POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 9items · current page 1–9 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 고흥-포두 지중T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-b9cbbc9a84ccf461e640e048
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_26a86d225382fc0c
stable_project_keyprjtDef:233713:ESB
project_definition233713
first_region_codeESB
manual_source_formatfalse
project_name154kV 고흥-포두 지중T/L 건설사업
project_name_list154kV 고흥-포두 지중T/L 건설사업
purpose고흥지역 계통보강
project_region_detail전남광주통합특별시 고흥군
project_period_raw2023.04~2026.12
project_scale_rawXLPE 2000㎟ 2C(D), 0.7KM
responsible_office_raw중부건설본부/광주전남건설지사
equipment_type지중송전
headquarters중부건설본부
office광주전남건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_a0bfd1c9556906a9
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_26a86d225382fc0c

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_26a86d225382fc0c

Sources EV-b9cbbc9a84ccf461e640e048
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 85c17d202fcfcbe5e90803f06910c79c0513b763265db530fda18c31fac6551c
Source schedule candidates · KOR · kepco_planned

154kV 고흥-포두 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeenergization
date2026-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233713|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a0bfd1c9556906a9

Sources EV-aaeb71fb990077435e0e1181
Evidence SHA-256 c50a66c33c8c78a7372231d57545e63276ef86809fcb061569c19f204ffc3d81
행 SHA-256 70262e18da67438dbc84144ae109398590b82676c3d2a8ca1bfbf499a0947a99
Source schedule candidates · KOR · kepco_planned

154kV 고흥-포두 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2023-04
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|233713|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a0bfd1c9556906a9

Sources EV-aaeb71fb990077435e0e1181
Evidence SHA-256 c50a66c33c8c78a7372231d57545e63276ef86809fcb061569c19f204ffc3d81
행 SHA-256 70262e18da67438dbc84144ae109398590b82676c3d2a8ca1bfbf499a0947a99
Source schedule candidates · KOR · kepco_planned

154kV 고흥-포두 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_completion
date2026-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233713|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a0bfd1c9556906a9

Sources EV-aaeb71fb990077435e0e1181
Evidence SHA-256 c50a66c33c8c78a7372231d57545e63276ef86809fcb061569c19f204ffc3d81
행 SHA-256 70262e18da67438dbc84144ae109398590b82676c3d2a8ca1bfbf499a0947a99
Source schedule candidates · KOR · kepco_planned

154kV 고흥-포두 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_completion
date2025-11
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233713|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a0bfd1c9556906a9

Sources EV-aaeb71fb990077435e0e1181
Evidence SHA-256 c50a66c33c8c78a7372231d57545e63276ef86809fcb061569c19f204ffc3d81
행 SHA-256 70262e18da67438dbc84144ae109398590b82676c3d2a8ca1bfbf499a0947a99
Source schedule candidates · KOR · kepco_planned

154kV 고흥-포두 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2026-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233713|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a0bfd1c9556906a9

Sources EV-aaeb71fb990077435e0e1181
Evidence SHA-256 c50a66c33c8c78a7372231d57545e63276ef86809fcb061569c19f204ffc3d81
행 SHA-256 70262e18da67438dbc84144ae109398590b82676c3d2a8ca1bfbf499a0947a99
Source schedule candidates · KOR · kepco_planned

154kV 고흥-포두 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2026-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|233713|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a0bfd1c9556906a9

Sources EV-aaeb71fb990077435e0e1181
Evidence SHA-256 c50a66c33c8c78a7372231d57545e63276ef86809fcb061569c19f204ffc3d81
행 SHA-256 70262e18da67438dbc84144ae109398590b82676c3d2a8ca1bfbf499a0947a99
Source snapshots by date · KOR · kepco_planned

154kV 고흥-포두 지중T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_a0bfd1c9556906a9
stable_project_idkproj_26a86d225382fc0c
source_key202609|233713|ESB
basic_ym202609
source_stage_raw계획확정-사업승인전
project_name_list154kV 고흥-포두 지중T/L 건설사업
project_name_detail154kV 고흥-포두 지중T/L 건설사업
region_summary_raw전남광주통합특별시 고흥군등 1 지역
equipment_type_raw지중송전
headquarters_raw중부건설본부
office_raw광주전남건설지사
section_fields
Project purpose
  • 고흥지역 계통보강
Project region
  • 전남광주통합특별시 고흥군
Project period
  • 2023.04~2026.12
사업 규모
  • XLPE 2000㎟ 2C(D), 0.7KM
담당 사업소
  • 중부건설본부/광주전남건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
○ '25.11 : 기본설계 완료 ○ '26.04 : 실시설계 완료 ○ '26.06 : 착공 ○ '26.12 : 가압
future_plan_redacted□ 향후계획 ○ '25.11 : 기본설계 완료 ○ '26.04 : 실시설계 완료 ○ '26.06 : 착공 ○ '26.12 : 가압
attachment_count0
source_detail_sha256c50a66c33c8c78a7372231d57545e63276ef86809fcb061569c19f204ffc3d81
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|233713|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a0bfd1c9556906a9

Sources EV-aaeb71fb990077435e0e1181
Evidence SHA-256 c50a66c33c8c78a7372231d57545e63276ef86809fcb061569c19f204ffc3d81
행 SHA-256 70262e18da67438dbc84144ae109398590b82676c3d2a8ca1bfbf499a0947a99
Source snapshots by date · KOR · kepco_planned

154kV 고흥-포두 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_26a86d225382fc0c
stable_project_keyprjtDef:233713:ESB
project_definition233713
first_region_codeESB
manual_source_formatfalse
project_name154kV 고흥-포두 지중T/L 건설사업
project_name_list154kV 고흥-포두 지중T/L 건설사업
purpose고흥지역 계통보강
project_region_detail전남광주통합특별시 고흥군
project_period_raw2023.04~2026.12
project_scale_rawXLPE 2000㎟ 2C(D), 0.7KM
responsible_office_raw중부건설본부/광주전남건설지사
equipment_type지중송전
headquarters중부건설본부
office광주전남건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_a0bfd1c9556906a9
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_26a86d225382fc0c

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_26a86d225382fc0c

Sources EV-b9cbbc9a84ccf461e640e048
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 85c17d202fcfcbe5e90803f06910c79c0513b763265db530fda18c31fac6551c

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel