POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 6items · current page 1–6 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 과림S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-f2395deb8f39ecfff1f90c7c
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_1f6282dff3ff0447
stable_project_keyprjtDef:231540:ESB
project_definition231540
first_region_codeESB
manual_source_formatfalse
project_name154kV 과림S/S 건설사업
project_name_list154,000V 과림변전소 건설사업
purpose수도권 3기 신도시(광명시흥지구) 전력 공급
project_region_detail경기도 시흥시
project_period_raw2026.09~2032.04
project_scale_raw154KV M.TR 60MVA X 2BANK(최종 4BANK)
responsible_office_raw경인건설본부/남서울인천건설지사
equipment_type변전
headquarters경인건설본부
office남서울인천건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_61f4d0648e4ad778
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_1f6282dff3ff0447

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_1f6282dff3ff0447

Sources EV-f2395deb8f39ecfff1f90c7c
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 1c538dcbfe74445fda895f08bdba5005d2ec3fe83d6efbd66a34c2cdd6c5d439
Source schedule candidates · KOR · kepco_planned

154kV 과림S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2032-04
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231540|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_61f4d0648e4ad778

Sources EV-f946261de5fb15db35e26b27
Evidence SHA-256 f7a27d361401372eccc403c6fa03585097e317d7e4a60bb152e3558a913bfb17
행 SHA-256 1d3c57b1546d6094385019fd3ebe079654b55a4f96081f341bf1e46d5e051926
Source schedule candidates · KOR · kepco_planned

154kV 과림S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2026-09
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231540|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_61f4d0648e4ad778

Sources EV-f946261de5fb15db35e26b27
Evidence SHA-256 f7a27d361401372eccc403c6fa03585097e317d7e4a60bb152e3558a913bfb17
행 SHA-256 1d3c57b1546d6094385019fd3ebe079654b55a4f96081f341bf1e46d5e051926
Source schedule candidates · KOR · kepco_planned

154kV 과림S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-05
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231540|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_61f4d0648e4ad778

Sources EV-f946261de5fb15db35e26b27
Evidence SHA-256 f7a27d361401372eccc403c6fa03585097e317d7e4a60bb152e3558a913bfb17
행 SHA-256 1d3c57b1546d6094385019fd3ebe079654b55a4f96081f341bf1e46d5e051926
Source snapshots by date · KOR · kepco_planned

154kV 과림S/S 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_61f4d0648e4ad778
stable_project_idkproj_1f6282dff3ff0447
source_key202609|231540|ESB
basic_ym202609
source_stage_raw계획확정-사업승인전
project_name_list154,000V 과림변전소 건설사업
project_name_detail154kV 과림S/S 건설사업
region_summary_raw경기도 시흥시등 1 지역
equipment_type_raw변전
headquarters_raw경인건설본부
office_raw남서울인천건설지사
section_fields
Project purpose
  • 수도권 3기 신도시(광명시흥지구) 전력 공급
Project region
  • 경기도 시흥시
Project period
  • 2026.09~2032.04
사업 규모
  • 154KV M.TR 60MVA X 2BANK(최종 4BANK)
담당 사업소
  • 경인건설본부/남서울인천건설지사
계획확정
  • 제11차 장기송변전설비계획 반영(2025.05)
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
○ '30. 5 : 공사 착공 ○ '32. 4 : 공사 준공 및 변전소 가압
future_plan_redacted□ 향후계획 ○ '30. 5 : 공사 착공 ○ '32. 4 : 공사 준공 및 변전소 가압
attachment_count0
source_detail_sha256f7a27d361401372eccc403c6fa03585097e317d7e4a60bb152e3558a913bfb17
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231540|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_61f4d0648e4ad778

Sources EV-f946261de5fb15db35e26b27
Evidence SHA-256 f7a27d361401372eccc403c6fa03585097e317d7e4a60bb152e3558a913bfb17
행 SHA-256 1d3c57b1546d6094385019fd3ebe079654b55a4f96081f341bf1e46d5e051926
Source snapshots by date · KOR · kepco_planned

154kV 과림S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_1f6282dff3ff0447
stable_project_keyprjtDef:231540:ESB
project_definition231540
first_region_codeESB
manual_source_formatfalse
project_name154kV 과림S/S 건설사업
project_name_list154,000V 과림변전소 건설사업
purpose수도권 3기 신도시(광명시흥지구) 전력 공급
project_region_detail경기도 시흥시
project_period_raw2026.09~2032.04
project_scale_raw154KV M.TR 60MVA X 2BANK(최종 4BANK)
responsible_office_raw경인건설본부/남서울인천건설지사
equipment_type변전
headquarters경인건설본부
office남서울인천건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_61f4d0648e4ad778
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_1f6282dff3ff0447

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_1f6282dff3ff0447

Sources EV-f2395deb8f39ecfff1f90c7c
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 1c538dcbfe74445fda895f08bdba5005d2ec3fe83d6efbd66a34c2cdd6c5d439

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel