POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 5items · current page 1–5 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 고흥-포두 전력구 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-b42f435fe43f7e45977defd1
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_585476fcf94d3cc6
stable_project_keyprjtDef:234718:ESB
project_definition234718
first_region_codeESB
manual_source_formatfalse
project_name154kV 고흥-포두 전력구 건설사업
project_name_list고흥지역 전기공급시설 전력구공사(고흥-포두)
purpose고흥지역 계통보강
project_region_detail전남광주통합특별시 고흥군
project_period_raw2023.07~2025.09
project_scale_raw관로 530M, 전력구 46M
responsible_office_raw중부건설본부/광주전남건설지사
equipment_type전력구
headquarters중부건설본부
office광주전남건설지사
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_6658297e6001ca01
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_585476fcf94d3cc6

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_585476fcf94d3cc6

Sources EV-b42f435fe43f7e45977defd1
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 ad7da4288ec6247d0ea97566fee54b08e0124fe75de14bb8f88a216281ab2a17
Source schedule candidates · KOR · kepco_planned

154kV 고흥-포두 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2025-09
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|234718|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6658297e6001ca01

Sources EV-2772f9ce1acbce958c88e72b
Evidence SHA-256 7107434b8a640fb5a7a948ffc390dd82955a0ad457c56c494392185e29eb93c6
행 SHA-256 6686ae9ffdee3498a7bc7b58c77f2c3e55716270f1d6bc6a6248581a4e2a29bb
Source schedule candidates · KOR · kepco_planned

154kV 고흥-포두 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2023-07
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|234718|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6658297e6001ca01

Sources EV-2772f9ce1acbce958c88e72b
Evidence SHA-256 7107434b8a640fb5a7a948ffc390dd82955a0ad457c56c494392185e29eb93c6
행 SHA-256 6686ae9ffdee3498a7bc7b58c77f2c3e55716270f1d6bc6a6248581a4e2a29bb
Source snapshots by date · KOR · kepco_planned

154kV 고흥-포두 전력구 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_6658297e6001ca01
stable_project_idkproj_585476fcf94d3cc6
source_key202609|234718|ESB
basic_ym202609
source_stage_raw공사착수-사업완료전
project_name_list고흥지역 전기공급시설 전력구공사(고흥-포두)
project_name_detail154kV 고흥-포두 전력구 건설사업
region_summary_raw전남광주통합특별시 고흥군등 1 지역
equipment_type_raw전력구
headquarters_raw중부건설본부
office_raw광주전남건설지사
section_fields
Project purpose
  • 고흥지역 계통보강
Project region
  • 전남광주통합특별시 고흥군
Project period
  • 2023.07~2025.09
사업 규모
  • 관로 530M, 전력구 46M
담당 사업소
  • 중부건설본부/광주전남건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 실시설계: 설계담당자: [redacted]
건설공사 개요
  • 공사 착공: 공사 기간: 감독자: [redacted], 실적): 97, 11
□ ‘23.12 : 지하매설물 유관기관 협의 □ ‘24.02 : 기본설계 심의 □ ‘24.05 : 실시설계 심의 □ ‘24.07 : 실시설계 완료 및 계약 시행 □ ‘24.08 : 실시설계 완료 □ ‘24.10 : 공사계약 및 착수 □ ‘24.11 : 계약완료 □ ‘24.12 : 공사착공 □ ‘24.12 : 도로굴착심의 완료 □ ‘25.02 : 도로점용 허가 완료(1구간) □ ‘25.03 : 착공전안전회의 시행 □ ‘25.03 : 고흥변전소 구내 줄파기 시행 □ ‘25.04 : 도로점용 허가 지연으로 인한 공사중지(2구간) □ ‘25.05 : 공사 재개 □ ‘26.05 : 공사 중지(C/T부지 미확보에 따른 공사중지)
future_plan_redacted□ 향후계획 □ ‘23.12 : 지하매설물 유관기관 협의 □ ‘24.02 : 기본설계 심의 □ ‘24.05 : 실시설계 심의 □ ‘24.07 : 실시설계 완료 및 계약 시행 □ ‘24.08 : 실시설계 완료 □ ‘24.10 : 공사계약 및 착수 □ ‘24.11 : 계약완료 □ ‘24.12 : 공사착공 □ ‘24.12 : 도로굴착심의 완료 □ ‘25.02 : 도로점용 허가 완료(1구간) □ ‘25.03 : 착공전안전회의 시행 □ ‘25.03 : 고흥변전소 구내 줄파기 시행 □ ‘25.04 : 도로점용 허가 지연으로 인한 공사중지(2구간) □ ‘25.05 : 공사 재개 □ ‘26.05 : 공사 중지(C/T부지 미확보에 따른 공사중지)
attachment_count0
source_detail_sha2567107434b8a640fb5a7a948ffc390dd82955a0ad457c56c494392185e29eb93c6
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|234718|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6658297e6001ca01

Sources EV-2772f9ce1acbce958c88e72b
Evidence SHA-256 7107434b8a640fb5a7a948ffc390dd82955a0ad457c56c494392185e29eb93c6
행 SHA-256 6686ae9ffdee3498a7bc7b58c77f2c3e55716270f1d6bc6a6248581a4e2a29bb
Source snapshots by date · KOR · kepco_planned

154kV 고흥-포두 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_585476fcf94d3cc6
stable_project_keyprjtDef:234718:ESB
project_definition234718
first_region_codeESB
manual_source_formatfalse
project_name154kV 고흥-포두 전력구 건설사업
project_name_list고흥지역 전기공급시설 전력구공사(고흥-포두)
purpose고흥지역 계통보강
project_region_detail전남광주통합특별시 고흥군
project_period_raw2023.07~2025.09
project_scale_raw관로 530M, 전력구 46M
responsible_office_raw중부건설본부/광주전남건설지사
equipment_type전력구
headquarters중부건설본부
office광주전남건설지사
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_6658297e6001ca01
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_585476fcf94d3cc6

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_585476fcf94d3cc6

Sources EV-b42f435fe43f7e45977defd1
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 ad7da4288ec6247d0ea97566fee54b08e0124fe75de14bb8f88a216281ab2a17

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel