POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 25items · current page 1–25 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 곡성#2분기T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-0472560eef9f823d61f74472
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_d93157336fc36034
stable_project_keyprjtDef:232670:ESB
project_definition232670
first_region_codeESB
manual_source_formatfalse
project_name154kV 곡성#2분기T/L 건설사업
project_name_list154kV 곡성#2분기 송전선로 건설사업
purpose곡성지역 재생E 계통 연계 및 보강
project_region_detail전남광주통합특별시 곡성군
project_period_raw2023.06~2030.12
project_scale_rawACSR 410㎟×S×4C
responsible_office_raw중부건설본부/광주전남건설지사
equipment_type가공송전
headquarters중부건설본부
office광주전남건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_b7af44fc0fcad228
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_d93157336fc36034

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_d93157336fc36034

Sources EV-0472560eef9f823d61f74472
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 6143e5c1f37ccdeb6917c4f14e25dcb967e7cb210ea3a41069ae528ad7afcf43
Source schedule candidates · KOR · kepco_planned

154kV 곡성#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-05
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232670|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7af44fc0fcad228

Sources EV-d00f80a7a3161ef1398ae636
Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62
행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9
Source schedule candidates · KOR · kepco_planned

154kV 곡성#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2030-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232670|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7af44fc0fcad228

Sources EV-d00f80a7a3161ef1398ae636
Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62
행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9
Source schedule candidates · KOR · kepco_planned

154kV 곡성#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-05
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232670|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7af44fc0fcad228

Sources EV-d00f80a7a3161ef1398ae636
Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62
행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9
Source schedule candidates · KOR · kepco_planned

154kV 곡성#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-08
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232670|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7af44fc0fcad228

Sources EV-d00f80a7a3161ef1398ae636
Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62
행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9
Source schedule candidates · KOR · kepco_planned

154kV 곡성#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232670|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7af44fc0fcad228

Sources EV-d00f80a7a3161ef1398ae636
Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62
행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9
Source schedule candidates · KOR · kepco_planned

154kV 곡성#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232670|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7af44fc0fcad228

Sources EV-d00f80a7a3161ef1398ae636
Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62
행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9
Source schedule candidates · KOR · kepco_planned

154kV 곡성#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-10
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232670|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7af44fc0fcad228

Sources EV-d00f80a7a3161ef1398ae636
Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62
행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9
Source schedule candidates · KOR · kepco_planned

154kV 곡성#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-07
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232670|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7af44fc0fcad228

Sources EV-d00f80a7a3161ef1398ae636
Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62
행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9
Source schedule candidates · KOR · kepco_planned

154kV 곡성#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-06
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232670|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7af44fc0fcad228

Sources EV-d00f80a7a3161ef1398ae636
Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62
행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9
Source schedule candidates · KOR · kepco_planned

154kV 곡성#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-01
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232670|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7af44fc0fcad228

Sources EV-d00f80a7a3161ef1398ae636
Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62
행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9
Source schedule candidates · KOR · kepco_planned

154kV 곡성#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232670|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7af44fc0fcad228

Sources EV-d00f80a7a3161ef1398ae636
Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62
행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9
Source schedule candidates · KOR · kepco_planned

154kV 곡성#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232670|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7af44fc0fcad228

Sources EV-d00f80a7a3161ef1398ae636
Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62
행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9
Source schedule candidates · KOR · kepco_planned

154kV 곡성#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-10
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232670|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7af44fc0fcad228

Sources EV-d00f80a7a3161ef1398ae636
Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62
행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9
Source schedule candidates · KOR · kepco_planned

154kV 곡성#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-01
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232670|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7af44fc0fcad228

Sources EV-d00f80a7a3161ef1398ae636
Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62
행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9
Source schedule candidates · KOR · kepco_planned

154kV 곡성#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2023-06
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232670|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7af44fc0fcad228

Sources EV-d00f80a7a3161ef1398ae636
Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62
행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9
Source schedule candidates · KOR · kepco_planned

154kV 곡성#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232670|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7af44fc0fcad228

Sources EV-d00f80a7a3161ef1398ae636
Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62
행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9
Source schedule candidates · KOR · kepco_planned

154kV 곡성#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2025-05
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232670|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7af44fc0fcad228

Sources EV-d00f80a7a3161ef1398ae636
Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62
행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9
Source schedule candidates · KOR · kepco_planned

154kV 곡성#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-08
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232670|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7af44fc0fcad228

Sources EV-d00f80a7a3161ef1398ae636
Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62
행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9
Source schedule candidates · KOR · kepco_planned

154kV 곡성#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-08
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232670|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7af44fc0fcad228

Sources EV-d00f80a7a3161ef1398ae636
Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62
행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9
Source schedule candidates · KOR · kepco_planned

154kV 곡성#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-06
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232670|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7af44fc0fcad228

Sources EV-d00f80a7a3161ef1398ae636
Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62
행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9
Source schedule candidates · KOR · kepco_planned

154kV 곡성#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-05
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232670|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7af44fc0fcad228

Sources EV-d00f80a7a3161ef1398ae636
Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62
행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9
Source schedule candidates · KOR · kepco_planned

154kV 곡성#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-02
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232670|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7af44fc0fcad228

Sources EV-d00f80a7a3161ef1398ae636
Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62
행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9
Source snapshots by date · KOR · kepco_planned

154kV 곡성#2분기T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_b7af44fc0fcad228
stable_project_idkproj_d93157336fc36034
source_key202609|232670|ESB
basic_ym202609
source_stage_raw계획확정-사업승인전
project_name_list154kV 곡성#2분기 송전선로 건설사업
project_name_detail154kV 곡성#2분기T/L 건설사업
region_summary_raw전남광주통합특별시 곡성군등 1 지역
equipment_type_raw가공송전
headquarters_raw중부건설본부
office_raw광주전남건설지사
section_fields
Project purpose
  • 곡성지역 재생E 계통 연계 및 보강
Project region
  • 전남광주통합특별시 곡성군
Project period
  • 2023.06~2030.12
사업 규모
  • ACSR 410㎟×S×4C
담당 사업소
  • 중부건설본부/광주전남건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 2024.08 입지선정위원회 구성시기: 2025.05 참여 위원 수 : 16 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
  • ○ 추진실적 - '23.04 : 제10차 전력수급기본계획 장기 송변전설비계획 반영 - '24.10 : 전력영향평가 및 경과지설계 용역 착수 - '25.01 : 입지선정위원회 위원 추천 요청(→곡성군) - '25.02 : 이장단(곡성군) 대상 사업설명 - '25.04 : 입지선정위원회 위원 추천 명단 회신(←곡성군) - '25.05 : 입지선정위원 구성 완료 및 착수 회의(5/27) - '25.06 : 입지선정위원회 2차회의 - '25.08 : 입지선정위원회 3차회의(회의 무산) - '25.10 : 입지선정위원회 3차회의(회의 무산) - '26.01 : 입지선정위원회 3차 회의 - '26.04 : 입지선정위원회 4차 회의(4/8) - '26.04 : 입지선정위원회 5차 회의(4/22) - '26.05 : 입지선정위원회 6차(서면) 회의(5/21~5/22) - '26.06 : 입지선정위원회 생략공고(6/9~6/10) - '26.07 : 입지선정 대안위원회 착수회의(7/6) - '26.08 : 입지선정 대안위원회 2차회의(8/10)
[향후계획] - `26.09 : 입지선정 대안위원회 3차회의(9/8)
future_plan_redacted□ 향후계획 [향후계획] - `26.09 : 입지선정 대안위원회 3차회의(9/8)
attachment_count0
source_detail_sha256db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|232670|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b7af44fc0fcad228

Sources EV-d00f80a7a3161ef1398ae636
Evidence SHA-256 db11c2b08f255afec261df1252a43a75c0fc8ef5f720f7a353b96f4b8c22ac62
행 SHA-256 cbefc39a6fb38c5d2779dd60eda31203e242db7ebcfc2941714e17061b4f81e9
Source snapshots by date · KOR · kepco_planned

154kV 곡성#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_d93157336fc36034
stable_project_keyprjtDef:232670:ESB
project_definition232670
first_region_codeESB
manual_source_formatfalse
project_name154kV 곡성#2분기T/L 건설사업
project_name_list154kV 곡성#2분기 송전선로 건설사업
purpose곡성지역 재생E 계통 연계 및 보강
project_region_detail전남광주통합특별시 곡성군
project_period_raw2023.06~2030.12
project_scale_rawACSR 410㎟×S×4C
responsible_office_raw중부건설본부/광주전남건설지사
equipment_type가공송전
headquarters중부건설본부
office광주전남건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_b7af44fc0fcad228
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_d93157336fc36034

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_d93157336fc36034

Sources EV-0472560eef9f823d61f74472
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 6143e5c1f37ccdeb6917c4f14e25dcb967e7cb210ea3a41069ae528ad7afcf43

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel