POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 22items · current page 1–22 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 광양항분기 지중T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-3c49beb01b3be2e1f1b72a58
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_dc40ded405d593f0
stable_project_keyprjtDef:233692:ESB
project_definition233692
first_region_codeESB
manual_source_formatfalse
project_name154kV 광양항분기 지중T/L 건설사업
project_name_list154kV 광양항분기 지중송전선로 건설사업
purpose광양항 배후단지 확대에 따른 전력 공급 능
project_region_detail전남광주통합특별시 광양시
project_period_raw2022.06~2026.12
project_scale_rawXLPE2500㎟ 4C, 0.3KM
responsible_office_raw중부건설본부/광주전남건설지사
equipment_type지중송전
headquarters중부건설본부
office광주전남건설지사
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_95950c71bfebebc7
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_dc40ded405d593f0

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_dc40ded405d593f0

Sources EV-3c49beb01b3be2e1f1b72a58
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 cc91c291c0bac271e84eb0943c8064004561ef910c5e44b95b733bad95d5a1fe
Source schedule candidates · KOR · kepco_planned

154kV 광양항분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2022-06
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|233692|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_95950c71bfebebc7

Sources EV-8de386baa6341a7d9f6bb1a9
Evidence SHA-256 6025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1
행 SHA-256 d0cd4eb3f97d7c6c10e7bc19e01be3273176ad2cb9540b5a7fad4398120ebbdd
Source schedule candidates · KOR · kepco_planned

154kV 광양항분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2025-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233692|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_95950c71bfebebc7

Sources EV-8de386baa6341a7d9f6bb1a9
Evidence SHA-256 6025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1
행 SHA-256 d0cd4eb3f97d7c6c10e7bc19e01be3273176ad2cb9540b5a7fad4398120ebbdd
Source schedule candidates · KOR · kepco_planned

154kV 광양항분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-12
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233692|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_95950c71bfebebc7

Sources EV-8de386baa6341a7d9f6bb1a9
Evidence SHA-256 6025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1
행 SHA-256 d0cd4eb3f97d7c6c10e7bc19e01be3273176ad2cb9540b5a7fad4398120ebbdd
Source schedule candidates · KOR · kepco_planned

154kV 광양항분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2025-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233692|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_95950c71bfebebc7

Sources EV-8de386baa6341a7d9f6bb1a9
Evidence SHA-256 6025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1
행 SHA-256 d0cd4eb3f97d7c6c10e7bc19e01be3273176ad2cb9540b5a7fad4398120ebbdd
Source schedule candidates · KOR · kepco_planned

154kV 광양항분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233692|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_95950c71bfebebc7

Sources EV-8de386baa6341a7d9f6bb1a9
Evidence SHA-256 6025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1
행 SHA-256 d0cd4eb3f97d7c6c10e7bc19e01be3273176ad2cb9540b5a7fad4398120ebbdd
Source schedule candidates · KOR · kepco_planned

154kV 광양항분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233692|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_95950c71bfebebc7

Sources EV-8de386baa6341a7d9f6bb1a9
Evidence SHA-256 6025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1
행 SHA-256 d0cd4eb3f97d7c6c10e7bc19e01be3273176ad2cb9540b5a7fad4398120ebbdd
Source schedule candidates · KOR · kepco_planned

154kV 광양항분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233692|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_95950c71bfebebc7

Sources EV-8de386baa6341a7d9f6bb1a9
Evidence SHA-256 6025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1
행 SHA-256 d0cd4eb3f97d7c6c10e7bc19e01be3273176ad2cb9540b5a7fad4398120ebbdd
Source schedule candidates · KOR · kepco_planned

154kV 광양항분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2025-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233692|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_95950c71bfebebc7

Sources EV-8de386baa6341a7d9f6bb1a9
Evidence SHA-256 6025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1
행 SHA-256 d0cd4eb3f97d7c6c10e7bc19e01be3273176ad2cb9540b5a7fad4398120ebbdd
Source schedule candidates · KOR · kepco_planned

154kV 광양항분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_completion
date2023-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233692|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_95950c71bfebebc7

Sources EV-8de386baa6341a7d9f6bb1a9
Evidence SHA-256 6025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1
행 SHA-256 d0cd4eb3f97d7c6c10e7bc19e01be3273176ad2cb9540b5a7fad4398120ebbdd
Source schedule candidates · KOR · kepco_planned

154kV 광양항분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-12
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233692|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_95950c71bfebebc7

Sources EV-8de386baa6341a7d9f6bb1a9
Evidence SHA-256 6025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1
행 SHA-256 d0cd4eb3f97d7c6c10e7bc19e01be3273176ad2cb9540b5a7fad4398120ebbdd
Source schedule candidates · KOR · kepco_planned

154kV 광양항분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-08
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233692|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_95950c71bfebebc7

Sources EV-8de386baa6341a7d9f6bb1a9
Evidence SHA-256 6025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1
행 SHA-256 d0cd4eb3f97d7c6c10e7bc19e01be3273176ad2cb9540b5a7fad4398120ebbdd
Source schedule candidates · KOR · kepco_planned

154kV 광양항분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_completion
date2025-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233692|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_95950c71bfebebc7

Sources EV-8de386baa6341a7d9f6bb1a9
Evidence SHA-256 6025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1
행 SHA-256 d0cd4eb3f97d7c6c10e7bc19e01be3273176ad2cb9540b5a7fad4398120ebbdd
Source schedule candidates · KOR · kepco_planned

154kV 광양항분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233692|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_95950c71bfebebc7

Sources EV-8de386baa6341a7d9f6bb1a9
Evidence SHA-256 6025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1
행 SHA-256 d0cd4eb3f97d7c6c10e7bc19e01be3273176ad2cb9540b5a7fad4398120ebbdd
Source schedule candidates · KOR · kepco_planned

154kV 광양항분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-05
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233692|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_95950c71bfebebc7

Sources EV-8de386baa6341a7d9f6bb1a9
Evidence SHA-256 6025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1
행 SHA-256 d0cd4eb3f97d7c6c10e7bc19e01be3273176ad2cb9540b5a7fad4398120ebbdd
Source schedule candidates · KOR · kepco_planned

154kV 광양항분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2026-11
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233692|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_95950c71bfebebc7

Sources EV-8de386baa6341a7d9f6bb1a9
Evidence SHA-256 6025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1
행 SHA-256 d0cd4eb3f97d7c6c10e7bc19e01be3273176ad2cb9540b5a7fad4398120ebbdd
Source schedule candidates · KOR · kepco_planned

154kV 광양항분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2026-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233692|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_95950c71bfebebc7

Sources EV-8de386baa6341a7d9f6bb1a9
Evidence SHA-256 6025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1
행 SHA-256 d0cd4eb3f97d7c6c10e7bc19e01be3273176ad2cb9540b5a7fad4398120ebbdd
Source schedule candidates · KOR · kepco_planned

154kV 광양항분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2026-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|233692|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_95950c71bfebebc7

Sources EV-8de386baa6341a7d9f6bb1a9
Evidence SHA-256 6025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1
행 SHA-256 d0cd4eb3f97d7c6c10e7bc19e01be3273176ad2cb9540b5a7fad4398120ebbdd
Source schedule candidates · KOR · kepco_planned

154kV 광양항분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233692|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_95950c71bfebebc7

Sources EV-8de386baa6341a7d9f6bb1a9
Evidence SHA-256 6025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1
행 SHA-256 d0cd4eb3f97d7c6c10e7bc19e01be3273176ad2cb9540b5a7fad4398120ebbdd
Source schedule candidates · KOR · kepco_planned

154kV 광양항분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2025-08
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233692|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_95950c71bfebebc7

Sources EV-8de386baa6341a7d9f6bb1a9
Evidence SHA-256 6025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1
행 SHA-256 d0cd4eb3f97d7c6c10e7bc19e01be3273176ad2cb9540b5a7fad4398120ebbdd
Source snapshots by date · KOR · kepco_planned

154kV 광양항분기 지중T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_95950c71bfebebc7
stable_project_idkproj_dc40ded405d593f0
source_key202609|233692|ESB
basic_ym202609
source_stage_raw공사착수-사업완료전
project_name_list154kV 광양항분기 지중송전선로 건설사업
project_name_detail154kV 광양항분기 지중T/L 건설사업
region_summary_raw전남광주통합특별시 광양시등 1 지역
equipment_type_raw지중송전
headquarters_raw중부건설본부
office_raw광주전남건설지사
section_fields
Project purpose
  • 광양항 배후단지 확대에 따른 전력 공급 능
Project region
  • 전남광주통합특별시 광양시
Project period
  • 2022.06~2026.12
사업 규모
  • XLPE2500㎟ 4C, 0.3KM
담당 사업소
  • 중부건설본부/광주전남건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 2023.04 ~ 2023.05 실시설계: 2023.12 ~ 2025.04 설계담당자: [redacted]
건설공사 개요
  • 공사 착공: 2025.08 공사 기간: 2025.08 ~ 2026.12 감독자: [redacted], 실적): 100, 24
[진행경과] □ '21.09 : 제9차 장기 송변전설비계획 반영 □ '23.05 : 기본설계 완료 □ '25.04 : 실시설계 완료 □ '25.09 : 공사 착공 □ '25.09 : 준공목표 변경요청 [계통운영부, `25.06→`26.12] □ '25.12 : 공사 중지 □ '26.07 : 공사 재착공 [향후계획] □ '26.11 : 공사 준공
future_plan_redacted□ 향후계획 [진행경과] □ '21.09 : 제9차 장기 송변전설비계획 반영 □ '23.05 : 기본설계 완료 □ '25.04 : 실시설계 완료 □ '25.09 : 공사 착공 □ '25.09 : 준공목표 변경요청 [계통운영부, `25.06→`26.12] □ '25.12 : 공사 중지 □ '26.07 : 공사 재착공 [향후계획] □ '26.11 : 공사 준공
attachment_count0
source_detail_sha2566025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|233692|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_95950c71bfebebc7

Sources EV-8de386baa6341a7d9f6bb1a9
Evidence SHA-256 6025f8ac8e4c8009d97d9163d79a5fa49225ec90cb8678be7f206396018caee1
행 SHA-256 d0cd4eb3f97d7c6c10e7bc19e01be3273176ad2cb9540b5a7fad4398120ebbdd
Source snapshots by date · KOR · kepco_planned

154kV 광양항분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_dc40ded405d593f0
stable_project_keyprjtDef:233692:ESB
project_definition233692
first_region_codeESB
manual_source_formatfalse
project_name154kV 광양항분기 지중T/L 건설사업
project_name_list154kV 광양항분기 지중송전선로 건설사업
purpose광양항 배후단지 확대에 따른 전력 공급 능
project_region_detail전남광주통합특별시 광양시
project_period_raw2022.06~2026.12
project_scale_rawXLPE2500㎟ 4C, 0.3KM
responsible_office_raw중부건설본부/광주전남건설지사
equipment_type지중송전
headquarters중부건설본부
office광주전남건설지사
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_95950c71bfebebc7
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_dc40ded405d593f0

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_dc40ded405d593f0

Sources EV-3c49beb01b3be2e1f1b72a58
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 cc91c291c0bac271e84eb0943c8064004561ef910c5e44b95b733bad95d5a1fe

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel