POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 25items · current page 1–25 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-0472560eef9f823d61f74472
Detailed source fields Original source field Published value or condition stable_project_id kproj_d93157336fc36034 stable_project_key prjtDef:232670:ESB project_definition 232670 first_region_code ESB manual_source_format false project_name 154kV 곡성#2분기T/L 건설사업 project_name_list 154kV 곡성#2분기 송전선로 건설사업 purpose 곡성지역 재생E 계통 연계 및 보강 project_region_detail 전남광주통합특별시 곡성군 project_period_raw 2023.06~2030.12 project_scale_raw ACSR 410㎟×S×4C responsible_office_raw 중부건설본부/광주전남건설지사 equipment_type 가공송전 headquarters 중부건설본부 office 광주전남건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_d93157336fc36034
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_d93157336fc36034
Sources EV-0472560eef9f823d61f74472 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 6143e5c1f37ccdeb6917c4f14e25dcb967e7cb210ea3a41069ae528ad7afcf43 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-05 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232670|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b7af44fc0fcad228
Sources EV-d00f80a7a3161ef1398ae636 Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62 행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2030-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232670|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b7af44fc0fcad228
Sources EV-d00f80a7a3161ef1398ae636 Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62 행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-05 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232670|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b7af44fc0fcad228
Sources EV-d00f80a7a3161ef1398ae636 Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62 행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-08 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232670|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b7af44fc0fcad228
Sources EV-d00f80a7a3161ef1398ae636 Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62 행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232670|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b7af44fc0fcad228
Sources EV-d00f80a7a3161ef1398ae636 Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62 행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-09 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232670|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b7af44fc0fcad228
Sources EV-d00f80a7a3161ef1398ae636 Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62 행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-10 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232670|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b7af44fc0fcad228
Sources EV-d00f80a7a3161ef1398ae636 Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62 행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-07 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232670|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b7af44fc0fcad228
Sources EV-d00f80a7a3161ef1398ae636 Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62 행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-06 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232670|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b7af44fc0fcad228
Sources EV-d00f80a7a3161ef1398ae636 Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62 행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-01 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232670|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b7af44fc0fcad228
Sources EV-d00f80a7a3161ef1398ae636 Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62 행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232670|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b7af44fc0fcad228
Sources EV-d00f80a7a3161ef1398ae636 Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62 행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232670|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b7af44fc0fcad228
Sources EV-d00f80a7a3161ef1398ae636 Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62 행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-10 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232670|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b7af44fc0fcad228
Sources EV-d00f80a7a3161ef1398ae636 Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62 행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-01 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232670|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b7af44fc0fcad228
Sources EV-d00f80a7a3161ef1398ae636 Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62 행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2023-06 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232670|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b7af44fc0fcad228
Sources EV-d00f80a7a3161ef1398ae636 Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62 행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232670|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b7af44fc0fcad228
Sources EV-d00f80a7a3161ef1398ae636 Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62 행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2025-05 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232670|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b7af44fc0fcad228
Sources EV-d00f80a7a3161ef1398ae636 Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62 행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-08 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232670|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b7af44fc0fcad228
Sources EV-d00f80a7a3161ef1398ae636 Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62 행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-08 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232670|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b7af44fc0fcad228
Sources EV-d00f80a7a3161ef1398ae636 Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62 행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-06 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232670|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b7af44fc0fcad228
Sources EV-d00f80a7a3161ef1398ae636 Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62 행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-05 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232670|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b7af44fc0fcad228
Sources EV-d00f80a7a3161ef1398ae636 Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62 행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-02 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232670|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b7af44fc0fcad228
Sources EV-d00f80a7a3161ef1398ae636 Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62 행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_b7af44fc0fcad228 stable_project_id kproj_d93157336fc36034 source_key 202609|232670|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 곡성#2분기 송전선로 건설사업 project_name_detail 154kV 곡성#2분기T/L 건설사업 region_summary_raw 전남광주통합특별시 곡성군등 1 지역 equipment_type_raw 가공송전 headquarters_raw 중부건설본부 office_raw 광주전남건설지사 section_fields 입지선정 전력입지영향평가 용역 착수: 2024.08 입지선정위원회 구성시기: 2025.05 참여 위원 수 : 16 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 입지선정 및 주민의견 수렴 주요 내용 ○ 추진실적 - '23.04 : 제10차 전력수급기본계획 장기 송변전설비계획 반영 - '24.10 : 전력영향평가 및 경과지설계 용역 착수 - '25.01 : 입지선정위원회 위원 추천 요청(→곡성군) - '25.02 : 이장단(곡성군) 대상 사업설명 - '25.04 : 입지선정위원회 위원 추천 명단 회신(←곡성군) - '25.05 : 입지선정위원 구성 완료 및 착수 회의(5/27) - '25.06 : 입지선정위원회 2차회의 - '25.08 : 입지선정위원회 3차회의(회의 무산) - '25.10 : 입지선정위원회 3차회의(회의 무산) - '26.01 : 입지선정위원회 3차 회의 - '26.04 : 입지선정위원회 4차 회의(4/8) - '26.04 : 입지선정위원회 5차 회의(4/22) - '26.05 : 입지선정위원회 6차(서면) 회의(5/21~5/22) - '26.06 : 입지선정위원회 생략공고(6/9~6/10) - '26.07 : 입지선정 대안위원회 착수회의(7/6) - '26.08 : 입지선정 대안위원회 2차회의(8/10) [향후계획] - `26.09 : 입지선정 대안위원회 3차회의(9/8) future_plan_redacted □ 향후계획 [향후계획] - `26.09 : 입지선정 대안위원회 3차회의(9/8) attachment_count 0 source_detail_sha256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|232670|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b7af44fc0fcad228
Sources EV-d00f80a7a3161ef1398ae636 Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62 행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_d93157336fc36034 stable_project_key prjtDef:232670:ESB project_definition 232670 first_region_code ESB manual_source_format false project_name 154kV 곡성#2분기T/L 건설사업 project_name_list 154kV 곡성#2분기 송전선로 건설사업 purpose 곡성지역 재생E 계통 연계 및 보강 project_region_detail 전남광주통합특별시 곡성군 project_period_raw 2023.06~2030.12 project_scale_raw ACSR 410㎟×S×4C responsible_office_raw 중부건설본부/광주전남건설지사 equipment_type 가공송전 headquarters 중부건설본부 office 광주전남건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_d93157336fc36034
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_d93157336fc36034
Sources EV-0472560eef9f823d61f74472 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 6143e5c1f37ccdeb6917c4f14e25dcb967e7cb210ea3a41069ae528ad7afcf43 Observations for this power asset History for this project