POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 201,406items · current page 701–800 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2024-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231486|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_52629799ba267c43
Sources EV-dff466a127d4000ab67e93f2 Evidence SHA-256 2d14ec519c7ce130e2ad13e732551936125c1d13314260284f869b4c2501912d 행 SHA-256 01c3c46a997ee20bd3b4c1651e73372f476e9e82b12aff95f63bae5759809bcd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-11 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231486|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_52629799ba267c43
Sources EV-dff466a127d4000ab67e93f2 Evidence SHA-256 2d14ec519c7ce130e2ad13e732551936125c1d13314260284f869b4c2501912d 행 SHA-256 01c3c46a997ee20bd3b4c1651e73372f476e9e82b12aff95f63bae5759809bcd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2017-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231486|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_52629799ba267c43
Sources EV-dff466a127d4000ab67e93f2 Evidence SHA-256 2d14ec519c7ce130e2ad13e732551936125c1d13314260284f869b4c2501912d 행 SHA-256 01c3c46a997ee20bd3b4c1651e73372f476e9e82b12aff95f63bae5759809bcd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231486|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_52629799ba267c43
Sources EV-dff466a127d4000ab67e93f2 Evidence SHA-256 2d14ec519c7ce130e2ad13e732551936125c1d13314260284f869b4c2501912d 행 SHA-256 01c3c46a997ee20bd3b4c1651e73372f476e9e82b12aff95f63bae5759809bcd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type implementation_plan_approval date 2023-08 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231486|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_52629799ba267c43
Sources EV-dff466a127d4000ab67e93f2 Evidence SHA-256 2d14ec519c7ce130e2ad13e732551936125c1d13314260284f869b4c2501912d 행 SHA-256 01c3c46a997ee20bd3b4c1651e73372f476e9e82b12aff95f63bae5759809bcd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2019-03 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231486|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_52629799ba267c43
Sources EV-dff466a127d4000ab67e93f2 Evidence SHA-256 2d14ec519c7ce130e2ad13e732551936125c1d13314260284f869b4c2501912d 행 SHA-256 01c3c46a997ee20bd3b4c1651e73372f476e9e82b12aff95f63bae5759809bcd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type energization date 2025-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231486|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_52629799ba267c43
Sources EV-dff466a127d4000ab67e93f2 Evidence SHA-256 2d14ec519c7ce130e2ad13e732551936125c1d13314260284f869b4c2501912d 행 SHA-256 01c3c46a997ee20bd3b4c1651e73372f476e9e82b12aff95f63bae5759809bcd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2025-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231486|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_52629799ba267c43
Sources EV-dff466a127d4000ab67e93f2 Evidence SHA-256 2d14ec519c7ce130e2ad13e732551936125c1d13314260284f869b4c2501912d 행 SHA-256 01c3c46a997ee20bd3b4c1651e73372f476e9e82b12aff95f63bae5759809bcd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2025-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231486|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_52629799ba267c43
Sources EV-dff466a127d4000ab67e93f2 Evidence SHA-256 2d14ec519c7ce130e2ad13e732551936125c1d13314260284f869b4c2501912d 행 SHA-256 01c3c46a997ee20bd3b4c1651e73372f476e9e82b12aff95f63bae5759809bcd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2018-02 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231486|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_52629799ba267c43
Sources EV-dff466a127d4000ab67e93f2 Evidence SHA-256 2d14ec519c7ce130e2ad13e732551936125c1d13314260284f869b4c2501912d 행 SHA-256 01c3c46a997ee20bd3b4c1651e73372f476e9e82b12aff95f63bae5759809bcd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2018-11 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231486|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_52629799ba267c43
Sources EV-dff466a127d4000ab67e93f2 Evidence SHA-256 2d14ec519c7ce130e2ad13e732551936125c1d13314260284f869b4c2501912d 행 SHA-256 01c3c46a997ee20bd3b4c1651e73372f476e9e82b12aff95f63bae5759809bcd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231486|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_52629799ba267c43
Sources EV-dff466a127d4000ab67e93f2 Evidence SHA-256 2d14ec519c7ce130e2ad13e732551936125c1d13314260284f869b4c2501912d 행 SHA-256 01c3c46a997ee20bd3b4c1651e73372f476e9e82b12aff95f63bae5759809bcd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2020-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231486|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_52629799ba267c43
Sources EV-dff466a127d4000ab67e93f2 Evidence SHA-256 2d14ec519c7ce130e2ad13e732551936125c1d13314260284f869b4c2501912d 행 SHA-256 01c3c46a997ee20bd3b4c1651e73372f476e9e82b12aff95f63bae5759809bcd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-12 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231486|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_52629799ba267c43
Sources EV-dff466a127d4000ab67e93f2 Evidence SHA-256 2d14ec519c7ce130e2ad13e732551936125c1d13314260284f869b4c2501912d 행 SHA-256 01c3c46a997ee20bd3b4c1651e73372f476e9e82b12aff95f63bae5759809bcd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_52629799ba267c43 stable_project_id kproj_24deb098bef4b822 source_key 202609|231486|ESB basic_ym 202609 source_stage_raw 공사착수-사업완료전 project_name_list 154kV 광양항S/S 건설사업 project_name_detail 154kV 광양항S/S 건설사업 region_summary_raw 전남광주통합특별시 광양시등 1 지역 equipment_type_raw 변전 headquarters_raw 중부건설본부 office_raw 광주전남건설지사 section_fields 사업 규모 154KV M.TR 60MVA X 2BANK (최종규모 4BANK) 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 기본설계: 2022.10 ~ 2022.10 실시설계: 2022.11 ~ 2023.02 설계담당자: [redacted] 건설공사 개요 공사 착공: 2024.04 공사 기간: 2024.04 ~ 2025.12 감독자: [redacted], 실적): 100, 94 [계획확정~사업승인전 추진실적] ○'17.12 : 광양항 변전소 설치건의, 검토요청(광양시) ○'18.11 : 광양항S/S 신설 계통계획 반영(확정'20.12) ○'19.03 : 입지확정위원회 및 부지확정보고 시행 [사업승인~공사착수전] [추진실적] ○'22.10 : 기본설계 변경(안) 확정 ○'23.02 : 실시설계 완료 ○'23.08 : 비관리청 항만개발사업 실시계획 승인 ○'23.12 : 건축허가 승인 ○'24.02 : 건축공사 착공 ○'24.10 : 변전공사 실착공 [향후계획] ○'25.12 : 변전소 기기가압 및 준공 future_plan_redacted □ 향후계획 [계획확정~사업승인전 추진실적] ○'17.12 : 광양항 변전소 설치건의, 검토요청(광양시) ○'18.11 : 광양항S/S 신설 계통계획 반영(확정'20.12) ○'19.03 : 입지확정위원회 및 부지확정보고 시행 [사업승인~공사착수전] [추진실적] ○'22.10 : 기본설계 변경(안) 확정 ○'23.02 : 실시설계 완료 ○'23.08 : 비관리청 항만개발사업 실시계획 승인 ○'23.12 : 건축허가 승인 ○'24.02 : 건축공사 착공 ○'24.10 : 변전공사 실착공 [향후계획] ○'25.12 : 변전소 기기가압 및 준공 attachment_count 0 source_detail_sha256 2d14ec519c7ce130e2ad13e732551936125c1d13314260284f869b4c2501912d first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231486|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_52629799ba267c43
Sources EV-dff466a127d4000ab67e93f2 Evidence SHA-256 2d14ec519c7ce130e2ad13e732551936125c1d13314260284f869b4c2501912d 행 SHA-256 01c3c46a997ee20bd3b4c1651e73372f476e9e82b12aff95f63bae5759809bcd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_24deb098bef4b822 stable_project_key prjtDef:231486:ESB project_definition 231486 first_region_code ESB manual_source_format false project_name 154kV 광양항S/S 건설사업 project_name_list 154kV 광양항S/S 건설사업 purpose 변전설비 적기확충으로 안정적 전력공급 project_region_detail 전남광주통합특별시 광양시 project_period_raw 2018.02~2025.12 project_scale_raw 154KV M.TR 60MVA X 2BANK (최종규모 4BANK) responsible_office_raw 중부건설본부/광주전남건설지사 equipment_type 변전 headquarters 중부건설본부 office 광주전남건설지사 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_24deb098bef4b822
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_24deb098bef4b822
Sources EV-96ac34aa54fe8e3f856daf79 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 b2cf6d06dc7f4842247089beafce4981b89a956cdc80545fc6a3ef557421fe1d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-3c49beb01b3be2e1f1b72a58
Detailed source fields Original source field Published value or condition stable_project_id kproj_dc40ded405d593f0 stable_project_key prjtDef:233692:ESB project_definition 233692 first_region_code ESB manual_source_format false project_name 154kV 광양항분기 지중T/L 건설사업 project_name_list 154kV 광양항분기 지중송전선로 건설사업 purpose 광양항 배후단지 확대에 따른 전력 공급 능 project_region_detail 전남광주통합특별시 광양시 project_period_raw 2022.06~2026.12 project_scale_raw XLPE2500㎟ 4C, 0.3KM responsible_office_raw 중부건설본부/광주전남건설지사 equipment_type 지중송전 headquarters 중부건설본부 office 광주전남건설지사 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_dc40ded405d593f0
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_dc40ded405d593f0
Sources EV-3c49beb01b3be2e1f1b72a58 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 cc91c291c0bac271e84eb0943c8064004561ef910c5e44b95b733bad95d5a1fe Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2022-06 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233692|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_95950c71bfebebc7
Sources EV-8de386baa6341a7d9f6bb1a9 Evidence SHA-256 6025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1 행 SHA-256 d0cd4eb3f97d7c6c10e7bc19e01be3273176ad2cb9540b5a7fad4398120ebbdd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2025-09 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233692|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_95950c71bfebebc7
Sources EV-8de386baa6341a7d9f6bb1a9 Evidence SHA-256 6025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1 행 SHA-256 d0cd4eb3f97d7c6c10e7bc19e01be3273176ad2cb9540b5a7fad4398120ebbdd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-12 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|233692|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_95950c71bfebebc7
Sources EV-8de386baa6341a7d9f6bb1a9 Evidence SHA-256 6025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1 행 SHA-256 d0cd4eb3f97d7c6c10e7bc19e01be3273176ad2cb9540b5a7fad4398120ebbdd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2025-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233692|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_95950c71bfebebc7
Sources EV-8de386baa6341a7d9f6bb1a9 Evidence SHA-256 6025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1 행 SHA-256 d0cd4eb3f97d7c6c10e7bc19e01be3273176ad2cb9540b5a7fad4398120ebbdd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|233692|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_95950c71bfebebc7
Sources EV-8de386baa6341a7d9f6bb1a9 Evidence SHA-256 6025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1 행 SHA-256 d0cd4eb3f97d7c6c10e7bc19e01be3273176ad2cb9540b5a7fad4398120ebbdd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-09 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233692|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_95950c71bfebebc7
Sources EV-8de386baa6341a7d9f6bb1a9 Evidence SHA-256 6025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1 행 SHA-256 d0cd4eb3f97d7c6c10e7bc19e01be3273176ad2cb9540b5a7fad4398120ebbdd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233692|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_95950c71bfebebc7
Sources EV-8de386baa6341a7d9f6bb1a9 Evidence SHA-256 6025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1 행 SHA-256 d0cd4eb3f97d7c6c10e7bc19e01be3273176ad2cb9540b5a7fad4398120ebbdd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2025-09 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233692|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_95950c71bfebebc7
Sources EV-8de386baa6341a7d9f6bb1a9 Evidence SHA-256 6025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1 행 SHA-256 d0cd4eb3f97d7c6c10e7bc19e01be3273176ad2cb9540b5a7fad4398120ebbdd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type design_completion date 2023-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233692|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_95950c71bfebebc7
Sources EV-8de386baa6341a7d9f6bb1a9 Evidence SHA-256 6025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1 행 SHA-256 d0cd4eb3f97d7c6c10e7bc19e01be3273176ad2cb9540b5a7fad4398120ebbdd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-12 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|233692|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_95950c71bfebebc7
Sources EV-8de386baa6341a7d9f6bb1a9 Evidence SHA-256 6025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1 행 SHA-256 d0cd4eb3f97d7c6c10e7bc19e01be3273176ad2cb9540b5a7fad4398120ebbdd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-08 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|233692|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_95950c71bfebebc7
Sources EV-8de386baa6341a7d9f6bb1a9 Evidence SHA-256 6025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1 행 SHA-256 d0cd4eb3f97d7c6c10e7bc19e01be3273176ad2cb9540b5a7fad4398120ebbdd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type design_completion date 2025-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233692|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_95950c71bfebebc7
Sources EV-8de386baa6341a7d9f6bb1a9 Evidence SHA-256 6025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1 행 SHA-256 d0cd4eb3f97d7c6c10e7bc19e01be3273176ad2cb9540b5a7fad4398120ebbdd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233692|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_95950c71bfebebc7
Sources EV-8de386baa6341a7d9f6bb1a9 Evidence SHA-256 6025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1 행 SHA-256 d0cd4eb3f97d7c6c10e7bc19e01be3273176ad2cb9540b5a7fad4398120ebbdd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-05 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|233692|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_95950c71bfebebc7
Sources EV-8de386baa6341a7d9f6bb1a9 Evidence SHA-256 6025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1 행 SHA-256 d0cd4eb3f97d7c6c10e7bc19e01be3273176ad2cb9540b5a7fad4398120ebbdd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2026-11 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233692|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_95950c71bfebebc7
Sources EV-8de386baa6341a7d9f6bb1a9 Evidence SHA-256 6025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1 행 SHA-256 d0cd4eb3f97d7c6c10e7bc19e01be3273176ad2cb9540b5a7fad4398120ebbdd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2026-07 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233692|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_95950c71bfebebc7
Sources EV-8de386baa6341a7d9f6bb1a9 Evidence SHA-256 6025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1 행 SHA-256 d0cd4eb3f97d7c6c10e7bc19e01be3273176ad2cb9540b5a7fad4398120ebbdd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2026-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233692|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_95950c71bfebebc7
Sources EV-8de386baa6341a7d9f6bb1a9 Evidence SHA-256 6025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1 행 SHA-256 d0cd4eb3f97d7c6c10e7bc19e01be3273176ad2cb9540b5a7fad4398120ebbdd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|233692|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_95950c71bfebebc7
Sources EV-8de386baa6341a7d9f6bb1a9 Evidence SHA-256 6025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1 행 SHA-256 d0cd4eb3f97d7c6c10e7bc19e01be3273176ad2cb9540b5a7fad4398120ebbdd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2025-08 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|233692|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_95950c71bfebebc7
Sources EV-8de386baa6341a7d9f6bb1a9 Evidence SHA-256 6025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1 행 SHA-256 d0cd4eb3f97d7c6c10e7bc19e01be3273176ad2cb9540b5a7fad4398120ebbdd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_95950c71bfebebc7 stable_project_id kproj_dc40ded405d593f0 source_key 202609|233692|ESB basic_ym 202609 source_stage_raw 공사착수-사업완료전 project_name_list 154kV 광양항분기 지중송전선로 건설사업 project_name_detail 154kV 광양항분기 지중T/L 건설사업 region_summary_raw 전남광주통합특별시 광양시등 1 지역 equipment_type_raw 지중송전 headquarters_raw 중부건설본부 office_raw 광주전남건설지사 section_fields 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 기본설계: 2023.04 ~ 2023.05 실시설계: 2023.12 ~ 2025.04 설계담당자: [redacted] 건설공사 개요 공사 착공: 2025.08 공사 기간: 2025.08 ~ 2026.12 감독자: [redacted], 실적): 100, 24 [진행경과] □ '21.09 : 제9차 장기 송변전설비계획 반영 □ '23.05 : 기본설계 완료 □ '25.04 : 실시설계 완료 □ '25.09 : 공사 착공 □ '25.09 : 준공목표 변경요청 [계통운영부, `25.06→`26.12] □ '25.12 : 공사 중지 □ '26.07 : 공사 재착공 [향후계획] □ '26.11 : 공사 준공 future_plan_redacted □ 향후계획 [진행경과] □ '21.09 : 제9차 장기 송변전설비계획 반영 □ '23.05 : 기본설계 완료 □ '25.04 : 실시설계 완료 □ '25.09 : 공사 착공 □ '25.09 : 준공목표 변경요청 [계통운영부, `25.06→`26.12] □ '25.12 : 공사 중지 □ '26.07 : 공사 재착공 [향후계획] □ '26.11 : 공사 준공 attachment_count 0 source_detail_sha256 6025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|233692|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_95950c71bfebebc7
Sources EV-8de386baa6341a7d9f6bb1a9 Evidence SHA-256 6025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1 행 SHA-256 d0cd4eb3f97d7c6c10e7bc19e01be3273176ad2cb9540b5a7fad4398120ebbdd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_dc40ded405d593f0 stable_project_key prjtDef:233692:ESB project_definition 233692 first_region_code ESB manual_source_format false project_name 154kV 광양항분기 지중T/L 건설사업 project_name_list 154kV 광양항분기 지중송전선로 건설사업 purpose 광양항 배후단지 확대에 따른 전력 공급 능 project_region_detail 전남광주통합특별시 광양시 project_period_raw 2022.06~2026.12 project_scale_raw XLPE2500㎟ 4C, 0.3KM responsible_office_raw 중부건설본부/광주전남건설지사 equipment_type 지중송전 headquarters 중부건설본부 office 광주전남건설지사 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_dc40ded405d593f0
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_dc40ded405d593f0
Sources EV-3c49beb01b3be2e1f1b72a58 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 cc91c291c0bac271e84eb0943c8064004561ef910c5e44b95b733bad95d5a1fe Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-994a00de1ff051881860d7d9
Detailed source fields Original source field Published value or condition stable_project_id kproj_87d4d152973a6096 stable_project_key prjtDef:231455:ESB project_definition 231455 first_region_code ESB manual_source_format false project_name 154kV 광일S/S 건설사업 project_name_list 154,000V 광일변전소 건설사업 purpose 수도권 3기 신도시(광명시흥지구) 전력 공급 project_region_detail 경기도 광명시 project_period_raw 2026.09~2032.04 project_scale_raw 154KV M.TR 60MVA X 2BANK(최종 4BANK) responsible_office_raw 경인건설본부/남서울인천건설지사 equipment_type 변전 headquarters 경인건설본부 office 남서울인천건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_87d4d152973a6096
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_87d4d152973a6096
Sources EV-994a00de1ff051881860d7d9 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 756d6826fbc08209fd8a9d21fda28d95d9cbe06506acc0caf3f225f816c98a14 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2026-09 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231455|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_4f43ce29dd994837
Sources EV-c170a139f1bbfa52f074c1e5 Evidence SHA-256 a1ee8be618b13240719e374dd63bdb01fa67f15e54139c345c205e551224989f 행 SHA-256 375332030e48c757ab7bab6b2c96c71a6545cf04bd132bfd2ffe6dbd1f8c1086 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2032-04 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231455|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_4f43ce29dd994837
Sources EV-c170a139f1bbfa52f074c1e5 Evidence SHA-256 a1ee8be618b13240719e374dd63bdb01fa67f15e54139c345c205e551224989f 행 SHA-256 375332030e48c757ab7bab6b2c96c71a6545cf04bd132bfd2ffe6dbd1f8c1086 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_4f43ce29dd994837 stable_project_id kproj_87d4d152973a6096 source_key 202609|231455|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154,000V 광일변전소 건설사업 project_name_detail 154kV 광일S/S 건설사업 region_summary_raw 경기도 광명시등 1 지역 equipment_type_raw 변전 headquarters_raw 경인건설본부 office_raw 남서울인천건설지사 section_fields 사업 규모 154KV M.TR 60MVA X 2BANK(최종 4BANK) 계획확정 제11차 장기송변전설비계획 반영(2025.05) 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: ○ '30. 5 : 공사 착공 ○ '32. 4 : 공사 준공 및 변전소 가압 future_plan_redacted □ 향후계획 ○ '30. 5 : 공사 착공 ○ '32. 4 : 공사 준공 및 변전소 가압 attachment_count 0 source_detail_sha256 a1ee8be618b13240719e374dd63bdb01fa67f15e54139c345c205e551224989f first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231455|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_4f43ce29dd994837
Sources EV-c170a139f1bbfa52f074c1e5 Evidence SHA-256 a1ee8be618b13240719e374dd63bdb01fa67f15e54139c345c205e551224989f 행 SHA-256 375332030e48c757ab7bab6b2c96c71a6545cf04bd132bfd2ffe6dbd1f8c1086 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_87d4d152973a6096 stable_project_key prjtDef:231455:ESB project_definition 231455 first_region_code ESB manual_source_format false project_name 154kV 광일S/S 건설사업 project_name_list 154,000V 광일변전소 건설사업 purpose 수도권 3기 신도시(광명시흥지구) 전력 공급 project_region_detail 경기도 광명시 project_period_raw 2026.09~2032.04 project_scale_raw 154KV M.TR 60MVA X 2BANK(최종 4BANK) responsible_office_raw 경인건설본부/남서울인천건설지사 equipment_type 변전 headquarters 경인건설본부 office 남서울인천건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_87d4d152973a6096
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_87d4d152973a6096
Sources EV-994a00de1ff051881860d7d9 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 756d6826fbc08209fd8a9d21fda28d95d9cbe06506acc0caf3f225f816c98a14 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date Not stated Sources EV-75497b997b2103e61680a1d0
Detailed source fields Original source field Published value or condition stable_project_id kproj_adbcd7cda9c92aed stable_project_key manual:7:0:- project_definition 0 first_region_code manual_source_format true project_name 154kV 광주이천(가칭) 변전소 및 관련분기 송전선로 건설사업 project_name_list 154kV 광주이천(가칭) 변전소 및 관련분기 송전선로 건설사업 purpose project_region_detail 경기도 광주시,이천시 project_period_raw 2023.05~ project_scale_raw responsible_office_raw 경인건설본부/경기건설지사 equipment_type 변전 headquarters 경인건설본부 office 경기건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_adbcd7cda9c92aed
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source Not stated · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_adbcd7cda9c92aed
Sources EV-75497b997b2103e61680a1d0 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 4c462e8a3aa2978cd289f9ba4cf7a563ae58129f975ad0893cd8ccaad30d9177 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2023-05 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 7|0| migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source Not stated · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d2bddb5cdf769843
Sources EV-d8ca3ce8fa62c230344eef72 Evidence SHA-256 a1d337cea7b47094ed7ac076e7a1999b317f7c0ce05b6d124bc14f58dc725fcd 행 SHA-256 c955fa95b45c5ed3902c98ac20640a0391f2362c972315741d07628eb67a9932 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2026-01 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 7|0| migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source Not stated · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d2bddb5cdf769843
Sources EV-d8ca3ce8fa62c230344eef72 Evidence SHA-256 a1d337cea7b47094ed7ac076e7a1999b317f7c0ce05b6d124bc14f58dc725fcd 행 SHA-256 c955fa95b45c5ed3902c98ac20640a0391f2362c972315741d07628eb67a9932 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2023-05 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 7|0| migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source Not stated · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d2bddb5cdf769843
Sources EV-d8ca3ce8fa62c230344eef72 Evidence SHA-256 a1d337cea7b47094ed7ac076e7a1999b317f7c0ce05b6d124bc14f58dc725fcd 행 SHA-256 c955fa95b45c5ed3902c98ac20640a0391f2362c972315741d07628eb67a9932 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-01 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 7|0| migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source Not stated · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d2bddb5cdf769843
Sources EV-d8ca3ce8fa62c230344eef72 Evidence SHA-256 a1d337cea7b47094ed7ac076e7a1999b317f7c0ce05b6d124bc14f58dc725fcd 행 SHA-256 c955fa95b45c5ed3902c98ac20640a0391f2362c972315741d07628eb67a9932 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-01 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 7|0| migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source Not stated · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d2bddb5cdf769843
Sources EV-d8ca3ce8fa62c230344eef72 Evidence SHA-256 a1d337cea7b47094ed7ac076e7a1999b317f7c0ce05b6d124bc14f58dc725fcd 행 SHA-256 c955fa95b45c5ed3902c98ac20640a0391f2362c972315741d07628eb67a9932 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_d2bddb5cdf769843 stable_project_id kproj_adbcd7cda9c92aed source_key 7|0| basic_ym 7 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 광주이천(가칭) 변전소 및 관련분기 송전선로 건설사업 project_name_detail 154kV 광주이천(가칭) 변전소 및 관련분기 송전선로 건설사업 region_summary_raw 경기도 광주시등 2 지역 equipment_type_raw 변전 headquarters_raw 경인건설본부 office_raw 경기건설지사 section_fields 입지선정 전력입지영향평가 용역 착수: 2025.01 입지선정위원회 구성시기: 2026.01 참여 위원 수 : 21 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: future_plan_redacted line □ 향후계획 입지선정위원회 6차회의 시 attachment_count 5 source_detail_sha256 a1d337cea7b47094ed7ac076e7a1999b317f7c0ce05b6d124bc14f58dc725fcd first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 7 source_record_id 7|0|
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source Not stated · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d2bddb5cdf769843
Sources EV-d8ca3ce8fa62c230344eef72 Evidence SHA-256 a1d337cea7b47094ed7ac076e7a1999b317f7c0ce05b6d124bc14f58dc725fcd 행 SHA-256 c955fa95b45c5ed3902c98ac20640a0391f2362c972315741d07628eb67a9932 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_adbcd7cda9c92aed stable_project_key manual:7:0:- project_definition 0 first_region_code manual_source_format true project_name 154kV 광주이천(가칭) 변전소 및 관련분기 송전선로 건설사업 project_name_list 154kV 광주이천(가칭) 변전소 및 관련분기 송전선로 건설사업 purpose project_region_detail 경기도 광주시,이천시 project_period_raw 2023.05~ project_scale_raw responsible_office_raw 경인건설본부/경기건설지사 equipment_type 변전 headquarters 경인건설본부 office 경기건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_adbcd7cda9c92aed
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source Not stated · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_adbcd7cda9c92aed
Sources EV-75497b997b2103e61680a1d0 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 4c462e8a3aa2978cd289f9ba4cf7a563ae58129f975ad0893cd8ccaad30d9177 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-b72a4cc781d7af64607cd2e2
Detailed source fields Original source field Published value or condition stable_project_id kproj_da14d4488d3eb457 stable_project_key prjtDef:231620:ESB project_definition 231620 first_region_code ESB manual_source_format false project_name 154kV 교산S/S 건설사업 project_name_list 154kV 교산S/S 건설사업 purpose 인근변전소 과부하 해소 및 계통보강 project_region_detail 경기도 하남시 project_period_raw 2022.06~2030.06 project_scale_raw 154KV M.TR 2BANK responsible_office_raw 경인건설본부/남서울인천건설지사 equipment_type 변전 headquarters 경인건설본부 office 남서울인천건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_da14d4488d3eb457
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_da14d4488d3eb457
Sources EV-b72a4cc781d7af64607cd2e2 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 4e39384971f2ff7f3513d951e0e31782c5a6fb4b552a09283b1ed6c1ab6621f5 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2030-06 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231620|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_2315b7e1051a564e
Sources EV-acf7548ecc83b49d48b1156e Evidence SHA-256 23c9b3b283e1db27960e66e28ab620d5d605055ee85010dd481a11a79bea28af 행 SHA-256 644447704bcf82bcbd534546755901b461539ecefefa6ed8ff4e6c3625d37ba2 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2022-06 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231620|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_2315b7e1051a564e
Sources EV-acf7548ecc83b49d48b1156e Evidence SHA-256 23c9b3b283e1db27960e66e28ab620d5d605055ee85010dd481a11a79bea28af 행 SHA-256 644447704bcf82bcbd534546755901b461539ecefefa6ed8ff4e6c3625d37ba2 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_2315b7e1051a564e stable_project_id kproj_da14d4488d3eb457 source_key 202609|231620|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 교산S/S 건설사업 project_name_detail 154kV 교산S/S 건설사업 region_summary_raw 경기도 하남시등 1 지역 equipment_type_raw 변전 headquarters_raw 경인건설본부 office_raw 남서울인천건설지사 section_fields 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 2024.05 참여 위원 수 : 15 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: ○추진실적 □ '23.05 : 송변전설비계획 확정 □ '23.06 ~ : 하남교산 공공주택지구내 변전소 배치(안) 협의 □ '24.12월 : 하남교산 공공주택지구 지정 변경(3차) 및 지구계획 변경(3차) 승인알림 ○향후계획 □ '28.06 : 변전, 토건공사 착공 □ '30.06 : 가압 및 공사 준공 future_plan_redacted □ 향후계획 ○추진실적 □ '23.05 : 송변전설비계획 확정 □ '23.06 ~ : 하남교산 공공주택지구내 변전소 배치(안) 협의 □ '24.12월 : 하남교산 공공주택지구 지정 변경(3차) 및 지구계획 변경(3차) 승인알림 ○향후계획 □ '28.06 : 변전, 토건공사 착공 □ '30.06 : 가압 및 공사 준공 attachment_count 0 source_detail_sha256 23c9b3b283e1db27960e66e28ab620d5d605055ee85010dd481a11a79bea28af first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231620|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_2315b7e1051a564e
Sources EV-acf7548ecc83b49d48b1156e Evidence SHA-256 23c9b3b283e1db27960e66e28ab620d5d605055ee85010dd481a11a79bea28af 행 SHA-256 644447704bcf82bcbd534546755901b461539ecefefa6ed8ff4e6c3625d37ba2 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_da14d4488d3eb457 stable_project_key prjtDef:231620:ESB project_definition 231620 first_region_code ESB manual_source_format false project_name 154kV 교산S/S 건설사업 project_name_list 154kV 교산S/S 건설사업 purpose 인근변전소 과부하 해소 및 계통보강 project_region_detail 경기도 하남시 project_period_raw 2022.06~2030.06 project_scale_raw 154KV M.TR 2BANK responsible_office_raw 경인건설본부/남서울인천건설지사 equipment_type 변전 headquarters 경인건설본부 office 남서울인천건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_da14d4488d3eb457
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_da14d4488d3eb457
Sources EV-b72a4cc781d7af64607cd2e2 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 4e39384971f2ff7f3513d951e0e31782c5a6fb4b552a09283b1ed6c1ab6621f5 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-f7bac3d01ce3232914ae83fb
Detailed source fields Original source field Published value or condition stable_project_id kproj_79331d7846b77787 stable_project_key prjtDef:231569:ESB project_definition 231569 first_region_code ESB manual_source_format false project_name 154kV 구로#2S/S 건설사업 project_name_list 154kV 구로#2S/S 건설사업 purpose 변전설비 적기확충으로 안정적 전력공급 project_region_detail 서울특별시 구로구 project_period_raw 2021.08~2032.12 project_scale_raw 154KV M.TR 2BANK(최종 4BANK), 170KV GIS 10CCT responsible_office_raw 경인건설본부/남서울인천건설지사 equipment_type 변전 headquarters 경인건설본부 office 남서울인천건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_79331d7846b77787
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_79331d7846b77787
Sources EV-f7bac3d01ce3232914ae83fb Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 73510279269057e4f6c7fed0ac30c94ad61b3fdbf4daa6f8a12608bec8cff768 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2032-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231569|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_caa890013f8522f2
Sources EV-88a789e8d4431110f26cfb5f Evidence SHA-256 325a1992573a48f7261e58e2482fc69d57c9acb812b0531d2010f4f920ca1b75 행 SHA-256 5cf7bedb7426fe514ef763b8081a8ab95098f9c83b6fdf96fe56e71f4e7eddb7 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2021-08 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231569|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_caa890013f8522f2
Sources EV-88a789e8d4431110f26cfb5f Evidence SHA-256 325a1992573a48f7261e58e2482fc69d57c9acb812b0531d2010f4f920ca1b75 행 SHA-256 5cf7bedb7426fe514ef763b8081a8ab95098f9c83b6fdf96fe56e71f4e7eddb7 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_caa890013f8522f2 stable_project_id kproj_79331d7846b77787 source_key 202609|231569|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 구로#2S/S 건설사업 project_name_detail 154kV 구로#2S/S 건설사업 region_summary_raw 서울특별시 구로구등 1 지역 equipment_type_raw 변전 headquarters_raw 경인건설본부 office_raw 남서울인천건설지사 section_fields 사업 규모 154KV M.TR 2BANK(최종 4BANK), 170KV GIS 10CCT 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 1. 진행경과 : 변전소 입지선정 부지협의중 2. 향후계획 - '27.06 : 부지확정완료 - '28.03 : 용지매수완료 - '28.11 : 토건 착공 - '30.10 : 변전소 가압 future_plan_redacted □ 향후계획 1. 진행경과 : 변전소 입지선정 부지협의중 2. 향후계획 - '27.06 : 부지확정완료 - '28.03 : 용지매수완료 - '28.11 : 토건 착공 - '30.10 : 변전소 가압 attachment_count 0 source_detail_sha256 325a1992573a48f7261e58e2482fc69d57c9acb812b0531d2010f4f920ca1b75 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231569|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_caa890013f8522f2
Sources EV-88a789e8d4431110f26cfb5f Evidence SHA-256 325a1992573a48f7261e58e2482fc69d57c9acb812b0531d2010f4f920ca1b75 행 SHA-256 5cf7bedb7426fe514ef763b8081a8ab95098f9c83b6fdf96fe56e71f4e7eddb7 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_79331d7846b77787 stable_project_key prjtDef:231569:ESB project_definition 231569 first_region_code ESB manual_source_format false project_name 154kV 구로#2S/S 건설사업 project_name_list 154kV 구로#2S/S 건설사업 purpose 변전설비 적기확충으로 안정적 전력공급 project_region_detail 서울특별시 구로구 project_period_raw 2021.08~2032.12 project_scale_raw 154KV M.TR 2BANK(최종 4BANK), 170KV GIS 10CCT responsible_office_raw 경인건설본부/남서울인천건설지사 equipment_type 변전 headquarters 경인건설본부 office 남서울인천건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_79331d7846b77787
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_79331d7846b77787
Sources EV-f7bac3d01ce3232914ae83fb Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 73510279269057e4f6c7fed0ac30c94ad61b3fdbf4daa6f8a12608bec8cff768 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-10 Sources EV-52ad41787095a775acefcb11
Detailed source fields Original source field Published value or condition stable_project_id kproj_d1b2181077ec8b7b stable_project_key prjtDef:232396:ESB project_definition 232396 first_region_code ESB manual_source_format false project_name 154kV 구룡-군북T/L 건설사업 project_name_list 154kV 구룡-군북송전선로 건설사업 purpose 구룡S/S 계통보강을 통한 공급신뢰도 향상 project_region_detail 경상남도 의령군,함안군 project_period_raw 2024.04~2029.10 project_scale_raw ACSR 410㎟ × 2C, 4C / ACSR 480㎟ × 2C responsible_office_raw 남부건설본부/직할 equipment_type 가공송전 headquarters 남부건설본부 office 직할 current_stage_raw 사업승인-공사착수전 snapshot_count 2 active_snapshot_count 2 snapshot_ids ksnap_3b21f157522c9f00 ksnap_7d1f2dd24a8e3071 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_d1b2181077ec8b7b
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_d1b2181077ec8b7b
Sources EV-52ad41787095a775acefcb11 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 c843801b19dff874d53cec84502c9cffa8f3a561844112c4d581c718a9d22f6b Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202610|232396|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7d1f2dd24a8e3071
Sources EV-c8bf0d421e6b605c4447b062 Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622 행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-07 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202610|232396|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7d1f2dd24a8e3071
Sources EV-c8bf0d421e6b605c4447b062 Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622 행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-11 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202610|232396|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7d1f2dd24a8e3071
Sources EV-c8bf0d421e6b605c4447b062 Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622 행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-07 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202610|232396|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7d1f2dd24a8e3071
Sources EV-c8bf0d421e6b605c4447b062 Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622 행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2016-02 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202610|232396|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7d1f2dd24a8e3071
Sources EV-c8bf0d421e6b605c4447b062 Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622 행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2029-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232396|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_3b21f157522c9f00
Sources EV-845bb56ead1c962add5caaea Evidence SHA-256 9f0b1d16c4da4f3269b5ba2f20dbe4d80a8ee3cc737940c8866fa34ea2c245f7 행 SHA-256 ffc1c7a86af17dc9efeda4677cce7594ee26e07256f3f4dca8f84bfae6e5c47b Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type implementation_plan_approval date 2026-03 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202610|232396|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7d1f2dd24a8e3071
Sources EV-c8bf0d421e6b605c4447b062 Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622 행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202610|232396|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7d1f2dd24a8e3071
Sources EV-c8bf0d421e6b605c4447b062 Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622 행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2024-04 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232396|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_3b21f157522c9f00
Sources EV-845bb56ead1c962add5caaea Evidence SHA-256 9f0b1d16c4da4f3269b5ba2f20dbe4d80a8ee3cc737940c8866fa34ea2c245f7 행 SHA-256 ffc1c7a86af17dc9efeda4677cce7594ee26e07256f3f4dca8f84bfae6e5c47b Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202610|232396|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7d1f2dd24a8e3071
Sources EV-c8bf0d421e6b605c4447b062 Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622 행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202610|232396|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7d1f2dd24a8e3071
Sources EV-c8bf0d421e6b605c4447b062 Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622 행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2023-05 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202610|232396|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7d1f2dd24a8e3071
Sources EV-c8bf0d421e6b605c4447b062 Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622 행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-05 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202610|232396|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7d1f2dd24a8e3071
Sources EV-c8bf0d421e6b605c4447b062 Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622 행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2017-11 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202610|232396|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7d1f2dd24a8e3071
Sources EV-c8bf0d421e6b605c4447b062 Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622 행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-12 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202610|232396|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7d1f2dd24a8e3071
Sources EV-c8bf0d421e6b605c4447b062 Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622 행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2017-07 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202610|232396|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7d1f2dd24a8e3071
Sources EV-c8bf0d421e6b605c4447b062 Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622 행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-05 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202610|232396|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7d1f2dd24a8e3071
Sources EV-c8bf0d421e6b605c4447b062 Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622 행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-11 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202610|232396|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7d1f2dd24a8e3071
Sources EV-c8bf0d421e6b605c4447b062 Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622 행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2029-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202610|232396|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7d1f2dd24a8e3071
Sources EV-c8bf0d421e6b605c4447b062 Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622 행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2024-04 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202610|232396|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7d1f2dd24a8e3071
Sources EV-c8bf0d421e6b605c4447b062 Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622 행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2017-07 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202610|232396|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7d1f2dd24a8e3071
Sources EV-c8bf0d421e6b605c4447b062 Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622 행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-02 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202610|232396|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7d1f2dd24a8e3071
Sources EV-c8bf0d421e6b605c4447b062 Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622 행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2022-08 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202610|232396|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7d1f2dd24a8e3071
Sources EV-c8bf0d421e6b605c4447b062 Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622 행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202610|232396|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7d1f2dd24a8e3071
Sources EV-c8bf0d421e6b605c4447b062 Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622 행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2017-11 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202610|232396|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7d1f2dd24a8e3071
Sources EV-c8bf0d421e6b605c4447b062 Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622 행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_3b21f157522c9f00 stable_project_id kproj_d1b2181077ec8b7b source_key 202609|232396|ESB basic_ym 202609 source_stage_raw 사업승인-공사착수전 project_name_list 154kV 구룡-군북송전선로 건설사업 project_name_detail 154kV 구룡-군북T/L 건설사업 region_summary_raw 경상남도 의령군등 2 지역 equipment_type_raw 가공송전 headquarters_raw 남부건설본부 office_raw 직할 section_fields 사업 규모 ACSR 410㎟ × 2C, 4C / ACSR 480㎟ × 2C 계획확정 제11차 장기송변전설비계획 반영(2025.05) 입지선정 전력입지영향평가 용역 착수: 2016.02 입지선정위원회 구성시기: 참여 위원 수 : 지장유무 조회: 2023.02~2023.05 경과지(부지) 확정: 2022.08 환경/재해 영향평가 환경영향평가: 2017.07 ~ 2025.07 재해영향평가: 2017.07 ~ 2025.07 주민의견 수렴 지자체 공고 열람: 2024.04 ~ 2024.04 설명회·공청회: 2024.04 자체설명회: 입지선정 및 주민의견 수렴 주요 내용 line - '16. 6 ∼ '16. 8 : 입지선정위원회 위원위촉 - '16. 9 ∼ '17. 4 : 입지선정위원회 5회 개최 - '17. 6 ~ '17. 9 : 최적 후보경과지 마을별 간담회 개최(의령 8개, 함안 15개) - '17.11 : 송전선로 건설 반대대책위(방어산 9개마을) 간담회 시행 - '21.11 : 군북변전소 입지확정위원회 회의결과 및 부지확정 알림 - '22. 6 : 군북변전소 주민설명회(송전 포함) 시행 - '22. 8 : 입지확정위원회 시행(최적 경과지 결정) - '23. 2 : 군북면장 및 마을이장(박곡, 수곡, 가덕) 대상 사업설명회 시 사업설계 설계용역: 기본설계: 2025.04 ~ 2025.04 실시설계: 2025.05 ~ 2025.12 설계담당자: [redacted] - '13. 6 : 제6차 장기송배전설비계획에 구룡-가야 송전선로 건설사업 반영 - '16. 6 ∼ '16. 8 : 입지선정위원회 위원위촉 - '16. 9 ∼ '17. 4 : 입지선정위원회 5회 개최 - '17. 6 ~ '17. 9 : 최적 후보경과지 마을별 간담회 개최(의령 8개, 함안 15개) - '17. 7 : 송전선로건설 반대대책위원회 발족 - '17. 9 : 송전선로 건설사업 공론화 관련 간담회 개최 - '17.11 : 송전선로 건설 반대대책위(방어산 9개마을) 간담회 시행 - '18. 9 : 제8차 장기송변전설비계획에 군북변전소 건설사업 반영 - '21.11 : 군북변전소 입지확정위원회 회의결과 및 부지확정 알림 - '22. 6 : 군북변전소 주민설명회(송전 포함) 시행 - '22. 8 : 입지확정위원회 시행(최적 경과지 결정) - '23. 2 : 군북면장 및 마을이장(박곡, 수곡, 가덕) 대상 사업설명회 시행 확정경과지 지장유무 조회(함안군, 의령군청) - '23. 3 : 확정경과지 지장유무 조회(한국도로공사, 낙동강유역환경청) - '24. 4 : 사업시행계획서 제출(산업부, 지자체) 및 주민설명회 개최(의령군, 함안군) - '24. 7 : 실시계획 승인 신청 - '26. 3 : 실시계획 승인 완료 - '26. 7 : 도급공사 공고 - '26. 12 : 공사 착공 - '28. 10 : 선로 가압 future_plan_redacted □ 향후계획 - '13. 6 : 제6차 장기송배전설비계획에 구룡-가야 송전선로 건설사업 반영 - '16. 6 ∼ '16. 8 : 입지선정위원회 위원위촉 - '16. 9 ∼ '17. 4 : 입지선정위원회 5회 개최 - '17. 6 ~ '17. 9 : 최적 후보경과지 마을별 간담회 개최(의령 8개, 함안 15개) - '17. 7 : 송전선로건설 반대대책위원회 발족 - '17. 9 : 송전선로 건설사업 공론화 관련 간담회 개최 - '17.11 : 송전선로 건설 반대대책위(방어산 9개마을) 간담회 시행 - '18. 9 : 제8차 장기송변전설비계획에 군북변전소 건설사업 반영 - '21.11 : 군북변전소 입지확정위원회 회의결과 및 부지확정 알림 - '22. 6 : 군북변전소 주민설명회(송전 포함) 시행 - '22. 8 : 입지확정위원회 시행(최적 경과지 결정) - '23. 2 : 군북면장 및 마을이장(박곡, 수곡, 가덕) 대상 사업설명회 시행 확정경과지 지장유무 조회(함안군, 의령군청) - '23. 3 : 확정경과지 지장유무 조회(한국도로공사, 낙동강유역환경청) - '24. 4 : 사업시행계획서 제출(산업부, 지자체) 및 주민설명회 개최(의령군, 함안군) - '24. 7 : 실시계획 승인 신청 - '26. 3 : 실시계획 승인 완료 - '26. 7 : 도급공사 공고 - '26. 12 : 공사 착공 - '28. 10 : 선로 가압 attachment_count 0 source_detail_sha256 9f0b1d16c4da4f3269b5ba2f20dbe4d80a8ee3cc737940c8866fa34ea2c245f7 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|232396|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_3b21f157522c9f00
Sources EV-845bb56ead1c962add5caaea Evidence SHA-256 9f0b1d16c4da4f3269b5ba2f20dbe4d80a8ee3cc737940c8866fa34ea2c245f7 행 SHA-256 ffc1c7a86af17dc9efeda4677cce7594ee26e07256f3f4dca8f84bfae6e5c47b Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_7d1f2dd24a8e3071 stable_project_id kproj_d1b2181077ec8b7b source_key 202610|232396|ESB basic_ym 202610 source_stage_raw 사업승인-공사착수전 project_name_list 154kV 구룡-군북송전선로 건설사업 project_name_detail 154kV 구룡-군북T/L 건설사업 region_summary_raw 경상남도 의령군등 2 지역 equipment_type_raw 가공송전 headquarters_raw 남부건설본부 office_raw 직할 section_fields 사업 규모 ACSR 410㎟ × 2C, 4C / ACSR 480㎟ × 2C 계획확정 제11차 장기송변전설비계획 반영(2025.05) 입지선정 전력입지영향평가 용역 착수: 2016.02 입지선정위원회 구성시기: 참여 위원 수 : 지장유무 조회: 2023.02~2023.05 경과지(부지) 확정: 2022.08 환경/재해 영향평가 환경영향평가: 2017.07 ~ 2025.07 재해영향평가: 2017.07 ~ 2025.07 주민의견 수렴 지자체 공고 열람: 2024.04 ~ 2024.04 설명회·공청회: 2024.04 자체설명회: 입지선정 및 주민의견 수렴 주요 내용 line - '16. 6 ∼ '16. 8 : 입지선정위원회 위원위촉 - '16. 9 ∼ '17. 4 : 입지선정위원회 5회 개최 - '17. 6 ~ '17. 9 : 최적 후보경과지 마을별 간담회 개최(의령 8개, 함안 15개) - '17.11 : 송전선로 건설 반대대책위(방어산 9개마을) 간담회 시행 - '21.11 : 군북변전소 입지확정위원회 회의결과 및 부지확정 알림 - '22. 6 : 군북변전소 주민설명회(송전 포함) 시행 - '22. 8 : 입지확정위원회 시행(최적 경과지 결정) - '23. 2 : 군북면장 및 마을이장(박곡, 수곡, 가덕) 대상 사업설명회 시행 - '24. 4 : 의령군 대상 주민설명회 시 - '24. 6 : 함안군 군북면 마을 대상 주민설명회 시 사업설계 설계용역: 기본설계: 2025.04 ~ 2025.04 실시설계: 2025.05 ~ 2025.12 설계담당자: [redacted] - '13. 6 : 제6차 장기송배전설비계획에 구룡-가야 송전선로 건설사업 반영 - '16. 6 ∼ '16. 8 : 입지선정위원회 위원위촉 - '16. 9 ∼ '17. 4 : 입지선정위원회 5회 개최 - '17. 6 ~ '17. 9 : 최적 후보경과지 마을별 간담회 개최(의령 8개, 함안 15개) - '17. 7 : 송전선로건설 반대대책위원회 발족 - '17. 9 : 송전선로 건설사업 공론화 관련 간담회 개최 - '17.11 : 송전선로 건설 반대대책위(방어산 9개마을) 간담회 시행 - '18. 9 : 제8차 장기송변전설비계획에 군북변전소 건설사업 반영 - '21.11 : 군북변전소 입지확정위원회 회의결과 및 부지확정 알림 - '22. 6 : 군북변전소 주민설명회(송전 포함) 시행 - '22. 8 : 입지확정위원회 시행(최적 경과지 결정) - '23. 2 : 군북면장 및 마을이장(박곡, 수곡, 가덕) 대상 사업설명회 시행 확정경과지 지장유무 조회(함안군, 의령군청) - '23. 3 : 확정경과지 지장유무 조회(한국도로공사, 낙동강유역환경청) - '24. 4 : 사업시행계획서 제출(산업부, 지자체) 및 주민설명회 개최(의령군, 함안군) - '24. 7 : 실시계획 승인 신청 - '26. 3 : 실시계획 승인 완료 - '26. 7 : 도급공사 공고 - '26. 12 : 공사 착공 - '28. 10 : 선로 가압 future_plan_redacted □ 향후계획 - '13. 6 : 제6차 장기송배전설비계획에 구룡-가야 송전선로 건설사업 반영 - '16. 6 ∼ '16. 8 : 입지선정위원회 위원위촉 - '16. 9 ∼ '17. 4 : 입지선정위원회 5회 개최 - '17. 6 ~ '17. 9 : 최적 후보경과지 마을별 간담회 개최(의령 8개, 함안 15개) - '17. 7 : 송전선로건설 반대대책위원회 발족 - '17. 9 : 송전선로 건설사업 공론화 관련 간담회 개최 - '17.11 : 송전선로 건설 반대대책위(방어산 9개마을) 간담회 시행 - '18. 9 : 제8차 장기송변전설비계획에 군북변전소 건설사업 반영 - '21.11 : 군북변전소 입지확정위원회 회의결과 및 부지확정 알림 - '22. 6 : 군북변전소 주민설명회(송전 포함) 시행 - '22. 8 : 입지확정위원회 시행(최적 경과지 결정) - '23. 2 : 군북면장 및 마을이장(박곡, 수곡, 가덕) 대상 사업설명회 시행 확정경과지 지장유무 조회(함안군, 의령군청) - '23. 3 : 확정경과지 지장유무 조회(한국도로공사, 낙동강유역환경청) - '24. 4 : 사업시행계획서 제출(산업부, 지자체) 및 주민설명회 개최(의령군, 함안군) - '24. 7 : 실시계획 승인 신청 - '26. 3 : 실시계획 승인 완료 - '26. 7 : 도급공사 공고 - '26. 12 : 공사 착공 - '28. 10 : 선로 가압 attachment_count 0 source_detail_sha256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202610 source_record_id 202610|232396|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7d1f2dd24a8e3071
Sources EV-c8bf0d421e6b605c4447b062 Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622 행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_d1b2181077ec8b7b stable_project_key prjtDef:232396:ESB project_definition 232396 first_region_code ESB manual_source_format false project_name 154kV 구룡-군북T/L 건설사업 project_name_list 154kV 구룡-군북송전선로 건설사업 purpose 구룡S/S 계통보강을 통한 공급신뢰도 향상 project_region_detail 경상남도 의령군,함안군 project_period_raw 2024.04~2029.10 project_scale_raw ACSR 410㎟ × 2C, 4C / ACSR 480㎟ × 2C responsible_office_raw 남부건설본부/직할 equipment_type 가공송전 headquarters 남부건설본부 office 직할 current_stage_raw 사업승인-공사착수전 snapshot_count 2 active_snapshot_count 2 snapshot_ids ksnap_3b21f157522c9f00 ksnap_7d1f2dd24a8e3071 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_d1b2181077ec8b7b
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-10 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_d1b2181077ec8b7b
Sources EV-52ad41787095a775acefcb11 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 c843801b19dff874d53cec84502c9cffa8f3a561844112c4d581c718a9d22f6b Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-bf88957e6614bf359edf86d5
Detailed source fields Original source field Published value or condition stable_project_id kproj_2d92c5f07c011998 stable_project_key prjtDef:234850:ESB project_definition 234850 first_region_code ESB manual_source_format false project_name 154kV 구월분기 전력구 건설사업 project_name_list 154kV 구월분기 전력구 건설사업 purpose 구월2지구 등 신규부하 공급능력 확보 project_region_detail 인천광역시 남동구,연수구 project_period_raw project_scale_raw 개착식전력구 500M, SHIELD TBM 2,100M [2,000㎟X2C(D)] responsible_office_raw 경인건설본부/직할 equipment_type 전력구 headquarters 경인건설본부 office 직할 current_stage_raw snapshot_count 1 active_snapshot_count 0 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text source_record_id stable_project_id:kproj_2d92c5f07c011998
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_2d92c5f07c011998
Sources EV-bf88957e6614bf359edf86d5 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 55dd754fb7a051b838b26fa9009454db5a6e9a21f118e6efeea58d9db44c3477 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_73b507c3b42506a7 stable_project_id kproj_2d92c5f07c011998 source_key 202609|234850|ESB basic_ym 202609 source_stage_raw project_name_list 154kV 구월분기 전력구 건설사업 project_name_detail 154kV 구월분기 전력구 건설사업 region_summary_raw 인천광역시 남동구등 2 지역 equipment_type_raw 전력구 headquarters_raw 경인건설본부 office_raw 직할 section_fields 사업 규모 개착식전력구 500M, SHIELD TBM 2,100M [2,000㎟X2C(D)] 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: future_plan_redacted □ 향후계획 attachment_count 0 source_detail_sha256 343e78981ca631bcd1c3bbc3d5b016ccaa117209dee9c858d9d7bedb02ffc065 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|234850|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_73b507c3b42506a7
Sources EV-aa3cd19fa3e481a0db0a098f Evidence SHA-256 343e78981ca631bcd1c3bbc3d5b016ccaa117209dee9c858d9d7bedb02ffc065 행 SHA-256 18b97b048455cd3ff7b274eb2987d1fd640ee7260d99ba24115bdba7c709efe4 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_2d92c5f07c011998 stable_project_key prjtDef:234850:ESB project_definition 234850 first_region_code ESB manual_source_format false project_name 154kV 구월분기 전력구 건설사업 project_name_list 154kV 구월분기 전력구 건설사업 purpose 구월2지구 등 신규부하 공급능력 확보 project_region_detail 인천광역시 남동구,연수구 project_period_raw project_scale_raw 개착식전력구 500M, SHIELD TBM 2,100M [2,000㎟X2C(D)] responsible_office_raw 경인건설본부/직할 equipment_type 전력구 headquarters 경인건설본부 office 직할 current_stage_raw snapshot_count 1 active_snapshot_count 0 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text source_record_id stable_project_id:kproj_2d92c5f07c011998
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_2d92c5f07c011998
Sources EV-bf88957e6614bf359edf86d5 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 55dd754fb7a051b838b26fa9009454db5a6e9a21f118e6efeea58d9db44c3477 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-b4346ea8c1d7c9e985d113dc
Detailed source fields Original source field Published value or condition stable_project_id kproj_f18f03de8d76874d stable_project_key prjtDef:234588:ESB project_definition 234588 first_region_code ESB manual_source_format false project_name 154kV 군공-내초 관로 건설사업 project_name_list 군산지역 전기공급시설 관로공사(군공-내초) purpose 군산 북부지역 신규부하 공급능력 확충 및 인근 변전 project_region_detail 전북특별자치도 군산시 project_period_raw 2025.04~2028.12 project_scale_raw 154KV 송전 1회선 관로 5KM responsible_office_raw 중부건설본부/전북건설지사 equipment_type 전력구 headquarters 중부건설본부 office 전북건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_f18f03de8d76874d
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_f18f03de8d76874d
Sources EV-b4346ea8c1d7c9e985d113dc Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 16e21a8bcf63b4782fae69bc7d0c7fd4aedf88d2abd6bf60df9dc8c1a96c8c8c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2025-04 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234588|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_395872de54e5fee0
Sources EV-23ed660a6cca56a5ad33b30c Evidence SHA-256 4ce4b47717ace368ff55557ad9b4fcd1e4eed9c070d8264d342d222afc1706d8 행 SHA-256 c64b46f42f2e030eb4b1bedc6ae045d6a5a1b2e812f5f21967a0d672af0cb023 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2026-04 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|234588|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_395872de54e5fee0
Sources EV-23ed660a6cca56a5ad33b30c Evidence SHA-256 4ce4b47717ace368ff55557ad9b4fcd1e4eed9c070d8264d342d222afc1706d8 행 SHA-256 c64b46f42f2e030eb4b1bedc6ae045d6a5a1b2e812f5f21967a0d672af0cb023 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-07 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|234588|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_395872de54e5fee0
Sources EV-23ed660a6cca56a5ad33b30c Evidence SHA-256 4ce4b47717ace368ff55557ad9b4fcd1e4eed9c070d8264d342d222afc1706d8 행 SHA-256 c64b46f42f2e030eb4b1bedc6ae045d6a5a1b2e812f5f21967a0d672af0cb023 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type design_completion date 2026-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|234588|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_395872de54e5fee0
Sources EV-23ed660a6cca56a5ad33b30c Evidence SHA-256 4ce4b47717ace368ff55557ad9b4fcd1e4eed9c070d8264d342d222afc1706d8 행 SHA-256 c64b46f42f2e030eb4b1bedc6ae045d6a5a1b2e812f5f21967a0d672af0cb023 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|234588|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_395872de54e5fee0
Sources EV-23ed660a6cca56a5ad33b30c Evidence SHA-256 4ce4b47717ace368ff55557ad9b4fcd1e4eed9c070d8264d342d222afc1706d8 행 SHA-256 c64b46f42f2e030eb4b1bedc6ae045d6a5a1b2e812f5f21967a0d672af0cb023 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-08 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|234588|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_395872de54e5fee0
Sources EV-23ed660a6cca56a5ad33b30c Evidence SHA-256 4ce4b47717ace368ff55557ad9b4fcd1e4eed9c070d8264d342d222afc1706d8 행 SHA-256 c64b46f42f2e030eb4b1bedc6ae045d6a5a1b2e812f5f21967a0d672af0cb023 Observations for this power asset History for this project Previous Next