For entries in the Architecture HUB Director’s list that explicitly mention data centers, retain only those that match the Verification Center’s entries, and distinguish between planning, permitting, groundbreaking, occupancy permit, and operation.
Data Center Licensing78

Link incidents on the same parcel to a single project site

Permit and Licensing Cases90

Retain original copies of permits, construction commencement notices, and occupancy permits

Data Center Specifications76

Check directly under “Building Name” or “Other Uses”

Verification Center on the Same Plot of Land2

Master record matching the official center address

Excludes non-data centers361

Broadcasting, Studio, Control Center, and General Telecommunications Facilities

Accurate coordinate linking9

Verification of lot and building coordinates completed

2026 AIDC SPECIAL ACT · OFFICIAL CHECK

The effective date of the AIDC Special Act and
Checklist for Bundled Licensing and Permitting

As of August 28, 2026. Although the law has been enacted, it has not yet taken effect; therefore, we do not assume that special provisions will be immediately applied to current projects, and we will reconfirm the enforcement decree, scope of application, transitional measures, and individual project conditions.
01Date of Promulgation and Effective DatePublished on June 9, 2026
Effective March 10, 2027

Act No. 21759 will take effect nine months after its promulgation. We are currently in the preparatory period for its implementation.

02Batch Processing of Permits and LicensesMinistry of Science and ICT One-Stop Service

A procedure is scheduled to be introduced to process permits and approvals from various relevant agencies in a single batch following deliberation and resolution by the National AI Strategy Committee.

03Processing Time ManagementIntroduction of a Timeout System

Regarding the processing deadlines and deeming provisions of relevant agencies, you must verify the enforcement decrees, applicable permits and licenses, and required documents before actually submitting an application.

04Power Supply Outside the Capital RegionVerify exemption requirements on a case-by-case basis

Special exemptions from the power system impact assessment for non-metropolitan AIDCs below a certain size are determined by comparing their location, capacity, whether they are new or expanded, and whether they are being converted, against the applicable sub-criteria.

Documents the operator needs to prepare now
  • Project Site Address, PNU, Land Title, and Zoning
  • Target IT Load, PUE, Contracted Power, and Phase-by-Phase Implementation Schedule
  • List of Consultations for Construction, Development, Transportation, Environment, and Fire Safety
  • Original text for each stage of power supply review, application, and contract
  • Location within the Seoul Metropolitan Area; whether the facility is new construction, an expansion, or a conversion; and history of existing permits and approvals

PROJECT STATUS LADDER

Status of Disclosure by Stage

Do not conflate “permit,” “construction start,” “occupancy permit,” and “operation” as a single status.
RESEARCH PRO

Detailed Register of 5-Year Licenses and Permits

Detailed Address

Status of Lot, Region, and Coordinate Verification

Administrative Date

Dates of Permit Issuance, Construction Start, and Occupancy Permit

Official Basis

Original Link · Date Verified · Classification Basis