POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 8items · current page 1–8 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 고창-신고창T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-a1116295be5e884472107771
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_988d451fa8d5f8ac
stable_project_keyprjtDef:232733:ESB
project_definition232733
first_region_codeESB
manual_source_formatfalse
project_name154kV 고창-신고창T/L 건설사업
project_name_list154kV 고창-신고창T/L 건설사업
purpose재생E 연계 계통 변경 및 과부하 해소
project_region_detail전북특별자치도 고창군
project_period_raw2025.10~2031.10
project_scale_rawACSR 410㎟ × 2B ×2C, 10KM
responsible_office_raw중부건설본부/전북건설지사
equipment_type가공송전
headquarters중부건설본부
office전북건설지사
current_stage_raw
snapshot_count1
active_snapshot_count0
snapshot_ids
  • ksnap_758f0ef438c66fb2
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text
source_record_idstable_project_id:kproj_988d451fa8d5f8ac

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_988d451fa8d5f8ac

Sources EV-a1116295be5e884472107771
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 8ecd815e97adeb97dc5ba669d0d370497289520cdfc1d0ee4c9e1ca9acab5807
Source schedule candidates · KOR · kepco_planned

154kV 고창-신고창T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-05
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232733|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_758f0ef438c66fb2

Sources EV-b4879c01b75bbf4f4bbf5bf4
Evidence SHA-256 2204a19a6a0a0d211f4b237dd5770086cadb12a723a4f5f17d9b56ad16358ac8
행 SHA-256 196b374951611431861da33c40b1af00e3953bf2be7be9eb4aa193c0cab441d4
Source schedule candidates · KOR · kepco_planned

154kV 고창-신고창T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2025-10
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232733|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_758f0ef438c66fb2

Sources EV-b4879c01b75bbf4f4bbf5bf4
Evidence SHA-256 2204a19a6a0a0d211f4b237dd5770086cadb12a723a4f5f17d9b56ad16358ac8
행 SHA-256 196b374951611431861da33c40b1af00e3953bf2be7be9eb4aa193c0cab441d4
Source schedule candidates · KOR · kepco_planned

154kV 고창-신고창T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2025-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232733|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_758f0ef438c66fb2

Sources EV-b4879c01b75bbf4f4bbf5bf4
Evidence SHA-256 2204a19a6a0a0d211f4b237dd5770086cadb12a723a4f5f17d9b56ad16358ac8
행 SHA-256 196b374951611431861da33c40b1af00e3953bf2be7be9eb4aa193c0cab441d4
Source schedule candidates · KOR · kepco_planned

154kV 고창-신고창T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232733|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_758f0ef438c66fb2

Sources EV-b4879c01b75bbf4f4bbf5bf4
Evidence SHA-256 2204a19a6a0a0d211f4b237dd5770086cadb12a723a4f5f17d9b56ad16358ac8
행 SHA-256 196b374951611431861da33c40b1af00e3953bf2be7be9eb4aa193c0cab441d4
Source schedule candidates · KOR · kepco_planned

154kV 고창-신고창T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2031-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232733|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_758f0ef438c66fb2

Sources EV-b4879c01b75bbf4f4bbf5bf4
Evidence SHA-256 2204a19a6a0a0d211f4b237dd5770086cadb12a723a4f5f17d9b56ad16358ac8
행 SHA-256 196b374951611431861da33c40b1af00e3953bf2be7be9eb4aa193c0cab441d4
Source snapshots by date · KOR · kepco_planned

154kV 고창-신고창T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_758f0ef438c66fb2
stable_project_idkproj_988d451fa8d5f8ac
source_key202609|232733|ESB
basic_ym202609
source_stage_raw
project_name_list154kV 고창-신고창T/L 건설사업
project_name_detail154kV 고창-신고창T/L 건설사업
region_summary_raw전북특별자치도 고창군등 1 지역
equipment_type_raw가공송전
headquarters_raw중부건설본부
office_raw전북건설지사
section_fields
Project purpose
  • 재생E 연계 계통 변경 및 과부하 해소
Project region
  • 전북특별자치도 고창군
Project period
  • 2025.10~2031.10
사업 규모
  • ACSR 410㎟ × 2B ×2C, 10KM
담당 사업소
  • 중부건설본부/전북건설지사
계획확정
  • 제11차 장기송변전설비계획 반영(2025.05)
입지선정
  • 전력입지영향평가 용역 착수: 2025.10 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
□'25.10 : 전력입지영향평가 용역 착수
future_plan_redacted□ 향후계획 □'25.10 : 전력입지영향평가 용역 착수
attachment_count0
source_detail_sha2562204a19a6a0a0d211f4b237dd5770086cadb12a723a4f5f17d9b56ad16358ac8
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|232733|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_758f0ef438c66fb2

Sources EV-b4879c01b75bbf4f4bbf5bf4
Evidence SHA-256 2204a19a6a0a0d211f4b237dd5770086cadb12a723a4f5f17d9b56ad16358ac8
행 SHA-256 196b374951611431861da33c40b1af00e3953bf2be7be9eb4aa193c0cab441d4
Source snapshots by date · KOR · kepco_planned

154kV 고창-신고창T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_988d451fa8d5f8ac
stable_project_keyprjtDef:232733:ESB
project_definition232733
first_region_codeESB
manual_source_formatfalse
project_name154kV 고창-신고창T/L 건설사업
project_name_list154kV 고창-신고창T/L 건설사업
purpose재생E 연계 계통 변경 및 과부하 해소
project_region_detail전북특별자치도 고창군
project_period_raw2025.10~2031.10
project_scale_rawACSR 410㎟ × 2B ×2C, 10KM
responsible_office_raw중부건설본부/전북건설지사
equipment_type가공송전
headquarters중부건설본부
office전북건설지사
current_stage_raw
snapshot_count1
active_snapshot_count0
snapshot_ids
  • ksnap_758f0ef438c66fb2
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text
source_record_idstable_project_id:kproj_988d451fa8d5f8ac

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_988d451fa8d5f8ac

Sources EV-a1116295be5e884472107771
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 8ecd815e97adeb97dc5ba669d0d370497289520cdfc1d0ee4c9e1ca9acab5807

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel