Practical Guide to Applying for Electricity · Overall Flowchart
Search for official forms and company contracts related to preliminary notices, technical reviews, power system impact assessments, contracts, and power supply agreements.
Data center development begins with site selection and proceeds through land acquisition, construction, power, telecommunications, water supply, and project scheduling. Select materials and tools appropriate for each required review stage, and make judgments by distinguishing between official verification documents and calculation assumptions.
Search for official forms and company contracts related to preliminary notices, technical reviews, power system impact assessments, contracts, and power supply agreements.
Review of land area, gross floor area, racks, IT load, PUE, and power requirements.
Site, construction, and development status; required documents; and the sequence for verification by relevant agencies.
Power reception capacity, 154 kV power reception, and the workflow for supply agreements and power system impact assessments.
Verify the candidates for nearby substations and the basis for the routes, and conduct a separate review of supply feasibility.
Verify the sources and location accuracy based on telecommunications companies, public corporations, and public documents.
Basis for nearby water supply facilities and pipelines, required water volume, and items to be verified by the relevant agency.
Verify the operator, location, disclosed capacity, and supporting evidence for each project phase.
Status of permits and licenses, distinguishing between administrative records and actual operational status.
Scope of work, roles of specialized firms, and preparation of materials for development and investment reviews.
Multilingual Data Center Terminology Guide · English · 日本語 · 简体中文 · Español
A data center is a facility equipped with power, cooling, communications, and security systems to operate servers, storage devices, and network equipment. IDC stands for Internet Data Center. When searching for information using the terms “DATACENTER” or “데이터센타,” be sure to verify the facility’s operator, location, and operational status before making comparisons.
Check the locations and operators of domestic data centers →When evaluating servers for AI computing, document the number of servers along with power consumption per rack, cooling methods, initial IT load, and expansion plans. Since IT equipment load and total facility power consumption are different, you must verify what the MW figure in the comparison data represents.
Data Center Power and Power Reception Capacity Guide →The site comparison table should include the address and title to the land, zoning classification, construction and development status, basis for power supply agreements, telecommunications and water supply, and the desired start date. A permit alone does not guarantee power supply or the commencement of operations. Please review the required documents and the sequence of approvals from relevant agencies for each project site.
Data Center Licensing Procedures and Required Documents →When preparing for electricity use, review the following stages: advance notice, technical review, electricity usage application and contract, facility construction, and power connection. Record the exact names of the documents you have, the issuing agencies, the applied capacity, the desired start date, and the response conditions, and verify any supply conditions that have not yet been finalized.
Preparatory Materials for the Notice of Intended Action and Next Steps →Project owners preparing for the assessment should organize their existing documents—such as business plans, load forecasts, and responses from KEPCO—and review the latest official guidelines for preparing the assessment. When consulting with an agent, document the scope of responsibility regarding eligibility and requirements, the preparation of the assessment report, support for technical reviews, responses to requests for additional information, and submission procedures. Verify the assessment results and the power supply contract as separate pieces of evidence.
Guide to Preparing and Submitting Power System Impact Assessments →A data center rack (RACK) is a frame or cabinet used to house servers and network equipment. Even with the same number of racks, the amount of equipment that can be accommodated varies depending on the power supply per rack and cooling conditions. When comparing data centers, be sure to request information on rack specifications, the size of the equipment to be used, power per rack (in kW), power redundancy, network connectivity, and operational support conditions.
Review of Racks, IT Capacity, and Move-in Date →Information found using an operator’s name must be cross-checked against the actual center name, address, and service provider. To request a quote from a provider under the same conditions, first organize the details regarding location, number of racks, power per rack, network connections, start date, and scope of operational support. Do not rely solely on publicly available facility information to determine current available capacity or contract terms.
Comparison based on the data center and operator database →Verify the scope of contracts for design, evaluation, and construction firms · Review of Data Center Sites Based on Addresses
Please provide the project site address, purpose of the review, required capacity, desired start date, and types of documents you have on hand. KakaoTalk consultation hours are 9:00 AM to 6:00 PM daily.
In the free site analysis, enter a street address or lot number to review the land and zoning class, planned gross floor area, number of racks, IT load, and estimated power requirements. Since this analysis combines reference data with calculation assumptions, you should verify the basis for each item before purchasing the site.
Free Address-Based Site Analysis →Please review the sequence of steps: target load, application materials, supply consultation, and verification of the connection system and service entrance design. Even if a nearby substation or the expected route is indicated, the available power supply, timing, and connection method must be confirmed using KEPCO’s official consultation documents.
Power Connection Procedures →First, organize the project site and its construction and development status, then review the items to be examined and the required documents based on site conditions in the permitting guide. The actual documents to be submitted and the scope of consultation will vary depending on the project plan and the review by the competent authority.
Guide to Preparing for Licensing →The Licensing Database distinguishes between permits, construction starts, and occupancy permits as separate stages. When determining whether a facility is actually in operation, you must cross-reference the reference date in the administrative records with evidence of operation, such as announcements by the operator.
Records of Permits, Construction Starts, and Occupancy Permits →It is easier to compare sites if you organize information on land and permitting status, power supply agreement status, and telecommunications infrastructure in that order. To identify differences between candidate sites, you must record sources and verification dates and distinguish between officially verified values and estimated values based on assumptions.
Guide to Reviewing Data Center Development →Consulting services coordinate the tasks necessary for site and permitting reviews, preparation for power supply negotiations, project management, and investment and transaction reviews. Based on the current stage of the project site and the available documentation, we outline the required deliverables, the roles of specialized firms, and the scope of consulting services.
Data Center Development and Power Consulting →