POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 24items · current page 1–24 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-96ac34aa54fe8e3f856daf79
Detailed source fields Original source field Published value or condition stable_project_id kproj_24deb098bef4b822 stable_project_key prjtDef:231486:ESB project_definition 231486 first_region_code ESB manual_source_format false project_name 154kV 광양항S/S 건설사업 project_name_list 154kV 광양항S/S 건설사업 purpose 변전설비 적기확충으로 안정적 전력공급 project_region_detail 전남광주통합특별시 광양시 project_period_raw 2018.02~2025.12 project_scale_raw 154KV M.TR 60MVA X 2BANK (최종규모 4BANK) responsible_office_raw 중부건설본부/광주전남건설지사 equipment_type 변전 headquarters 중부건설본부 office 광주전남건설지사 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_24deb098bef4b822
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_24deb098bef4b822
Sources EV-96ac34aa54fe8e3f856daf79 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 b2cf6d06dc7f4842247089beafce4981b89a956cdc80545fc6a3ef557421fe1d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-02 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231486|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_52629799ba267c43
Sources EV-dff466a127d4000ab67e93f2 Evidence SHA-256 2d14ec519c7ce130e2ad13e732551936125c1d13314260284f869b4c2501912d 행 SHA-256 01c3c46a997ee20bd3b4c1651e73372f476e9e82b12aff95f63bae5759809bcd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-10 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231486|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_52629799ba267c43
Sources EV-dff466a127d4000ab67e93f2 Evidence SHA-256 2d14ec519c7ce130e2ad13e732551936125c1d13314260284f869b4c2501912d 행 SHA-256 01c3c46a997ee20bd3b4c1651e73372f476e9e82b12aff95f63bae5759809bcd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-10 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231486|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_52629799ba267c43
Sources EV-dff466a127d4000ab67e93f2 Evidence SHA-256 2d14ec519c7ce130e2ad13e732551936125c1d13314260284f869b4c2501912d 행 SHA-256 01c3c46a997ee20bd3b4c1651e73372f476e9e82b12aff95f63bae5759809bcd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2024-02 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231486|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_52629799ba267c43
Sources EV-dff466a127d4000ab67e93f2 Evidence SHA-256 2d14ec519c7ce130e2ad13e732551936125c1d13314260284f869b4c2501912d 행 SHA-256 01c3c46a997ee20bd3b4c1651e73372f476e9e82b12aff95f63bae5759809bcd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type design_completion date 2023-02 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231486|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_52629799ba267c43
Sources EV-dff466a127d4000ab67e93f2 Evidence SHA-256 2d14ec519c7ce130e2ad13e732551936125c1d13314260284f869b4c2501912d 행 SHA-256 01c3c46a997ee20bd3b4c1651e73372f476e9e82b12aff95f63bae5759809bcd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231486|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_52629799ba267c43
Sources EV-dff466a127d4000ab67e93f2 Evidence SHA-256 2d14ec519c7ce130e2ad13e732551936125c1d13314260284f869b4c2501912d 행 SHA-256 01c3c46a997ee20bd3b4c1651e73372f476e9e82b12aff95f63bae5759809bcd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2024-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231486|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_52629799ba267c43
Sources EV-dff466a127d4000ab67e93f2 Evidence SHA-256 2d14ec519c7ce130e2ad13e732551936125c1d13314260284f869b4c2501912d 행 SHA-256 01c3c46a997ee20bd3b4c1651e73372f476e9e82b12aff95f63bae5759809bcd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2024-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231486|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_52629799ba267c43
Sources EV-dff466a127d4000ab67e93f2 Evidence SHA-256 2d14ec519c7ce130e2ad13e732551936125c1d13314260284f869b4c2501912d 행 SHA-256 01c3c46a997ee20bd3b4c1651e73372f476e9e82b12aff95f63bae5759809bcd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-11 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231486|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_52629799ba267c43
Sources EV-dff466a127d4000ab67e93f2 Evidence SHA-256 2d14ec519c7ce130e2ad13e732551936125c1d13314260284f869b4c2501912d 행 SHA-256 01c3c46a997ee20bd3b4c1651e73372f476e9e82b12aff95f63bae5759809bcd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2017-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231486|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_52629799ba267c43
Sources EV-dff466a127d4000ab67e93f2 Evidence SHA-256 2d14ec519c7ce130e2ad13e732551936125c1d13314260284f869b4c2501912d 행 SHA-256 01c3c46a997ee20bd3b4c1651e73372f476e9e82b12aff95f63bae5759809bcd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231486|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_52629799ba267c43
Sources EV-dff466a127d4000ab67e93f2 Evidence SHA-256 2d14ec519c7ce130e2ad13e732551936125c1d13314260284f869b4c2501912d 행 SHA-256 01c3c46a997ee20bd3b4c1651e73372f476e9e82b12aff95f63bae5759809bcd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type implementation_plan_approval date 2023-08 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231486|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_52629799ba267c43
Sources EV-dff466a127d4000ab67e93f2 Evidence SHA-256 2d14ec519c7ce130e2ad13e732551936125c1d13314260284f869b4c2501912d 행 SHA-256 01c3c46a997ee20bd3b4c1651e73372f476e9e82b12aff95f63bae5759809bcd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2019-03 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231486|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_52629799ba267c43
Sources EV-dff466a127d4000ab67e93f2 Evidence SHA-256 2d14ec519c7ce130e2ad13e732551936125c1d13314260284f869b4c2501912d 행 SHA-256 01c3c46a997ee20bd3b4c1651e73372f476e9e82b12aff95f63bae5759809bcd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type energization date 2025-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231486|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_52629799ba267c43
Sources EV-dff466a127d4000ab67e93f2 Evidence SHA-256 2d14ec519c7ce130e2ad13e732551936125c1d13314260284f869b4c2501912d 행 SHA-256 01c3c46a997ee20bd3b4c1651e73372f476e9e82b12aff95f63bae5759809bcd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2025-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231486|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_52629799ba267c43
Sources EV-dff466a127d4000ab67e93f2 Evidence SHA-256 2d14ec519c7ce130e2ad13e732551936125c1d13314260284f869b4c2501912d 행 SHA-256 01c3c46a997ee20bd3b4c1651e73372f476e9e82b12aff95f63bae5759809bcd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2025-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231486|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_52629799ba267c43
Sources EV-dff466a127d4000ab67e93f2 Evidence SHA-256 2d14ec519c7ce130e2ad13e732551936125c1d13314260284f869b4c2501912d 행 SHA-256 01c3c46a997ee20bd3b4c1651e73372f476e9e82b12aff95f63bae5759809bcd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2018-02 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231486|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_52629799ba267c43
Sources EV-dff466a127d4000ab67e93f2 Evidence SHA-256 2d14ec519c7ce130e2ad13e732551936125c1d13314260284f869b4c2501912d 행 SHA-256 01c3c46a997ee20bd3b4c1651e73372f476e9e82b12aff95f63bae5759809bcd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2018-11 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231486|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_52629799ba267c43
Sources EV-dff466a127d4000ab67e93f2 Evidence SHA-256 2d14ec519c7ce130e2ad13e732551936125c1d13314260284f869b4c2501912d 행 SHA-256 01c3c46a997ee20bd3b4c1651e73372f476e9e82b12aff95f63bae5759809bcd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231486|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_52629799ba267c43
Sources EV-dff466a127d4000ab67e93f2 Evidence SHA-256 2d14ec519c7ce130e2ad13e732551936125c1d13314260284f869b4c2501912d 행 SHA-256 01c3c46a997ee20bd3b4c1651e73372f476e9e82b12aff95f63bae5759809bcd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2020-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231486|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_52629799ba267c43
Sources EV-dff466a127d4000ab67e93f2 Evidence SHA-256 2d14ec519c7ce130e2ad13e732551936125c1d13314260284f869b4c2501912d 행 SHA-256 01c3c46a997ee20bd3b4c1651e73372f476e9e82b12aff95f63bae5759809bcd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-12 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231486|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_52629799ba267c43
Sources EV-dff466a127d4000ab67e93f2 Evidence SHA-256 2d14ec519c7ce130e2ad13e732551936125c1d13314260284f869b4c2501912d 행 SHA-256 01c3c46a997ee20bd3b4c1651e73372f476e9e82b12aff95f63bae5759809bcd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_52629799ba267c43 stable_project_id kproj_24deb098bef4b822 source_key 202609|231486|ESB basic_ym 202609 source_stage_raw 공사착수-사업완료전 project_name_list 154kV 광양항S/S 건설사업 project_name_detail 154kV 광양항S/S 건설사업 region_summary_raw 전남광주통합특별시 광양시등 1 지역 equipment_type_raw 변전 headquarters_raw 중부건설본부 office_raw 광주전남건설지사 section_fields 사업 규모 154KV M.TR 60MVA X 2BANK (최종규모 4BANK) 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 기본설계: 2022.10 ~ 2022.10 실시설계: 2022.11 ~ 2023.02 설계담당자: [redacted] 건설공사 개요 공사 착공: 2024.04 공사 기간: 2024.04 ~ 2025.12 감독자: [redacted], 실적): 100, 94 [계획확정~사업승인전 추진실적] ○'17.12 : 광양항 변전소 설치건의, 검토요청(광양시) ○'18.11 : 광양항S/S 신설 계통계획 반영(확정'20.12) ○'19.03 : 입지확정위원회 및 부지확정보고 시행 [사업승인~공사착수전] [추진실적] ○'22.10 : 기본설계 변경(안) 확정 ○'23.02 : 실시설계 완료 ○'23.08 : 비관리청 항만개발사업 실시계획 승인 ○'23.12 : 건축허가 승인 ○'24.02 : 건축공사 착공 ○'24.10 : 변전공사 실착공 [향후계획] ○'25.12 : 변전소 기기가압 및 준공 future_plan_redacted □ 향후계획 [계획확정~사업승인전 추진실적] ○'17.12 : 광양항 변전소 설치건의, 검토요청(광양시) ○'18.11 : 광양항S/S 신설 계통계획 반영(확정'20.12) ○'19.03 : 입지확정위원회 및 부지확정보고 시행 [사업승인~공사착수전] [추진실적] ○'22.10 : 기본설계 변경(안) 확정 ○'23.02 : 실시설계 완료 ○'23.08 : 비관리청 항만개발사업 실시계획 승인 ○'23.12 : 건축허가 승인 ○'24.02 : 건축공사 착공 ○'24.10 : 변전공사 실착공 [향후계획] ○'25.12 : 변전소 기기가압 및 준공 attachment_count 0 source_detail_sha256 2d14ec519c7ce130e2ad13e732551936125c1d13314260284f869b4c2501912d first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231486|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_52629799ba267c43
Sources EV-dff466a127d4000ab67e93f2 Evidence SHA-256 2d14ec519c7ce130e2ad13e732551936125c1d13314260284f869b4c2501912d 행 SHA-256 01c3c46a997ee20bd3b4c1651e73372f476e9e82b12aff95f63bae5759809bcd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_24deb098bef4b822 stable_project_key prjtDef:231486:ESB project_definition 231486 first_region_code ESB manual_source_format false project_name 154kV 광양항S/S 건설사업 project_name_list 154kV 광양항S/S 건설사업 purpose 변전설비 적기확충으로 안정적 전력공급 project_region_detail 전남광주통합특별시 광양시 project_period_raw 2018.02~2025.12 project_scale_raw 154KV M.TR 60MVA X 2BANK (최종규모 4BANK) responsible_office_raw 중부건설본부/광주전남건설지사 equipment_type 변전 headquarters 중부건설본부 office 광주전남건설지사 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_24deb098bef4b822
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_24deb098bef4b822
Sources EV-96ac34aa54fe8e3f856daf79 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 b2cf6d06dc7f4842247089beafce4981b89a956cdc80545fc6a3ef557421fe1d Observations for this power asset History for this project