POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 9items · current page 1–9 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 고천S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-8ae4db09d17dc12d8c5133f7
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_7cb4750e5bda94ec
stable_project_keyprjtDef:231660:ESB
project_definition231660
first_region_codeESB
manual_source_formatfalse
project_name154kV 고천S/S 건설사업
project_name_list154kV 고천변전소 건설사업
purpose인근변전소 부하분담 및 고천지구 등 신규부하 공급
project_region_detail경기도 의왕시
project_period_raw2023.05~2029.04
project_scale_raw154KV M.TR 60MVA× 2BANK
responsible_office_raw경인건설본부/경기건설지사
equipment_type변전
headquarters경인건설본부
office경기건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_442a3cb51f627416
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_7cb4750e5bda94ec

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_7cb4750e5bda94ec

Sources EV-8ae4db09d17dc12d8c5133f7
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 0a150c052bb0d6f7c7e4f1cfc29c364d4ad05653a9cbdcb35f967d0788181298
Source schedule candidates · KOR · kepco_planned

154kV 고천S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2023-05
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231660|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_442a3cb51f627416

Sources EV-e67334ed5fe19b5ccbabfd3a
Evidence SHA-256 a59f8efac766bad358dab3bf59c4c6b0be3c75fb7d27984c9ae1b0fcb1a1138e
행 SHA-256 b5546af95750562146d59a41a3e3596a7c6beda17b18b9f838170ba63a5b11a8
Source schedule candidates · KOR · kepco_planned

154kV 고천S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2024-11
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231660|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_442a3cb51f627416

Sources EV-e67334ed5fe19b5ccbabfd3a
Evidence SHA-256 a59f8efac766bad358dab3bf59c4c6b0be3c75fb7d27984c9ae1b0fcb1a1138e
행 SHA-256 b5546af95750562146d59a41a3e3596a7c6beda17b18b9f838170ba63a5b11a8
Source schedule candidates · KOR · kepco_planned

154kV 고천S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeenergization
date2030-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231660|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_442a3cb51f627416

Sources EV-e67334ed5fe19b5ccbabfd3a
Evidence SHA-256 a59f8efac766bad358dab3bf59c4c6b0be3c75fb7d27984c9ae1b0fcb1a1138e
행 SHA-256 b5546af95750562146d59a41a3e3596a7c6beda17b18b9f838170ba63a5b11a8
Source schedule candidates · KOR · kepco_planned

154kV 고천S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2029-04
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231660|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_442a3cb51f627416

Sources EV-e67334ed5fe19b5ccbabfd3a
Evidence SHA-256 a59f8efac766bad358dab3bf59c4c6b0be3c75fb7d27984c9ae1b0fcb1a1138e
행 SHA-256 b5546af95750562146d59a41a3e3596a7c6beda17b18b9f838170ba63a5b11a8
Source schedule candidates · KOR · kepco_planned

154kV 고천S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2025-02
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231660|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_442a3cb51f627416

Sources EV-e67334ed5fe19b5ccbabfd3a
Evidence SHA-256 a59f8efac766bad358dab3bf59c4c6b0be3c75fb7d27984c9ae1b0fcb1a1138e
행 SHA-256 b5546af95750562146d59a41a3e3596a7c6beda17b18b9f838170ba63a5b11a8
Source schedule candidates · KOR · kepco_planned

154kV 고천S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2030-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231660|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_442a3cb51f627416

Sources EV-e67334ed5fe19b5ccbabfd3a
Evidence SHA-256 a59f8efac766bad358dab3bf59c4c6b0be3c75fb7d27984c9ae1b0fcb1a1138e
행 SHA-256 b5546af95750562146d59a41a3e3596a7c6beda17b18b9f838170ba63a5b11a8
Source snapshots by date · KOR · kepco_planned

154kV 고천S/S 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_442a3cb51f627416
stable_project_idkproj_7cb4750e5bda94ec
source_key202609|231660|ESB
basic_ym202609
source_stage_raw계획확정-사업승인전
project_name_list154kV 고천변전소 건설사업
project_name_detail154kV 고천S/S 건설사업
region_summary_raw경기도 의왕시등 1 지역
equipment_type_raw변전
headquarters_raw경인건설본부
office_raw경기건설지사
section_fields
Project purpose
  • 인근변전소 부하분담 및 고천지구 등 신규부하 공급
Project region
  • 경기도 의왕시
Project period
  • 2023.05~2029.04
사업 규모
  • 154KV M.TR 60MVA× 2BANK
담당 사업소
  • 경인건설본부/경기건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 2025.02 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
[진행경과] □ ‘23. 5 : 제 10차 장기 송변전설비계획 반영 □ ‘23. 8 : 입지선정실무위원회 구성 □ ‘24. 2 : 입지선정실무위원회 결과보고 □ ‘24.11 : 전력영향평가 용역 발주 □ ‘25. 2 : 전력영향평가 용역 착수 □ ‘25. 6 : 대관협의(의왕시청) □ ‘25. 9 : 대관협의(수원시청) □ ‘26. 3 : 의왕시 사업설명회 완료 (7개동) [향후계획] □ ‘28. 5 : 용지매수 완료 □ ‘29. 5 : 토건공사 착공 □ ‘29. 8 : 변전공사 착공 □ ‘30.12 : 토건공사 준공 □ ‘31. 4 : 준공 및 가압
future_plan_redacted□ 향후계획 [진행경과] □ ‘23. 5 : 제 10차 장기 송변전설비계획 반영 □ ‘23. 8 : 입지선정실무위원회 구성 □ ‘24. 2 : 입지선정실무위원회 결과보고 □ ‘24.11 : 전력영향평가 용역 발주 □ ‘25. 2 : 전력영향평가 용역 착수 □ ‘25. 6 : 대관협의(의왕시청) □ ‘25. 9 : 대관협의(수원시청) □ ‘26. 3 : 의왕시 사업설명회 완료 (7개동) [향후계획] □ ‘28. 5 : 용지매수 완료 □ ‘29. 5 : 토건공사 착공 □ ‘29. 8 : 변전공사 착공 □ ‘30.12 : 토건공사 준공 □ ‘31. 4 : 준공 및 가압
attachment_count0
source_detail_sha256a59f8efac766bad358dab3bf59c4c6b0be3c75fb7d27984c9ae1b0fcb1a1138e
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231660|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_442a3cb51f627416

Sources EV-e67334ed5fe19b5ccbabfd3a
Evidence SHA-256 a59f8efac766bad358dab3bf59c4c6b0be3c75fb7d27984c9ae1b0fcb1a1138e
행 SHA-256 b5546af95750562146d59a41a3e3596a7c6beda17b18b9f838170ba63a5b11a8
Source snapshots by date · KOR · kepco_planned

154kV 고천S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_7cb4750e5bda94ec
stable_project_keyprjtDef:231660:ESB
project_definition231660
first_region_codeESB
manual_source_formatfalse
project_name154kV 고천S/S 건설사업
project_name_list154kV 고천변전소 건설사업
purpose인근변전소 부하분담 및 고천지구 등 신규부하 공급
project_region_detail경기도 의왕시
project_period_raw2023.05~2029.04
project_scale_raw154KV M.TR 60MVA× 2BANK
responsible_office_raw경인건설본부/경기건설지사
equipment_type변전
headquarters경인건설본부
office경기건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_442a3cb51f627416
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_7cb4750e5bda94ec

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_7cb4750e5bda94ec

Sources EV-8ae4db09d17dc12d8c5133f7
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 0a150c052bb0d6f7c7e4f1cfc29c364d4ad05653a9cbdcb35f967d0788181298

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel