POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 13items · current page 1–13 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 군공-내초 관로 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-b4346ea8c1d7c9e985d113dc
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_f18f03de8d76874d
stable_project_keyprjtDef:234588:ESB
project_definition234588
first_region_codeESB
manual_source_formatfalse
project_name154kV 군공-내초 관로 건설사업
project_name_list군산지역 전기공급시설 관로공사(군공-내초)
purpose군산 북부지역 신규부하 공급능력 확충 및 인근 변전
project_region_detail전북특별자치도 군산시
project_period_raw2025.04~2028.12
project_scale_raw154KV 송전 1회선 관로 5KM
responsible_office_raw중부건설본부/전북건설지사
equipment_type전력구
headquarters중부건설본부
office전북건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_395872de54e5fee0
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_f18f03de8d76874d

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_f18f03de8d76874d

Sources EV-b4346ea8c1d7c9e985d113dc
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 16e21a8bcf63b4782fae69bc7d0c7fd4aedf88d2abd6bf60df9dc8c1a96c8c8c
Source schedule candidates · KOR · kepco_planned

154kV 군공-내초 관로 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2025-04
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|234588|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_395872de54e5fee0

Sources EV-23ed660a6cca56a5ad33b30c
Evidence SHA-256 4ce4b47717ace368ff55557ad9b4fcd1e4eed9c070d8264d342d222afc1706d8
행 SHA-256 c64b46f42f2e030eb4b1bedc6ae045d6a5a1b2e812f5f21967a0d672af0cb023
Source schedule candidates · KOR · kepco_planned

154kV 군공-내초 관로 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2026-04
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234588|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_395872de54e5fee0

Sources EV-23ed660a6cca56a5ad33b30c
Evidence SHA-256 4ce4b47717ace368ff55557ad9b4fcd1e4eed9c070d8264d342d222afc1706d8
행 SHA-256 c64b46f42f2e030eb4b1bedc6ae045d6a5a1b2e812f5f21967a0d672af0cb023
Source schedule candidates · KOR · kepco_planned

154kV 군공-내초 관로 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234588|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_395872de54e5fee0

Sources EV-23ed660a6cca56a5ad33b30c
Evidence SHA-256 4ce4b47717ace368ff55557ad9b4fcd1e4eed9c070d8264d342d222afc1706d8
행 SHA-256 c64b46f42f2e030eb4b1bedc6ae045d6a5a1b2e812f5f21967a0d672af0cb023
Source schedule candidates · KOR · kepco_planned

154kV 군공-내초 관로 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_completion
date2026-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234588|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_395872de54e5fee0

Sources EV-23ed660a6cca56a5ad33b30c
Evidence SHA-256 4ce4b47717ace368ff55557ad9b4fcd1e4eed9c070d8264d342d222afc1706d8
행 SHA-256 c64b46f42f2e030eb4b1bedc6ae045d6a5a1b2e812f5f21967a0d672af0cb023
Source schedule candidates · KOR · kepco_planned

154kV 군공-내초 관로 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234588|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_395872de54e5fee0

Sources EV-23ed660a6cca56a5ad33b30c
Evidence SHA-256 4ce4b47717ace368ff55557ad9b4fcd1e4eed9c070d8264d342d222afc1706d8
행 SHA-256 c64b46f42f2e030eb4b1bedc6ae045d6a5a1b2e812f5f21967a0d672af0cb023
Source schedule candidates · KOR · kepco_planned

154kV 군공-내초 관로 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-08
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234588|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_395872de54e5fee0

Sources EV-23ed660a6cca56a5ad33b30c
Evidence SHA-256 4ce4b47717ace368ff55557ad9b4fcd1e4eed9c070d8264d342d222afc1706d8
행 SHA-256 c64b46f42f2e030eb4b1bedc6ae045d6a5a1b2e812f5f21967a0d672af0cb023
Source schedule candidates · KOR · kepco_planned

154kV 군공-내초 관로 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_start
date2025-03
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234588|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_395872de54e5fee0

Sources EV-23ed660a6cca56a5ad33b30c
Evidence SHA-256 4ce4b47717ace368ff55557ad9b4fcd1e4eed9c070d8264d342d222afc1706d8
행 SHA-256 c64b46f42f2e030eb4b1bedc6ae045d6a5a1b2e812f5f21967a0d672af0cb023
Source schedule candidates · KOR · kepco_planned

154kV 군공-내초 관로 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-03
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234588|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_395872de54e5fee0

Sources EV-23ed660a6cca56a5ad33b30c
Evidence SHA-256 4ce4b47717ace368ff55557ad9b4fcd1e4eed9c070d8264d342d222afc1706d8
행 SHA-256 c64b46f42f2e030eb4b1bedc6ae045d6a5a1b2e812f5f21967a0d672af0cb023
Source schedule candidates · KOR · kepco_planned

154kV 군공-내초 관로 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-01
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234588|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_395872de54e5fee0

Sources EV-23ed660a6cca56a5ad33b30c
Evidence SHA-256 4ce4b47717ace368ff55557ad9b4fcd1e4eed9c070d8264d342d222afc1706d8
행 SHA-256 c64b46f42f2e030eb4b1bedc6ae045d6a5a1b2e812f5f21967a0d672af0cb023
Source schedule candidates · KOR · kepco_planned

154kV 군공-내초 관로 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2028-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|234588|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_395872de54e5fee0

Sources EV-23ed660a6cca56a5ad33b30c
Evidence SHA-256 4ce4b47717ace368ff55557ad9b4fcd1e4eed9c070d8264d342d222afc1706d8
행 SHA-256 c64b46f42f2e030eb4b1bedc6ae045d6a5a1b2e812f5f21967a0d672af0cb023
Source snapshots by date · KOR · kepco_planned

154kV 군공-내초 관로 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_395872de54e5fee0
stable_project_idkproj_f18f03de8d76874d
source_key202609|234588|ESB
basic_ym202609
source_stage_raw계획확정-사업승인전
project_name_list군산지역 전기공급시설 관로공사(군공-내초)
project_name_detail154kV 군공-내초 관로 건설사업
region_summary_raw전북특별자치도 군산시등 1 지역
equipment_type_raw전력구
headquarters_raw중부건설본부
office_raw전북건설지사
section_fields
Project purpose
  • 군산 북부지역 신규부하 공급능력 확충 및 인근 변전
Project region
  • 전북특별자치도 군산시
Project period
  • 2025.04~2028.12
사업 규모
  • 154KV 송전 1회선 관로 5KM
담당 사업소
  • 중부건설본부/전북건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 지장유무 조회: 2026.01~2026.04 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
□‘25.03 : 기본설계 착수 □‘25.08 : 기본설계심의 완료 □‘25.12 : 실시설계심의 완료 □‘26.03 : 설계안전성검토 완료 □‘26.05 : 실시설계 완료 □‘26.07 : 계약 의뢰
future_plan_redacted□ 향후계획 □‘25.03 : 기본설계 착수 □‘25.08 : 기본설계심의 완료 □‘25.12 : 실시설계심의 완료 □‘26.03 : 설계안전성검토 완료 □‘26.05 : 실시설계 완료 □‘26.07 : 계약 의뢰
attachment_count0
source_detail_sha2564ce4b47717ace368ff55557ad9b4fcd1e4eed9c070d8264d342d222afc1706d8
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|234588|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_395872de54e5fee0

Sources EV-23ed660a6cca56a5ad33b30c
Evidence SHA-256 4ce4b47717ace368ff55557ad9b4fcd1e4eed9c070d8264d342d222afc1706d8
행 SHA-256 c64b46f42f2e030eb4b1bedc6ae045d6a5a1b2e812f5f21967a0d672af0cb023
Source snapshots by date · KOR · kepco_planned

154kV 군공-내초 관로 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_f18f03de8d76874d
stable_project_keyprjtDef:234588:ESB
project_definition234588
first_region_codeESB
manual_source_formatfalse
project_name154kV 군공-내초 관로 건설사업
project_name_list군산지역 전기공급시설 관로공사(군공-내초)
purpose군산 북부지역 신규부하 공급능력 확충 및 인근 변전
project_region_detail전북특별자치도 군산시
project_period_raw2025.04~2028.12
project_scale_raw154KV 송전 1회선 관로 5KM
responsible_office_raw중부건설본부/전북건설지사
equipment_type전력구
headquarters중부건설본부
office전북건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_395872de54e5fee0
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_f18f03de8d76874d

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_f18f03de8d76874d

Sources EV-b4346ea8c1d7c9e985d113dc
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 16e21a8bcf63b4782fae69bc7d0c7fd4aedf88d2abd6bf60df9dc8c1a96c8c8c

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel