Link incidents on the same parcel to a single project site
OFFICIAL PERMIT INTELLIGENCE · 5 YEARS
Data Center
Database of Licensing and Permitting Stages
For entries in the Architecture HUB Director’s list that explicitly mention data centers, retain only those that match the Verification Center’s entries, and distinguish between planning, permitting, groundbreaking, occupancy permit, and operation.Retain original copies of permits, construction commencement notices, and occupancy permits
Check directly under “Building Name” or “Other Uses”
Master record matching the official center address
Broadcasting, Studio, Control Center, and General Telecommunications Facilities
Verification of lot and building coordinates completed
2026 AIDC SPECIAL ACT · OFFICIAL CHECK
The effective date of the AIDC Special Act and
Checklist for Bundled Licensing and Permitting
Effective March 10, 2027
Act No. 21759 will take effect nine months after its promulgation. We are currently in the preparatory period for its implementation.
A procedure is scheduled to be introduced to process permits and approvals from various relevant agencies in a single batch following deliberation and resolution by the National AI Strategy Committee.
Regarding the processing deadlines and deeming provisions of relevant agencies, you must verify the enforcement decrees, applicable permits and licenses, and required documents before actually submitting an application.
Special exemptions from the power system impact assessment for non-metropolitan AIDCs below a certain size are determined by comparing their location, capacity, whether they are new or expanded, and whether they are being converted, against the applicable sub-criteria.
- Project Site Address, PNU, Land Title, and Zoning
- Target IT Load, PUE, Contracted Power, and Phase-by-Phase Implementation Schedule
- List of Consultations for Construction, Development, Transportation, Environment, and Fire Safety
- Original text for each stage of power supply review, application, and contract
- Location within the Seoul Metropolitan Area; whether the facility is new construction, an expansion, or a conversion; and history of existing permits and approvals
PROJECT STATUS LADDER
Status of Disclosure by Stage
Official grounds for pre-permit approval, including business plans, design, transportation, and environmental factors
02Permit and Licensing Process0itemsProcessing applications for review or permits for construction and development activities
03Licensing Complete23itemsDate of building permit confirmed; date of groundbreaking unconfirmed
04Groundbreaking and Construction29itemsVerify the construction commencement notification or the basis for construction progress
05Operational Approval22itemsVerify the date of use approval or the basis for completion as recorded in the Architecture HUB
06Operations4itemsCross-check with official operational data from the operator
Detailed Register of 5-Year Licenses and Permits
Status of Lot, Region, and Coordinate Verification
Dates of Permit Issuance, Construction Start, and Occupancy Permit
Original Link · Date Verified · Classification Basis
Search by Center Name, Operator, Region, or Phase
