Each request is reviewed against its global or overseas location conditions. Placement in Korea is not confirmed; suitability and final terms are checked with the customer and operator.
01 / U.S. procurement · interim hostingGPU procurement & facility support
This requirement links U.S. GPU procurement with actual hosting and facility support. Please propose allocatable power, racks and cooling, together with facility documentation and LOI support for the supply channel’s review.
Detailed requirements| Support scope | Allocatable power, racks and cooling assessment; actual hosting; LOI and facility review documentation |
|---|
| Operating plan | This U.S. B300 stock purchase requires actual equipment installation and operation, with project inspection support. |
|---|
| Follow-on relocation | Relocation is planned once the follow-on Malaysian facility is ready. The initial hosting location remains subject to discussion. |
|---|
| Interim hosting term | Discuss the term against equipment arrival and the follow-on facility’s readiness. Include extension and removal conditions for delays. |
|---|
| Separate quotations | ① Actual hosting: space, electricity, installation, removal and relocation support ② LOI / preliminary support: scope, fees and processing time |
|---|
| Items to confirm | Review assumes that initial deployment, the interim hosting purpose and planned relocation are disclosed to and confirmed with the supply channel. |
|---|
Documentation support and actual operating conditions are reviewed together.
Information needed for an initial proposal
- Supported equipment quantity, allocatable power, rack and cooling conditions
- Earliest receiving, installation and operating dates, and minimum term
- Actual hosting quotation and LOI / preliminary support quotation
- Scope and costs of extension, removal and relocation support
02 / Global locations · liquid coolingGB300 liquid-cooled colocation
We are reviewing global data center locations for 144 undeployed GB300 systems stored in Taiwan. Distinguish total facility capacity from IT power actually allocatable to this project.
Detailed requirements| Equipment / quantity | 144 complete GB300 systems. Rack count and detailed configuration will be confirmed during technical discussions. |
|---|
| Equipment status | Stored in a Taiwan warehouse; not yet installed or deployed. |
|---|
| Facility scale | 10MW-class total facility. Specify project-allocatable IT power separately. |
|---|
| Cooling / technology | Propose liquid cooling, rack power and layout, cooling interfaces and supporting infrastructure, and network conditions. |
|---|
| Target locations | Global review. Suitable locations including Korea may be proposed, subject to customer evaluation. |
|---|
| Preferred readiness | 2026 or Q1 2027. |
|---|
| Phased delivery | Full delivery in Q2–Q3 2027 requires earlier partial delivery. Specify the initial date and capacity, and subsequent phases. |
|---|
10MW refers to total facility scale. Allocatable IT power is reviewed separately.
Information needed for an initial proposal
- Total facility capacity and project-allocatable IT power
- Liquid cooling, rack layout, network and operating support scope
- First partial-delivery date and capacity, and full-delivery date
- Hosting, electricity, cooling, network and one-time charges
03 / Southeast Asian locations · air coolingB300 air-cooled colocation
Two separate, concurrent requirements seek 2MW and 5MW of IT power in Southeast Asia. Partners may support either requirement or propose different facilities for each.
Detailed requirements| Allocatable IT power | Requirement 1: 2MW / Requirement 2: 5MW. These are independent concurrent requirements, not alternatives. |
|---|
| Region / cooling | Southeast Asia · air cooling. Korean partners may propose their local facilities or networks. |
|---|
| Contract term | Open to a 3–5-year colocation agreement. |
|---|
| Facility reliability | Tier III or equivalent technical reliability is evaluated subject to customer review. |
|---|
| Power / connectivity | Propose dual power feeds and direct backbone connectivity. |
|---|
| Preferred readiness | Preferably 2026. The current target deadline is Q1 2027. |
|---|
| Equipment quantity / layout | Final quantities, layouts and operating loads will be confirmed by the customer and selected facility. The earlier 144-server batch is not a fixed allocation across 2MW and 5MW. |
|---|
2MW and 5MW are separate requirements. Propose resources and pricing individually.
Information needed for an initial proposal
- Which 2MW / 5MW requirement you can support, and allocatable IT power per facility
- Facility location, air cooling, power redundancy and backbone connectivity
- Earliest readiness per facility and phased-delivery options
- Separate quotation, contract term and other conditions for each requirement