POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 5items · current page 1–5 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 고창-신고창 전력구 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-dbdb1f4aa2a8846ed0e82772
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_93fc352db78d8b02
stable_project_keyprjtDef:234830:ESB
project_definition234830
first_region_codeESB
manual_source_formatfalse
project_name154kV 고창-신고창 전력구 건설사업
project_name_list154kV 고창-신고창 전력구 건설사업
purpose고창지역 신재생에너지 연계
project_region_detail전북특별자치도 고창군
project_period_raw2026.02~2031.10
project_scale_raw154KV 송전 2회선 10KM
responsible_office_raw중부건설본부/전북건설지사
equipment_type전력구
headquarters중부건설본부
office전북건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_d29e6ab96a9dc8d0
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_93fc352db78d8b02

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_93fc352db78d8b02

Sources EV-dbdb1f4aa2a8846ed0e82772
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 b68f787fef46622c84c5015e854b32a915609143c59d7b266122a6b9464887d6
Source schedule candidates · KOR · kepco_planned

154kV 고창-신고창 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2031-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|234830|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d29e6ab96a9dc8d0

Sources EV-426d070bcb66a1912955ac2e
Evidence SHA-256 bf7c62cd859a559ccaffb29f1e77f7658bb79ddd1460939238ae1539b628105b
행 SHA-256 aebc7071e76f8d6ebd08c900a7c2e48b471a32ced33d58391f961f423aad89f8
Source schedule candidates · KOR · kepco_planned

154kV 고창-신고창 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2026-02
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|234830|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d29e6ab96a9dc8d0

Sources EV-426d070bcb66a1912955ac2e
Evidence SHA-256 bf7c62cd859a559ccaffb29f1e77f7658bb79ddd1460939238ae1539b628105b
행 SHA-256 aebc7071e76f8d6ebd08c900a7c2e48b471a32ced33d58391f961f423aad89f8
Source snapshots by date · KOR · kepco_planned

154kV 고창-신고창 전력구 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_d29e6ab96a9dc8d0
stable_project_idkproj_93fc352db78d8b02
source_key202609|234830|ESB
basic_ym202609
source_stage_raw계획확정-사업승인전
project_name_list154kV 고창-신고창 전력구 건설사업
project_name_detail154kV 고창-신고창 전력구 건설사업
region_summary_raw전북특별자치도 고창군등 1 지역
equipment_type_raw전력구
headquarters_raw중부건설본부
office_raw전북건설지사
section_fields
Project purpose
  • 고창지역 신재생에너지 연계
Project region
  • 전북특별자치도 고창군
Project period
  • 2026.02~2031.10
사업 규모
  • 154KV 송전 2회선 10KM
담당 사업소
  • 중부건설본부/전북건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
future_plan_redacted□ 향후계획
attachment_count0
source_detail_sha256bf7c62cd859a559ccaffb29f1e77f7658bb79ddd1460939238ae1539b628105b
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|234830|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d29e6ab96a9dc8d0

Sources EV-426d070bcb66a1912955ac2e
Evidence SHA-256 bf7c62cd859a559ccaffb29f1e77f7658bb79ddd1460939238ae1539b628105b
행 SHA-256 aebc7071e76f8d6ebd08c900a7c2e48b471a32ced33d58391f961f423aad89f8
Source snapshots by date · KOR · kepco_planned

154kV 고창-신고창 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_93fc352db78d8b02
stable_project_keyprjtDef:234830:ESB
project_definition234830
first_region_codeESB
manual_source_formatfalse
project_name154kV 고창-신고창 전력구 건설사업
project_name_list154kV 고창-신고창 전력구 건설사업
purpose고창지역 신재생에너지 연계
project_region_detail전북특별자치도 고창군
project_period_raw2026.02~2031.10
project_scale_raw154KV 송전 2회선 10KM
responsible_office_raw중부건설본부/전북건설지사
equipment_type전력구
headquarters중부건설본부
office전북건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_d29e6ab96a9dc8d0
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_93fc352db78d8b02

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_93fc352db78d8b02

Sources EV-dbdb1f4aa2a8846ed0e82772
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 b68f787fef46622c84c5015e854b32a915609143c59d7b266122a6b9464887d6

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel