POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 201,406items · current page 501–600 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-07 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232503|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_09492982b8daf20c
Sources EV-0904aa1a5561a380c9080bce Evidence SHA-256 dc49a5ea8b06169ea1b5655fdf176a473718b6d0bb11ddf0a75572bde17cf4af 행 SHA-256 3ab3c23cc0f8e0a55d286aa0ea4b59f498d64030e1f50c5010579f49f63efdfd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-11 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232503|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_09492982b8daf20c
Sources EV-0904aa1a5561a380c9080bce Evidence SHA-256 dc49a5ea8b06169ea1b5655fdf176a473718b6d0bb11ddf0a75572bde17cf4af 행 SHA-256 3ab3c23cc0f8e0a55d286aa0ea4b59f498d64030e1f50c5010579f49f63efdfd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2021-12 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232503|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_09492982b8daf20c
Sources EV-0904aa1a5561a380c9080bce Evidence SHA-256 dc49a5ea8b06169ea1b5655fdf176a473718b6d0bb11ddf0a75572bde17cf4af 행 SHA-256 3ab3c23cc0f8e0a55d286aa0ea4b59f498d64030e1f50c5010579f49f63efdfd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-11 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232503|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_09492982b8daf20c
Sources EV-0904aa1a5561a380c9080bce Evidence SHA-256 dc49a5ea8b06169ea1b5655fdf176a473718b6d0bb11ddf0a75572bde17cf4af 행 SHA-256 3ab3c23cc0f8e0a55d286aa0ea4b59f498d64030e1f50c5010579f49f63efdfd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2026-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232503|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_09492982b8daf20c
Sources EV-0904aa1a5561a380c9080bce Evidence SHA-256 dc49a5ea8b06169ea1b5655fdf176a473718b6d0bb11ddf0a75572bde17cf4af 행 SHA-256 3ab3c23cc0f8e0a55d286aa0ea4b59f498d64030e1f50c5010579f49f63efdfd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2020-03 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232503|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_09492982b8daf20c
Sources EV-0904aa1a5561a380c9080bce Evidence SHA-256 dc49a5ea8b06169ea1b5655fdf176a473718b6d0bb11ddf0a75572bde17cf4af 행 SHA-256 3ab3c23cc0f8e0a55d286aa0ea4b59f498d64030e1f50c5010579f49f63efdfd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2020-03 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232503|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_09492982b8daf20c
Sources EV-0904aa1a5561a380c9080bce Evidence SHA-256 dc49a5ea8b06169ea1b5655fdf176a473718b6d0bb11ddf0a75572bde17cf4af 행 SHA-256 3ab3c23cc0f8e0a55d286aa0ea4b59f498d64030e1f50c5010579f49f63efdfd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type design_completion date 2025-03 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232503|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_09492982b8daf20c
Sources EV-0904aa1a5561a380c9080bce Evidence SHA-256 dc49a5ea8b06169ea1b5655fdf176a473718b6d0bb11ddf0a75572bde17cf4af 행 SHA-256 3ab3c23cc0f8e0a55d286aa0ea4b59f498d64030e1f50c5010579f49f63efdfd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232503|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_09492982b8daf20c
Sources EV-0904aa1a5561a380c9080bce Evidence SHA-256 dc49a5ea8b06169ea1b5655fdf176a473718b6d0bb11ddf0a75572bde17cf4af 행 SHA-256 3ab3c23cc0f8e0a55d286aa0ea4b59f498d64030e1f50c5010579f49f63efdfd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-03 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232503|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_09492982b8daf20c
Sources EV-0904aa1a5561a380c9080bce Evidence SHA-256 dc49a5ea8b06169ea1b5655fdf176a473718b6d0bb11ddf0a75572bde17cf4af 행 SHA-256 3ab3c23cc0f8e0a55d286aa0ea4b59f498d64030e1f50c5010579f49f63efdfd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232503|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_09492982b8daf20c
Sources EV-0904aa1a5561a380c9080bce Evidence SHA-256 dc49a5ea8b06169ea1b5655fdf176a473718b6d0bb11ddf0a75572bde17cf4af 행 SHA-256 3ab3c23cc0f8e0a55d286aa0ea4b59f498d64030e1f50c5010579f49f63efdfd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-07 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232503|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_09492982b8daf20c
Sources EV-0904aa1a5561a380c9080bce Evidence SHA-256 dc49a5ea8b06169ea1b5655fdf176a473718b6d0bb11ddf0a75572bde17cf4af 행 SHA-256 3ab3c23cc0f8e0a55d286aa0ea4b59f498d64030e1f50c5010579f49f63efdfd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type implementation_plan_approval date 2025-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232503|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_09492982b8daf20c
Sources EV-0904aa1a5561a380c9080bce Evidence SHA-256 dc49a5ea8b06169ea1b5655fdf176a473718b6d0bb11ddf0a75572bde17cf4af 행 SHA-256 3ab3c23cc0f8e0a55d286aa0ea4b59f498d64030e1f50c5010579f49f63efdfd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232503|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_09492982b8daf20c
Sources EV-0904aa1a5561a380c9080bce Evidence SHA-256 dc49a5ea8b06169ea1b5655fdf176a473718b6d0bb11ddf0a75572bde17cf4af 행 SHA-256 3ab3c23cc0f8e0a55d286aa0ea4b59f498d64030e1f50c5010579f49f63efdfd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-05 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232503|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_09492982b8daf20c
Sources EV-0904aa1a5561a380c9080bce Evidence SHA-256 dc49a5ea8b06169ea1b5655fdf176a473718b6d0bb11ddf0a75572bde17cf4af 행 SHA-256 3ab3c23cc0f8e0a55d286aa0ea4b59f498d64030e1f50c5010579f49f63efdfd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232503|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_09492982b8daf20c
Sources EV-0904aa1a5561a380c9080bce Evidence SHA-256 dc49a5ea8b06169ea1b5655fdf176a473718b6d0bb11ddf0a75572bde17cf4af 행 SHA-256 3ab3c23cc0f8e0a55d286aa0ea4b59f498d64030e1f50c5010579f49f63efdfd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-01 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232503|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_09492982b8daf20c
Sources EV-0904aa1a5561a380c9080bce Evidence SHA-256 dc49a5ea8b06169ea1b5655fdf176a473718b6d0bb11ddf0a75572bde17cf4af 행 SHA-256 3ab3c23cc0f8e0a55d286aa0ea4b59f498d64030e1f50c5010579f49f63efdfd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232503|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_09492982b8daf20c
Sources EV-0904aa1a5561a380c9080bce Evidence SHA-256 dc49a5ea8b06169ea1b5655fdf176a473718b6d0bb11ddf0a75572bde17cf4af 행 SHA-256 3ab3c23cc0f8e0a55d286aa0ea4b59f498d64030e1f50c5010579f49f63efdfd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_09492982b8daf20c stable_project_id kproj_bfad09fbdf0bb47d source_key 202609|232503|ESB basic_ym 202609 source_stage_raw 사업승인-공사착수전 project_name_list 154kV 고옥-득량T/L 건설사업 project_name_detail 154kV 고옥-득량T/L 건설사업 region_summary_raw 전남광주통합특별시 보성군등 1 지역 equipment_type_raw 가공송전 headquarters_raw 중부건설본부 office_raw 광주전남건설지사 section_fields Project purpose 재생에너지 연계용량 확보 및 고흥S/S 단일계통해소 사업 규모 A/AW 410㎟×2B×2C×15.4KM, 철탑 39기 계획확정 제09차 장기송변전설비계획 반영(2018.11) 입지선정 전력입지영향평가 용역 착수: 2020.03 입지선정위원회 구성시기: 2021.04 참여 위원 수 : 11 지장유무 조회: 2021.11~2021.12 경과지(부지) 확정: 2021.07 환경/재해 영향평가 환경영향평가: 2022.05 ~ 2024.07 재해영향평가: 2022.05 ~ 2025.11 주민의견 수렴 지자체 공고 열람: 2023.11 ~ 2023.12 설명회·공청회: 2024.07 자체설명회: 2020.08 ~ 2023.12 입지선정 및 주민의견 수렴 주요 내용 ㅇ 1차('21. 4.29) : 입선위 위원장 선출 및 운영규범안 확정 ㅇ 2차('21. 6.10) : 최적경과대역 선정 ㅇ 3차('21. 7.21) : 최적경과지 선정 사업설계 설계용역: 2020.03 ~ 기본설계: 2025.03 ~ 2025.03 실시설계: 2025.04 ~ 2026.04 설계담당자: [redacted] [추진실적] □ '20.03 : 전력영향평가 및 경과지설계 용역 착수 □ '21.04 - 07 : 입지선정위원회(총 3회) □ '22.06 - 08 : 최적 경과지 사전 주민의견 청취 □ '22.05 : 소규모 환경·재해영향평가 용역 착수 □ '23.11 : 사업시행계획 열람·공고 □ '23.12 : 법적 주민설명회 개최 □ '24.01~06 : 공청회 공고 요청(→보성군) 및 행정심판 소송 진행 □ '24.07~08 : 공청회 생략 공고 게재 및 서면으로 의견 수렴 진행 □ '25.03 : 기본설계 완료 □ '25.05 : 실시계획 승인신청(→산업부) □ '26.04 : 실시계획 승인 (←기후부) [향후계획] □ '26.12 : 공사 계약 및 착공 future_plan_redacted □ 향후계획 [추진실적] □ '20.03 : 전력영향평가 및 경과지설계 용역 착수 □ '21.04 - 07 : 입지선정위원회(총 3회) □ '22.06 - 08 : 최적 경과지 사전 주민의견 청취 □ '22.05 : 소규모 환경·재해영향평가 용역 착수 □ '23.11 : 사업시행계획 열람·공고 □ '23.12 : 법적 주민설명회 개최 □ '24.01~06 : 공청회 공고 요청(→보성군) 및 행정심판 소송 진행 □ '24.07~08 : 공청회 생략 공고 게재 및 서면으로 의견 수렴 진행 □ '25.03 : 기본설계 완료 □ '25.05 : 실시계획 승인신청(→산업부) □ '26.04 : 실시계획 승인 (←기후부) [향후계획] □ '26.12 : 공사 계약 및 착공 attachment_count 0 source_detail_sha256 dc49a5ea8b06169ea1b5655fdf176a473718b6d0bb11ddf0a75572bde17cf4af first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|232503|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_09492982b8daf20c
Sources EV-0904aa1a5561a380c9080bce Evidence SHA-256 dc49a5ea8b06169ea1b5655fdf176a473718b6d0bb11ddf0a75572bde17cf4af 행 SHA-256 3ab3c23cc0f8e0a55d286aa0ea4b59f498d64030e1f50c5010579f49f63efdfd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_bfad09fbdf0bb47d stable_project_key prjtDef:232503:ESB project_definition 232503 first_region_code ESB manual_source_format false project_name 154kV 고옥-득량T/L 건설사업 project_name_list 154kV 고옥-득량T/L 건설사업 purpose 재생에너지 연계용량 확보 및 고흥S/S 단일계통해소 project_region_detail 전남광주통합특별시 보성군 project_period_raw 2020.03~2026.12 project_scale_raw A/AW 410㎟×2B×2C×15.4KM, 철탑 39기 responsible_office_raw 중부건설본부/광주전남건설지사 equipment_type 가공송전 headquarters 중부건설본부 office 광주전남건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_bfad09fbdf0bb47d
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_bfad09fbdf0bb47d
Sources EV-1114d7f46e9906baeb471619 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 b67d41e790f9b28d51da4b51a9ceadf3090d3ea6cf8a2d2adf04e8bed86e660d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-dbdb1f4aa2a8846ed0e82772
Detailed source fields Original source field Published value or condition stable_project_id kproj_93fc352db78d8b02 stable_project_key prjtDef:234830:ESB project_definition 234830 first_region_code ESB manual_source_format false project_name 154kV 고창-신고창 전력구 건설사업 project_name_list 154kV 고창-신고창 전력구 건설사업 purpose 고창지역 신재생에너지 연계 project_region_detail 전북특별자치도 고창군 project_period_raw 2026.02~2031.10 project_scale_raw 154KV 송전 2회선 10KM responsible_office_raw 중부건설본부/전북건설지사 equipment_type 전력구 headquarters 중부건설본부 office 전북건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_93fc352db78d8b02
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_93fc352db78d8b02
Sources EV-dbdb1f4aa2a8846ed0e82772 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 b68f787fef46622c84c5015e854b32a915609143c59d7b266122a6b9464887d6 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2031-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234830|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d29e6ab96a9dc8d0
Sources EV-426d070bcb66a1912955ac2e Evidence SHA-256 bf7c62cd859a559ccaffb29f1e77f7658bb79ddd1460939238ae1539b628105b 행 SHA-256 aebc7071e76f8d6ebd08c900a7c2e48b471a32ced33d58391f961f423aad89f8 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2026-02 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234830|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d29e6ab96a9dc8d0
Sources EV-426d070bcb66a1912955ac2e Evidence SHA-256 bf7c62cd859a559ccaffb29f1e77f7658bb79ddd1460939238ae1539b628105b 행 SHA-256 aebc7071e76f8d6ebd08c900a7c2e48b471a32ced33d58391f961f423aad89f8 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_d29e6ab96a9dc8d0 stable_project_id kproj_93fc352db78d8b02 source_key 202609|234830|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 고창-신고창 전력구 건설사업 project_name_detail 154kV 고창-신고창 전력구 건설사업 region_summary_raw 전북특별자치도 고창군등 1 지역 equipment_type_raw 전력구 headquarters_raw 중부건설본부 office_raw 전북건설지사 section_fields 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: future_plan_redacted □ 향후계획 attachment_count 0 source_detail_sha256 bf7c62cd859a559ccaffb29f1e77f7658bb79ddd1460939238ae1539b628105b first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|234830|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d29e6ab96a9dc8d0
Sources EV-426d070bcb66a1912955ac2e Evidence SHA-256 bf7c62cd859a559ccaffb29f1e77f7658bb79ddd1460939238ae1539b628105b 행 SHA-256 aebc7071e76f8d6ebd08c900a7c2e48b471a32ced33d58391f961f423aad89f8 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_93fc352db78d8b02 stable_project_key prjtDef:234830:ESB project_definition 234830 first_region_code ESB manual_source_format false project_name 154kV 고창-신고창 전력구 건설사업 project_name_list 154kV 고창-신고창 전력구 건설사업 purpose 고창지역 신재생에너지 연계 project_region_detail 전북특별자치도 고창군 project_period_raw 2026.02~2031.10 project_scale_raw 154KV 송전 2회선 10KM responsible_office_raw 중부건설본부/전북건설지사 equipment_type 전력구 headquarters 중부건설본부 office 전북건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_93fc352db78d8b02
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_93fc352db78d8b02
Sources EV-dbdb1f4aa2a8846ed0e82772 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 b68f787fef46622c84c5015e854b32a915609143c59d7b266122a6b9464887d6 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-a1116295be5e884472107771
Detailed source fields Original source field Published value or condition stable_project_id kproj_988d451fa8d5f8ac stable_project_key prjtDef:232733:ESB project_definition 232733 first_region_code ESB manual_source_format false project_name 154kV 고창-신고창T/L 건설사업 project_name_list 154kV 고창-신고창T/L 건설사업 purpose 재생E 연계 계통 변경 및 과부하 해소 project_region_detail 전북특별자치도 고창군 project_period_raw 2025.10~2031.10 project_scale_raw ACSR 410㎟ × 2B ×2C, 10KM responsible_office_raw 중부건설본부/전북건설지사 equipment_type 가공송전 headquarters 중부건설본부 office 전북건설지사 current_stage_raw snapshot_count 1 active_snapshot_count 0 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text source_record_id stable_project_id:kproj_988d451fa8d5f8ac
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_988d451fa8d5f8ac
Sources EV-a1116295be5e884472107771 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 8ecd815e97adeb97dc5ba669d0d370497289520cdfc1d0ee4c9e1ca9acab5807 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-05 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232733|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_758f0ef438c66fb2
Sources EV-b4879c01b75bbf4f4bbf5bf4 Evidence SHA-256 2204a19a6a0a0d211f4b237dd5770086cadb12a723a4f5f17d9b56ad16358ac8 행 SHA-256 196b374951611431861da33c40b1af00e3953bf2be7be9eb4aa193c0cab441d4 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2025-10 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232733|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_758f0ef438c66fb2
Sources EV-b4879c01b75bbf4f4bbf5bf4 Evidence SHA-256 2204a19a6a0a0d211f4b237dd5770086cadb12a723a4f5f17d9b56ad16358ac8 행 SHA-256 196b374951611431861da33c40b1af00e3953bf2be7be9eb4aa193c0cab441d4 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2025-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232733|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_758f0ef438c66fb2
Sources EV-b4879c01b75bbf4f4bbf5bf4 Evidence SHA-256 2204a19a6a0a0d211f4b237dd5770086cadb12a723a4f5f17d9b56ad16358ac8 행 SHA-256 196b374951611431861da33c40b1af00e3953bf2be7be9eb4aa193c0cab441d4 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232733|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_758f0ef438c66fb2
Sources EV-b4879c01b75bbf4f4bbf5bf4 Evidence SHA-256 2204a19a6a0a0d211f4b237dd5770086cadb12a723a4f5f17d9b56ad16358ac8 행 SHA-256 196b374951611431861da33c40b1af00e3953bf2be7be9eb4aa193c0cab441d4 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2031-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232733|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_758f0ef438c66fb2
Sources EV-b4879c01b75bbf4f4bbf5bf4 Evidence SHA-256 2204a19a6a0a0d211f4b237dd5770086cadb12a723a4f5f17d9b56ad16358ac8 행 SHA-256 196b374951611431861da33c40b1af00e3953bf2be7be9eb4aa193c0cab441d4 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_758f0ef438c66fb2 stable_project_id kproj_988d451fa8d5f8ac source_key 202609|232733|ESB basic_ym 202609 source_stage_raw project_name_list 154kV 고창-신고창T/L 건설사업 project_name_detail 154kV 고창-신고창T/L 건설사업 region_summary_raw 전북특별자치도 고창군등 1 지역 equipment_type_raw 가공송전 headquarters_raw 중부건설본부 office_raw 전북건설지사 section_fields 계획확정 제11차 장기송변전설비계획 반영(2025.05) 입지선정 전력입지영향평가 용역 착수: 2025.10 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: future_plan_redacted □ 향후계획 □'25.10 : 전력입지영향평가 용역 착수 attachment_count 0 source_detail_sha256 2204a19a6a0a0d211f4b237dd5770086cadb12a723a4f5f17d9b56ad16358ac8 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|232733|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_758f0ef438c66fb2
Sources EV-b4879c01b75bbf4f4bbf5bf4 Evidence SHA-256 2204a19a6a0a0d211f4b237dd5770086cadb12a723a4f5f17d9b56ad16358ac8 행 SHA-256 196b374951611431861da33c40b1af00e3953bf2be7be9eb4aa193c0cab441d4 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_988d451fa8d5f8ac stable_project_key prjtDef:232733:ESB project_definition 232733 first_region_code ESB manual_source_format false project_name 154kV 고창-신고창T/L 건설사업 project_name_list 154kV 고창-신고창T/L 건설사업 purpose 재생E 연계 계통 변경 및 과부하 해소 project_region_detail 전북특별자치도 고창군 project_period_raw 2025.10~2031.10 project_scale_raw ACSR 410㎟ × 2B ×2C, 10KM responsible_office_raw 중부건설본부/전북건설지사 equipment_type 가공송전 headquarters 중부건설본부 office 전북건설지사 current_stage_raw snapshot_count 1 active_snapshot_count 0 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text source_record_id stable_project_id:kproj_988d451fa8d5f8ac
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_988d451fa8d5f8ac
Sources EV-a1116295be5e884472107771 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 8ecd815e97adeb97dc5ba669d0d370497289520cdfc1d0ee4c9e1ca9acab5807 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-8ae4db09d17dc12d8c5133f7
Detailed source fields Original source field Published value or condition stable_project_id kproj_7cb4750e5bda94ec stable_project_key prjtDef:231660:ESB project_definition 231660 first_region_code ESB manual_source_format false project_name 154kV 고천S/S 건설사업 project_name_list 154kV 고천변전소 건설사업 purpose 인근변전소 부하분담 및 고천지구 등 신규부하 공급 project_region_detail 경기도 의왕시 project_period_raw 2023.05~2029.04 project_scale_raw 154KV M.TR 60MVA× 2BANK responsible_office_raw 경인건설본부/경기건설지사 equipment_type 변전 headquarters 경인건설본부 office 경기건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_7cb4750e5bda94ec
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_7cb4750e5bda94ec
Sources EV-8ae4db09d17dc12d8c5133f7 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 0a150c052bb0d6f7c7e4f1cfc29c364d4ad05653a9cbdcb35f967d0788181298 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2023-05 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231660|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_442a3cb51f627416
Sources EV-e67334ed5fe19b5ccbabfd3a Evidence SHA-256 a59f8efac766bad358dab3bf59c4c6b0be3c75fb7d27984c9ae1b0fcb1a1138e 행 SHA-256 b5546af95750562146d59a41a3e3596a7c6beda17b18b9f838170ba63a5b11a8 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2024-11 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231660|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_442a3cb51f627416
Sources EV-e67334ed5fe19b5ccbabfd3a Evidence SHA-256 a59f8efac766bad358dab3bf59c4c6b0be3c75fb7d27984c9ae1b0fcb1a1138e 행 SHA-256 b5546af95750562146d59a41a3e3596a7c6beda17b18b9f838170ba63a5b11a8 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type energization date 2030-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231660|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_442a3cb51f627416
Sources EV-e67334ed5fe19b5ccbabfd3a Evidence SHA-256 a59f8efac766bad358dab3bf59c4c6b0be3c75fb7d27984c9ae1b0fcb1a1138e 행 SHA-256 b5546af95750562146d59a41a3e3596a7c6beda17b18b9f838170ba63a5b11a8 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2029-04 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231660|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_442a3cb51f627416
Sources EV-e67334ed5fe19b5ccbabfd3a Evidence SHA-256 a59f8efac766bad358dab3bf59c4c6b0be3c75fb7d27984c9ae1b0fcb1a1138e 행 SHA-256 b5546af95750562146d59a41a3e3596a7c6beda17b18b9f838170ba63a5b11a8 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2025-02 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231660|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_442a3cb51f627416
Sources EV-e67334ed5fe19b5ccbabfd3a Evidence SHA-256 a59f8efac766bad358dab3bf59c4c6b0be3c75fb7d27984c9ae1b0fcb1a1138e 행 SHA-256 b5546af95750562146d59a41a3e3596a7c6beda17b18b9f838170ba63a5b11a8 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2030-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231660|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_442a3cb51f627416
Sources EV-e67334ed5fe19b5ccbabfd3a Evidence SHA-256 a59f8efac766bad358dab3bf59c4c6b0be3c75fb7d27984c9ae1b0fcb1a1138e 행 SHA-256 b5546af95750562146d59a41a3e3596a7c6beda17b18b9f838170ba63a5b11a8 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_442a3cb51f627416 stable_project_id kproj_7cb4750e5bda94ec source_key 202609|231660|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 고천변전소 건설사업 project_name_detail 154kV 고천S/S 건설사업 region_summary_raw 경기도 의왕시등 1 지역 equipment_type_raw 변전 headquarters_raw 경인건설본부 office_raw 경기건설지사 section_fields Project purpose 인근변전소 부하분담 및 고천지구 등 신규부하 공급 입지선정 전력입지영향평가 용역 착수: 2025.02 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: [진행경과] □ ‘23. 5 : 제 10차 장기 송변전설비계획 반영 □ ‘23. 8 : 입지선정실무위원회 구성 □ ‘24. 2 : 입지선정실무위원회 결과보고 □ ‘24.11 : 전력영향평가 용역 발주 □ ‘25. 2 : 전력영향평가 용역 착수 □ ‘25. 6 : 대관협의(의왕시청) □ ‘25. 9 : 대관협의(수원시청) □ ‘26. 3 : 의왕시 사업설명회 완료 (7개동) [향후계획] □ ‘28. 5 : 용지매수 완료 □ ‘29. 5 : 토건공사 착공 □ ‘29. 8 : 변전공사 착공 □ ‘30.12 : 토건공사 준공 □ ‘31. 4 : 준공 및 가압 future_plan_redacted □ 향후계획 [진행경과] □ ‘23. 5 : 제 10차 장기 송변전설비계획 반영 □ ‘23. 8 : 입지선정실무위원회 구성 □ ‘24. 2 : 입지선정실무위원회 결과보고 □ ‘24.11 : 전력영향평가 용역 발주 □ ‘25. 2 : 전력영향평가 용역 착수 □ ‘25. 6 : 대관협의(의왕시청) □ ‘25. 9 : 대관협의(수원시청) □ ‘26. 3 : 의왕시 사업설명회 완료 (7개동) [향후계획] □ ‘28. 5 : 용지매수 완료 □ ‘29. 5 : 토건공사 착공 □ ‘29. 8 : 변전공사 착공 □ ‘30.12 : 토건공사 준공 □ ‘31. 4 : 준공 및 가압 attachment_count 0 source_detail_sha256 a59f8efac766bad358dab3bf59c4c6b0be3c75fb7d27984c9ae1b0fcb1a1138e first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231660|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_442a3cb51f627416
Sources EV-e67334ed5fe19b5ccbabfd3a Evidence SHA-256 a59f8efac766bad358dab3bf59c4c6b0be3c75fb7d27984c9ae1b0fcb1a1138e 행 SHA-256 b5546af95750562146d59a41a3e3596a7c6beda17b18b9f838170ba63a5b11a8 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_7cb4750e5bda94ec stable_project_key prjtDef:231660:ESB project_definition 231660 first_region_code ESB manual_source_format false project_name 154kV 고천S/S 건설사업 project_name_list 154kV 고천변전소 건설사업 purpose 인근변전소 부하분담 및 고천지구 등 신규부하 공급 project_region_detail 경기도 의왕시 project_period_raw 2023.05~2029.04 project_scale_raw 154KV M.TR 60MVA× 2BANK responsible_office_raw 경인건설본부/경기건설지사 equipment_type 변전 headquarters 경인건설본부 office 경기건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_7cb4750e5bda94ec
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_7cb4750e5bda94ec
Sources EV-8ae4db09d17dc12d8c5133f7 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 0a150c052bb0d6f7c7e4f1cfc29c364d4ad05653a9cbdcb35f967d0788181298 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-ed3352668f4e56898084e66b
Detailed source fields Original source field Published value or condition stable_project_id kproj_878b1feca543753e stable_project_key prjtDef:231644:ESB project_definition 231644 first_region_code ESB manual_source_format false project_name 154kV 고흥#4S/S 건설사업 project_name_list 154kV 고흥#4S/S 건설사업 purpose 고흥지역 재생E 계통연계 project_region_detail 전남광주통합특별시 고흥군 project_period_raw 2023.05~2030.12 project_scale_raw 154KV M.TR 2BANK(최종5BANK) responsible_office_raw 중부건설본부/광주전남건설지사 equipment_type 변전 headquarters 중부건설본부 office 광주전남건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_878b1feca543753e
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_878b1feca543753e
Sources EV-ed3352668f4e56898084e66b Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 edffacd5490427f71e5dca43aff1e84de332be8b92534f27bf870aef34463f38 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231644|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_69c48b46ddf7b29c
Sources EV-76fe8273c1cfc92e760efa60 Evidence SHA-256 93797f462517027503bf134f67cae61314c9cbe180c23a1dce1961685d736680 행 SHA-256 ddc865b7db3a109c2ee768b9dcefe381933435bba26cec06cd08bdf45faa8104 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231644|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_69c48b46ddf7b29c
Sources EV-76fe8273c1cfc92e760efa60 Evidence SHA-256 93797f462517027503bf134f67cae61314c9cbe180c23a1dce1961685d736680 행 SHA-256 ddc865b7db3a109c2ee768b9dcefe381933435bba26cec06cd08bdf45faa8104 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-02 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231644|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_69c48b46ddf7b29c
Sources EV-76fe8273c1cfc92e760efa60 Evidence SHA-256 93797f462517027503bf134f67cae61314c9cbe180c23a1dce1961685d736680 행 SHA-256 ddc865b7db3a109c2ee768b9dcefe381933435bba26cec06cd08bdf45faa8104 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-11 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231644|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_69c48b46ddf7b29c
Sources EV-76fe8273c1cfc92e760efa60 Evidence SHA-256 93797f462517027503bf134f67cae61314c9cbe180c23a1dce1961685d736680 행 SHA-256 ddc865b7db3a109c2ee768b9dcefe381933435bba26cec06cd08bdf45faa8104 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type plan_change date 2025-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231644|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_69c48b46ddf7b29c
Sources EV-76fe8273c1cfc92e760efa60 Evidence SHA-256 93797f462517027503bf134f67cae61314c9cbe180c23a1dce1961685d736680 행 SHA-256 ddc865b7db3a109c2ee768b9dcefe381933435bba26cec06cd08bdf45faa8104 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231644|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_69c48b46ddf7b29c
Sources EV-76fe8273c1cfc92e760efa60 Evidence SHA-256 93797f462517027503bf134f67cae61314c9cbe180c23a1dce1961685d736680 행 SHA-256 ddc865b7db3a109c2ee768b9dcefe381933435bba26cec06cd08bdf45faa8104 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-09 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231644|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_69c48b46ddf7b29c
Sources EV-76fe8273c1cfc92e760efa60 Evidence SHA-256 93797f462517027503bf134f67cae61314c9cbe180c23a1dce1961685d736680 행 SHA-256 ddc865b7db3a109c2ee768b9dcefe381933435bba26cec06cd08bdf45faa8104 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type plan_change date 2038-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231644|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_69c48b46ddf7b29c
Sources EV-76fe8273c1cfc92e760efa60 Evidence SHA-256 93797f462517027503bf134f67cae61314c9cbe180c23a1dce1961685d736680 행 SHA-256 ddc865b7db3a109c2ee768b9dcefe381933435bba26cec06cd08bdf45faa8104 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2030-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231644|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_69c48b46ddf7b29c
Sources EV-76fe8273c1cfc92e760efa60 Evidence SHA-256 93797f462517027503bf134f67cae61314c9cbe180c23a1dce1961685d736680 행 SHA-256 ddc865b7db3a109c2ee768b9dcefe381933435bba26cec06cd08bdf45faa8104 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2023-05 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231644|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_69c48b46ddf7b29c
Sources EV-76fe8273c1cfc92e760efa60 Evidence SHA-256 93797f462517027503bf134f67cae61314c9cbe180c23a1dce1961685d736680 행 SHA-256 ddc865b7db3a109c2ee768b9dcefe381933435bba26cec06cd08bdf45faa8104 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_69c48b46ddf7b29c stable_project_id kproj_878b1feca543753e source_key 202609|231644|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 고흥#4S/S 건설사업 project_name_detail 154kV 고흥#4S/S 건설사업 region_summary_raw 전남광주통합특별시 고흥군등 1 지역 equipment_type_raw 변전 headquarters_raw 중부건설본부 office_raw 광주전남건설지사 section_fields 사업 규모 154KV M.TR 2BANK(최종5BANK) 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: [계획확정~사업승인전 추진실적] ○'23.05 : 제10차 장기송변전설비계획 반영 ○'24.09 : 전력영향평가용역 발주 시행 ○'24.11 : 전력영향평가 용역 착수 ○'24.12 : 전력영향평가 용역 착수회의 시행 ○'24.12~'25.02 : 지자체 및 주민 사업설명회 및 입지선정위원 추천 요청 ○'25.05 : 제11차 장기송변전설비계획 준고목표 변경('38.10) future_plan_redacted □ 향후계획 [계획확정~사업승인전 추진실적] ○'23.05 : 제10차 장기송변전설비계획 반영 ○'24.09 : 전력영향평가용역 발주 시행 ○'24.11 : 전력영향평가 용역 착수 ○'24.12 : 전력영향평가 용역 착수회의 시행 ○'24.12~'25.02 : 지자체 및 주민 사업설명회 및 입지선정위원 추천 요청 ○'25.05 : 제11차 장기송변전설비계획 준고목표 변경('38.10) attachment_count 0 source_detail_sha256 93797f462517027503bf134f67cae61314c9cbe180c23a1dce1961685d736680 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231644|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_69c48b46ddf7b29c
Sources EV-76fe8273c1cfc92e760efa60 Evidence SHA-256 93797f462517027503bf134f67cae61314c9cbe180c23a1dce1961685d736680 행 SHA-256 ddc865b7db3a109c2ee768b9dcefe381933435bba26cec06cd08bdf45faa8104 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_878b1feca543753e stable_project_key prjtDef:231644:ESB project_definition 231644 first_region_code ESB manual_source_format false project_name 154kV 고흥#4S/S 건설사업 project_name_list 154kV 고흥#4S/S 건설사업 purpose 고흥지역 재생E 계통연계 project_region_detail 전남광주통합특별시 고흥군 project_period_raw 2023.05~2030.12 project_scale_raw 154KV M.TR 2BANK(최종5BANK) responsible_office_raw 중부건설본부/광주전남건설지사 equipment_type 변전 headquarters 중부건설본부 office 광주전남건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_878b1feca543753e
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_878b1feca543753e
Sources EV-ed3352668f4e56898084e66b Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 edffacd5490427f71e5dca43aff1e84de332be8b92534f27bf870aef34463f38 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-3c6b125b5c0819c3a0b41c12
Detailed source fields Original source field Published value or condition stable_project_id kproj_bfec460e71713427 stable_project_key prjtDef:234722:ESB project_definition 234722 first_region_code ESB manual_source_format false project_name 154kV 고흥#4분기 전력구 건설사업 project_name_list 154kV 고흥#4분기 전력구 건설사업 purpose 고흥지역의 전력공급을 위함. project_region_detail 전남광주통합특별시 고흥군 project_period_raw 2024.06~2030.12 project_scale_raw To be determined responsible_office_raw 중부건설본부/광주전남건설지사 equipment_type 전력구 headquarters 중부건설본부 office 광주전남건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_bfec460e71713427
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_bfec460e71713427
Sources EV-3c6b125b5c0819c3a0b41c12 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 e949d8c49c4448736a6c59502f0c71d9263d716dc91323c3c8154ba066d1d815 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2030-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234722|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_81e0882b05a6f076
Sources EV-273ebdf70109b03ea0893960 Evidence SHA-256 daa53c20397ef2ae099d06e9ce3ab43d0c588cba35fa268e3d8ac352c3c36674 행 SHA-256 3ff8cee08e5aa316dfebea753c94c9f2558a20fec122b3e4ff40966610e05485 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2024-06-10 date_precision day assertion planned verification_status source_text_candidate operational_proof false source_key 202609|234722|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_81e0882b05a6f076
Sources EV-273ebdf70109b03ea0893960 Evidence SHA-256 daa53c20397ef2ae099d06e9ce3ab43d0c588cba35fa268e3d8ac352c3c36674 행 SHA-256 3ff8cee08e5aa316dfebea753c94c9f2558a20fec122b3e4ff40966610e05485 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-09-03 date_precision day assertion planned verification_status source_text_candidate operational_proof false source_key 202609|234722|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_81e0882b05a6f076
Sources EV-273ebdf70109b03ea0893960 Evidence SHA-256 daa53c20397ef2ae099d06e9ce3ab43d0c588cba35fa268e3d8ac352c3c36674 행 SHA-256 3ff8cee08e5aa316dfebea753c94c9f2558a20fec122b3e4ff40966610e05485 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2024-06 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234722|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_81e0882b05a6f076
Sources EV-273ebdf70109b03ea0893960 Evidence SHA-256 daa53c20397ef2ae099d06e9ce3ab43d0c588cba35fa268e3d8ac352c3c36674 행 SHA-256 3ff8cee08e5aa316dfebea753c94c9f2558a20fec122b3e4ff40966610e05485 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_81e0882b05a6f076 stable_project_id kproj_bfec460e71713427 source_key 202609|234722|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 고흥#4분기 전력구 건설사업 project_name_detail 154kV 고흥#4분기 전력구 건설사업 region_summary_raw 전남광주통합특별시 고흥군등 1 지역 equipment_type_raw 전력구 headquarters_raw 중부건설본부 office_raw 광주전남건설지사 section_fields 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: line ○ ‘24.06.10 154kV 고흥#4S/S 예정부지 현장검토 및 변전소 입지 선정후 경과지 확정 예정 ○ ‘24.09.03 154kV 고흥#4분기T/L 및 고흥#4S/S 전력영향평가 및 경과지설계 용역 시 future_plan_redacted line □ 향후계획 ○ ‘24.06.10 154kV 고흥#4S/S 예정부지 현장검토 및 변전소 입지 선정후 경과지 확정 예정 ○ ‘24.09.03 154kV 고흥#4분기T/L 및 고흥#4S/S 전력영향평가 및 경과지설계 용역 시 attachment_count 0 source_detail_sha256 daa53c20397ef2ae099d06e9ce3ab43d0c588cba35fa268e3d8ac352c3c36674 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|234722|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_81e0882b05a6f076
Sources EV-273ebdf70109b03ea0893960 Evidence SHA-256 daa53c20397ef2ae099d06e9ce3ab43d0c588cba35fa268e3d8ac352c3c36674 행 SHA-256 3ff8cee08e5aa316dfebea753c94c9f2558a20fec122b3e4ff40966610e05485 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_bfec460e71713427 stable_project_key prjtDef:234722:ESB project_definition 234722 first_region_code ESB manual_source_format false project_name 154kV 고흥#4분기 전력구 건설사업 project_name_list 154kV 고흥#4분기 전력구 건설사업 purpose 고흥지역의 전력공급을 위함. project_region_detail 전남광주통합특별시 고흥군 project_period_raw 2024.06~2030.12 project_scale_raw To be determined responsible_office_raw 중부건설본부/광주전남건설지사 equipment_type 전력구 headquarters 중부건설본부 office 광주전남건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_bfec460e71713427
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_bfec460e71713427
Sources EV-3c6b125b5c0819c3a0b41c12 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 e949d8c49c4448736a6c59502f0c71d9263d716dc91323c3c8154ba066d1d815 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-5f469e4b776f7dfa880b3444
Detailed source fields Original source field Published value or condition stable_project_id kproj_02fb07376c507e8d stable_project_key prjtDef:233779:ESB project_definition 233779 first_region_code ESB manual_source_format false project_name 154kV 고흥#4분기 지중T/L 건설사업 project_name_list 154kV 고흥#4분기 지중T/L 건설사업 purpose 고흥지역 재생E 계통연계 보강 project_region_detail 전남광주통합특별시 고흥군 project_period_raw 2029.01~2030.12 project_scale_raw 154KV XLPE 2000㎟, 4C(D)-1.2KM responsible_office_raw 중부건설본부/광주전남건설지사 equipment_type 지중송전 headquarters 중부건설본부 office 광주전남건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_02fb07376c507e8d
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_02fb07376c507e8d
Sources EV-5f469e4b776f7dfa880b3444 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 9ff2f1d77d19b2cf20cf2ff2cd4392ce5967b8c7aa309fec4786122e63da664f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2029-01 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233779|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_eb71ef4e5d92f83d
Sources EV-c7f219c0a139a16b91d870cd Evidence SHA-256 f7c75ccc4182686f32d2a183971808c8bc6ea33d3137857951893cf5da4e44a6 행 SHA-256 c90222136f859f92fd106902218aac64a88abb160c0cb1dd950537e27dcf1412 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2030-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233779|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_eb71ef4e5d92f83d
Sources EV-c7f219c0a139a16b91d870cd Evidence SHA-256 f7c75ccc4182686f32d2a183971808c8bc6ea33d3137857951893cf5da4e44a6 행 SHA-256 c90222136f859f92fd106902218aac64a88abb160c0cb1dd950537e27dcf1412 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_eb71ef4e5d92f83d stable_project_id kproj_02fb07376c507e8d source_key 202609|233779|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 고흥#4분기 지중T/L 건설사업 project_name_detail 154kV 고흥#4분기 지중T/L 건설사업 region_summary_raw 전남광주통합특별시 고흥군등 1 지역 equipment_type_raw 지중송전 headquarters_raw 중부건설본부 office_raw 광주전남건설지사 section_fields 사업 규모 154KV XLPE 2000㎟, 4C(D)-1.2KM 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: ○ `23.04 : 제10차 장기 송변전설비계획 신규 반영 future_plan_redacted □ 향후계획 ○ `23.04 : 제10차 장기 송변전설비계획 신규 반영 attachment_count 0 source_detail_sha256 f7c75ccc4182686f32d2a183971808c8bc6ea33d3137857951893cf5da4e44a6 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|233779|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_eb71ef4e5d92f83d
Sources EV-c7f219c0a139a16b91d870cd Evidence SHA-256 f7c75ccc4182686f32d2a183971808c8bc6ea33d3137857951893cf5da4e44a6 행 SHA-256 c90222136f859f92fd106902218aac64a88abb160c0cb1dd950537e27dcf1412 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_02fb07376c507e8d stable_project_key prjtDef:233779:ESB project_definition 233779 first_region_code ESB manual_source_format false project_name 154kV 고흥#4분기 지중T/L 건설사업 project_name_list 154kV 고흥#4분기 지중T/L 건설사업 purpose 고흥지역 재생E 계통연계 보강 project_region_detail 전남광주통합특별시 고흥군 project_period_raw 2029.01~2030.12 project_scale_raw 154KV XLPE 2000㎟, 4C(D)-1.2KM responsible_office_raw 중부건설본부/광주전남건설지사 equipment_type 지중송전 headquarters 중부건설본부 office 광주전남건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_02fb07376c507e8d
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_02fb07376c507e8d
Sources EV-5f469e4b776f7dfa880b3444 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 9ff2f1d77d19b2cf20cf2ff2cd4392ce5967b8c7aa309fec4786122e63da664f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-2c51629988707fa47d37228d
Detailed source fields Original source field Published value or condition stable_project_id kproj_ad124d1fc217eb5e stable_project_key prjtDef:232681:ESB project_definition 232681 first_region_code ESB manual_source_format false project_name 154kV 고흥#4분기T/L 건설사업 project_name_list 154kV 고흥#4분기T/L 건설사업 purpose 고흥지역 계통연계 project_region_detail 전남광주통합특별시 고흥군 project_period_raw 2024.06~2030.12 project_scale_raw ACSR/AW 410㎟×2B×4C×12.7KM, 철탑 32기 responsible_office_raw 중부건설본부/광주전남건설지사 equipment_type 가공송전 headquarters 중부건설본부 office 광주전남건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_ad124d1fc217eb5e
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_ad124d1fc217eb5e
Sources EV-2c51629988707fa47d37228d Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 069d6d8da885c5f6bdd6d89d6bb889b9a8f55930d55eeec911f7818ab631c124 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2024-06 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232681|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_f179c1245462d09c
Sources EV-cbadcf7ce217fdddbabfa4dc Evidence SHA-256 ea29b043a2e3b828447448f1e3dc08298bf055b88bc52c8924b5cbf8516b3e2c 행 SHA-256 10608c515ee6c57e63c2dcaafe83ace12f0036cdb9a8700103650312ab9844df Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2030-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232681|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_f179c1245462d09c
Sources EV-cbadcf7ce217fdddbabfa4dc Evidence SHA-256 ea29b043a2e3b828447448f1e3dc08298bf055b88bc52c8924b5cbf8516b3e2c 행 SHA-256 10608c515ee6c57e63c2dcaafe83ace12f0036cdb9a8700103650312ab9844df Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_f179c1245462d09c stable_project_id kproj_ad124d1fc217eb5e source_key 202609|232681|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 고흥#4분기T/L 건설사업 project_name_detail 154kV 고흥#4분기T/L 건설사업 region_summary_raw 전남광주통합특별시 고흥군등 1 지역 equipment_type_raw 가공송전 headquarters_raw 중부건설본부 office_raw 광주전남건설지사 section_fields 사업 규모 ACSR/AW 410㎟×2B×4C×12.7KM, 철탑 32기 계획확정 제10차 장기송변전설비계획 반영(2023.04) 입지선정 전력입지영향평가 용역 착수: 2024.11 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: line [추진실적] □ '23.04 : 제 10차 장기 송변전설비계획 신규 반영 □ '24.11 : 전력영향평가 및 경과지설계 용역 착수 □ '24.12 : 지자체(고흥군) 대상 사업설명 시행 □ '25.01 : 지자체(영남면, 점암면) 대상 사업설명 시행 □ '25.02 : 지자체(영남면 이장단) 사업설명회 시행 기설 벌교-고흥T/L 분기개소 기술 검토 및 KLIS 등 기초자료 구축 □ '25.03 : 지자체(점암면 이장단, 포두면) 사업설명회 시행 분기지점(변전소 및 분기점) 드론 영상촬영 □ '25.04~05 : 사업추진 보류 - 계통계획 변경 검토 대상 사업으로 11차 장기송변전계획 또는 장기 적정성 검토 후 추진 예정 □ '25.06 : 11차 장기 송변전계획에 따른 사업 연기 관련 용역 협의(6/5) - 내용 : 공기 연장 □ '25.07 : 제1회 기성 신청 관련 서류 검토 □ '25.08 : 제1회 기성 검사 및 선금 정산 시행 □ '25.09 : 사업 연기에 따른 전력영향평가 용역 관계자 회의 시행(9/2) - 내용 : 공기 연장 시행 전력영향평가 용역 변경예정공정표 제출 □ '25.10 : 전력영향평가 용역 변경예정공정표 승인 □ '25.11~ : 전력영향평가 용역 계약변경 시행 대기 [향후계획] □ 용역계약 변경 시 future_plan_redacted line □ 향후계획 [추진실적] □ '23.04 : 제 10차 장기 송변전설비계획 신규 반영 □ '24.11 : 전력영향평가 및 경과지설계 용역 착수 □ '24.12 : 지자체(고흥군) 대상 사업설명 시행 □ '25.01 : 지자체(영남면, 점암면) 대상 사업설명 시행 □ '25.02 : 지자체(영남면 이장단) 사업설명회 시행 기설 벌교-고흥T/L 분기개소 기술 검토 및 KLIS 등 기초자료 구축 □ '25.03 : 지자체(점암면 이장단, 포두면) 사업설명회 시행 분기지점(변전소 및 분기점) 드론 영상촬영 □ '25.04~05 : 사업추진 보류 - 계통계획 변경 검토 대상 사업으로 11차 장기송변전계획 또는 장기 적정성 검토 후 추진 예정 □ '25.06 : 11차 장기 송변전계획에 따른 사업 연기 관련 용역 협의(6/5) - 내용 : 공기 연장 □ '25.07 : 제1회 기성 신청 관련 서류 검토 □ '25.08 : 제1회 기성 검사 및 선금 정산 시행 □ '25.09 : 사업 연기에 따른 전력영향평가 용역 관계자 회의 시행(9/2) - 내용 : 공기 연장 시행 전력영향평가 용역 변경예정공정표 제출 □ '25.10 : 전력영향평가 용역 변경예정공정표 승인 □ '25.11~ : 전력영향평가 용역 계약변경 시행 대기 [향후계획] □ 용역계약 변경 시 attachment_count 0 source_detail_sha256 ea29b043a2e3b828447448f1e3dc08298bf055b88bc52c8924b5cbf8516b3e2c first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|232681|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_f179c1245462d09c
Sources EV-cbadcf7ce217fdddbabfa4dc Evidence SHA-256 ea29b043a2e3b828447448f1e3dc08298bf055b88bc52c8924b5cbf8516b3e2c 행 SHA-256 10608c515ee6c57e63c2dcaafe83ace12f0036cdb9a8700103650312ab9844df Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_ad124d1fc217eb5e stable_project_key prjtDef:232681:ESB project_definition 232681 first_region_code ESB manual_source_format false project_name 154kV 고흥#4분기T/L 건설사업 project_name_list 154kV 고흥#4분기T/L 건설사업 purpose 고흥지역 계통연계 project_region_detail 전남광주통합특별시 고흥군 project_period_raw 2024.06~2030.12 project_scale_raw ACSR/AW 410㎟×2B×4C×12.7KM, 철탑 32기 responsible_office_raw 중부건설본부/광주전남건설지사 equipment_type 가공송전 headquarters 중부건설본부 office 광주전남건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_ad124d1fc217eb5e
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_ad124d1fc217eb5e
Sources EV-2c51629988707fa47d37228d Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 069d6d8da885c5f6bdd6d89d6bb889b9a8f55930d55eeec911f7818ab631c124 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-a0b13cc44249bf25547a229d
Detailed source fields Original source field Published value or condition stable_project_id kproj_b8b63968b7a0682e stable_project_key prjtDef:233761:ESB project_definition 233761 first_region_code ESB manual_source_format false project_name 154kV 고흥-고옥 복도체화 건설사업 project_name_list 154kV 고흥-고옥 지중송전선로 복도체화 건설사업 purpose 고흥지역 과부하 해소 및 계통안정성 확보 project_region_detail 전남광주통합특별시 고흥군 project_period_raw 2023.05~2030.12 project_scale_raw XLPE 2,000 * 2C(D) * 5.35KM responsible_office_raw 중부건설본부/광주전남건설지사 equipment_type 지중송전 headquarters 중부건설본부 office 광주전남건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_b8b63968b7a0682e
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_b8b63968b7a0682e
Sources EV-a0b13cc44249bf25547a229d Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 cdb1254f8447b9177f56464c6f58a63d818cc475a38ba43641be8d7824225f72 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2029-09 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233761|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b669d3e72ecbf5a6
Sources EV-2bbc99a7af651f9653d8b5ba Evidence SHA-256 ea03ef51f7a315709f78c46c8b6145448273c40914b6cb39882701c4843c6c31 행 SHA-256 f344510c3d66bbf6fcd09357d6810adb52b22c532902a24bcbdd7a6ff50729c5 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2023-05 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233761|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b669d3e72ecbf5a6
Sources EV-2bbc99a7af651f9653d8b5ba Evidence SHA-256 ea03ef51f7a315709f78c46c8b6145448273c40914b6cb39882701c4843c6c31 행 SHA-256 f344510c3d66bbf6fcd09357d6810adb52b22c532902a24bcbdd7a6ff50729c5 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type design_completion date 2028-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233761|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b669d3e72ecbf5a6
Sources EV-2bbc99a7af651f9653d8b5ba Evidence SHA-256 ea03ef51f7a315709f78c46c8b6145448273c40914b6cb39882701c4843c6c31 행 SHA-256 f344510c3d66bbf6fcd09357d6810adb52b22c532902a24bcbdd7a6ff50729c5 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2030-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233761|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b669d3e72ecbf5a6
Sources EV-2bbc99a7af651f9653d8b5ba Evidence SHA-256 ea03ef51f7a315709f78c46c8b6145448273c40914b6cb39882701c4843c6c31 행 SHA-256 f344510c3d66bbf6fcd09357d6810adb52b22c532902a24bcbdd7a6ff50729c5 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2030-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233761|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b669d3e72ecbf5a6
Sources EV-2bbc99a7af651f9653d8b5ba Evidence SHA-256 ea03ef51f7a315709f78c46c8b6145448273c40914b6cb39882701c4843c6c31 행 SHA-256 f344510c3d66bbf6fcd09357d6810adb52b22c532902a24bcbdd7a6ff50729c5 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233761|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b669d3e72ecbf5a6
Sources EV-2bbc99a7af651f9653d8b5ba Evidence SHA-256 ea03ef51f7a315709f78c46c8b6145448273c40914b6cb39882701c4843c6c31 행 SHA-256 f344510c3d66bbf6fcd09357d6810adb52b22c532902a24bcbdd7a6ff50729c5 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type design_completion date 2029-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233761|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b669d3e72ecbf5a6
Sources EV-2bbc99a7af651f9653d8b5ba Evidence SHA-256 ea03ef51f7a315709f78c46c8b6145448273c40914b6cb39882701c4843c6c31 행 SHA-256 f344510c3d66bbf6fcd09357d6810adb52b22c532902a24bcbdd7a6ff50729c5 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-05 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|233761|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b669d3e72ecbf5a6
Sources EV-2bbc99a7af651f9653d8b5ba Evidence SHA-256 ea03ef51f7a315709f78c46c8b6145448273c40914b6cb39882701c4843c6c31 행 SHA-256 f344510c3d66bbf6fcd09357d6810adb52b22c532902a24bcbdd7a6ff50729c5 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_b669d3e72ecbf5a6 stable_project_id kproj_b8b63968b7a0682e source_key 202609|233761|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 고흥-고옥 지중송전선로 복도체화 건설사업 project_name_detail 154kV 고흥-고옥 복도체화 건설사업 region_summary_raw 전남광주통합특별시 고흥군등 1 지역 equipment_type_raw 지중송전 headquarters_raw 중부건설본부 office_raw 광주전남건설지사 section_fields 사업 규모 XLPE 2,000 * 2C(D) * 5.35KM 계획확정 제10차 장기송변전설비계획 반영(2023.05) 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: [진행경과] □ '23.05 : 제10차 장기 송변전설비계획 반영 □ '28.12 : 기본설계 완료 [향후계획] □ '29.06 : 실시설계 완료 □ '29.09 : 공사 착공 □ '30.12 : 공사 준공 future_plan_redacted □ 향후계획 [진행경과] □ '23.05 : 제10차 장기 송변전설비계획 반영 □ '28.12 : 기본설계 완료 [향후계획] □ '29.06 : 실시설계 완료 □ '29.09 : 공사 착공 □ '30.12 : 공사 준공 attachment_count 0 source_detail_sha256 ea03ef51f7a315709f78c46c8b6145448273c40914b6cb39882701c4843c6c31 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|233761|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b669d3e72ecbf5a6
Sources EV-2bbc99a7af651f9653d8b5ba Evidence SHA-256 ea03ef51f7a315709f78c46c8b6145448273c40914b6cb39882701c4843c6c31 행 SHA-256 f344510c3d66bbf6fcd09357d6810adb52b22c532902a24bcbdd7a6ff50729c5 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_b8b63968b7a0682e stable_project_key prjtDef:233761:ESB project_definition 233761 first_region_code ESB manual_source_format false project_name 154kV 고흥-고옥 복도체화 건설사업 project_name_list 154kV 고흥-고옥 지중송전선로 복도체화 건설사업 purpose 고흥지역 과부하 해소 및 계통안정성 확보 project_region_detail 전남광주통합특별시 고흥군 project_period_raw 2023.05~2030.12 project_scale_raw XLPE 2,000 * 2C(D) * 5.35KM responsible_office_raw 중부건설본부/광주전남건설지사 equipment_type 지중송전 headquarters 중부건설본부 office 광주전남건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_b8b63968b7a0682e
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_b8b63968b7a0682e
Sources EV-a0b13cc44249bf25547a229d Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 cdb1254f8447b9177f56464c6f58a63d818cc475a38ba43641be8d7824225f72 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-b42f435fe43f7e45977defd1
Detailed source fields Original source field Published value or condition stable_project_id kproj_585476fcf94d3cc6 stable_project_key prjtDef:234718:ESB project_definition 234718 first_region_code ESB manual_source_format false project_name 154kV 고흥-포두 전력구 건설사업 project_name_list 고흥지역 전기공급시설 전력구공사(고흥-포두) purpose 고흥지역 계통보강 project_region_detail 전남광주통합특별시 고흥군 project_period_raw 2023.07~2025.09 project_scale_raw 관로 530M, 전력구 46M responsible_office_raw 중부건설본부/광주전남건설지사 equipment_type 전력구 headquarters 중부건설본부 office 광주전남건설지사 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_585476fcf94d3cc6
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_585476fcf94d3cc6
Sources EV-b42f435fe43f7e45977defd1 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 ad7da4288ec6247d0ea97566fee54b08e0124fe75de14bb8f88a216281ab2a17 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2025-09 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234718|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6658297e6001ca01
Sources EV-2772f9ce1acbce958c88e72b Evidence SHA-256 7107434b8a640fb5a7a948ffc390dd82955a0ad457c56c494392185e29eb93c6 행 SHA-256 6686ae9ffdee3498a7bc7b58c77f2c3e55716270f1d6bc6a6248581a4e2a29bb Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2023-07 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234718|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6658297e6001ca01
Sources EV-2772f9ce1acbce958c88e72b Evidence SHA-256 7107434b8a640fb5a7a948ffc390dd82955a0ad457c56c494392185e29eb93c6 행 SHA-256 6686ae9ffdee3498a7bc7b58c77f2c3e55716270f1d6bc6a6248581a4e2a29bb Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_6658297e6001ca01 stable_project_id kproj_585476fcf94d3cc6 source_key 202609|234718|ESB basic_ym 202609 source_stage_raw 공사착수-사업완료전 project_name_list 고흥지역 전기공급시설 전력구공사(고흥-포두) project_name_detail 154kV 고흥-포두 전력구 건설사업 region_summary_raw 전남광주통합특별시 고흥군등 1 지역 equipment_type_raw 전력구 headquarters_raw 중부건설본부 office_raw 광주전남건설지사 section_fields 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 기본설계: 실시설계: 설계담당자: [redacted] 건설공사 개요 공사 착공: 공사 기간: 감독자: [redacted], 실적): 97, 11 □ ‘23.12 : 지하매설물 유관기관 협의 □ ‘24.02 : 기본설계 심의 □ ‘24.05 : 실시설계 심의 □ ‘24.07 : 실시설계 완료 및 계약 시행 □ ‘24.08 : 실시설계 완료 □ ‘24.10 : 공사계약 및 착수 □ ‘24.11 : 계약완료 □ ‘24.12 : 공사착공 □ ‘24.12 : 도로굴착심의 완료 □ ‘25.02 : 도로점용 허가 완료(1구간) □ ‘25.03 : 착공전안전회의 시행 □ ‘25.03 : 고흥변전소 구내 줄파기 시행 □ ‘25.04 : 도로점용 허가 지연으로 인한 공사중지(2구간) □ ‘25.05 : 공사 재개 □ ‘26.05 : 공사 중지(C/T부지 미확보에 따른 공사중지) future_plan_redacted □ 향후계획 □ ‘23.12 : 지하매설물 유관기관 협의 □ ‘24.02 : 기본설계 심의 □ ‘24.05 : 실시설계 심의 □ ‘24.07 : 실시설계 완료 및 계약 시행 □ ‘24.08 : 실시설계 완료 □ ‘24.10 : 공사계약 및 착수 □ ‘24.11 : 계약완료 □ ‘24.12 : 공사착공 □ ‘24.12 : 도로굴착심의 완료 □ ‘25.02 : 도로점용 허가 완료(1구간) □ ‘25.03 : 착공전안전회의 시행 □ ‘25.03 : 고흥변전소 구내 줄파기 시행 □ ‘25.04 : 도로점용 허가 지연으로 인한 공사중지(2구간) □ ‘25.05 : 공사 재개 □ ‘26.05 : 공사 중지(C/T부지 미확보에 따른 공사중지) attachment_count 0 source_detail_sha256 7107434b8a640fb5a7a948ffc390dd82955a0ad457c56c494392185e29eb93c6 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|234718|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6658297e6001ca01
Sources EV-2772f9ce1acbce958c88e72b Evidence SHA-256 7107434b8a640fb5a7a948ffc390dd82955a0ad457c56c494392185e29eb93c6 행 SHA-256 6686ae9ffdee3498a7bc7b58c77f2c3e55716270f1d6bc6a6248581a4e2a29bb Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_585476fcf94d3cc6 stable_project_key prjtDef:234718:ESB project_definition 234718 first_region_code ESB manual_source_format false project_name 154kV 고흥-포두 전력구 건설사업 project_name_list 고흥지역 전기공급시설 전력구공사(고흥-포두) purpose 고흥지역 계통보강 project_region_detail 전남광주통합특별시 고흥군 project_period_raw 2023.07~2025.09 project_scale_raw 관로 530M, 전력구 46M responsible_office_raw 중부건설본부/광주전남건설지사 equipment_type 전력구 headquarters 중부건설본부 office 광주전남건설지사 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_585476fcf94d3cc6
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_585476fcf94d3cc6
Sources EV-b42f435fe43f7e45977defd1 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 ad7da4288ec6247d0ea97566fee54b08e0124fe75de14bb8f88a216281ab2a17 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-b9cbbc9a84ccf461e640e048
Detailed source fields Original source field Published value or condition stable_project_id kproj_26a86d225382fc0c stable_project_key prjtDef:233713:ESB project_definition 233713 first_region_code ESB manual_source_format false project_name 154kV 고흥-포두 지중T/L 건설사업 project_name_list 154kV 고흥-포두 지중T/L 건설사업 purpose 고흥지역 계통보강 project_region_detail 전남광주통합특별시 고흥군 project_period_raw 2023.04~2026.12 project_scale_raw XLPE 2000㎟ 2C(D), 0.7KM responsible_office_raw 중부건설본부/광주전남건설지사 equipment_type 지중송전 headquarters 중부건설본부 office 광주전남건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_26a86d225382fc0c
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_26a86d225382fc0c
Sources EV-b9cbbc9a84ccf461e640e048 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 85c17d202fcfcbe5e90803f06910c79c0513b763265db530fda18c31fac6551c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type energization date 2026-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233713|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_a0bfd1c9556906a9
Sources EV-aaeb71fb990077435e0e1181 Evidence SHA-256 c50a66c33c8c78a7372231d57545e63276ef86809fcb061569c19f204ffc3d81 행 SHA-256 70262e18da67438dbc84144ae109398590b82676c3d2a8ca1bfbf499a0947a99 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2023-04 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233713|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_a0bfd1c9556906a9
Sources EV-aaeb71fb990077435e0e1181 Evidence SHA-256 c50a66c33c8c78a7372231d57545e63276ef86809fcb061569c19f204ffc3d81 행 SHA-256 70262e18da67438dbc84144ae109398590b82676c3d2a8ca1bfbf499a0947a99 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type design_completion date 2026-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233713|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_a0bfd1c9556906a9
Sources EV-aaeb71fb990077435e0e1181 Evidence SHA-256 c50a66c33c8c78a7372231d57545e63276ef86809fcb061569c19f204ffc3d81 행 SHA-256 70262e18da67438dbc84144ae109398590b82676c3d2a8ca1bfbf499a0947a99 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type design_completion date 2025-11 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233713|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_a0bfd1c9556906a9
Sources EV-aaeb71fb990077435e0e1181 Evidence SHA-256 c50a66c33c8c78a7372231d57545e63276ef86809fcb061569c19f204ffc3d81 행 SHA-256 70262e18da67438dbc84144ae109398590b82676c3d2a8ca1bfbf499a0947a99 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2026-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233713|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_a0bfd1c9556906a9
Sources EV-aaeb71fb990077435e0e1181 Evidence SHA-256 c50a66c33c8c78a7372231d57545e63276ef86809fcb061569c19f204ffc3d81 행 SHA-256 70262e18da67438dbc84144ae109398590b82676c3d2a8ca1bfbf499a0947a99 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2026-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233713|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_a0bfd1c9556906a9
Sources EV-aaeb71fb990077435e0e1181 Evidence SHA-256 c50a66c33c8c78a7372231d57545e63276ef86809fcb061569c19f204ffc3d81 행 SHA-256 70262e18da67438dbc84144ae109398590b82676c3d2a8ca1bfbf499a0947a99 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_a0bfd1c9556906a9 stable_project_id kproj_26a86d225382fc0c source_key 202609|233713|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 고흥-포두 지중T/L 건설사업 project_name_detail 154kV 고흥-포두 지중T/L 건설사업 region_summary_raw 전남광주통합특별시 고흥군등 1 지역 equipment_type_raw 지중송전 headquarters_raw 중부건설본부 office_raw 광주전남건설지사 section_fields 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: ○ '25.11 : 기본설계 완료 ○ '26.04 : 실시설계 완료 ○ '26.06 : 착공 ○ '26.12 : 가압 future_plan_redacted □ 향후계획 ○ '25.11 : 기본설계 완료 ○ '26.04 : 실시설계 완료 ○ '26.06 : 착공 ○ '26.12 : 가압 attachment_count 0 source_detail_sha256 c50a66c33c8c78a7372231d57545e63276ef86809fcb061569c19f204ffc3d81 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|233713|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_a0bfd1c9556906a9
Sources EV-aaeb71fb990077435e0e1181 Evidence SHA-256 c50a66c33c8c78a7372231d57545e63276ef86809fcb061569c19f204ffc3d81 행 SHA-256 70262e18da67438dbc84144ae109398590b82676c3d2a8ca1bfbf499a0947a99 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_26a86d225382fc0c stable_project_key prjtDef:233713:ESB project_definition 233713 first_region_code ESB manual_source_format false project_name 154kV 고흥-포두 지중T/L 건설사업 project_name_list 154kV 고흥-포두 지중T/L 건설사업 purpose 고흥지역 계통보강 project_region_detail 전남광주통합특별시 고흥군 project_period_raw 2023.04~2026.12 project_scale_raw XLPE 2000㎟ 2C(D), 0.7KM responsible_office_raw 중부건설본부/광주전남건설지사 equipment_type 지중송전 headquarters 중부건설본부 office 광주전남건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_26a86d225382fc0c
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_26a86d225382fc0c
Sources EV-b9cbbc9a84ccf461e640e048 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 85c17d202fcfcbe5e90803f06910c79c0513b763265db530fda18c31fac6551c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-c54b13ca411999958d4b49db
Detailed source fields Original source field Published value or condition stable_project_id kproj_288ea2091f47e097 stable_project_key prjtDef:232444:ESB project_definition 232444 first_region_code ESB manual_source_format false project_name 154kV 고흥-포두T/L 건설사업 project_name_list 154kV 고흥-포두T/L 건설사업 purpose 고흥S/S 신재생E 접속대기 해소 project_region_detail 전남광주통합특별시 고흥군 project_period_raw 2018.05~2027.03 project_scale_raw ACSR 410㎟×2B×2C, 선로길이 : 10.4KM, 철탑 : 25기 responsible_office_raw 중부건설본부/광주전남건설지사 equipment_type 가공송전 headquarters 중부건설본부 office 광주전남건설지사 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_288ea2091f47e097
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_288ea2091f47e097
Sources EV-c54b13ca411999958d4b49db Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 d997e3454bda5eb5913be766eaeadb537f47c2cdd17cdbcdce883ddafaf2881a Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2027-03 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232444|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_3bc73ca0dbeb72f5
Sources EV-e434c13dcddcb8eee0df530d Evidence SHA-256 6fac557dbfdebc33430022e9e69573667ca1e1268fa605e64648a3149101ceb4 행 SHA-256 634938c8f6be5db9a64a83b708c78538e313f1d0e460124c89d249c66920dbd6 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2018-05 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232444|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_3bc73ca0dbeb72f5
Sources EV-e434c13dcddcb8eee0df530d Evidence SHA-256 6fac557dbfdebc33430022e9e69573667ca1e1268fa605e64648a3149101ceb4 행 SHA-256 634938c8f6be5db9a64a83b708c78538e313f1d0e460124c89d249c66920dbd6 Observations for this power asset History for this project Previous Next