_region_detail 경기도 과천시 project_period_raw 2024.01~2027.04 project_scale_raw 전력구 1KM responsible_office_raw 경인건설본부/직할 equipment_type 전력구 headquarters 경인건설본부 office 직할 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_021b903aceee3825
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_021b903aceee3825
Sources EV-bcc6f3b1155521cd9bc60e55 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 5c28c2f9b01cec818be3b6719fef37003c8b6264649b314367f487587f3908ac Observations for this power asset History for this project