POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 13items · current page 1–13 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 고흥#4S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-ed3352668f4e56898084e66b
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_878b1feca543753e
stable_project_keyprjtDef:231644:ESB
project_definition231644
first_region_codeESB
manual_source_formatfalse
project_name154kV 고흥#4S/S 건설사업
project_name_list154kV 고흥#4S/S 건설사업
purpose고흥지역 재생E 계통연계
project_region_detail전남광주통합특별시 고흥군
project_period_raw2023.05~2030.12
project_scale_raw154KV M.TR 2BANK(최종5BANK)
responsible_office_raw중부건설본부/광주전남건설지사
equipment_type변전
headquarters중부건설본부
office광주전남건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_69c48b46ddf7b29c
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_878b1feca543753e

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_878b1feca543753e

Sources EV-ed3352668f4e56898084e66b
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 edffacd5490427f71e5dca43aff1e84de332be8b92534f27bf870aef34463f38
Source schedule candidates · KOR · kepco_planned

154kV 고흥#4S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231644|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_69c48b46ddf7b29c

Sources EV-76fe8273c1cfc92e760efa60
Evidence SHA-256 93797f462517027503bf134f67cae61314c9cbe180c23a1dce1961685d736680
행 SHA-256 ddc865b7db3a109c2ee768b9dcefe381933435bba26cec06cd08bdf45faa8104
Source schedule candidates · KOR · kepco_planned

154kV 고흥#4S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231644|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_69c48b46ddf7b29c

Sources EV-76fe8273c1cfc92e760efa60
Evidence SHA-256 93797f462517027503bf134f67cae61314c9cbe180c23a1dce1961685d736680
행 SHA-256 ddc865b7db3a109c2ee768b9dcefe381933435bba26cec06cd08bdf45faa8104
Source schedule candidates · KOR · kepco_planned

154kV 고흥#4S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-02
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231644|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_69c48b46ddf7b29c

Sources EV-76fe8273c1cfc92e760efa60
Evidence SHA-256 93797f462517027503bf134f67cae61314c9cbe180c23a1dce1961685d736680
행 SHA-256 ddc865b7db3a109c2ee768b9dcefe381933435bba26cec06cd08bdf45faa8104
Source schedule candidates · KOR · kepco_planned

154kV 고흥#4S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-11
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231644|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_69c48b46ddf7b29c

Sources EV-76fe8273c1cfc92e760efa60
Evidence SHA-256 93797f462517027503bf134f67cae61314c9cbe180c23a1dce1961685d736680
행 SHA-256 ddc865b7db3a109c2ee768b9dcefe381933435bba26cec06cd08bdf45faa8104
Source schedule candidates · KOR · kepco_planned

154kV 고흥#4S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeplan_change
date2025-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231644|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_69c48b46ddf7b29c

Sources EV-76fe8273c1cfc92e760efa60
Evidence SHA-256 93797f462517027503bf134f67cae61314c9cbe180c23a1dce1961685d736680
행 SHA-256 ddc865b7db3a109c2ee768b9dcefe381933435bba26cec06cd08bdf45faa8104
Source schedule candidates · KOR · kepco_planned

154kV 고흥#4S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231644|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_69c48b46ddf7b29c

Sources EV-76fe8273c1cfc92e760efa60
Evidence SHA-256 93797f462517027503bf134f67cae61314c9cbe180c23a1dce1961685d736680
행 SHA-256 ddc865b7db3a109c2ee768b9dcefe381933435bba26cec06cd08bdf45faa8104
Source schedule candidates · KOR · kepco_planned

154kV 고흥#4S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231644|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_69c48b46ddf7b29c

Sources EV-76fe8273c1cfc92e760efa60
Evidence SHA-256 93797f462517027503bf134f67cae61314c9cbe180c23a1dce1961685d736680
행 SHA-256 ddc865b7db3a109c2ee768b9dcefe381933435bba26cec06cd08bdf45faa8104
Source schedule candidates · KOR · kepco_planned

154kV 고흥#4S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeplan_change
date2038-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231644|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_69c48b46ddf7b29c

Sources EV-76fe8273c1cfc92e760efa60
Evidence SHA-256 93797f462517027503bf134f67cae61314c9cbe180c23a1dce1961685d736680
행 SHA-256 ddc865b7db3a109c2ee768b9dcefe381933435bba26cec06cd08bdf45faa8104
Source schedule candidates · KOR · kepco_planned

154kV 고흥#4S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2030-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231644|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_69c48b46ddf7b29c

Sources EV-76fe8273c1cfc92e760efa60
Evidence SHA-256 93797f462517027503bf134f67cae61314c9cbe180c23a1dce1961685d736680
행 SHA-256 ddc865b7db3a109c2ee768b9dcefe381933435bba26cec06cd08bdf45faa8104
Source schedule candidates · KOR · kepco_planned

154kV 고흥#4S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2023-05
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231644|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_69c48b46ddf7b29c

Sources EV-76fe8273c1cfc92e760efa60
Evidence SHA-256 93797f462517027503bf134f67cae61314c9cbe180c23a1dce1961685d736680
행 SHA-256 ddc865b7db3a109c2ee768b9dcefe381933435bba26cec06cd08bdf45faa8104
Source snapshots by date · KOR · kepco_planned

154kV 고흥#4S/S 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_69c48b46ddf7b29c
stable_project_idkproj_878b1feca543753e
source_key202609|231644|ESB
basic_ym202609
source_stage_raw계획확정-사업승인전
project_name_list154kV 고흥#4S/S 건설사업
project_name_detail154kV 고흥#4S/S 건설사업
region_summary_raw전남광주통합특별시 고흥군등 1 지역
equipment_type_raw변전
headquarters_raw중부건설본부
office_raw광주전남건설지사
section_fields
Project purpose
  • 고흥지역 재생E 계통연계
Project region
  • 전남광주통합특별시 고흥군
Project period
  • 2023.05~2030.12
사업 규모
  • 154KV M.TR 2BANK(최종5BANK)
담당 사업소
  • 중부건설본부/광주전남건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
[계획확정~사업승인전 추진실적] ○'23.05 : 제10차 장기송변전설비계획 반영 ○'24.09 : 전력영향평가용역 발주 시행 ○'24.11 : 전력영향평가 용역 착수 ○'24.12 : 전력영향평가 용역 착수회의 시행 ○'24.12~'25.02 : 지자체 및 주민 사업설명회 및 입지선정위원 추천 요청 ○'25.05 : 제11차 장기송변전설비계획 준고목표 변경('38.10)
future_plan_redacted□ 향후계획 [계획확정~사업승인전 추진실적] ○'23.05 : 제10차 장기송변전설비계획 반영 ○'24.09 : 전력영향평가용역 발주 시행 ○'24.11 : 전력영향평가 용역 착수 ○'24.12 : 전력영향평가 용역 착수회의 시행 ○'24.12~'25.02 : 지자체 및 주민 사업설명회 및 입지선정위원 추천 요청 ○'25.05 : 제11차 장기송변전설비계획 준고목표 변경('38.10)
attachment_count0
source_detail_sha25693797f462517027503bf134f67cae61314c9cbe180c23a1dce1961685d736680
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231644|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_69c48b46ddf7b29c

Sources EV-76fe8273c1cfc92e760efa60
Evidence SHA-256 93797f462517027503bf134f67cae61314c9cbe180c23a1dce1961685d736680
행 SHA-256 ddc865b7db3a109c2ee768b9dcefe381933435bba26cec06cd08bdf45faa8104
Source snapshots by date · KOR · kepco_planned

154kV 고흥#4S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_878b1feca543753e
stable_project_keyprjtDef:231644:ESB
project_definition231644
first_region_codeESB
manual_source_formatfalse
project_name154kV 고흥#4S/S 건설사업
project_name_list154kV 고흥#4S/S 건설사업
purpose고흥지역 재생E 계통연계
project_region_detail전남광주통합특별시 고흥군
project_period_raw2023.05~2030.12
project_scale_raw154KV M.TR 2BANK(최종5BANK)
responsible_office_raw중부건설본부/광주전남건설지사
equipment_type변전
headquarters중부건설본부
office광주전남건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_69c48b46ddf7b29c
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_878b1feca543753e

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_878b1feca543753e

Sources EV-ed3352668f4e56898084e66b
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 edffacd5490427f71e5dca43aff1e84de332be8b92534f27bf870aef34463f38

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel