POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 5items · current page 1–5 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 광석분기 전력구 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-1a951e8b81e27ba2184c1c9c
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_0d9f06b93d463957
stable_project_keyprjtDef:234157:ESB
project_definition234157
first_region_codeESB
manual_source_formatfalse
project_name154kV 광석분기 전력구 건설사업
project_name_list시흥-안산지역 전기공급시설 전력구공사(광석분기)
purpose시흥,안산지역 신규부하 및 안정적 전력공급
project_region_detail경기도 시흥시
project_period_raw2022.03~2026.12
project_scale_raw개착식 전력구 42M, 터널식 전력구 4,019M
responsible_office_raw경인건설본부/남서울인천건설지사
equipment_type전력구
headquarters경인건설본부
office남서울인천건설지사
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_1addb4b7ce350c3c
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_0d9f06b93d463957

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_0d9f06b93d463957

Sources EV-1a951e8b81e27ba2184c1c9c
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 4e654bd452638a5148c5a2aca3b4f9bb1c10c85dda7a21047987ac1a57b75dd6
Source schedule candidates · KOR · kepco_planned

154kV 광석분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2022-03
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|234157|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_1addb4b7ce350c3c

Sources EV-0fefc8ba03c83ba108ebd50b
Evidence SHA-256 402a40cc4b2b7030bb7fee86d2bd3428acf72db5ff326f31f9a709f2a7f7a5da
행 SHA-256 95c69d3589559ce45c1f33cc9a33c8750b92ca8dd4cf912a69e3c151bfb32096
Source schedule candidates · KOR · kepco_planned

154kV 광석분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2026-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|234157|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_1addb4b7ce350c3c

Sources EV-0fefc8ba03c83ba108ebd50b
Evidence SHA-256 402a40cc4b2b7030bb7fee86d2bd3428acf72db5ff326f31f9a709f2a7f7a5da
행 SHA-256 95c69d3589559ce45c1f33cc9a33c8750b92ca8dd4cf912a69e3c151bfb32096
Source snapshots by date · KOR · kepco_planned

154kV 광석분기 전력구 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_1addb4b7ce350c3c
stable_project_idkproj_0d9f06b93d463957
source_key202609|234157|ESB
basic_ym202609
source_stage_raw공사착수-사업완료전
project_name_list시흥-안산지역 전기공급시설 전력구공사(광석분기)
project_name_detail154kV 광석분기 전력구 건설사업
region_summary_raw경기도 시흥시등 1 지역
equipment_type_raw전력구
headquarters_raw경인건설본부
office_raw남서울인천건설지사
section_fields
Project purpose
  • 시흥,안산지역 신규부하 및 안정적 전력공급
Project region
  • 경기도 시흥시
Project period
  • 2022.03~2026.12
사업 규모
  • 개착식 전력구 42M, 터널식 전력구 4,019M
담당 사업소
  • 경인건설본부/남서울인천건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회: 2022.08 ~ 2022.09
입지선정 및 주민의견 수렴 주요 내용
  • ○ '19.02.15 : 전력구 설계용역 착수 ○ '22.03.22 : 전력구공사 착공(도급계약자 : 코오롱글로벌(주)) ○ '22.09.27 : 건설사업관리단 착수(도급계약자 : (주)대한콘설탄트) ○ '27.07.24 : 전력구공사 준공예정
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 2019.02 ~ 2021.10 기본설계: 2019.02 ~ 2020.06 실시설계: 2020.06 ~ 2021.06 설계담당자: [redacted]
건설공사 개요
  • 공사 착공: 2022.03 공사 기간: 2022.03 ~ 2027.07 감독자: [redacted], 실적): 96, 79
- '19.02 : 설계용역 착수 - '21.10 : 설계용역 준공 - '22.03 : 공사 착공 - '26.04 : 수직구#1 시험발파 - '26.06 : 공사금액 및 기간 설계변경 완료(2차) - '26.08 : 수직구#1, #2 장비반출 완료 - '27. 7 : 공사 준공
future_plan_redacted□ 향후계획 - '19.02 : 설계용역 착수 - '21.10 : 설계용역 준공 - '22.03 : 공사 착공 - '26.04 : 수직구#1 시험발파 - '26.06 : 공사금액 및 기간 설계변경 완료(2차) - '26.08 : 수직구#1, #2 장비반출 완료 - '27. 7 : 공사 준공
attachment_count0
source_detail_sha256402a40cc4b2b7030bb7fee86d2bd3428acf72db5ff326f31f9a709f2a7f7a5da
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|234157|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_1addb4b7ce350c3c

Sources EV-0fefc8ba03c83ba108ebd50b
Evidence SHA-256 402a40cc4b2b7030bb7fee86d2bd3428acf72db5ff326f31f9a709f2a7f7a5da
행 SHA-256 95c69d3589559ce45c1f33cc9a33c8750b92ca8dd4cf912a69e3c151bfb32096
Source snapshots by date · KOR · kepco_planned

154kV 광석분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_0d9f06b93d463957
stable_project_keyprjtDef:234157:ESB
project_definition234157
first_region_codeESB
manual_source_formatfalse
project_name154kV 광석분기 전력구 건설사업
project_name_list시흥-안산지역 전기공급시설 전력구공사(광석분기)
purpose시흥,안산지역 신규부하 및 안정적 전력공급
project_region_detail경기도 시흥시
project_period_raw2022.03~2026.12
project_scale_raw개착식 전력구 42M, 터널식 전력구 4,019M
responsible_office_raw경인건설본부/남서울인천건설지사
equipment_type전력구
headquarters경인건설본부
office남서울인천건설지사
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_1addb4b7ce350c3c
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_0d9f06b93d463957

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_0d9f06b93d463957

Sources EV-1a951e8b81e27ba2184c1c9c
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 4e654bd452638a5148c5a2aca3b4f9bb1c10c85dda7a21047987ac1a57b75dd6

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel