Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 5items · current page 1–5 · Source records, not unique facilities.
Power assets and projects · KOR · kepco_planned
154kV 고흥#4분기 지중T/L 건설사업
Power project · Construction project
Metric or condition
Source value
Basis, scope and stage
project_name_voltage_label
154 kV
literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-5f469e4b776f7dfa880b3444
Sources EV-c7f219c0a139a16b91d870cd Evidence SHA-256 f7c75ccc4182686f32d2a183971808c8bc6ea33d3137857951893cf5da4e44a6 행 SHA-256 c90222136f859f92fd106902218aac64a88abb160c0cb1dd950537e27dcf1412Source snapshots by date · KOR · kepco_planned
154kV 고흥#4분기 지중T/L 건설사업
Project · historical source snapshot
Metric or condition
Source value
Basis, scope and stage
Detailed source fields
Original source field
Published value or condition
snapshot_id
ksnap_eb71ef4e5d92f83d
stable_project_id
kproj_02fb07376c507e8d
source_key
202609|233779|ESB
basic_ym
202609
source_stage_raw
계획확정-사업승인전
project_name_list
154kV 고흥#4분기 지중T/L 건설사업
project_name_detail
154kV 고흥#4분기 지중T/L 건설사업
region_summary_raw
전남광주통합특별시 고흥군등 1 지역
equipment_type_raw
지중송전
headquarters_raw
중부건설본부
office_raw
광주전남건설지사
section_fields
Project purpose
고흥지역 재생E 계통연계 보강
Project region
전남광주통합특별시 고흥군
Project period
2029.01~2030.12
사업 규모
154KV XLPE 2000㎟, 4C(D)-1.2KM
담당 사업소
중부건설본부/광주전남건설지사
계획확정
입지선정
전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
Sources EV-c7f219c0a139a16b91d870cd Evidence SHA-256 f7c75ccc4182686f32d2a183971808c8bc6ea33d3137857951893cf5da4e44a6 행 SHA-256 c90222136f859f92fd106902218aac64a88abb160c0cb1dd950537e27dcf1412Source snapshots by date · KOR · kepco_planned