POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 13items · current page 1–13 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-ed3352668f4e56898084e66b
Detailed source fields Original source field Published value or condition stable_project_id kproj_878b1feca543753e stable_project_key prjtDef:231644:ESB project_definition 231644 first_region_code ESB manual_source_format false project_name 154kV 고흥#4S/S 건설사업 project_name_list 154kV 고흥#4S/S 건설사업 purpose 고흥지역 재생E 계통연계 project_region_detail 전남광주통합특별시 고흥군 project_period_raw 2023.05~2030.12 project_scale_raw 154KV M.TR 2BANK(최종5BANK) responsible_office_raw 중부건설본부/광주전남건설지사 equipment_type 변전 headquarters 중부건설본부 office 광주전남건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_878b1feca543753e
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_878b1feca543753e
Sources EV-ed3352668f4e56898084e66b Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 edffacd5490427f71e5dca43aff1e84de332be8b92534f27bf870aef34463f38 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231644|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_69c48b46ddf7b29c
Sources EV-76fe8273c1cfc92e760efa60 Evidence SHA-256 93797f462517027503bf134f67cae61314c9cbe180c23a1dce1961685d736680 행 SHA-256 ddc865b7db3a109c2ee768b9dcefe381933435bba26cec06cd08bdf45faa8104 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231644|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_69c48b46ddf7b29c
Sources EV-76fe8273c1cfc92e760efa60 Evidence SHA-256 93797f462517027503bf134f67cae61314c9cbe180c23a1dce1961685d736680 행 SHA-256 ddc865b7db3a109c2ee768b9dcefe381933435bba26cec06cd08bdf45faa8104 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-02 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231644|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_69c48b46ddf7b29c
Sources EV-76fe8273c1cfc92e760efa60 Evidence SHA-256 93797f462517027503bf134f67cae61314c9cbe180c23a1dce1961685d736680 행 SHA-256 ddc865b7db3a109c2ee768b9dcefe381933435bba26cec06cd08bdf45faa8104 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-11 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231644|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_69c48b46ddf7b29c
Sources EV-76fe8273c1cfc92e760efa60 Evidence SHA-256 93797f462517027503bf134f67cae61314c9cbe180c23a1dce1961685d736680 행 SHA-256 ddc865b7db3a109c2ee768b9dcefe381933435bba26cec06cd08bdf45faa8104 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type plan_change date 2025-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231644|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_69c48b46ddf7b29c
Sources EV-76fe8273c1cfc92e760efa60 Evidence SHA-256 93797f462517027503bf134f67cae61314c9cbe180c23a1dce1961685d736680 행 SHA-256 ddc865b7db3a109c2ee768b9dcefe381933435bba26cec06cd08bdf45faa8104 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231644|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_69c48b46ddf7b29c
Sources EV-76fe8273c1cfc92e760efa60 Evidence SHA-256 93797f462517027503bf134f67cae61314c9cbe180c23a1dce1961685d736680 행 SHA-256 ddc865b7db3a109c2ee768b9dcefe381933435bba26cec06cd08bdf45faa8104 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-09 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231644|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_69c48b46ddf7b29c
Sources EV-76fe8273c1cfc92e760efa60 Evidence SHA-256 93797f462517027503bf134f67cae61314c9cbe180c23a1dce1961685d736680 행 SHA-256 ddc865b7db3a109c2ee768b9dcefe381933435bba26cec06cd08bdf45faa8104 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type plan_change date 2038-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231644|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_69c48b46ddf7b29c
Sources EV-76fe8273c1cfc92e760efa60 Evidence SHA-256 93797f462517027503bf134f67cae61314c9cbe180c23a1dce1961685d736680 행 SHA-256 ddc865b7db3a109c2ee768b9dcefe381933435bba26cec06cd08bdf45faa8104 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2030-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231644|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_69c48b46ddf7b29c
Sources EV-76fe8273c1cfc92e760efa60 Evidence SHA-256 93797f462517027503bf134f67cae61314c9cbe180c23a1dce1961685d736680 행 SHA-256 ddc865b7db3a109c2ee768b9dcefe381933435bba26cec06cd08bdf45faa8104 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2023-05 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231644|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_69c48b46ddf7b29c
Sources EV-76fe8273c1cfc92e760efa60 Evidence SHA-256 93797f462517027503bf134f67cae61314c9cbe180c23a1dce1961685d736680 행 SHA-256 ddc865b7db3a109c2ee768b9dcefe381933435bba26cec06cd08bdf45faa8104 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_69c48b46ddf7b29c stable_project_id kproj_878b1feca543753e source_key 202609|231644|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 고흥#4S/S 건설사업 project_name_detail 154kV 고흥#4S/S 건설사업 region_summary_raw 전남광주통합특별시 고흥군등 1 지역 equipment_type_raw 변전 headquarters_raw 중부건설본부 office_raw 광주전남건설지사 section_fields 사업 규모 154KV M.TR 2BANK(최종5BANK) 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: [계획확정~사업승인전 추진실적] ○'23.05 : 제10차 장기송변전설비계획 반영 ○'24.09 : 전력영향평가용역 발주 시행 ○'24.11 : 전력영향평가 용역 착수 ○'24.12 : 전력영향평가 용역 착수회의 시행 ○'24.12~'25.02 : 지자체 및 주민 사업설명회 및 입지선정위원 추천 요청 ○'25.05 : 제11차 장기송변전설비계획 준고목표 변경('38.10) future_plan_redacted □ 향후계획 [계획확정~사업승인전 추진실적] ○'23.05 : 제10차 장기송변전설비계획 반영 ○'24.09 : 전력영향평가용역 발주 시행 ○'24.11 : 전력영향평가 용역 착수 ○'24.12 : 전력영향평가 용역 착수회의 시행 ○'24.12~'25.02 : 지자체 및 주민 사업설명회 및 입지선정위원 추천 요청 ○'25.05 : 제11차 장기송변전설비계획 준고목표 변경('38.10) attachment_count 0 source_detail_sha256 93797f462517027503bf134f67cae61314c9cbe180c23a1dce1961685d736680 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231644|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_69c48b46ddf7b29c
Sources EV-76fe8273c1cfc92e760efa60 Evidence SHA-256 93797f462517027503bf134f67cae61314c9cbe180c23a1dce1961685d736680 행 SHA-256 ddc865b7db3a109c2ee768b9dcefe381933435bba26cec06cd08bdf45faa8104 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_878b1feca543753e stable_project_key prjtDef:231644:ESB project_definition 231644 first_region_code ESB manual_source_format false project_name 154kV 고흥#4S/S 건설사업 project_name_list 154kV 고흥#4S/S 건설사업 purpose 고흥지역 재생E 계통연계 project_region_detail 전남광주통합특별시 고흥군 project_period_raw 2023.05~2030.12 project_scale_raw 154KV M.TR 2BANK(최종5BANK) responsible_office_raw 중부건설본부/광주전남건설지사 equipment_type 변전 headquarters 중부건설본부 office 광주전남건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_878b1feca543753e
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_878b1feca543753e
Sources EV-ed3352668f4e56898084e66b Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 edffacd5490427f71e5dca43aff1e84de332be8b92534f27bf870aef34463f38 Observations for this power asset History for this project