CORELINK PARTNERS · REPORT PRODUCT STANDARD

The report structure is disclosed, and
Site analysis is conducted through internal review.

While drawing on the structure of information memorandums from leading accounting and advisory firms, this document was independently designed to align with the licensing, power, construction, and project finance (PF) processes specific to Korean data centers.
BASIC · 01

Preliminary Review of Project Sites

330,000 won

After internally verifying the submitted address and materials, we issue a preliminary review of the land and building scale.

  1. 01Cover Page, Document Number, Issuance Recipient
  2. 02Address, PNU, Land Area, Zoning District
  3. 03Statutory Building Coverage Ratio, Floor Area Ratio, and Total Floor Area Limits
  4. 04Assumptions Regarding Gross Floor Area for the First Phase
  5. 05Formulas, Assumptions, Disclaimers, and Source Data Verification Date
DeliverablesA4 PDF · Receipt Number · Internal Review History
VERIFIED · 02

Expert Cross-Verification Report

Starting at 3.3 million won

Staff members cross-check public records with customer-submitted data to classify entries as verified or unverified.

  1. 01Executive Summary and Key Conclusions
  2. 02Cross-Verification of Parcels, Rights, Land Use, and Building HUB
  3. 03Status by Phase: Architecture, Power, Construction, and Operation
  4. 04Review of substations, service lines, and KEPCO documentation within a 15-km radius
  5. 05Racks, IT Load, PUE, and Requested Capacity: 3 Scenarios
  6. 06Risk Matrix and List of Supporting Materials
  7. 07Reference Log · Source · Date Verified · Reviewer’s Comments
DeliverablesReview Comments PDF · List of Revisions · Supporting Documentation Register
INSTITUTIONAL · 03

Detailed Review for Submission to the Agency

Starting at 11 million won

Version control of project costs and financial projections to ensure they can be used for investment, project financing, divestiture, and internal review.

  1. 01Investment Summary, Business Structure, and Decision-Making Agenda Items
  2. 02Development Plans, Design Standards, Construction Process, and Procurement Strategy
  3. 03CAPEX: Land, Construction, MEP, Power Connection, Equipment, Contingency
  4. 04PF: Equity, Loans, Interest Rates, Withdrawal Curves, Fees
  5. 05Operating Results: Utilization Rate, Rent, OPEX, NOI
  6. 06Sensitivity: Construction Costs, Interest Rates, PUE, Rent, Exit Cap
  7. 07Monthly Milestones, Preconditions, and Responsible Parties
  8. 08Residential Homes · Change History · Data Room Document List
DeliverablesDetailed PDF · Financial Model · Schedule · Review Meetings

FINANCIAL MODEL STANDARD

A cost-benefit analysis is not just a table filled with numbers, but
This is a model in which assumptions are linked to evidence.

01Separate entries

Separate assumptions regarding land, power, design, estimates, and financing from the source data

02Unit Control

Do not use IT MW, facility MW, MVA, rack, ㎡, and pyeong interchangeably.

03Cost Verification

Compare both the IT MW standard and the actual gross floor area standard

04Sensitivity

Check for changes in construction costs, interest rates, utilization rates, rent, and exit caps

05Version Control

Preserve the change history for automatic values, expert-reviewed values, and final approved values.

06Verification Status

Mark as "Official," "Operator," "Submitted Documents," "AI-DC Calculation," or "Unconfirmed"

The samples do not use actual customer projects, transaction terms, or original financial statements. The provided materials reflect only the item structure and calculation logic, with all identifying information anonymized.