POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 관교-구월 전력구 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-9c3fd9ca9e8510dc983519ff
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_741dbd3654c5448a
stable_project_keyprjtDef:234857:ESB
project_definition234857
first_region_codeESB
manual_source_formatfalse
project_name154kV 관교-구월 전력구 건설사업
project_name_list154kV 관교-구월 전력구 건설사업
purpose구월2지구 등 신규부하 공급능력 확보
project_region_detail인천광역시 남동구,연수구
project_period_raw
project_scale_raw개착식전력구 600M (2,000㎟X2C)
responsible_office_raw경인건설본부/직할
equipment_type전력구
headquarters경인건설본부
office직할
current_stage_raw
snapshot_count1
active_snapshot_count0
snapshot_ids
  • ksnap_5022a7f5cfb2dbd6
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text
source_record_idstable_project_id:kproj_741dbd3654c5448a

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_741dbd3654c5448a

Sources EV-9c3fd9ca9e8510dc983519ff
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 c4d2e14692fdbfbcb85eaddbfed3bd595b69995d34d5ce347f10600eaa8075c3
Source snapshots by date · KOR · kepco_planned

154kV 관교-구월 전력구 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_5022a7f5cfb2dbd6
stable_project_idkproj_741dbd3654c5448a
source_key202609|234857|ESB
basic_ym202609
source_stage_raw
project_name_list154kV 관교-구월 전력구 건설사업
project_name_detail154kV 관교-구월 전력구 건설사업
region_summary_raw인천광역시 남동구등 2 지역
equipment_type_raw전력구
headquarters_raw경인건설본부
office_raw직할
section_fields
Project purpose
  • 구월2지구 등 신규부하 공급능력 확보
Project region
  • 인천광역시 남동구,연수구
Project period
사업 규모
  • 개착식전력구 600M (2,000㎟X2C)
담당 사업소
  • 경인건설본부/직할
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
future_plan_redacted□ 향후계획
attachment_count0
source_detail_sha2568bcd188bff5876d058d178df2cb2099818f9f27531580be8de6b077fa365081e
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|234857|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_5022a7f5cfb2dbd6

Sources EV-4a85ebd05a4e87f056c2fc32
Evidence SHA-256 8bcd188bff5876d058d178df2cb2099818f9f27531580be8de6b077fa365081e
행 SHA-256 cc44f67482b8f54a46d9cef0a2778fbfdea620f9569b46f2e64a382ac78f74cf
Source snapshots by date · KOR · kepco_planned

154kV 관교-구월 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_741dbd3654c5448a
stable_project_keyprjtDef:234857:ESB
project_definition234857
first_region_codeESB
manual_source_formatfalse
project_name154kV 관교-구월 전력구 건설사업
project_name_list154kV 관교-구월 전력구 건설사업
purpose구월2지구 등 신규부하 공급능력 확보
project_region_detail인천광역시 남동구,연수구
project_period_raw
project_scale_raw개착식전력구 600M (2,000㎟X2C)
responsible_office_raw경인건설본부/직할
equipment_type전력구
headquarters경인건설본부
office직할
current_stage_raw
snapshot_count1
active_snapshot_count0
snapshot_ids
  • ksnap_5022a7f5cfb2dbd6
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text
source_record_idstable_project_id:kproj_741dbd3654c5448a

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_741dbd3654c5448a

Sources EV-9c3fd9ca9e8510dc983519ff
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 c4d2e14692fdbfbcb85eaddbfed3bd595b69995d34d5ce347f10600eaa8075c3

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel