POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 201,406items · current page 701–800 · Source records, not unique facilities.

Source schedule candidates · KOR · kepco_planned

154kV 광양항S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2024-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231486|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52629799ba267c43

Sources EV-dff466a127d4000ab67e93f2
Evidence SHA-256 2d14ec519c7ce130e2ad13e732551936125c1d13314260284f869b4c2501912d
행 SHA-256 01c3c46a997ee20bd3b4c1651e73372f476e9e82b12aff95f63bae5759809bcd
Source schedule candidates · KOR · kepco_planned

154kV 광양항S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-11
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231486|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52629799ba267c43

Sources EV-dff466a127d4000ab67e93f2
Evidence SHA-256 2d14ec519c7ce130e2ad13e732551936125c1d13314260284f869b4c2501912d
행 SHA-256 01c3c46a997ee20bd3b4c1651e73372f476e9e82b12aff95f63bae5759809bcd
Source schedule candidates · KOR · kepco_planned

154kV 광양항S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2017-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231486|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52629799ba267c43

Sources EV-dff466a127d4000ab67e93f2
Evidence SHA-256 2d14ec519c7ce130e2ad13e732551936125c1d13314260284f869b4c2501912d
행 SHA-256 01c3c46a997ee20bd3b4c1651e73372f476e9e82b12aff95f63bae5759809bcd
Source schedule candidates · KOR · kepco_planned

154kV 광양항S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231486|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52629799ba267c43

Sources EV-dff466a127d4000ab67e93f2
Evidence SHA-256 2d14ec519c7ce130e2ad13e732551936125c1d13314260284f869b4c2501912d
행 SHA-256 01c3c46a997ee20bd3b4c1651e73372f476e9e82b12aff95f63bae5759809bcd
Source schedule candidates · KOR · kepco_planned

154kV 광양항S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeimplementation_plan_approval
date2023-08
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231486|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52629799ba267c43

Sources EV-dff466a127d4000ab67e93f2
Evidence SHA-256 2d14ec519c7ce130e2ad13e732551936125c1d13314260284f869b4c2501912d
행 SHA-256 01c3c46a997ee20bd3b4c1651e73372f476e9e82b12aff95f63bae5759809bcd
Source schedule candidates · KOR · kepco_planned

154kV 광양항S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2019-03
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231486|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52629799ba267c43

Sources EV-dff466a127d4000ab67e93f2
Evidence SHA-256 2d14ec519c7ce130e2ad13e732551936125c1d13314260284f869b4c2501912d
행 SHA-256 01c3c46a997ee20bd3b4c1651e73372f476e9e82b12aff95f63bae5759809bcd
Source schedule candidates · KOR · kepco_planned

154kV 광양항S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeenergization
date2025-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231486|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52629799ba267c43

Sources EV-dff466a127d4000ab67e93f2
Evidence SHA-256 2d14ec519c7ce130e2ad13e732551936125c1d13314260284f869b4c2501912d
행 SHA-256 01c3c46a997ee20bd3b4c1651e73372f476e9e82b12aff95f63bae5759809bcd
Source schedule candidates · KOR · kepco_planned

154kV 광양항S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2025-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231486|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52629799ba267c43

Sources EV-dff466a127d4000ab67e93f2
Evidence SHA-256 2d14ec519c7ce130e2ad13e732551936125c1d13314260284f869b4c2501912d
행 SHA-256 01c3c46a997ee20bd3b4c1651e73372f476e9e82b12aff95f63bae5759809bcd
Source schedule candidates · KOR · kepco_planned

154kV 광양항S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2025-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231486|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52629799ba267c43

Sources EV-dff466a127d4000ab67e93f2
Evidence SHA-256 2d14ec519c7ce130e2ad13e732551936125c1d13314260284f869b4c2501912d
행 SHA-256 01c3c46a997ee20bd3b4c1651e73372f476e9e82b12aff95f63bae5759809bcd
Source schedule candidates · KOR · kepco_planned

154kV 광양항S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2018-02
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231486|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52629799ba267c43

Sources EV-dff466a127d4000ab67e93f2
Evidence SHA-256 2d14ec519c7ce130e2ad13e732551936125c1d13314260284f869b4c2501912d
행 SHA-256 01c3c46a997ee20bd3b4c1651e73372f476e9e82b12aff95f63bae5759809bcd
Source schedule candidates · KOR · kepco_planned

154kV 광양항S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2018-11
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231486|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52629799ba267c43

Sources EV-dff466a127d4000ab67e93f2
Evidence SHA-256 2d14ec519c7ce130e2ad13e732551936125c1d13314260284f869b4c2501912d
행 SHA-256 01c3c46a997ee20bd3b4c1651e73372f476e9e82b12aff95f63bae5759809bcd
Source schedule candidates · KOR · kepco_planned

154kV 광양항S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231486|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52629799ba267c43

Sources EV-dff466a127d4000ab67e93f2
Evidence SHA-256 2d14ec519c7ce130e2ad13e732551936125c1d13314260284f869b4c2501912d
행 SHA-256 01c3c46a997ee20bd3b4c1651e73372f476e9e82b12aff95f63bae5759809bcd
Source schedule candidates · KOR · kepco_planned

154kV 광양항S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2020-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231486|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52629799ba267c43

Sources EV-dff466a127d4000ab67e93f2
Evidence SHA-256 2d14ec519c7ce130e2ad13e732551936125c1d13314260284f869b4c2501912d
행 SHA-256 01c3c46a997ee20bd3b4c1651e73372f476e9e82b12aff95f63bae5759809bcd
Source schedule candidates · KOR · kepco_planned

154kV 광양항S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-12
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231486|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52629799ba267c43

Sources EV-dff466a127d4000ab67e93f2
Evidence SHA-256 2d14ec519c7ce130e2ad13e732551936125c1d13314260284f869b4c2501912d
행 SHA-256 01c3c46a997ee20bd3b4c1651e73372f476e9e82b12aff95f63bae5759809bcd
Source snapshots by date · KOR · kepco_planned

154kV 광양항S/S 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_52629799ba267c43
stable_project_idkproj_24deb098bef4b822
source_key202609|231486|ESB
basic_ym202609
source_stage_raw공사착수-사업완료전
project_name_list154kV 광양항S/S 건설사업
project_name_detail154kV 광양항S/S 건설사업
region_summary_raw전남광주통합특별시 광양시등 1 지역
equipment_type_raw변전
headquarters_raw중부건설본부
office_raw광주전남건설지사
section_fields
Project purpose
  • 변전설비 적기확충으로 안정적 전력공급
Project region
  • 전남광주통합특별시 광양시
Project period
  • 2018.02~2025.12
사업 규모
  • 154KV M.TR 60MVA X 2BANK (최종규모 4BANK)
담당 사업소
  • 중부건설본부/광주전남건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 2022.10 ~ 2022.10 실시설계: 2022.11 ~ 2023.02 설계담당자: [redacted]
건설공사 개요
  • 공사 착공: 2024.04 공사 기간: 2024.04 ~ 2025.12 감독자: [redacted], 실적): 100, 94
[계획확정~사업승인전 추진실적] ○'17.12 : 광양항 변전소 설치건의, 검토요청(광양시) ○'18.11 : 광양항S/S 신설 계통계획 반영(확정'20.12) ○'19.03 : 입지확정위원회 및 부지확정보고 시행 [사업승인~공사착수전] [추진실적] ○'22.10 : 기본설계 변경(안) 확정 ○'23.02 : 실시설계 완료 ○'23.08 : 비관리청 항만개발사업 실시계획 승인 ○'23.12 : 건축허가 승인 ○'24.02 : 건축공사 착공 ○'24.10 : 변전공사 실착공 [향후계획] ○'25.12 : 변전소 기기가압 및 준공
future_plan_redacted□ 향후계획 [계획확정~사업승인전 추진실적] ○'17.12 : 광양항 변전소 설치건의, 검토요청(광양시) ○'18.11 : 광양항S/S 신설 계통계획 반영(확정'20.12) ○'19.03 : 입지확정위원회 및 부지확정보고 시행 [사업승인~공사착수전] [추진실적] ○'22.10 : 기본설계 변경(안) 확정 ○'23.02 : 실시설계 완료 ○'23.08 : 비관리청 항만개발사업 실시계획 승인 ○'23.12 : 건축허가 승인 ○'24.02 : 건축공사 착공 ○'24.10 : 변전공사 실착공 [향후계획] ○'25.12 : 변전소 기기가압 및 준공
attachment_count0
source_detail_sha2562d14ec519c7ce130e2ad13e732551936125c1d13314260284f869b4c2501912d
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231486|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_52629799ba267c43

Sources EV-dff466a127d4000ab67e93f2
Evidence SHA-256 2d14ec519c7ce130e2ad13e732551936125c1d13314260284f869b4c2501912d
행 SHA-256 01c3c46a997ee20bd3b4c1651e73372f476e9e82b12aff95f63bae5759809bcd
Source snapshots by date · KOR · kepco_planned

154kV 광양항S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_24deb098bef4b822
stable_project_keyprjtDef:231486:ESB
project_definition231486
first_region_codeESB
manual_source_formatfalse
project_name154kV 광양항S/S 건설사업
project_name_list154kV 광양항S/S 건설사업
purpose변전설비 적기확충으로 안정적 전력공급
project_region_detail전남광주통합특별시 광양시
project_period_raw2018.02~2025.12
project_scale_raw154KV M.TR 60MVA X 2BANK (최종규모 4BANK)
responsible_office_raw중부건설본부/광주전남건설지사
equipment_type변전
headquarters중부건설본부
office광주전남건설지사
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_52629799ba267c43
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_24deb098bef4b822

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_24deb098bef4b822

Sources EV-96ac34aa54fe8e3f856daf79
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 b2cf6d06dc7f4842247089beafce4981b89a956cdc80545fc6a3ef557421fe1d
Power assets and projects · KOR · kepco_planned

154kV 광양항분기 지중T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-3c49beb01b3be2e1f1b72a58
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_dc40ded405d593f0
stable_project_keyprjtDef:233692:ESB
project_definition233692
first_region_codeESB
manual_source_formatfalse
project_name154kV 광양항분기 지중T/L 건설사업
project_name_list154kV 광양항분기 지중송전선로 건설사업
purpose광양항 배후단지 확대에 따른 전력 공급 능
project_region_detail전남광주통합특별시 광양시
project_period_raw2022.06~2026.12
project_scale_rawXLPE2500㎟ 4C, 0.3KM
responsible_office_raw중부건설본부/광주전남건설지사
equipment_type지중송전
headquarters중부건설본부
office광주전남건설지사
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_95950c71bfebebc7
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_dc40ded405d593f0

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_dc40ded405d593f0

Sources EV-3c49beb01b3be2e1f1b72a58
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 cc91c291c0bac271e84eb0943c8064004561ef910c5e44b95b733bad95d5a1fe
Source schedule candidates · KOR · kepco_planned

154kV 광양항분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2022-06
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|233692|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_95950c71bfebebc7

Sources EV-8de386baa6341a7d9f6bb1a9
Evidence SHA-256 6025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1
행 SHA-256 d0cd4eb3f97d7c6c10e7bc19e01be3273176ad2cb9540b5a7fad4398120ebbdd
Source schedule candidates · KOR · kepco_planned

154kV 광양항분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2025-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233692|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_95950c71bfebebc7

Sources EV-8de386baa6341a7d9f6bb1a9
Evidence SHA-256 6025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1
행 SHA-256 d0cd4eb3f97d7c6c10e7bc19e01be3273176ad2cb9540b5a7fad4398120ebbdd
Source schedule candidates · KOR · kepco_planned

154kV 광양항분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-12
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233692|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_95950c71bfebebc7

Sources EV-8de386baa6341a7d9f6bb1a9
Evidence SHA-256 6025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1
행 SHA-256 d0cd4eb3f97d7c6c10e7bc19e01be3273176ad2cb9540b5a7fad4398120ebbdd
Source schedule candidates · KOR · kepco_planned

154kV 광양항분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2025-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233692|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_95950c71bfebebc7

Sources EV-8de386baa6341a7d9f6bb1a9
Evidence SHA-256 6025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1
행 SHA-256 d0cd4eb3f97d7c6c10e7bc19e01be3273176ad2cb9540b5a7fad4398120ebbdd
Source schedule candidates · KOR · kepco_planned

154kV 광양항분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233692|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_95950c71bfebebc7

Sources EV-8de386baa6341a7d9f6bb1a9
Evidence SHA-256 6025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1
행 SHA-256 d0cd4eb3f97d7c6c10e7bc19e01be3273176ad2cb9540b5a7fad4398120ebbdd
Source schedule candidates · KOR · kepco_planned

154kV 광양항분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233692|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_95950c71bfebebc7

Sources EV-8de386baa6341a7d9f6bb1a9
Evidence SHA-256 6025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1
행 SHA-256 d0cd4eb3f97d7c6c10e7bc19e01be3273176ad2cb9540b5a7fad4398120ebbdd
Source schedule candidates · KOR · kepco_planned

154kV 광양항분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233692|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_95950c71bfebebc7

Sources EV-8de386baa6341a7d9f6bb1a9
Evidence SHA-256 6025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1
행 SHA-256 d0cd4eb3f97d7c6c10e7bc19e01be3273176ad2cb9540b5a7fad4398120ebbdd
Source schedule candidates · KOR · kepco_planned

154kV 광양항분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2025-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233692|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_95950c71bfebebc7

Sources EV-8de386baa6341a7d9f6bb1a9
Evidence SHA-256 6025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1
행 SHA-256 d0cd4eb3f97d7c6c10e7bc19e01be3273176ad2cb9540b5a7fad4398120ebbdd
Source schedule candidates · KOR · kepco_planned

154kV 광양항분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_completion
date2023-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233692|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_95950c71bfebebc7

Sources EV-8de386baa6341a7d9f6bb1a9
Evidence SHA-256 6025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1
행 SHA-256 d0cd4eb3f97d7c6c10e7bc19e01be3273176ad2cb9540b5a7fad4398120ebbdd
Source schedule candidates · KOR · kepco_planned

154kV 광양항분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-12
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233692|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_95950c71bfebebc7

Sources EV-8de386baa6341a7d9f6bb1a9
Evidence SHA-256 6025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1
행 SHA-256 d0cd4eb3f97d7c6c10e7bc19e01be3273176ad2cb9540b5a7fad4398120ebbdd
Source schedule candidates · KOR · kepco_planned

154kV 광양항분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-08
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233692|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_95950c71bfebebc7

Sources EV-8de386baa6341a7d9f6bb1a9
Evidence SHA-256 6025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1
행 SHA-256 d0cd4eb3f97d7c6c10e7bc19e01be3273176ad2cb9540b5a7fad4398120ebbdd
Source schedule candidates · KOR · kepco_planned

154kV 광양항분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_completion
date2025-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233692|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_95950c71bfebebc7

Sources EV-8de386baa6341a7d9f6bb1a9
Evidence SHA-256 6025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1
행 SHA-256 d0cd4eb3f97d7c6c10e7bc19e01be3273176ad2cb9540b5a7fad4398120ebbdd
Source schedule candidates · KOR · kepco_planned

154kV 광양항분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233692|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_95950c71bfebebc7

Sources EV-8de386baa6341a7d9f6bb1a9
Evidence SHA-256 6025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1
행 SHA-256 d0cd4eb3f97d7c6c10e7bc19e01be3273176ad2cb9540b5a7fad4398120ebbdd
Source schedule candidates · KOR · kepco_planned

154kV 광양항분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-05
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233692|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_95950c71bfebebc7

Sources EV-8de386baa6341a7d9f6bb1a9
Evidence SHA-256 6025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1
행 SHA-256 d0cd4eb3f97d7c6c10e7bc19e01be3273176ad2cb9540b5a7fad4398120ebbdd
Source schedule candidates · KOR · kepco_planned

154kV 광양항분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2026-11
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233692|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_95950c71bfebebc7

Sources EV-8de386baa6341a7d9f6bb1a9
Evidence SHA-256 6025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1
행 SHA-256 d0cd4eb3f97d7c6c10e7bc19e01be3273176ad2cb9540b5a7fad4398120ebbdd
Source schedule candidates · KOR · kepco_planned

154kV 광양항분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2026-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233692|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_95950c71bfebebc7

Sources EV-8de386baa6341a7d9f6bb1a9
Evidence SHA-256 6025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1
행 SHA-256 d0cd4eb3f97d7c6c10e7bc19e01be3273176ad2cb9540b5a7fad4398120ebbdd
Source schedule candidates · KOR · kepco_planned

154kV 광양항분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2026-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|233692|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_95950c71bfebebc7

Sources EV-8de386baa6341a7d9f6bb1a9
Evidence SHA-256 6025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1
행 SHA-256 d0cd4eb3f97d7c6c10e7bc19e01be3273176ad2cb9540b5a7fad4398120ebbdd
Source schedule candidates · KOR · kepco_planned

154kV 광양항분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233692|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_95950c71bfebebc7

Sources EV-8de386baa6341a7d9f6bb1a9
Evidence SHA-256 6025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1
행 SHA-256 d0cd4eb3f97d7c6c10e7bc19e01be3273176ad2cb9540b5a7fad4398120ebbdd
Source schedule candidates · KOR · kepco_planned

154kV 광양항분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2025-08
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233692|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_95950c71bfebebc7

Sources EV-8de386baa6341a7d9f6bb1a9
Evidence SHA-256 6025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1
행 SHA-256 d0cd4eb3f97d7c6c10e7bc19e01be3273176ad2cb9540b5a7fad4398120ebbdd
Source snapshots by date · KOR · kepco_planned

154kV 광양항분기 지중T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_95950c71bfebebc7
stable_project_idkproj_dc40ded405d593f0
source_key202609|233692|ESB
basic_ym202609
source_stage_raw공사착수-사업완료전
project_name_list154kV 광양항분기 지중송전선로 건설사업
project_name_detail154kV 광양항분기 지중T/L 건설사업
region_summary_raw전남광주통합특별시 광양시등 1 지역
equipment_type_raw지중송전
headquarters_raw중부건설본부
office_raw광주전남건설지사
section_fields
Project purpose
  • 광양항 배후단지 확대에 따른 전력 공급 능
Project region
  • 전남광주통합특별시 광양시
Project period
  • 2022.06~2026.12
사업 규모
  • XLPE2500㎟ 4C, 0.3KM
담당 사업소
  • 중부건설본부/광주전남건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 2023.04 ~ 2023.05 실시설계: 2023.12 ~ 2025.04 설계담당자: [redacted]
건설공사 개요
  • 공사 착공: 2025.08 공사 기간: 2025.08 ~ 2026.12 감독자: [redacted], 실적): 100, 24
[진행경과] □ '21.09 : 제9차 장기 송변전설비계획 반영 □ '23.05 : 기본설계 완료 □ '25.04 : 실시설계 완료 □ '25.09 : 공사 착공 □ '25.09 : 준공목표 변경요청 [계통운영부, `25.06→`26.12] □ '25.12 : 공사 중지 □ '26.07 : 공사 재착공 [향후계획] □ '26.11 : 공사 준공
future_plan_redacted□ 향후계획 [진행경과] □ '21.09 : 제9차 장기 송변전설비계획 반영 □ '23.05 : 기본설계 완료 □ '25.04 : 실시설계 완료 □ '25.09 : 공사 착공 □ '25.09 : 준공목표 변경요청 [계통운영부, `25.06→`26.12] □ '25.12 : 공사 중지 □ '26.07 : 공사 재착공 [향후계획] □ '26.11 : 공사 준공
attachment_count0
source_detail_sha2566025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|233692|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_95950c71bfebebc7

Sources EV-8de386baa6341a7d9f6bb1a9
Evidence SHA-256 6025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1
행 SHA-256 d0cd4eb3f97d7c6c10e7bc19e01be3273176ad2cb9540b5a7fad4398120ebbdd
Source snapshots by date · KOR · kepco_planned

154kV 광양항분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_dc40ded405d593f0
stable_project_keyprjtDef:233692:ESB
project_definition233692
first_region_codeESB
manual_source_formatfalse
project_name154kV 광양항분기 지중T/L 건설사업
project_name_list154kV 광양항분기 지중송전선로 건설사업
purpose광양항 배후단지 확대에 따른 전력 공급 능
project_region_detail전남광주통합특별시 광양시
project_period_raw2022.06~2026.12
project_scale_rawXLPE2500㎟ 4C, 0.3KM
responsible_office_raw중부건설본부/광주전남건설지사
equipment_type지중송전
headquarters중부건설본부
office광주전남건설지사
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_95950c71bfebebc7
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_dc40ded405d593f0

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_dc40ded405d593f0

Sources EV-3c49beb01b3be2e1f1b72a58
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 cc91c291c0bac271e84eb0943c8064004561ef910c5e44b95b733bad95d5a1fe
Power assets and projects · KOR · kepco_planned

154kV 광일S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-994a00de1ff051881860d7d9
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_87d4d152973a6096
stable_project_keyprjtDef:231455:ESB
project_definition231455
first_region_codeESB
manual_source_formatfalse
project_name154kV 광일S/S 건설사업
project_name_list154,000V 광일변전소 건설사업
purpose수도권 3기 신도시(광명시흥지구) 전력 공급
project_region_detail경기도 광명시
project_period_raw2026.09~2032.04
project_scale_raw154KV M.TR 60MVA X 2BANK(최종 4BANK)
responsible_office_raw경인건설본부/남서울인천건설지사
equipment_type변전
headquarters경인건설본부
office남서울인천건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_4f43ce29dd994837
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_87d4d152973a6096

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_87d4d152973a6096

Sources EV-994a00de1ff051881860d7d9
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 756d6826fbc08209fd8a9d21fda28d95d9cbe06506acc0caf3f225f816c98a14
Source schedule candidates · KOR · kepco_planned

154kV 광일S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2026-09
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231455|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_4f43ce29dd994837

Sources EV-c170a139f1bbfa52f074c1e5
Evidence SHA-256 a1ee8be618b13240719e374dd63bdb01fa67f15e54139c345c205e551224989f
행 SHA-256 375332030e48c757ab7bab6b2c96c71a6545cf04bd132bfd2ffe6dbd1f8c1086
Source schedule candidates · KOR · kepco_planned

154kV 광일S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2032-04
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231455|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_4f43ce29dd994837

Sources EV-c170a139f1bbfa52f074c1e5
Evidence SHA-256 a1ee8be618b13240719e374dd63bdb01fa67f15e54139c345c205e551224989f
행 SHA-256 375332030e48c757ab7bab6b2c96c71a6545cf04bd132bfd2ffe6dbd1f8c1086
Source snapshots by date · KOR · kepco_planned

154kV 광일S/S 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_4f43ce29dd994837
stable_project_idkproj_87d4d152973a6096
source_key202609|231455|ESB
basic_ym202609
source_stage_raw계획확정-사업승인전
project_name_list154,000V 광일변전소 건설사업
project_name_detail154kV 광일S/S 건설사업
region_summary_raw경기도 광명시등 1 지역
equipment_type_raw변전
headquarters_raw경인건설본부
office_raw남서울인천건설지사
section_fields
Project purpose
  • 수도권 3기 신도시(광명시흥지구) 전력 공급
Project region
  • 경기도 광명시
Project period
  • 2026.09~2032.04
사업 규모
  • 154KV M.TR 60MVA X 2BANK(최종 4BANK)
담당 사업소
  • 경인건설본부/남서울인천건설지사
계획확정
  • 제11차 장기송변전설비계획 반영(2025.05)
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
○ '30. 5 : 공사 착공 ○ '32. 4 : 공사 준공 및 변전소 가압
future_plan_redacted□ 향후계획 ○ '30. 5 : 공사 착공 ○ '32. 4 : 공사 준공 및 변전소 가압
attachment_count0
source_detail_sha256a1ee8be618b13240719e374dd63bdb01fa67f15e54139c345c205e551224989f
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231455|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_4f43ce29dd994837

Sources EV-c170a139f1bbfa52f074c1e5
Evidence SHA-256 a1ee8be618b13240719e374dd63bdb01fa67f15e54139c345c205e551224989f
행 SHA-256 375332030e48c757ab7bab6b2c96c71a6545cf04bd132bfd2ffe6dbd1f8c1086
Source snapshots by date · KOR · kepco_planned

154kV 광일S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_87d4d152973a6096
stable_project_keyprjtDef:231455:ESB
project_definition231455
first_region_codeESB
manual_source_formatfalse
project_name154kV 광일S/S 건설사업
project_name_list154,000V 광일변전소 건설사업
purpose수도권 3기 신도시(광명시흥지구) 전력 공급
project_region_detail경기도 광명시
project_period_raw2026.09~2032.04
project_scale_raw154KV M.TR 60MVA X 2BANK(최종 4BANK)
responsible_office_raw경인건설본부/남서울인천건설지사
equipment_type변전
headquarters경인건설본부
office남서울인천건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_4f43ce29dd994837
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_87d4d152973a6096

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_87d4d152973a6096

Sources EV-994a00de1ff051881860d7d9
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 756d6826fbc08209fd8a9d21fda28d95d9cbe06506acc0caf3f225f816c98a14
Power assets and projects · KOR · kepco_planned

154kV 광주이천(가칭) 변전소 및 관련분기 송전선로 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date Not stated
Sources EV-75497b997b2103e61680a1d0
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_adbcd7cda9c92aed
stable_project_keymanual:7:0:-
project_definition0
first_region_code
manual_source_formattrue
project_name154kV 광주이천(가칭) 변전소 및 관련분기 송전선로 건설사업
project_name_list154kV 광주이천(가칭) 변전소 및 관련분기 송전선로 건설사업
purpose
project_region_detail경기도 광주시,이천시
project_period_raw2023.05~
project_scale_raw
responsible_office_raw경인건설본부/경기건설지사
equipment_type변전
headquarters경인건설본부
office경기건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_d2bddb5cdf769843
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_adbcd7cda9c92aed

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source Not stated · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_adbcd7cda9c92aed

Sources EV-75497b997b2103e61680a1d0
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 4c462e8a3aa2978cd289f9ba4cf7a563ae58129f975ad0893cd8ccaad30d9177
Source schedule candidates · KOR · kepco_planned

154kV 광주이천(가칭) 변전소 및 관련분기 송전선로 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2023-05
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key7|0|
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source Not stated · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d2bddb5cdf769843

Sources EV-d8ca3ce8fa62c230344eef72
Evidence SHA-256 a1d337cea7b47094ed7ac076e7a1999b317f7c0ce05b6d124bc14f58dc725fcd
행 SHA-256 c955fa95b45c5ed3902c98ac20640a0391f2362c972315741d07628eb67a9932
Source schedule candidates · KOR · kepco_planned

154kV 광주이천(가칭) 변전소 및 관련분기 송전선로 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2026-01
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key7|0|
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source Not stated · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d2bddb5cdf769843

Sources EV-d8ca3ce8fa62c230344eef72
Evidence SHA-256 a1d337cea7b47094ed7ac076e7a1999b317f7c0ce05b6d124bc14f58dc725fcd
행 SHA-256 c955fa95b45c5ed3902c98ac20640a0391f2362c972315741d07628eb67a9932
Source schedule candidates · KOR · kepco_planned

154kV 광주이천(가칭) 변전소 및 관련분기 송전선로 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2023-05
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key7|0|
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source Not stated · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d2bddb5cdf769843

Sources EV-d8ca3ce8fa62c230344eef72
Evidence SHA-256 a1d337cea7b47094ed7ac076e7a1999b317f7c0ce05b6d124bc14f58dc725fcd
행 SHA-256 c955fa95b45c5ed3902c98ac20640a0391f2362c972315741d07628eb67a9932
Source schedule candidates · KOR · kepco_planned

154kV 광주이천(가칭) 변전소 및 관련분기 송전선로 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-01
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key7|0|
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source Not stated · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d2bddb5cdf769843

Sources EV-d8ca3ce8fa62c230344eef72
Evidence SHA-256 a1d337cea7b47094ed7ac076e7a1999b317f7c0ce05b6d124bc14f58dc725fcd
행 SHA-256 c955fa95b45c5ed3902c98ac20640a0391f2362c972315741d07628eb67a9932
Source schedule candidates · KOR · kepco_planned

154kV 광주이천(가칭) 변전소 및 관련분기 송전선로 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-01
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key7|0|
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source Not stated · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d2bddb5cdf769843

Sources EV-d8ca3ce8fa62c230344eef72
Evidence SHA-256 a1d337cea7b47094ed7ac076e7a1999b317f7c0ce05b6d124bc14f58dc725fcd
행 SHA-256 c955fa95b45c5ed3902c98ac20640a0391f2362c972315741d07628eb67a9932
Source snapshots by date · KOR · kepco_planned

154kV 광주이천(가칭) 변전소 및 관련분기 송전선로 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_d2bddb5cdf769843
stable_project_idkproj_adbcd7cda9c92aed
source_key7|0|
basic_ym7
source_stage_raw계획확정-사업승인전
project_name_list154kV 광주이천(가칭) 변전소 및 관련분기 송전선로 건설사업
project_name_detail154kV 광주이천(가칭) 변전소 및 관련분기 송전선로 건설사업
region_summary_raw경기도 광주시등 2 지역
equipment_type_raw변전
headquarters_raw경인건설본부
office_raw경기건설지사
section_fields
Project purpose
Project region
  • 경기도 광주시,이천시
Project period
  • 2023.05~
사업 규모
담당 사업소
  • 경인건설본부/경기건설지사
계획확정
  • 제10차 장기송변전설비계획 반영(10)
입지선정
  • 전력입지영향평가 용역 착수: 2025.01 입지선정위원회 구성시기: 2026.01 참여 위원 수 : 21 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
  • 입지선정위원회 구성 및 활동 중
line 입지선정위원회 6차회의 시
future_plan_redactedline □ 향후계획 입지선정위원회 6차회의 시
attachment_count5
source_detail_sha256a1d337cea7b47094ed7ac076e7a1999b317f7c0ce05b6d124bc14f58dc725fcd
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period7
source_record_id7|0|

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source Not stated · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d2bddb5cdf769843

Sources EV-d8ca3ce8fa62c230344eef72
Evidence SHA-256 a1d337cea7b47094ed7ac076e7a1999b317f7c0ce05b6d124bc14f58dc725fcd
행 SHA-256 c955fa95b45c5ed3902c98ac20640a0391f2362c972315741d07628eb67a9932
Source snapshots by date · KOR · kepco_planned

154kV 광주이천(가칭) 변전소 및 관련분기 송전선로 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_adbcd7cda9c92aed
stable_project_keymanual:7:0:-
project_definition0
first_region_code
manual_source_formattrue
project_name154kV 광주이천(가칭) 변전소 및 관련분기 송전선로 건설사업
project_name_list154kV 광주이천(가칭) 변전소 및 관련분기 송전선로 건설사업
purpose
project_region_detail경기도 광주시,이천시
project_period_raw2023.05~
project_scale_raw
responsible_office_raw경인건설본부/경기건설지사
equipment_type변전
headquarters경인건설본부
office경기건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_d2bddb5cdf769843
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_adbcd7cda9c92aed

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source Not stated · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_adbcd7cda9c92aed

Sources EV-75497b997b2103e61680a1d0
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 4c462e8a3aa2978cd289f9ba4cf7a563ae58129f975ad0893cd8ccaad30d9177
Power assets and projects · KOR · kepco_planned

154kV 교산S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-b72a4cc781d7af64607cd2e2
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_da14d4488d3eb457
stable_project_keyprjtDef:231620:ESB
project_definition231620
first_region_codeESB
manual_source_formatfalse
project_name154kV 교산S/S 건설사업
project_name_list154kV 교산S/S 건설사업
purpose인근변전소 과부하 해소 및 계통보강
project_region_detail경기도 하남시
project_period_raw2022.06~2030.06
project_scale_raw154KV M.TR 2BANK
responsible_office_raw경인건설본부/남서울인천건설지사
equipment_type변전
headquarters경인건설본부
office남서울인천건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_2315b7e1051a564e
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_da14d4488d3eb457

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_da14d4488d3eb457

Sources EV-b72a4cc781d7af64607cd2e2
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 4e39384971f2ff7f3513d951e0e31782c5a6fb4b552a09283b1ed6c1ab6621f5
Source schedule candidates · KOR · kepco_planned

154kV 교산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2030-06
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231620|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_2315b7e1051a564e

Sources EV-acf7548ecc83b49d48b1156e
Evidence SHA-256 23c9b3b283e1db27960e66e28ab620d5d605055ee85010dd481a11a79bea28af
행 SHA-256 644447704bcf82bcbd534546755901b461539ecefefa6ed8ff4e6c3625d37ba2
Source schedule candidates · KOR · kepco_planned

154kV 교산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2022-06
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231620|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_2315b7e1051a564e

Sources EV-acf7548ecc83b49d48b1156e
Evidence SHA-256 23c9b3b283e1db27960e66e28ab620d5d605055ee85010dd481a11a79bea28af
행 SHA-256 644447704bcf82bcbd534546755901b461539ecefefa6ed8ff4e6c3625d37ba2
Source snapshots by date · KOR · kepco_planned

154kV 교산S/S 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_2315b7e1051a564e
stable_project_idkproj_da14d4488d3eb457
source_key202609|231620|ESB
basic_ym202609
source_stage_raw계획확정-사업승인전
project_name_list154kV 교산S/S 건설사업
project_name_detail154kV 교산S/S 건설사업
region_summary_raw경기도 하남시등 1 지역
equipment_type_raw변전
headquarters_raw경인건설본부
office_raw남서울인천건설지사
section_fields
Project purpose
  • 인근변전소 과부하 해소 및 계통보강
Project region
  • 경기도 하남시
Project period
  • 2022.06~2030.06
사업 규모
  • 154KV M.TR 2BANK
담당 사업소
  • 경인건설본부/남서울인천건설지사
계획확정
  • 제10차 장기송변전설비계획 반영()
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 2024.05 참여 위원 수 : 15 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
○추진실적 □ '23.05 : 송변전설비계획 확정 □ '23.06 ~ : 하남교산 공공주택지구내 변전소 배치(안) 협의 □ '24.12월 : 하남교산 공공주택지구 지정 변경(3차) 및 지구계획 변경(3차) 승인알림 ○향후계획 □ '28.06 : 변전, 토건공사 착공 □ '30.06 : 가압 및 공사 준공
future_plan_redacted□ 향후계획 ○추진실적 □ '23.05 : 송변전설비계획 확정 □ '23.06 ~ : 하남교산 공공주택지구내 변전소 배치(안) 협의 □ '24.12월 : 하남교산 공공주택지구 지정 변경(3차) 및 지구계획 변경(3차) 승인알림 ○향후계획 □ '28.06 : 변전, 토건공사 착공 □ '30.06 : 가압 및 공사 준공
attachment_count0
source_detail_sha25623c9b3b283e1db27960e66e28ab620d5d605055ee85010dd481a11a79bea28af
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231620|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_2315b7e1051a564e

Sources EV-acf7548ecc83b49d48b1156e
Evidence SHA-256 23c9b3b283e1db27960e66e28ab620d5d605055ee85010dd481a11a79bea28af
행 SHA-256 644447704bcf82bcbd534546755901b461539ecefefa6ed8ff4e6c3625d37ba2
Source snapshots by date · KOR · kepco_planned

154kV 교산S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_da14d4488d3eb457
stable_project_keyprjtDef:231620:ESB
project_definition231620
first_region_codeESB
manual_source_formatfalse
project_name154kV 교산S/S 건설사업
project_name_list154kV 교산S/S 건설사업
purpose인근변전소 과부하 해소 및 계통보강
project_region_detail경기도 하남시
project_period_raw2022.06~2030.06
project_scale_raw154KV M.TR 2BANK
responsible_office_raw경인건설본부/남서울인천건설지사
equipment_type변전
headquarters경인건설본부
office남서울인천건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_2315b7e1051a564e
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_da14d4488d3eb457

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_da14d4488d3eb457

Sources EV-b72a4cc781d7af64607cd2e2
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 4e39384971f2ff7f3513d951e0e31782c5a6fb4b552a09283b1ed6c1ab6621f5
Power assets and projects · KOR · kepco_planned

154kV 구로#2S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-f7bac3d01ce3232914ae83fb
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_79331d7846b77787
stable_project_keyprjtDef:231569:ESB
project_definition231569
first_region_codeESB
manual_source_formatfalse
project_name154kV 구로#2S/S 건설사업
project_name_list154kV 구로#2S/S 건설사업
purpose변전설비 적기확충으로 안정적 전력공급
project_region_detail서울특별시 구로구
project_period_raw2021.08~2032.12
project_scale_raw154KV M.TR 2BANK(최종 4BANK), 170KV GIS 10CCT
responsible_office_raw경인건설본부/남서울인천건설지사
equipment_type변전
headquarters경인건설본부
office남서울인천건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_caa890013f8522f2
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_79331d7846b77787

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_79331d7846b77787

Sources EV-f7bac3d01ce3232914ae83fb
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 73510279269057e4f6c7fed0ac30c94ad61b3fdbf4daa6f8a12608bec8cff768
Source schedule candidates · KOR · kepco_planned

154kV 구로#2S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2032-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231569|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_caa890013f8522f2

Sources EV-88a789e8d4431110f26cfb5f
Evidence SHA-256 325a1992573a48f7261e58e2482fc69d57c9acb812b0531d2010f4f920ca1b75
행 SHA-256 5cf7bedb7426fe514ef763b8081a8ab95098f9c83b6fdf96fe56e71f4e7eddb7
Source schedule candidates · KOR · kepco_planned

154kV 구로#2S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2021-08
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231569|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_caa890013f8522f2

Sources EV-88a789e8d4431110f26cfb5f
Evidence SHA-256 325a1992573a48f7261e58e2482fc69d57c9acb812b0531d2010f4f920ca1b75
행 SHA-256 5cf7bedb7426fe514ef763b8081a8ab95098f9c83b6fdf96fe56e71f4e7eddb7
Source snapshots by date · KOR · kepco_planned

154kV 구로#2S/S 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_caa890013f8522f2
stable_project_idkproj_79331d7846b77787
source_key202609|231569|ESB
basic_ym202609
source_stage_raw계획확정-사업승인전
project_name_list154kV 구로#2S/S 건설사업
project_name_detail154kV 구로#2S/S 건설사업
region_summary_raw서울특별시 구로구등 1 지역
equipment_type_raw변전
headquarters_raw경인건설본부
office_raw남서울인천건설지사
section_fields
Project purpose
  • 변전설비 적기확충으로 안정적 전력공급
Project region
  • 서울특별시 구로구
Project period
  • 2021.08~2032.12
사업 규모
  • 154KV M.TR 2BANK(최종 4BANK), 170KV GIS 10CCT
담당 사업소
  • 경인건설본부/남서울인천건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
1. 진행경과 : 변전소 입지선정 부지협의중 2. 향후계획 - '27.06 : 부지확정완료 - '28.03 : 용지매수완료 - '28.11 : 토건 착공 - '30.10 : 변전소 가압
future_plan_redacted□ 향후계획 1. 진행경과 : 변전소 입지선정 부지협의중 2. 향후계획 - '27.06 : 부지확정완료 - '28.03 : 용지매수완료 - '28.11 : 토건 착공 - '30.10 : 변전소 가압
attachment_count0
source_detail_sha256325a1992573a48f7261e58e2482fc69d57c9acb812b0531d2010f4f920ca1b75
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231569|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_caa890013f8522f2

Sources EV-88a789e8d4431110f26cfb5f
Evidence SHA-256 325a1992573a48f7261e58e2482fc69d57c9acb812b0531d2010f4f920ca1b75
행 SHA-256 5cf7bedb7426fe514ef763b8081a8ab95098f9c83b6fdf96fe56e71f4e7eddb7
Source snapshots by date · KOR · kepco_planned

154kV 구로#2S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_79331d7846b77787
stable_project_keyprjtDef:231569:ESB
project_definition231569
first_region_codeESB
manual_source_formatfalse
project_name154kV 구로#2S/S 건설사업
project_name_list154kV 구로#2S/S 건설사업
purpose변전설비 적기확충으로 안정적 전력공급
project_region_detail서울특별시 구로구
project_period_raw2021.08~2032.12
project_scale_raw154KV M.TR 2BANK(최종 4BANK), 170KV GIS 10CCT
responsible_office_raw경인건설본부/남서울인천건설지사
equipment_type변전
headquarters경인건설본부
office남서울인천건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_caa890013f8522f2
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_79331d7846b77787

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_79331d7846b77787

Sources EV-f7bac3d01ce3232914ae83fb
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 73510279269057e4f6c7fed0ac30c94ad61b3fdbf4daa6f8a12608bec8cff768
Power assets and projects · KOR · kepco_planned

154kV 구룡-군북T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-10
Sources EV-52ad41787095a775acefcb11
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_d1b2181077ec8b7b
stable_project_keyprjtDef:232396:ESB
project_definition232396
first_region_codeESB
manual_source_formatfalse
project_name154kV 구룡-군북T/L 건설사업
project_name_list154kV 구룡-군북송전선로 건설사업
purpose구룡S/S 계통보강을 통한 공급신뢰도 향상
project_region_detail경상남도 의령군,함안군
project_period_raw2024.04~2029.10
project_scale_rawACSR 410㎟ × 2C, 4C / ACSR 480㎟ × 2C
responsible_office_raw남부건설본부/직할
equipment_type가공송전
headquarters남부건설본부
office직할
current_stage_raw사업승인-공사착수전
snapshot_count2
active_snapshot_count2
snapshot_ids
  • ksnap_3b21f157522c9f00
  • ksnap_7d1f2dd24a8e3071
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_d1b2181077ec8b7b

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_d1b2181077ec8b7b

Sources EV-52ad41787095a775acefcb11
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 c843801b19dff874d53cec84502c9cffa8f3a561844112c4d581c718a9d22f6b
Source schedule candidates · KOR · kepco_planned

154kV 구룡-군북T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232396|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7d1f2dd24a8e3071

Sources EV-c8bf0d421e6b605c4447b062
Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622
행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5
Source schedule candidates · KOR · kepco_planned

154kV 구룡-군북T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-07
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232396|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7d1f2dd24a8e3071

Sources EV-c8bf0d421e6b605c4447b062
Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622
행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5
Source schedule candidates · KOR · kepco_planned

154kV 구룡-군북T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-11
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232396|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7d1f2dd24a8e3071

Sources EV-c8bf0d421e6b605c4447b062
Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622
행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5
Source schedule candidates · KOR · kepco_planned

154kV 구룡-군북T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-07
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232396|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7d1f2dd24a8e3071

Sources EV-c8bf0d421e6b605c4447b062
Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622
행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5
Source schedule candidates · KOR · kepco_planned

154kV 구룡-군북T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2016-02
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232396|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7d1f2dd24a8e3071

Sources EV-c8bf0d421e6b605c4447b062
Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622
행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5
Source schedule candidates · KOR · kepco_planned

154kV 구룡-군북T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2029-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232396|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_3b21f157522c9f00

Sources EV-845bb56ead1c962add5caaea
Evidence SHA-256 9f0b1d16c4da4f3269b5ba2f20dbe4d80a8ee3cc737940c8866fa34ea2c245f7
행 SHA-256 ffc1c7a86af17dc9efeda4677cce7594ee26e07256f3f4dca8f84bfae6e5c47b
Source schedule candidates · KOR · kepco_planned

154kV 구룡-군북T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeimplementation_plan_approval
date2026-03
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232396|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7d1f2dd24a8e3071

Sources EV-c8bf0d421e6b605c4447b062
Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622
행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5
Source schedule candidates · KOR · kepco_planned

154kV 구룡-군북T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232396|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7d1f2dd24a8e3071

Sources EV-c8bf0d421e6b605c4447b062
Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622
행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5
Source schedule candidates · KOR · kepco_planned

154kV 구룡-군북T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2024-04
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232396|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_3b21f157522c9f00

Sources EV-845bb56ead1c962add5caaea
Evidence SHA-256 9f0b1d16c4da4f3269b5ba2f20dbe4d80a8ee3cc737940c8866fa34ea2c245f7
행 SHA-256 ffc1c7a86af17dc9efeda4677cce7594ee26e07256f3f4dca8f84bfae6e5c47b
Source schedule candidates · KOR · kepco_planned

154kV 구룡-군북T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232396|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7d1f2dd24a8e3071

Sources EV-c8bf0d421e6b605c4447b062
Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622
행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5
Source schedule candidates · KOR · kepco_planned

154kV 구룡-군북T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232396|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7d1f2dd24a8e3071

Sources EV-c8bf0d421e6b605c4447b062
Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622
행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5
Source schedule candidates · KOR · kepco_planned

154kV 구룡-군북T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2023-05
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232396|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7d1f2dd24a8e3071

Sources EV-c8bf0d421e6b605c4447b062
Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622
행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5
Source schedule candidates · KOR · kepco_planned

154kV 구룡-군북T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-05
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232396|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7d1f2dd24a8e3071

Sources EV-c8bf0d421e6b605c4447b062
Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622
행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5
Source schedule candidates · KOR · kepco_planned

154kV 구룡-군북T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2017-11
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232396|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7d1f2dd24a8e3071

Sources EV-c8bf0d421e6b605c4447b062
Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622
행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5
Source schedule candidates · KOR · kepco_planned

154kV 구룡-군북T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-12
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232396|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7d1f2dd24a8e3071

Sources EV-c8bf0d421e6b605c4447b062
Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622
행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5
Source schedule candidates · KOR · kepco_planned

154kV 구룡-군북T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2017-07
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232396|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7d1f2dd24a8e3071

Sources EV-c8bf0d421e6b605c4447b062
Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622
행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5
Source schedule candidates · KOR · kepco_planned

154kV 구룡-군북T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-05
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232396|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7d1f2dd24a8e3071

Sources EV-c8bf0d421e6b605c4447b062
Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622
행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5
Source schedule candidates · KOR · kepco_planned

154kV 구룡-군북T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-11
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232396|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7d1f2dd24a8e3071

Sources EV-c8bf0d421e6b605c4447b062
Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622
행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5
Source schedule candidates · KOR · kepco_planned

154kV 구룡-군북T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2029-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202610|232396|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7d1f2dd24a8e3071

Sources EV-c8bf0d421e6b605c4447b062
Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622
행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5
Source schedule candidates · KOR · kepco_planned

154kV 구룡-군북T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2024-04
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202610|232396|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7d1f2dd24a8e3071

Sources EV-c8bf0d421e6b605c4447b062
Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622
행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5
Source schedule candidates · KOR · kepco_planned

154kV 구룡-군북T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2017-07
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232396|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7d1f2dd24a8e3071

Sources EV-c8bf0d421e6b605c4447b062
Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622
행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5
Source schedule candidates · KOR · kepco_planned

154kV 구룡-군북T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-02
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232396|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7d1f2dd24a8e3071

Sources EV-c8bf0d421e6b605c4447b062
Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622
행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5
Source schedule candidates · KOR · kepco_planned

154kV 구룡-군북T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2022-08
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232396|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7d1f2dd24a8e3071

Sources EV-c8bf0d421e6b605c4447b062
Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622
행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5
Source schedule candidates · KOR · kepco_planned

154kV 구룡-군북T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232396|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7d1f2dd24a8e3071

Sources EV-c8bf0d421e6b605c4447b062
Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622
행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5
Source schedule candidates · KOR · kepco_planned

154kV 구룡-군북T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2017-11
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232396|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7d1f2dd24a8e3071

Sources EV-c8bf0d421e6b605c4447b062
Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622
행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5
Source snapshots by date · KOR · kepco_planned

154kV 구룡-군북T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_3b21f157522c9f00
stable_project_idkproj_d1b2181077ec8b7b
source_key202609|232396|ESB
basic_ym202609
source_stage_raw사업승인-공사착수전
project_name_list154kV 구룡-군북송전선로 건설사업
project_name_detail154kV 구룡-군북T/L 건설사업
region_summary_raw경상남도 의령군등 2 지역
equipment_type_raw가공송전
headquarters_raw남부건설본부
office_raw직할
section_fields
Project purpose
  • 구룡S/S 계통보강을 통한 공급신뢰도 향상
Project region
  • 경상남도 의령군,함안군
Project period
  • 2024.04~2029.10
사업 규모
  • ACSR 410㎟ × 2C, 4C / ACSR 480㎟ × 2C
담당 사업소
  • 남부건설본부/직할
계획확정
  • 제11차 장기송변전설비계획 반영(2025.05)
입지선정
  • 전력입지영향평가 용역 착수: 2016.02 입지선정위원회 구성시기: 참여 위원 수 : 지장유무 조회: 2023.02~2023.05 경과지(부지) 확정: 2022.08
환경/재해 영향평가
  • 환경영향평가: 2017.07 ~ 2025.07 재해영향평가: 2017.07 ~ 2025.07
주민의견 수렴
  • 지자체 공고 열람: 2024.04 ~ 2024.04 설명회·공청회: 2024.04 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
  • line - '16. 6 ∼ '16. 8 : 입지선정위원회 위원위촉 - '16. 9 ∼ '17. 4 : 입지선정위원회 5회 개최 - '17. 6 ~ '17. 9 : 최적 후보경과지 마을별 간담회 개최(의령 8개, 함안 15개) - '17.11 : 송전선로 건설 반대대책위(방어산 9개마을) 간담회 시행 - '21.11 : 군북변전소 입지확정위원회 회의결과 및 부지확정 알림 - '22. 6 : 군북변전소 주민설명회(송전 포함) 시행 - '22. 8 : 입지확정위원회 시행(최적 경과지 결정) - '23. 2 : 군북면장 및 마을이장(박곡, 수곡, 가덕) 대상 사업설명회 시
전원개발사업 실시계획 승인
  • 2026.03
사업설계
  • 설계용역: 기본설계: 2025.04 ~ 2025.04 실시설계: 2025.05 ~ 2025.12 설계담당자: [redacted]
- '13. 6 : 제6차 장기송배전설비계획에 구룡-가야 송전선로 건설사업 반영 - '16. 6 ∼ '16. 8 : 입지선정위원회 위원위촉 - '16. 9 ∼ '17. 4 : 입지선정위원회 5회 개최 - '17. 6 ~ '17. 9 : 최적 후보경과지 마을별 간담회 개최(의령 8개, 함안 15개) - '17. 7 : 송전선로건설 반대대책위원회 발족 - '17. 9 : 송전선로 건설사업 공론화 관련 간담회 개최 - '17.11 : 송전선로 건설 반대대책위(방어산 9개마을) 간담회 시행 - '18. 9 : 제8차 장기송변전설비계획에 군북변전소 건설사업 반영 - '21.11 : 군북변전소 입지확정위원회 회의결과 및 부지확정 알림 - '22. 6 : 군북변전소 주민설명회(송전 포함) 시행 - '22. 8 : 입지확정위원회 시행(최적 경과지 결정) - '23. 2 : 군북면장 및 마을이장(박곡, 수곡, 가덕) 대상 사업설명회 시행 확정경과지 지장유무 조회(함안군, 의령군청) - '23. 3 : 확정경과지 지장유무 조회(한국도로공사, 낙동강유역환경청) - '24. 4 : 사업시행계획서 제출(산업부, 지자체) 및 주민설명회 개최(의령군, 함안군) - '24. 7 : 실시계획 승인 신청 - '26. 3 : 실시계획 승인 완료 - '26. 7 : 도급공사 공고 - '26. 12 : 공사 착공 - '28. 10 : 선로 가압
future_plan_redacted□ 향후계획 - '13. 6 : 제6차 장기송배전설비계획에 구룡-가야 송전선로 건설사업 반영 - '16. 6 ∼ '16. 8 : 입지선정위원회 위원위촉 - '16. 9 ∼ '17. 4 : 입지선정위원회 5회 개최 - '17. 6 ~ '17. 9 : 최적 후보경과지 마을별 간담회 개최(의령 8개, 함안 15개) - '17. 7 : 송전선로건설 반대대책위원회 발족 - '17. 9 : 송전선로 건설사업 공론화 관련 간담회 개최 - '17.11 : 송전선로 건설 반대대책위(방어산 9개마을) 간담회 시행 - '18. 9 : 제8차 장기송변전설비계획에 군북변전소 건설사업 반영 - '21.11 : 군북변전소 입지확정위원회 회의결과 및 부지확정 알림 - '22. 6 : 군북변전소 주민설명회(송전 포함) 시행 - '22. 8 : 입지확정위원회 시행(최적 경과지 결정) - '23. 2 : 군북면장 및 마을이장(박곡, 수곡, 가덕) 대상 사업설명회 시행 확정경과지 지장유무 조회(함안군, 의령군청) - '23. 3 : 확정경과지 지장유무 조회(한국도로공사, 낙동강유역환경청) - '24. 4 : 사업시행계획서 제출(산업부, 지자체) 및 주민설명회 개최(의령군, 함안군) - '24. 7 : 실시계획 승인 신청 - '26. 3 : 실시계획 승인 완료 - '26. 7 : 도급공사 공고 - '26. 12 : 공사 착공 - '28. 10 : 선로 가압
attachment_count0
source_detail_sha2569f0b1d16c4da4f3269b5ba2f20dbe4d80a8ee3cc737940c8866fa34ea2c245f7
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|232396|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_3b21f157522c9f00

Sources EV-845bb56ead1c962add5caaea
Evidence SHA-256 9f0b1d16c4da4f3269b5ba2f20dbe4d80a8ee3cc737940c8866fa34ea2c245f7
행 SHA-256 ffc1c7a86af17dc9efeda4677cce7594ee26e07256f3f4dca8f84bfae6e5c47b
Source snapshots by date · KOR · kepco_planned

154kV 구룡-군북T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_7d1f2dd24a8e3071
stable_project_idkproj_d1b2181077ec8b7b
source_key202610|232396|ESB
basic_ym202610
source_stage_raw사업승인-공사착수전
project_name_list154kV 구룡-군북송전선로 건설사업
project_name_detail154kV 구룡-군북T/L 건설사업
region_summary_raw경상남도 의령군등 2 지역
equipment_type_raw가공송전
headquarters_raw남부건설본부
office_raw직할
section_fields
Project purpose
  • 구룡S/S 계통보강을 통한 공급신뢰도 향상
Project region
  • 경상남도 의령군,함안군
Project period
  • 2024.04~2029.10
사업 규모
  • ACSR 410㎟ × 2C, 4C / ACSR 480㎟ × 2C
담당 사업소
  • 남부건설본부/직할
계획확정
  • 제11차 장기송변전설비계획 반영(2025.05)
입지선정
  • 전력입지영향평가 용역 착수: 2016.02 입지선정위원회 구성시기: 참여 위원 수 : 지장유무 조회: 2023.02~2023.05 경과지(부지) 확정: 2022.08
환경/재해 영향평가
  • 환경영향평가: 2017.07 ~ 2025.07 재해영향평가: 2017.07 ~ 2025.07
주민의견 수렴
  • 지자체 공고 열람: 2024.04 ~ 2024.04 설명회·공청회: 2024.04 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
  • line - '16. 6 ∼ '16. 8 : 입지선정위원회 위원위촉 - '16. 9 ∼ '17. 4 : 입지선정위원회 5회 개최 - '17. 6 ~ '17. 9 : 최적 후보경과지 마을별 간담회 개최(의령 8개, 함안 15개) - '17.11 : 송전선로 건설 반대대책위(방어산 9개마을) 간담회 시행 - '21.11 : 군북변전소 입지확정위원회 회의결과 및 부지확정 알림 - '22. 6 : 군북변전소 주민설명회(송전 포함) 시행 - '22. 8 : 입지확정위원회 시행(최적 경과지 결정) - '23. 2 : 군북면장 및 마을이장(박곡, 수곡, 가덕) 대상 사업설명회 시행 - '24. 4 : 의령군 대상 주민설명회 시 - '24. 6 : 함안군 군북면 마을 대상 주민설명회 시
전원개발사업 실시계획 승인
  • 2026.03
사업설계
  • 설계용역: 기본설계: 2025.04 ~ 2025.04 실시설계: 2025.05 ~ 2025.12 설계담당자: [redacted]
- '13. 6 : 제6차 장기송배전설비계획에 구룡-가야 송전선로 건설사업 반영 - '16. 6 ∼ '16. 8 : 입지선정위원회 위원위촉 - '16. 9 ∼ '17. 4 : 입지선정위원회 5회 개최 - '17. 6 ~ '17. 9 : 최적 후보경과지 마을별 간담회 개최(의령 8개, 함안 15개) - '17. 7 : 송전선로건설 반대대책위원회 발족 - '17. 9 : 송전선로 건설사업 공론화 관련 간담회 개최 - '17.11 : 송전선로 건설 반대대책위(방어산 9개마을) 간담회 시행 - '18. 9 : 제8차 장기송변전설비계획에 군북변전소 건설사업 반영 - '21.11 : 군북변전소 입지확정위원회 회의결과 및 부지확정 알림 - '22. 6 : 군북변전소 주민설명회(송전 포함) 시행 - '22. 8 : 입지확정위원회 시행(최적 경과지 결정) - '23. 2 : 군북면장 및 마을이장(박곡, 수곡, 가덕) 대상 사업설명회 시행 확정경과지 지장유무 조회(함안군, 의령군청) - '23. 3 : 확정경과지 지장유무 조회(한국도로공사, 낙동강유역환경청) - '24. 4 : 사업시행계획서 제출(산업부, 지자체) 및 주민설명회 개최(의령군, 함안군) - '24. 7 : 실시계획 승인 신청 - '26. 3 : 실시계획 승인 완료 - '26. 7 : 도급공사 공고 - '26. 12 : 공사 착공 - '28. 10 : 선로 가압
future_plan_redacted□ 향후계획 - '13. 6 : 제6차 장기송배전설비계획에 구룡-가야 송전선로 건설사업 반영 - '16. 6 ∼ '16. 8 : 입지선정위원회 위원위촉 - '16. 9 ∼ '17. 4 : 입지선정위원회 5회 개최 - '17. 6 ~ '17. 9 : 최적 후보경과지 마을별 간담회 개최(의령 8개, 함안 15개) - '17. 7 : 송전선로건설 반대대책위원회 발족 - '17. 9 : 송전선로 건설사업 공론화 관련 간담회 개최 - '17.11 : 송전선로 건설 반대대책위(방어산 9개마을) 간담회 시행 - '18. 9 : 제8차 장기송변전설비계획에 군북변전소 건설사업 반영 - '21.11 : 군북변전소 입지확정위원회 회의결과 및 부지확정 알림 - '22. 6 : 군북변전소 주민설명회(송전 포함) 시행 - '22. 8 : 입지확정위원회 시행(최적 경과지 결정) - '23. 2 : 군북면장 및 마을이장(박곡, 수곡, 가덕) 대상 사업설명회 시행 확정경과지 지장유무 조회(함안군, 의령군청) - '23. 3 : 확정경과지 지장유무 조회(한국도로공사, 낙동강유역환경청) - '24. 4 : 사업시행계획서 제출(산업부, 지자체) 및 주민설명회 개최(의령군, 함안군) - '24. 7 : 실시계획 승인 신청 - '26. 3 : 실시계획 승인 완료 - '26. 7 : 도급공사 공고 - '26. 12 : 공사 착공 - '28. 10 : 선로 가압
attachment_count0
source_detail_sha256662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202610
source_record_id202610|232396|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7d1f2dd24a8e3071

Sources EV-c8bf0d421e6b605c4447b062
Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622
행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5
Source snapshots by date · KOR · kepco_planned

154kV 구룡-군북T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_d1b2181077ec8b7b
stable_project_keyprjtDef:232396:ESB
project_definition232396
first_region_codeESB
manual_source_formatfalse
project_name154kV 구룡-군북T/L 건설사업
project_name_list154kV 구룡-군북송전선로 건설사업
purpose구룡S/S 계통보강을 통한 공급신뢰도 향상
project_region_detail경상남도 의령군,함안군
project_period_raw2024.04~2029.10
project_scale_rawACSR 410㎟ × 2C, 4C / ACSR 480㎟ × 2C
responsible_office_raw남부건설본부/직할
equipment_type가공송전
headquarters남부건설본부
office직할
current_stage_raw사업승인-공사착수전
snapshot_count2
active_snapshot_count2
snapshot_ids
  • ksnap_3b21f157522c9f00
  • ksnap_7d1f2dd24a8e3071
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_d1b2181077ec8b7b

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_d1b2181077ec8b7b

Sources EV-52ad41787095a775acefcb11
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 c843801b19dff874d53cec84502c9cffa8f3a561844112c4d581c718a9d22f6b
Power assets and projects · KOR · kepco_planned

154kV 구월분기 전력구 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-bf88957e6614bf359edf86d5
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_2d92c5f07c011998
stable_project_keyprjtDef:234850:ESB
project_definition234850
first_region_codeESB
manual_source_formatfalse
project_name154kV 구월분기 전력구 건설사업
project_name_list154kV 구월분기 전력구 건설사업
purpose구월2지구 등 신규부하 공급능력 확보
project_region_detail인천광역시 남동구,연수구
project_period_raw
project_scale_raw개착식전력구 500M, SHIELD TBM 2,100M [2,000㎟X2C(D)]
responsible_office_raw경인건설본부/직할
equipment_type전력구
headquarters경인건설본부
office직할
current_stage_raw
snapshot_count1
active_snapshot_count0
snapshot_ids
  • ksnap_73b507c3b42506a7
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text
source_record_idstable_project_id:kproj_2d92c5f07c011998

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_2d92c5f07c011998

Sources EV-bf88957e6614bf359edf86d5
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 55dd754fb7a051b838b26fa9009454db5a6e9a21f118e6efeea58d9db44c3477
Source snapshots by date · KOR · kepco_planned

154kV 구월분기 전력구 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_73b507c3b42506a7
stable_project_idkproj_2d92c5f07c011998
source_key202609|234850|ESB
basic_ym202609
source_stage_raw
project_name_list154kV 구월분기 전력구 건설사업
project_name_detail154kV 구월분기 전력구 건설사업
region_summary_raw인천광역시 남동구등 2 지역
equipment_type_raw전력구
headquarters_raw경인건설본부
office_raw직할
section_fields
Project purpose
  • 구월2지구 등 신규부하 공급능력 확보
Project region
  • 인천광역시 남동구,연수구
Project period
사업 규모
  • 개착식전력구 500M, SHIELD TBM 2,100M [2,000㎟X2C(D)]
담당 사업소
  • 경인건설본부/직할
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
future_plan_redacted□ 향후계획
attachment_count0
source_detail_sha256343e78981ca631bcd1c3bbc3d5b016ccaa117209dee9c858d9d7bedb02ffc065
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|234850|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_73b507c3b42506a7

Sources EV-aa3cd19fa3e481a0db0a098f
Evidence SHA-256 343e78981ca631bcd1c3bbc3d5b016ccaa117209dee9c858d9d7bedb02ffc065
행 SHA-256 18b97b048455cd3ff7b274eb2987d1fd640ee7260d99ba24115bdba7c709efe4
Source snapshots by date · KOR · kepco_planned

154kV 구월분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_2d92c5f07c011998
stable_project_keyprjtDef:234850:ESB
project_definition234850
first_region_codeESB
manual_source_formatfalse
project_name154kV 구월분기 전력구 건설사업
project_name_list154kV 구월분기 전력구 건설사업
purpose구월2지구 등 신규부하 공급능력 확보
project_region_detail인천광역시 남동구,연수구
project_period_raw
project_scale_raw개착식전력구 500M, SHIELD TBM 2,100M [2,000㎟X2C(D)]
responsible_office_raw경인건설본부/직할
equipment_type전력구
headquarters경인건설본부
office직할
current_stage_raw
snapshot_count1
active_snapshot_count0
snapshot_ids
  • ksnap_73b507c3b42506a7
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text
source_record_idstable_project_id:kproj_2d92c5f07c011998

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_2d92c5f07c011998

Sources EV-bf88957e6614bf359edf86d5
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 55dd754fb7a051b838b26fa9009454db5a6e9a21f118e6efeea58d9db44c3477
Power assets and projects · KOR · kepco_planned

154kV 군공-내초 관로 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-b4346ea8c1d7c9e985d113dc
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_f18f03de8d76874d
stable_project_keyprjtDef:234588:ESB
project_definition234588
first_region_codeESB
manual_source_formatfalse
project_name154kV 군공-내초 관로 건설사업
project_name_list군산지역 전기공급시설 관로공사(군공-내초)
purpose군산 북부지역 신규부하 공급능력 확충 및 인근 변전
project_region_detail전북특별자치도 군산시
project_period_raw2025.04~2028.12
project_scale_raw154KV 송전 1회선 관로 5KM
responsible_office_raw중부건설본부/전북건설지사
equipment_type전력구
headquarters중부건설본부
office전북건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_395872de54e5fee0
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_f18f03de8d76874d

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_f18f03de8d76874d

Sources EV-b4346ea8c1d7c9e985d113dc
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 16e21a8bcf63b4782fae69bc7d0c7fd4aedf88d2abd6bf60df9dc8c1a96c8c8c
Source schedule candidates · KOR · kepco_planned

154kV 군공-내초 관로 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2025-04
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|234588|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_395872de54e5fee0

Sources EV-23ed660a6cca56a5ad33b30c
Evidence SHA-256 4ce4b47717ace368ff55557ad9b4fcd1e4eed9c070d8264d342d222afc1706d8
행 SHA-256 c64b46f42f2e030eb4b1bedc6ae045d6a5a1b2e812f5f21967a0d672af0cb023
Source schedule candidates · KOR · kepco_planned

154kV 군공-내초 관로 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2026-04
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234588|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_395872de54e5fee0

Sources EV-23ed660a6cca56a5ad33b30c
Evidence SHA-256 4ce4b47717ace368ff55557ad9b4fcd1e4eed9c070d8264d342d222afc1706d8
행 SHA-256 c64b46f42f2e030eb4b1bedc6ae045d6a5a1b2e812f5f21967a0d672af0cb023
Source schedule candidates · KOR · kepco_planned

154kV 군공-내초 관로 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234588|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_395872de54e5fee0

Sources EV-23ed660a6cca56a5ad33b30c
Evidence SHA-256 4ce4b47717ace368ff55557ad9b4fcd1e4eed9c070d8264d342d222afc1706d8
행 SHA-256 c64b46f42f2e030eb4b1bedc6ae045d6a5a1b2e812f5f21967a0d672af0cb023
Source schedule candidates · KOR · kepco_planned

154kV 군공-내초 관로 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_completion
date2026-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234588|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_395872de54e5fee0

Sources EV-23ed660a6cca56a5ad33b30c
Evidence SHA-256 4ce4b47717ace368ff55557ad9b4fcd1e4eed9c070d8264d342d222afc1706d8
행 SHA-256 c64b46f42f2e030eb4b1bedc6ae045d6a5a1b2e812f5f21967a0d672af0cb023
Source schedule candidates · KOR · kepco_planned

154kV 군공-내초 관로 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234588|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_395872de54e5fee0

Sources EV-23ed660a6cca56a5ad33b30c
Evidence SHA-256 4ce4b47717ace368ff55557ad9b4fcd1e4eed9c070d8264d342d222afc1706d8
행 SHA-256 c64b46f42f2e030eb4b1bedc6ae045d6a5a1b2e812f5f21967a0d672af0cb023
Source schedule candidates · KOR · kepco_planned

154kV 군공-내초 관로 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-08
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234588|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_395872de54e5fee0

Sources EV-23ed660a6cca56a5ad33b30c
Evidence SHA-256 4ce4b47717ace368ff55557ad9b4fcd1e4eed9c070d8264d342d222afc1706d8
행 SHA-256 c64b46f42f2e030eb4b1bedc6ae045d6a5a1b2e812f5f21967a0d672af0cb023

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel