Power assets and projects · KOR · kepco_planned

154kV 광석분기T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-f4e2b70b524d48075768f9e1
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_ff6607f089c15aee
stable_project_keyprjtDef:232554:ESB
project_definition232554
first_region_codeESB
manual_source_formatfalse
project_name154kV 광석분기T/L 건설사업
project_name_list154kV 광석분기T/L 건설사업
purpose신설 광석S/S 신규부하 공급
project_region_detail경기도 안산시 단원구
project_period_raw2023.08~2027.12
project_scale_rawC/H철탑 1기,선로길이 0.555KM
responsible_office_raw경인건설본부/직할
equipment_type가공송전
headquarters경인건설본부
office직할
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_ee56c909e88c8c2d
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_ff6607f089c15aee

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_ff6607f089c15aee

Sources EV-f4e2b70b524d48075768f9e1
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 4c7319445d7d4bd50b6441c36dbd7879786191c0096c046f83016cf0eb46863b
Source schedule candidates · KOR · kepco_planned

154kV 광석분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2027-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232554|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_ee56c909e88c8c2d

Sources EV-dd755a7f27468f4c2f5f61dd
Evidence SHA-256 366c73e9a43ab1d016f2f0a69f42864b7231c1390eeb3411348e34420c8afed6
행 SHA-256 16e43d491fd5b8b1152872a41ccfc4de8dc629ccbc0ac762b1dcd5092b8da2f0
Source schedule candidates · KOR · kepco_planned

154kV 광석분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2023-08
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232554|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_ee56c909e88c8c2d

Sources EV-dd755a7f27468f4c2f5f61dd
Evidence SHA-256 366c73e9a43ab1d016f2f0a69f42864b7231c1390eeb3411348e34420c8afed6
행 SHA-256 16e43d491fd5b8b1152872a41ccfc4de8dc629ccbc0ac762b1dcd5092b8da2f0
Source snapshots by date · KOR · kepco_planned

154kV 광석분기T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_ee56c909e88c8c2d
stable_project_idkproj_ff6607f089c15aee
source_key202609|232554|ESB
basic_ym202609
source_stage_raw사업승인-공사착수전
project_name_list154kV 광석분기T/L 건설사업
project_name_detail154kV 광석분기T/L 건설사업
region_summary_raw경기도 안산시 단원구등 1 지역
equipment_type_raw가공송전
headquarters_raw경인건설본부
office_raw직할
section_fields
Project purpose
  • 신설 광석S/S 신규부하 공급
Project region
  • 경기도 안산시 단원구
Project period
  • 2023.08~2027.12
사업 규모
  • C/H철탑 1기,선로길이 0.555KM
담당 사업소
  • 경인건설본부/직할
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 지장유무 조회: 2023.05~2023.06 경과지(부지) 확정: 2023.06
환경/재해 영향평가
  • 환경영향평가: 2022.11 ~ 2024.03 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 2023.07 ~ 2023.08 설명회·공청회: 2023.08 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 실시설계: 2025.01 ~ 설계담당자: [redacted]
[추진실적] □‘18.08. : 제8차 장기 송변전설비계획 반영 □‘23.06. : 경과지 확정 □‘23.06. : 지장유무조회 □‘23.08. : 사업시행계획 열람 및 주민설명회 개최 □‘24.03. : 사업시행계획서 제출 □‘24.04. : 실시계획승인 신청 □‘24.12. : 전원개발사업 실시계획승인(산업부) □‘25.12. : 용지매수 완료 □‘26.04. : 실시설계 진행중 [향후계획] □‘27.06. : 공사착공 □‘28.12. : 공사준공
future_plan_redacted□ 향후계획 [추진실적] □‘18.08. : 제8차 장기 송변전설비계획 반영 □‘23.06. : 경과지 확정 □‘23.06. : 지장유무조회 □‘23.08. : 사업시행계획 열람 및 주민설명회 개최 □‘24.03. : 사업시행계획서 제출 □‘24.04. : 실시계획승인 신청 □‘24.12. : 전원개발사업 실시계획승인(산업부) □‘25.12. : 용지매수 완료 □‘26.04. : 실시설계 진행중 [향후계획] □‘27.06. : 공사착공 □‘28.12. : 공사준공
attachment_count0
source_detail_sha256366c73e9a43ab1d016f2f0a69f42864b7231c1390eeb3411348e34420c8afed6
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|232554|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_ee56c909e88c8c2d

Sources EV-dd755a7f27468f4c2f5f61dd
Evidence SHA-256 366c73e9a43ab1d016f2f0a69f42864b7231c1390eeb3411348e34420c8afed6
행 SHA-256 16e43d491fd5b8b1152872a41ccfc4de8dc629ccbc0ac762b1dcd5092b8da2f0
Source snapshots by date · KOR · kepco_planned

154kV 광석분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_ff6607f089c15aee
stable_project_keyprjtDef:232554:ESB
project_definition232554
first_region_codeESB
manual_source_formatfalse
project_name154kV 광석분기T/L 건설사업
project_name_list154kV 광석분기T/L 건설사업
purpose신설 광석S/S 신규부하 공급
project_region_detail경기도 안산시 단원구
project_period_raw2023.08~2027.12
project_scale_rawC/H철탑 1기,선로길이 0.555KM
responsible_office_raw경인건설본부/직할
equipment_type가공송전
headquarters경인건설본부
office직할
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_ee56c909e88c8c2d
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_ff6607f089c15aee

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_ff6607f089c15aee

Sources EV-f4e2b70b524d48075768f9e1
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 4c7319445d7d4bd50b6441c36dbd7879786191c0096c046f83016cf0eb46863b

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel