POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 201,406items · current page 801–900 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type design_start date 2025-03 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|234588|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_395872de54e5fee0
Sources EV-23ed660a6cca56a5ad33b30c Evidence SHA-256 4ce4b47717ace368ff55557ad9b4fcd1e4eed9c070d8264d342d222afc1706d8 행 SHA-256 c64b46f42f2e030eb4b1bedc6ae045d6a5a1b2e812f5f21967a0d672af0cb023 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-03 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|234588|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_395872de54e5fee0
Sources EV-23ed660a6cca56a5ad33b30c Evidence SHA-256 4ce4b47717ace368ff55557ad9b4fcd1e4eed9c070d8264d342d222afc1706d8 행 SHA-256 c64b46f42f2e030eb4b1bedc6ae045d6a5a1b2e812f5f21967a0d672af0cb023 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-01 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|234588|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_395872de54e5fee0
Sources EV-23ed660a6cca56a5ad33b30c Evidence SHA-256 4ce4b47717ace368ff55557ad9b4fcd1e4eed9c070d8264d342d222afc1706d8 행 SHA-256 c64b46f42f2e030eb4b1bedc6ae045d6a5a1b2e812f5f21967a0d672af0cb023 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2028-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234588|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_395872de54e5fee0
Sources EV-23ed660a6cca56a5ad33b30c Evidence SHA-256 4ce4b47717ace368ff55557ad9b4fcd1e4eed9c070d8264d342d222afc1706d8 행 SHA-256 c64b46f42f2e030eb4b1bedc6ae045d6a5a1b2e812f5f21967a0d672af0cb023 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_395872de54e5fee0 stable_project_id kproj_f18f03de8d76874d source_key 202609|234588|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 군산지역 전기공급시설 관로공사(군공-내초) project_name_detail 154kV 군공-내초 관로 건설사업 region_summary_raw 전북특별자치도 군산시등 1 지역 equipment_type_raw 전력구 headquarters_raw 중부건설본부 office_raw 전북건설지사 section_fields Project purpose 군산 북부지역 신규부하 공급능력 확충 및 인근 변전 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 지장유무 조회: 2026.01~2026.04 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: □‘25.03 : 기본설계 착수 □‘25.08 : 기본설계심의 완료 □‘25.12 : 실시설계심의 완료 □‘26.03 : 설계안전성검토 완료 □‘26.05 : 실시설계 완료 □‘26.07 : 계약 의뢰 future_plan_redacted □ 향후계획 □‘25.03 : 기본설계 착수 □‘25.08 : 기본설계심의 완료 □‘25.12 : 실시설계심의 완료 □‘26.03 : 설계안전성검토 완료 □‘26.05 : 실시설계 완료 □‘26.07 : 계약 의뢰 attachment_count 0 source_detail_sha256 4ce4b47717ace368ff55557ad9b4fcd1e4eed9c070d8264d342d222afc1706d8 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|234588|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_395872de54e5fee0
Sources EV-23ed660a6cca56a5ad33b30c Evidence SHA-256 4ce4b47717ace368ff55557ad9b4fcd1e4eed9c070d8264d342d222afc1706d8 행 SHA-256 c64b46f42f2e030eb4b1bedc6ae045d6a5a1b2e812f5f21967a0d672af0cb023 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_f18f03de8d76874d stable_project_key prjtDef:234588:ESB project_definition 234588 first_region_code ESB manual_source_format false project_name 154kV 군공-내초 관로 건설사업 project_name_list 군산지역 전기공급시설 관로공사(군공-내초) purpose 군산 북부지역 신규부하 공급능력 확충 및 인근 변전 project_region_detail 전북특별자치도 군산시 project_period_raw 2025.04~2028.12 project_scale_raw 154KV 송전 1회선 관로 5KM responsible_office_raw 중부건설본부/전북건설지사 equipment_type 전력구 headquarters 중부건설본부 office 전북건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_f18f03de8d76874d
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_f18f03de8d76874d
Sources EV-b4346ea8c1d7c9e985d113dc Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 16e21a8bcf63b4782fae69bc7d0c7fd4aedf88d2abd6bf60df9dc8c1a96c8c8c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-b9d894b6757fb01c5b015276
Detailed source fields Original source field Published value or condition stable_project_id kproj_a846c198ebc98872 stable_project_key prjtDef:233655:ESB project_definition 233655 first_region_code ESB manual_source_format false project_name 154kV 군공-내초#3 지중T/L 건설사업 project_name_list 154kV 군공-내초#3 지중송전선로 건설사업 purpose 군산지역 발전단 집중에 따른 과부하 해소 project_region_detail 전북특별자치도 군산시 project_period_raw 2021.10~2029.12 project_scale_raw XLPE2000㎟X1C, 5.0KM responsible_office_raw 중부건설본부/전북건설지사 equipment_type 지중송전 headquarters 중부건설본부 office 전북건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_a846c198ebc98872
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_a846c198ebc98872
Sources EV-b9d894b6757fb01c5b015276 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 c773a0324d4d177b15e1901315e176f5f0b23038b6553399f5e977bf5843b468 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2027-08 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233655|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_27c7cf549d1f92da
Sources EV-8bb18db91a15df66c969e517 Evidence SHA-256 cfeedff1c69c63367c447e0dd21e4d9e3dadb236fa2cff228483c6e7ded4491f 행 SHA-256 c8501d8d557ad5bd6fbd1e634fd0250481495882d9ea0acdd6a9a5dd1f510c33 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-09 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233655|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_27c7cf549d1f92da
Sources EV-8bb18db91a15df66c969e517 Evidence SHA-256 cfeedff1c69c63367c447e0dd21e4d9e3dadb236fa2cff228483c6e7ded4491f 행 SHA-256 c8501d8d557ad5bd6fbd1e634fd0250481495882d9ea0acdd6a9a5dd1f510c33 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233655|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_27c7cf549d1f92da
Sources EV-8bb18db91a15df66c969e517 Evidence SHA-256 cfeedff1c69c63367c447e0dd21e4d9e3dadb236fa2cff228483c6e7ded4491f 행 SHA-256 c8501d8d557ad5bd6fbd1e634fd0250481495882d9ea0acdd6a9a5dd1f510c33 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2029-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233655|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_27c7cf549d1f92da
Sources EV-8bb18db91a15df66c969e517 Evidence SHA-256 cfeedff1c69c63367c447e0dd21e4d9e3dadb236fa2cff228483c6e7ded4491f 행 SHA-256 c8501d8d557ad5bd6fbd1e634fd0250481495882d9ea0acdd6a9a5dd1f510c33 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2024-06-13 date_precision day assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233655|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_27c7cf549d1f92da
Sources EV-8bb18db91a15df66c969e517 Evidence SHA-256 cfeedff1c69c63367c447e0dd21e4d9e3dadb236fa2cff228483c6e7ded4491f 행 SHA-256 c8501d8d557ad5bd6fbd1e634fd0250481495882d9ea0acdd6a9a5dd1f510c33 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2021-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233655|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_27c7cf549d1f92da
Sources EV-8bb18db91a15df66c969e517 Evidence SHA-256 cfeedff1c69c63367c447e0dd21e4d9e3dadb236fa2cff228483c6e7ded4491f 행 SHA-256 c8501d8d557ad5bd6fbd1e634fd0250481495882d9ea0acdd6a9a5dd1f510c33 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2025-02-14 date_precision day assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233655|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_27c7cf549d1f92da
Sources EV-8bb18db91a15df66c969e517 Evidence SHA-256 cfeedff1c69c63367c447e0dd21e4d9e3dadb236fa2cff228483c6e7ded4491f 행 SHA-256 c8501d8d557ad5bd6fbd1e634fd0250481495882d9ea0acdd6a9a5dd1f510c33 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-08 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233655|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_27c7cf549d1f92da
Sources EV-8bb18db91a15df66c969e517 Evidence SHA-256 cfeedff1c69c63367c447e0dd21e4d9e3dadb236fa2cff228483c6e7ded4491f 행 SHA-256 c8501d8d557ad5bd6fbd1e634fd0250481495882d9ea0acdd6a9a5dd1f510c33 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233655|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_27c7cf549d1f92da
Sources EV-8bb18db91a15df66c969e517 Evidence SHA-256 cfeedff1c69c63367c447e0dd21e4d9e3dadb236fa2cff228483c6e7ded4491f 행 SHA-256 c8501d8d557ad5bd6fbd1e634fd0250481495882d9ea0acdd6a9a5dd1f510c33 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233655|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_27c7cf549d1f92da
Sources EV-8bb18db91a15df66c969e517 Evidence SHA-256 cfeedff1c69c63367c447e0dd21e4d9e3dadb236fa2cff228483c6e7ded4491f 행 SHA-256 c8501d8d557ad5bd6fbd1e634fd0250481495882d9ea0acdd6a9a5dd1f510c33 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2022-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233655|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_27c7cf549d1f92da
Sources EV-8bb18db91a15df66c969e517 Evidence SHA-256 cfeedff1c69c63367c447e0dd21e4d9e3dadb236fa2cff228483c6e7ded4491f 행 SHA-256 c8501d8d557ad5bd6fbd1e634fd0250481495882d9ea0acdd6a9a5dd1f510c33 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_27c7cf549d1f92da stable_project_id kproj_a846c198ebc98872 source_key 202609|233655|ESB basic_ym 202609 source_stage_raw 사업승인-공사착수전 project_name_list 154kV 군공-내초#3 지중송전선로 건설사업 project_name_detail 154kV 군공-내초#3 지중T/L 건설사업 region_summary_raw 전북특별자치도 군산시등 1 지역 equipment_type_raw 지중송전 headquarters_raw 중부건설본부 office_raw 전북건설지사 section_fields 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 기본설계: 실시설계: 설계담당자: [redacted] [진행경과] □ ‘21.09. 제9차 장기송변전설비계획 신규사업 반영 □ ’21.10. 예비관로(기설) 활용을 위한 관련부서 회의(계통, 운영) □ ’22.06. 예비관로 건전성 확인 주체 협의 □ ‘22.12. 예비관로 도통시험공사 착공 □ ‘23.08. 예비관로 도통시험 관련부서 회의 결과 통보 □ ’23.12. 예비관로 사용불가 판정 회신 □ ‘24.06.13 : 단기 적정성(‘23년 ~ ‘25년) 검토에 따른 사업계획 확정 - 준공목표 : ‘23년 12월 → ‘26년 12월 □ ‘25.02.14 : 중장기 적정성(‘26년 이후) 검토에 따른 준공목표 변경 - 준공목표 : ‘26년 12월 → ‘28년 12월 [향후계획] □ ‘27.08. : 케이블공사 설계착수 future_plan_redacted □ 향후계획 [진행경과] □ ‘21.09. 제9차 장기송변전설비계획 신규사업 반영 □ ’21.10. 예비관로(기설) 활용을 위한 관련부서 회의(계통, 운영) □ ’22.06. 예비관로 건전성 확인 주체 협의 □ ‘22.12. 예비관로 도통시험공사 착공 □ ‘23.08. 예비관로 도통시험 관련부서 회의 결과 통보 □ ’23.12. 예비관로 사용불가 판정 회신 □ ‘24.06.13 : 단기 적정성(‘23년 ~ ‘25년) 검토에 따른 사업계획 확정 - 준공목표 : ‘23년 12월 → ‘26년 12월 □ ‘25.02.14 : 중장기 적정성(‘26년 이후) 검토에 따른 준공목표 변경 - 준공목표 : ‘26년 12월 → ‘28년 12월 [향후계획] □ ‘27.08. : 케이블공사 설계착수 attachment_count 0 source_detail_sha256 cfeedff1c69c63367c447e0dd21e4d9e3dadb236fa2cff228483c6e7ded4491f first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|233655|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_27c7cf549d1f92da
Sources EV-8bb18db91a15df66c969e517 Evidence SHA-256 cfeedff1c69c63367c447e0dd21e4d9e3dadb236fa2cff228483c6e7ded4491f 행 SHA-256 c8501d8d557ad5bd6fbd1e634fd0250481495882d9ea0acdd6a9a5dd1f510c33 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_a846c198ebc98872 stable_project_key prjtDef:233655:ESB project_definition 233655 first_region_code ESB manual_source_format false project_name 154kV 군공-내초#3 지중T/L 건설사업 project_name_list 154kV 군공-내초#3 지중송전선로 건설사업 purpose 군산지역 발전단 집중에 따른 과부하 해소 project_region_detail 전북특별자치도 군산시 project_period_raw 2021.10~2029.12 project_scale_raw XLPE2000㎟X1C, 5.0KM responsible_office_raw 중부건설본부/전북건설지사 equipment_type 지중송전 headquarters 중부건설본부 office 전북건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_a846c198ebc98872
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_a846c198ebc98872
Sources EV-b9d894b6757fb01c5b015276 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 c773a0324d4d177b15e1901315e176f5f0b23038b6553399f5e977bf5843b468 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-16abdb1c1bccd41762561074
Detailed source fields Original source field Published value or condition stable_project_id kproj_be17104fdbbe11ff stable_project_key prjtDef:234656:ESB project_definition 234656 first_region_code ESB manual_source_format false project_name 154kV 군북-가야 전력구 건설사업 project_name_list 154kV 함안지역 전기공급시설 전력구공사 purpose 표본 project_region_detail 경상남도 함안군 project_period_raw 2020.09~2027.12 project_scale_raw 관로, 전력구, 세미쉴드, 강관추진, 수직구 4개소 responsible_office_raw 남부건설본부/직할 equipment_type 전력구 headquarters 남부건설본부 office 직할 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_be17104fdbbe11ff
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_be17104fdbbe11ff
Sources EV-16abdb1c1bccd41762561074 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 0e2d77fd4108847e1cfebb34bb8d2148c2cc3228744e67fad3cb1c99b8e70aea Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2020-09 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234656|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_70972d824d3ea3ff
Sources EV-c9b57328138064904615cb1e Evidence SHA-256 191d4c39f545f62b3e6616623abc8d01fc35a81b0067842de71b49a9613a47c9 행 SHA-256 f7e6774a04310221356adcd96592477369b3069e75b2aeeee907c23c28c5cae3 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2027-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234656|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_70972d824d3ea3ff
Sources EV-c9b57328138064904615cb1e Evidence SHA-256 191d4c39f545f62b3e6616623abc8d01fc35a81b0067842de71b49a9613a47c9 행 SHA-256 f7e6774a04310221356adcd96592477369b3069e75b2aeeee907c23c28c5cae3 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_70972d824d3ea3ff stable_project_id kproj_be17104fdbbe11ff source_key 202609|234656|ESB basic_ym 202609 source_stage_raw 공사착수-사업완료전 project_name_list 154kV 함안지역 전기공급시설 전력구공사 project_name_detail 154kV 군북-가야 전력구 건설사업 region_summary_raw 경상남도 함안군등 1 지역 equipment_type_raw 전력구 headquarters_raw 남부건설본부 office_raw 직할 section_fields 사업 규모 관로, 전력구, 세미쉴드, 강관추진, 수직구 4개소 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 2021.12 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 2022.04 ~ 2024.02 기본설계: 2022.04 ~ 2023.06 실시설계: 2023.06 ~ 2024.02 설계담당자: [redacted] 건설공사 개요 공사 착공: 2025.04 공사 기간: 2025.04 ~ 2027.12 감독자: [redacted], 실적): 70, 45 □ ’15.07 : 제6차 장기송변전설비계획 반영 □ ’18.09 : 제8차 장기송변전설비계획 군북S/S 반영 □ ’20.07 : 계통계획 변경 검토 및 계획변경 지중화 관련 본사 관계자 회의 시행 □ ’20.09 : 문서번호 송건(송전)-847 지중화 승인 알림 ○ 당초 : 가공 2C-21km → 변경 : 가공 2C-10.4km, 지중 2C-7.66km □ '24.02.08 : 설계용역 준공 □ '24.04.23 : 공사계약(수의계약) 의뢰 □ '24.05.28 : 지하안전평가 보고서 제출(부산지방국토관리청) □ '24.07.19 : 수의시담(죽암건설, 상생조달처, 송변전건설단, 남부건설본부) □ ’24.08.20 : 수의계약 유찰 □ ’24.09.13 : 계약의뢰(분리발주 시행) □ ’24.10.15 : 1차공사 수의계약 완료[(주)죽암건설 외 2개사] □ ’24.10.31 : 1차공사 착공 □ ’24.11.19 : 2차공사 입찰공고(간이종심제) □ ’25.03.18 : 2차공사 공사계약 완료[엘티삼보 주식회사] □ ’25.04.21 : 군북-가야 전력구공사 건설사업관리용역 착수 □ ’25.04.17 : 2차공사 착공 future_plan_redacted □ 향후계획 □ ’15.07 : 제6차 장기송변전설비계획 반영 □ ’18.09 : 제8차 장기송변전설비계획 군북S/S 반영 □ ’20.07 : 계통계획 변경 검토 및 계획변경 지중화 관련 본사 관계자 회의 시행 □ ’20.09 : 문서번호 송건(송전)-847 지중화 승인 알림 ○ 당초 : 가공 2C-21km → 변경 : 가공 2C-10.4km, 지중 2C-7.66km □ '24.02.08 : 설계용역 준공 □ '24.04.23 : 공사계약(수의계약) 의뢰 □ '24.05.28 : 지하안전평가 보고서 제출(부산지방국토관리청) □ '24.07.19 : 수의시담(죽암건설, 상생조달처, 송변전건설단, 남부건설본부) □ ’24.08.20 : 수의계약 유찰 □ ’24.09.13 : 계약의뢰(분리발주 시행) □ ’24.10.15 : 1차공사 수의계약 완료[(주)죽암건설 외 2개사] □ ’24.10.31 : 1차공사 착공 □ ’24.11.19 : 2차공사 입찰공고(간이종심제) □ ’25.03.18 : 2차공사 공사계약 완료[엘티삼보 주식회사] □ ’25.04.21 : 군북-가야 전력구공사 건설사업관리용역 착수 □ ’25.04.17 : 2차공사 착공 attachment_count 0 source_detail_sha256 191d4c39f545f62b3e6616623abc8d01fc35a81b0067842de71b49a9613a47c9 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|234656|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_70972d824d3ea3ff
Sources EV-c9b57328138064904615cb1e Evidence SHA-256 191d4c39f545f62b3e6616623abc8d01fc35a81b0067842de71b49a9613a47c9 행 SHA-256 f7e6774a04310221356adcd96592477369b3069e75b2aeeee907c23c28c5cae3 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_be17104fdbbe11ff stable_project_key prjtDef:234656:ESB project_definition 234656 first_region_code ESB manual_source_format false project_name 154kV 군북-가야 전력구 건설사업 project_name_list 154kV 함안지역 전기공급시설 전력구공사 purpose 표본 project_region_detail 경상남도 함안군 project_period_raw 2020.09~2027.12 project_scale_raw 관로, 전력구, 세미쉴드, 강관추진, 수직구 4개소 responsible_office_raw 남부건설본부/직할 equipment_type 전력구 headquarters 남부건설본부 office 직할 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_be17104fdbbe11ff
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_be17104fdbbe11ff
Sources EV-16abdb1c1bccd41762561074 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 0e2d77fd4108847e1cfebb34bb8d2148c2cc3228744e67fad3cb1c99b8e70aea Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-d23b541a23b98ff3a2c34933
Detailed source fields Original source field Published value or condition stable_project_id kproj_86aa91ac3c67b1ca stable_project_key prjtDef:233624:ESB project_definition 233624 first_region_code ESB manual_source_format false project_name 154kV 군북-가야 지중T/L 건설사업 project_name_list 154kV 군북-가야 지중송전선로 건설사업 purpose 구룡S/S 계통보강을 통한 공급신뢰도 향상 project_region_detail 경상남도 함안군 project_period_raw 2022.07~2028.12 project_scale_raw XLPE 2,000MM2 2C-6.795KM responsible_office_raw 남부건설본부/직할 equipment_type 지중송전 headquarters 남부건설본부 office 직할 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_86aa91ac3c67b1ca
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_86aa91ac3c67b1ca
Sources EV-d23b541a23b98ff3a2c34933 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 9059e3289f5aba8a58f5e279988ffcace7f56ecef38e0b197f6d18e7a3366de0 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2028-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233624|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_bf116d3b9dcbd555
Sources EV-4ce888253140f5ba2ef934e3 Evidence SHA-256 49735e2990e589094d0c207fa99464ecb0c4f87d217c0019aa184b89d374535f 행 SHA-256 321d30ac352f8052084ad979f245825ee45b99c02b82f5b406c29aa8bff0c7c2 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2022-07 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233624|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_bf116d3b9dcbd555
Sources EV-4ce888253140f5ba2ef934e3 Evidence SHA-256 49735e2990e589094d0c207fa99464ecb0c4f87d217c0019aa184b89d374535f 행 SHA-256 321d30ac352f8052084ad979f245825ee45b99c02b82f5b406c29aa8bff0c7c2 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_bf116d3b9dcbd555 stable_project_id kproj_86aa91ac3c67b1ca source_key 202609|233624|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 군북-가야 지중송전선로 건설사업 project_name_detail 154kV 군북-가야 지중T/L 건설사업 region_summary_raw 경상남도 함안군등 1 지역 equipment_type_raw 지중송전 headquarters_raw 남부건설본부 office_raw 직할 section_fields 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: -'15.07 : 제6차 장기송변전설비계획 반영 -'22.08 : 사업계획 변경(구룡-가야, 군북분기 -> 구룡-군북, 군북-가야) -'27.02 : 지중송전선로 기본설계 완료(예정) -'27.06 : 지중송전선로 실시설계 완료(예정) -'27.09 : 착공(예정) -'28.10 : 가압(예정) future_plan_redacted □ 향후계획 -'15.07 : 제6차 장기송변전설비계획 반영 -'22.08 : 사업계획 변경(구룡-가야, 군북분기 -> 구룡-군북, 군북-가야) -'27.02 : 지중송전선로 기본설계 완료(예정) -'27.06 : 지중송전선로 실시설계 완료(예정) -'27.09 : 착공(예정) -'28.10 : 가압(예정) attachment_count 0 source_detail_sha256 49735e2990e589094d0c207fa99464ecb0c4f87d217c0019aa184b89d374535f first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|233624|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_bf116d3b9dcbd555
Sources EV-4ce888253140f5ba2ef934e3 Evidence SHA-256 49735e2990e589094d0c207fa99464ecb0c4f87d217c0019aa184b89d374535f 행 SHA-256 321d30ac352f8052084ad979f245825ee45b99c02b82f5b406c29aa8bff0c7c2 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_86aa91ac3c67b1ca stable_project_key prjtDef:233624:ESB project_definition 233624 first_region_code ESB manual_source_format false project_name 154kV 군북-가야 지중T/L 건설사업 project_name_list 154kV 군북-가야 지중송전선로 건설사업 purpose 구룡S/S 계통보강을 통한 공급신뢰도 향상 project_region_detail 경상남도 함안군 project_period_raw 2022.07~2028.12 project_scale_raw XLPE 2,000MM2 2C-6.795KM responsible_office_raw 남부건설본부/직할 equipment_type 지중송전 headquarters 남부건설본부 office 직할 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_86aa91ac3c67b1ca
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_86aa91ac3c67b1ca
Sources EV-d23b541a23b98ff3a2c34933 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 9059e3289f5aba8a58f5e279988ffcace7f56ecef38e0b197f6d18e7a3366de0 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-015b5eb0ad81d2122ea4cb39
Detailed source fields Original source field Published value or condition stable_project_id kproj_51881c742a2f82ad stable_project_key prjtDef:231450:ESB project_definition 231450 first_region_code ESB manual_source_format false project_name 154kV 군북S/S 건설사업 project_name_list 154kV 군북S/S 건설사업 purpose 변전설비 적기확충으로 안정적 전력공급 project_region_detail 경상남도 의령군 project_period_raw 2018.06~2028.10 project_scale_raw 154KV M.TR(45/60MVA)×2BANK responsible_office_raw 남부건설본부/직할 equipment_type 변전 headquarters 남부건설본부 office 직할 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_51881c742a2f82ad
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_51881c742a2f82ad
Sources EV-015b5eb0ad81d2122ea4cb39 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 a719098312fbf28981eeb4873e8af5e44b42ceade24756d2e2da78caa6106f30 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2028-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231450|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_58d2877256760de7
Sources EV-62dd15b0760d9ec98ce79105 Evidence SHA-256 4f871e0531cc995e87e31a8122f89df47f76df034fb6468ddf36ae1f0ebff32c 행 SHA-256 96673582432f818dfebbfd631aa564a2aef0e9abf2618cbcafc2914a9085ac9c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2018-06 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231450|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_58d2877256760de7
Sources EV-62dd15b0760d9ec98ce79105 Evidence SHA-256 4f871e0531cc995e87e31a8122f89df47f76df034fb6468ddf36ae1f0ebff32c 행 SHA-256 96673582432f818dfebbfd631aa564a2aef0e9abf2618cbcafc2914a9085ac9c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_58d2877256760de7 stable_project_id kproj_51881c742a2f82ad source_key 202609|231450|ESB basic_ym 202609 source_stage_raw 사업승인-공사착수전 project_name_list 154kV 군북S/S 건설사업 project_name_detail 154kV 군북S/S 건설사업 region_summary_raw 경상남도 의령군등 1 지역 equipment_type_raw 변전 headquarters_raw 남부건설본부 office_raw 직할 section_fields 사업 규모 154KV M.TR(45/60MVA)×2BANK 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 2021.06 참여 위원 수 : 15 지장유무 조회: 2021.05~2021.08 경과지(부지) 확정: 2021.11 환경/재해 영향평가 환경영향평가: 2021.11 ~ 2022.10 재해영향평가: 2021.11 ~ 2022.10 주민의견 수렴 지자체 공고 열람: 2022.06 ~ 2022.06 설명회·공청회: 2022.06 자체설명회: 사업설계 설계용역: 기본설계: 2024.12 ~ 2025.01 실시설계: 2025.06 ~ 설계담당자: [redacted] - 진행 경과 □ '18.06. : 제8차 장기 송변전설비계획 신규반영 □ '21.11. : 건설사업 입지확정 □ '22.11. : 실시계획 승인신청 □ '24.07. : 실시계획 승인관련 보완 자료 제출 □ '24.08. : 실시계획 승인 고시 □ '25.01. : 변전소 기본설계 완료 □ '25.07 : 주자재 발주 □ '27.02 : 변전공사 착공 future_plan_redacted □ 향후계획 - 진행 경과 □ '18.06. : 제8차 장기 송변전설비계획 신규반영 □ '21.11. : 건설사업 입지확정 □ '22.11. : 실시계획 승인신청 □ '24.07. : 실시계획 승인관련 보완 자료 제출 □ '24.08. : 실시계획 승인 고시 □ '25.01. : 변전소 기본설계 완료 □ '25.07 : 주자재 발주 □ '27.02 : 변전공사 착공 attachment_count 0 source_detail_sha256 4f871e0531cc995e87e31a8122f89df47f76df034fb6468ddf36ae1f0ebff32c first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231450|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_58d2877256760de7
Sources EV-62dd15b0760d9ec98ce79105 Evidence SHA-256 4f871e0531cc995e87e31a8122f89df47f76df034fb6468ddf36ae1f0ebff32c 행 SHA-256 96673582432f818dfebbfd631aa564a2aef0e9abf2618cbcafc2914a9085ac9c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_51881c742a2f82ad stable_project_key prjtDef:231450:ESB project_definition 231450 first_region_code ESB manual_source_format false project_name 154kV 군북S/S 건설사업 project_name_list 154kV 군북S/S 건설사업 purpose 변전설비 적기확충으로 안정적 전력공급 project_region_detail 경상남도 의령군 project_period_raw 2018.06~2028.10 project_scale_raw 154KV M.TR(45/60MVA)×2BANK responsible_office_raw 남부건설본부/직할 equipment_type 변전 headquarters 남부건설본부 office 직할 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_51881c742a2f82ad
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_51881c742a2f82ad
Sources EV-015b5eb0ad81d2122ea4cb39 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 a719098312fbf28981eeb4873e8af5e44b42ceade24756d2e2da78caa6106f30 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-adac9dd63c9b056dfea268a6
Detailed source fields Original source field Published value or condition stable_project_id kproj_f0f1cb7e290626ae stable_project_key prjtDef:233654:ESB project_definition 233654 first_region_code ESB manual_source_format false project_name 154kV 군산-함열 지중T/L 건설사업 project_name_list 154kV 군산-함열 지중T/L 건설사업 purpose 새만금지역 신재생발전 접속용량 확보 project_region_detail 전북특별자치도 익산시,군산시 project_period_raw 2021.10~2027.12 project_scale_raw 154㎸ XLPE 2500㎟, 2C × 9.0㎞ responsible_office_raw 중부건설본부/전북건설지사 equipment_type 지중송전 headquarters 중부건설본부 office 전북건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_f0f1cb7e290626ae
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_f0f1cb7e290626ae
Sources EV-adac9dd63c9b056dfea268a6 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 f66209857a7effaac278ba2300adfb6ec1543394f7a9e9336610ac07f30b80da Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-05-28 date_precision day assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233654|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e289dc5ee7a4bc0f
Sources EV-dd7b21ac96bd6a850db2cb3a Evidence SHA-256 29f4e58b58c7d66c6ff6cc8ee7c7d27381c1f60eb7d39c4c7accddf21548c3d0 행 SHA-256 dfb0fadf4ddee0ae3cc791e61af6b66a947e8bd331baf2fe505401f9f2f69d49 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type design_start date 2025-07 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233654|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e289dc5ee7a4bc0f
Sources EV-dd7b21ac96bd6a850db2cb3a Evidence SHA-256 29f4e58b58c7d66c6ff6cc8ee7c7d27381c1f60eb7d39c4c7accddf21548c3d0 행 SHA-256 dfb0fadf4ddee0ae3cc791e61af6b66a947e8bd331baf2fe505401f9f2f69d49 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2021-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233654|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e289dc5ee7a4bc0f
Sources EV-dd7b21ac96bd6a850db2cb3a Evidence SHA-256 29f4e58b58c7d66c6ff6cc8ee7c7d27381c1f60eb7d39c4c7accddf21548c3d0 행 SHA-256 dfb0fadf4ddee0ae3cc791e61af6b66a947e8bd331baf2fe505401f9f2f69d49 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-01-04 date_precision day assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233654|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e289dc5ee7a4bc0f
Sources EV-dd7b21ac96bd6a850db2cb3a Evidence SHA-256 29f4e58b58c7d66c6ff6cc8ee7c7d27381c1f60eb7d39c4c7accddf21548c3d0 행 SHA-256 dfb0fadf4ddee0ae3cc791e61af6b66a947e8bd331baf2fe505401f9f2f69d49 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233654|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e289dc5ee7a4bc0f
Sources EV-dd7b21ac96bd6a850db2cb3a Evidence SHA-256 29f4e58b58c7d66c6ff6cc8ee7c7d27381c1f60eb7d39c4c7accddf21548c3d0 행 SHA-256 dfb0fadf4ddee0ae3cc791e61af6b66a947e8bd331baf2fe505401f9f2f69d49 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-12-01 date_precision day assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233654|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e289dc5ee7a4bc0f
Sources EV-dd7b21ac96bd6a850db2cb3a Evidence SHA-256 29f4e58b58c7d66c6ff6cc8ee7c7d27381c1f60eb7d39c4c7accddf21548c3d0 행 SHA-256 dfb0fadf4ddee0ae3cc791e61af6b66a947e8bd331baf2fe505401f9f2f69d49 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-03-06 date_precision day assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233654|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e289dc5ee7a4bc0f
Sources EV-dd7b21ac96bd6a850db2cb3a Evidence SHA-256 29f4e58b58c7d66c6ff6cc8ee7c7d27381c1f60eb7d39c4c7accddf21548c3d0 행 SHA-256 dfb0fadf4ddee0ae3cc791e61af6b66a947e8bd331baf2fe505401f9f2f69d49 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2027-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233654|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e289dc5ee7a4bc0f
Sources EV-dd7b21ac96bd6a850db2cb3a Evidence SHA-256 29f4e58b58c7d66c6ff6cc8ee7c7d27381c1f60eb7d39c4c7accddf21548c3d0 행 SHA-256 dfb0fadf4ddee0ae3cc791e61af6b66a947e8bd331baf2fe505401f9f2f69d49 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-01-03 date_precision day assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233654|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e289dc5ee7a4bc0f
Sources EV-dd7b21ac96bd6a850db2cb3a Evidence SHA-256 29f4e58b58c7d66c6ff6cc8ee7c7d27381c1f60eb7d39c4c7accddf21548c3d0 행 SHA-256 dfb0fadf4ddee0ae3cc791e61af6b66a947e8bd331baf2fe505401f9f2f69d49 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-07 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233654|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e289dc5ee7a4bc0f
Sources EV-dd7b21ac96bd6a850db2cb3a Evidence SHA-256 29f4e58b58c7d66c6ff6cc8ee7c7d27381c1f60eb7d39c4c7accddf21548c3d0 행 SHA-256 dfb0fadf4ddee0ae3cc791e61af6b66a947e8bd331baf2fe505401f9f2f69d49 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_e289dc5ee7a4bc0f stable_project_id kproj_f0f1cb7e290626ae source_key 202609|233654|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 군산-함열 지중T/L 건설사업 project_name_detail 154kV 군산-함열 지중T/L 건설사업 region_summary_raw 전북특별자치도 군산시등 2 지역 equipment_type_raw 지중송전 headquarters_raw 중부건설본부 office_raw 전북건설지사 section_fields 사업 규모 154㎸ XLPE 2500㎟, 2C × 9.0㎞ 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: [시행근거] □ ‘23.06 일부 지중화 시공성 검토 □ ’23.07 제5차 입지선정위원회 시행(가공송전) □ ’23.12.01 케이블 직매식 공법 적용을 위한 제작사 의견수렴 회의 시행 □ ’24.01.04 직매공법 개선 관련 전문가 회의 시행 - 관련문서 : 전북건(송변)-19(2024.1.3.) □ ’24.03.06 토목공사 설계부서 합동 현장 점검 및 경과지 검토 □ ’25.05.28 전력구공사 기본설계심의 [ 향후계획]> □ '25.07 기본설계 착수 future_plan_redacted □ 향후계획 [시행근거] □ ‘23.06 일부 지중화 시공성 검토 □ ’23.07 제5차 입지선정위원회 시행(가공송전) □ ’23.12.01 케이블 직매식 공법 적용을 위한 제작사 의견수렴 회의 시행 □ ’24.01.04 직매공법 개선 관련 전문가 회의 시행 - 관련문서 : 전북건(송변)-19(2024.1.3.) □ ’24.03.06 토목공사 설계부서 합동 현장 점검 및 경과지 검토 □ ’25.05.28 전력구공사 기본설계심의 [ 향후계획]> □ '25.07 기본설계 착수 attachment_count 0 source_detail_sha256 29f4e58b58c7d66c6ff6cc8ee7c7d27381c1f60eb7d39c4c7accddf21548c3d0 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|233654|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e289dc5ee7a4bc0f
Sources EV-dd7b21ac96bd6a850db2cb3a Evidence SHA-256 29f4e58b58c7d66c6ff6cc8ee7c7d27381c1f60eb7d39c4c7accddf21548c3d0 행 SHA-256 dfb0fadf4ddee0ae3cc791e61af6b66a947e8bd331baf2fe505401f9f2f69d49 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_f0f1cb7e290626ae stable_project_key prjtDef:233654:ESB project_definition 233654 first_region_code ESB manual_source_format false project_name 154kV 군산-함열 지중T/L 건설사업 project_name_list 154kV 군산-함열 지중T/L 건설사업 purpose 새만금지역 신재생발전 접속용량 확보 project_region_detail 전북특별자치도 익산시,군산시 project_period_raw 2021.10~2027.12 project_scale_raw 154㎸ XLPE 2500㎟, 2C × 9.0㎞ responsible_office_raw 중부건설본부/전북건설지사 equipment_type 지중송전 headquarters 중부건설본부 office 전북건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_f0f1cb7e290626ae
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_f0f1cb7e290626ae
Sources EV-adac9dd63c9b056dfea268a6 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 f66209857a7effaac278ba2300adfb6ec1543394f7a9e9336610ac07f30b80da Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-7058a68f36e70da3feafc77b
Detailed source fields Original source field Published value or condition stable_project_id kproj_49187ad8f42d952b stable_project_key prjtDef:232581:ESB project_definition 232581 first_region_code ESB manual_source_format false project_name 154kV 군산-함열T/L 건설사업 project_name_list 154kV 군산-함열 송전선로 건설사업 purpose 새만금 지역 신재생발전 및 익산,군산지역 계통보강 project_region_detail 전북특별자치도 군산시,익산시 project_period_raw 2021.09~2028.12 project_scale_raw ACSR 410㎟×2B×2C, 약 15KM responsible_office_raw 중부건설본부/전북건설지사 equipment_type 가공송전 headquarters 중부건설본부 office 전북건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_49187ad8f42d952b
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_49187ad8f42d952b
Sources EV-7058a68f36e70da3feafc77b Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 d9a367c0465c795a083435ea57bd526afd95ba682d0f362cec4607627320ce94 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-09 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232581|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b67a11ad23bdffd9
Sources EV-f74ceeffd58737564278bd27 Evidence SHA-256 0d745fff1a8e9bfaea588da0f9ee4a31c9ee7462edc4dca02b453fcb0d705a2a 행 SHA-256 3ab3a9c0718111dbda54a09e4543b215df255c7ad8c75b6d7e72de8602045b00 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232581|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b67a11ad23bdffd9
Sources EV-f74ceeffd58737564278bd27 Evidence SHA-256 0d745fff1a8e9bfaea588da0f9ee4a31c9ee7462edc4dca02b453fcb0d705a2a 행 SHA-256 3ab3a9c0718111dbda54a09e4543b215df255c7ad8c75b6d7e72de8602045b00 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-07 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232581|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b67a11ad23bdffd9
Sources EV-f74ceeffd58737564278bd27 Evidence SHA-256 0d745fff1a8e9bfaea588da0f9ee4a31c9ee7462edc4dca02b453fcb0d705a2a 행 SHA-256 3ab3a9c0718111dbda54a09e4543b215df255c7ad8c75b6d7e72de8602045b00 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-09 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232581|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b67a11ad23bdffd9
Sources EV-f74ceeffd58737564278bd27 Evidence SHA-256 0d745fff1a8e9bfaea588da0f9ee4a31c9ee7462edc4dca02b453fcb0d705a2a 행 SHA-256 3ab3a9c0718111dbda54a09e4543b215df255c7ad8c75b6d7e72de8602045b00 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2009-02 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232581|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b67a11ad23bdffd9
Sources EV-f74ceeffd58737564278bd27 Evidence SHA-256 0d745fff1a8e9bfaea588da0f9ee4a31c9ee7462edc4dca02b453fcb0d705a2a 행 SHA-256 3ab3a9c0718111dbda54a09e4543b215df255c7ad8c75b6d7e72de8602045b00 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-09 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232581|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b67a11ad23bdffd9
Sources EV-f74ceeffd58737564278bd27 Evidence SHA-256 0d745fff1a8e9bfaea588da0f9ee4a31c9ee7462edc4dca02b453fcb0d705a2a 행 SHA-256 3ab3a9c0718111dbda54a09e4543b215df255c7ad8c75b6d7e72de8602045b00 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232581|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b67a11ad23bdffd9
Sources EV-f74ceeffd58737564278bd27 Evidence SHA-256 0d745fff1a8e9bfaea588da0f9ee4a31c9ee7462edc4dca02b453fcb0d705a2a 행 SHA-256 3ab3a9c0718111dbda54a09e4543b215df255c7ad8c75b6d7e72de8602045b00 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232581|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b67a11ad23bdffd9
Sources EV-f74ceeffd58737564278bd27 Evidence SHA-256 0d745fff1a8e9bfaea588da0f9ee4a31c9ee7462edc4dca02b453fcb0d705a2a 행 SHA-256 3ab3a9c0718111dbda54a09e4543b215df255c7ad8c75b6d7e72de8602045b00 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-04 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232581|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b67a11ad23bdffd9
Sources EV-f74ceeffd58737564278bd27 Evidence SHA-256 0d745fff1a8e9bfaea588da0f9ee4a31c9ee7462edc4dca02b453fcb0d705a2a 행 SHA-256 3ab3a9c0718111dbda54a09e4543b215df255c7ad8c75b6d7e72de8602045b00 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-11 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232581|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b67a11ad23bdffd9
Sources EV-f74ceeffd58737564278bd27 Evidence SHA-256 0d745fff1a8e9bfaea588da0f9ee4a31c9ee7462edc4dca02b453fcb0d705a2a 행 SHA-256 3ab3a9c0718111dbda54a09e4543b215df255c7ad8c75b6d7e72de8602045b00 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2028-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232581|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b67a11ad23bdffd9
Sources EV-f74ceeffd58737564278bd27 Evidence SHA-256 0d745fff1a8e9bfaea588da0f9ee4a31c9ee7462edc4dca02b453fcb0d705a2a 행 SHA-256 3ab3a9c0718111dbda54a09e4543b215df255c7ad8c75b6d7e72de8602045b00 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2024-09 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232581|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b67a11ad23bdffd9
Sources EV-f74ceeffd58737564278bd27 Evidence SHA-256 0d745fff1a8e9bfaea588da0f9ee4a31c9ee7462edc4dca02b453fcb0d705a2a 행 SHA-256 3ab3a9c0718111dbda54a09e4543b215df255c7ad8c75b6d7e72de8602045b00 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-09 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232581|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b67a11ad23bdffd9
Sources EV-f74ceeffd58737564278bd27 Evidence SHA-256 0d745fff1a8e9bfaea588da0f9ee4a31c9ee7462edc4dca02b453fcb0d705a2a 행 SHA-256 3ab3a9c0718111dbda54a09e4543b215df255c7ad8c75b6d7e72de8602045b00 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2009-02 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232581|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b67a11ad23bdffd9
Sources EV-f74ceeffd58737564278bd27 Evidence SHA-256 0d745fff1a8e9bfaea588da0f9ee4a31c9ee7462edc4dca02b453fcb0d705a2a 행 SHA-256 3ab3a9c0718111dbda54a09e4543b215df255c7ad8c75b6d7e72de8602045b00 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-11 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232581|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b67a11ad23bdffd9
Sources EV-f74ceeffd58737564278bd27 Evidence SHA-256 0d745fff1a8e9bfaea588da0f9ee4a31c9ee7462edc4dca02b453fcb0d705a2a 행 SHA-256 3ab3a9c0718111dbda54a09e4543b215df255c7ad8c75b6d7e72de8602045b00 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-08 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232581|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b67a11ad23bdffd9
Sources EV-f74ceeffd58737564278bd27 Evidence SHA-256 0d745fff1a8e9bfaea588da0f9ee4a31c9ee7462edc4dca02b453fcb0d705a2a 행 SHA-256 3ab3a9c0718111dbda54a09e4543b215df255c7ad8c75b6d7e72de8602045b00 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type implementation_plan_approval date 2026-08 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232581|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b67a11ad23bdffd9
Sources EV-f74ceeffd58737564278bd27 Evidence SHA-256 0d745fff1a8e9bfaea588da0f9ee4a31c9ee7462edc4dca02b453fcb0d705a2a 행 SHA-256 3ab3a9c0718111dbda54a09e4543b215df255c7ad8c75b6d7e72de8602045b00 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2021-09 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232581|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b67a11ad23bdffd9
Sources EV-f74ceeffd58737564278bd27 Evidence SHA-256 0d745fff1a8e9bfaea588da0f9ee4a31c9ee7462edc4dca02b453fcb0d705a2a 행 SHA-256 3ab3a9c0718111dbda54a09e4543b215df255c7ad8c75b6d7e72de8602045b00 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2024-09 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232581|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b67a11ad23bdffd9
Sources EV-f74ceeffd58737564278bd27 Evidence SHA-256 0d745fff1a8e9bfaea588da0f9ee4a31c9ee7462edc4dca02b453fcb0d705a2a 행 SHA-256 3ab3a9c0718111dbda54a09e4543b215df255c7ad8c75b6d7e72de8602045b00 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232581|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b67a11ad23bdffd9
Sources EV-f74ceeffd58737564278bd27 Evidence SHA-256 0d745fff1a8e9bfaea588da0f9ee4a31c9ee7462edc4dca02b453fcb0d705a2a 행 SHA-256 3ab3a9c0718111dbda54a09e4543b215df255c7ad8c75b6d7e72de8602045b00 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232581|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b67a11ad23bdffd9
Sources EV-f74ceeffd58737564278bd27 Evidence SHA-256 0d745fff1a8e9bfaea588da0f9ee4a31c9ee7462edc4dca02b453fcb0d705a2a 행 SHA-256 3ab3a9c0718111dbda54a09e4543b215df255c7ad8c75b6d7e72de8602045b00 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_b67a11ad23bdffd9 stable_project_id kproj_49187ad8f42d952b source_key 202609|232581|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 군산-함열 송전선로 건설사업 project_name_detail 154kV 군산-함열T/L 건설사업 region_summary_raw 전북특별자치도 군산시등 2 지역 equipment_type_raw 가공송전 headquarters_raw 중부건설본부 office_raw 전북건설지사 section_fields Project purpose 새만금 지역 신재생발전 및 익산,군산지역 계통보강 입지선정 전력입지영향평가 용역 착수: 2022.04 입지선정위원회 구성시기: 2024.09 참여 위원 수 : 35 경과지(부지) 확정: 2024.09 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 2024.11 자체설명회: [진행경과] '21.09 : 제9차 장기송변전설비계획 반영 '22.05~08 : 예정 경과대역 읍면대상 사전설명회 시행 '22.10 : 입지선정위원회 구성 완료 '22.11~'23.08 : 1~6차 입지선정위원회 시행 - 최적경과대역 확정(6차) '24.05 : 입지선정위원회 재구성 완료 '24.06 : 7차 입지선정위원회 시행 '24.07 : 8차 입지선정위원회 시행 '24.09 : 9차 입지선정위원회 시행(최적경과지 선정) '25.06 : 측량 완료 '25.09 : 주민설명회 완료 - 09.22(군산 서수행정복지센터), 09.26(익산 함열 농업기술센터) '26.08 : 실시계획승인고 future_plan_redacted □ 향후계획 [진행경과] '21.09 : 제9차 장기송변전설비계획 반영 '22.05~08 : 예정 경과대역 읍면대상 사전설명회 시행 '22.10 : 입지선정위원회 구성 완료 '22.11~'23.08 : 1~6차 입지선정위원회 시행 - 최적경과대역 확정(6차) '24.05 : 입지선정위원회 재구성 완료 '24.06 : 7차 입지선정위원회 시행 '24.07 : 8차 입지선정위원회 시행 '24.09 : 9차 입지선정위원회 시행(최적경과지 선정) '25.06 : 측량 완료 '25.09 : 주민설명회 완료 - 09.22(군산 서수행정복지센터), 09.26(익산 함열 농업기술센터) '26.08 : 실시계획승인고 attachment_count 0 source_detail_sha256 0d745fff1a8e9bfaea588da0f9ee4a31c9ee7462edc4dca02b453fcb0d705a2a first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|232581|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b67a11ad23bdffd9
Sources EV-f74ceeffd58737564278bd27 Evidence SHA-256 0d745fff1a8e9bfaea588da0f9ee4a31c9ee7462edc4dca02b453fcb0d705a2a 행 SHA-256 3ab3a9c0718111dbda54a09e4543b215df255c7ad8c75b6d7e72de8602045b00 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_49187ad8f42d952b stable_project_key prjtDef:232581:ESB project_definition 232581 first_region_code ESB manual_source_format false project_name 154kV 군산-함열T/L 건설사업 project_name_list 154kV 군산-함열 송전선로 건설사업 purpose 새만금 지역 신재생발전 및 익산,군산지역 계통보강 project_region_detail 전북특별자치도 군산시,익산시 project_period_raw 2021.09~2028.12 project_scale_raw ACSR 410㎟×2B×2C, 약 15KM responsible_office_raw 중부건설본부/전북건설지사 equipment_type 가공송전 headquarters 중부건설본부 office 전북건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_49187ad8f42d952b
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_49187ad8f42d952b
Sources EV-7058a68f36e70da3feafc77b Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 d9a367c0465c795a083435ea57bd526afd95ba682d0f362cec4607627320ce94 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-e84a83f961bd40d54a5c0d58
Detailed source fields Original source field Published value or condition stable_project_id kproj_9145ca2f7c4b4775 stable_project_key prjtDef:234620:ESB project_definition 234620 first_region_code ESB manual_source_format false project_name 154kV 군산-함열T/L 전력구 건설사업 project_name_list 154kV 군산-함열T/L 전력구 건설사업 purpose 계통보강을 통한 안정적 전력공급 project_region_detail 전북특별자치도 군산시 project_period_raw 2024.01~2027.12 project_scale_raw 개착식 관로 3,096M, 지향성압입 118M responsible_office_raw 중부건설본부/전북건설지사 equipment_type 전력구 headquarters 중부건설본부 office 전북건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_9145ca2f7c4b4775
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_9145ca2f7c4b4775
Sources EV-e84a83f961bd40d54a5c0d58 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 2c7557ba7daddb479bc454c3abd56b93fb5a3c72fe311262a5ecb9f795ffd1e3 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2027-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234620|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_a7b3358bab338ebd
Sources EV-b7d7b05772c8e9815faa6c6b Evidence SHA-256 bae3f2446c75264852934c90a6d43ba83303e0c46c654bd853487f43de80b779 행 SHA-256 7353248f183076ff06b399b823d5ef7fe645ab8b550e52b6cbde273763d69c5c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2024-01 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234620|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_a7b3358bab338ebd
Sources EV-b7d7b05772c8e9815faa6c6b Evidence SHA-256 bae3f2446c75264852934c90a6d43ba83303e0c46c654bd853487f43de80b779 행 SHA-256 7353248f183076ff06b399b823d5ef7fe645ab8b550e52b6cbde273763d69c5c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_a7b3358bab338ebd stable_project_id kproj_9145ca2f7c4b4775 source_key 202609|234620|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 군산-함열T/L 전력구 건설사업 project_name_detail 154kV 군산-함열T/L 전력구 건설사업 region_summary_raw 전북특별자치도 군산시등 1 지역 equipment_type_raw 전력구 headquarters_raw 중부건설본부 office_raw 전북건설지사 section_fields 사업 규모 개착식 관로 3,096M, 지향성압입 118M 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: future_plan_redacted □ 향후계획 ㅇ실시설계 중('26.05완료예정) attachment_count 0 source_detail_sha256 bae3f2446c75264852934c90a6d43ba83303e0c46c654bd853487f43de80b779 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|234620|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_a7b3358bab338ebd
Sources EV-b7d7b05772c8e9815faa6c6b Evidence SHA-256 bae3f2446c75264852934c90a6d43ba83303e0c46c654bd853487f43de80b779 행 SHA-256 7353248f183076ff06b399b823d5ef7fe645ab8b550e52b6cbde273763d69c5c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_9145ca2f7c4b4775 stable_project_key prjtDef:234620:ESB project_definition 234620 first_region_code ESB manual_source_format false project_name 154kV 군산-함열T/L 전력구 건설사업 project_name_list 154kV 군산-함열T/L 전력구 건설사업 purpose 계통보강을 통한 안정적 전력공급 project_region_detail 전북특별자치도 군산시 project_period_raw 2024.01~2027.12 project_scale_raw 개착식 관로 3,096M, 지향성압입 118M responsible_office_raw 중부건설본부/전북건설지사 equipment_type 전력구 headquarters 중부건설본부 office 전북건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_9145ca2f7c4b4775
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_9145ca2f7c4b4775
Sources EV-e84a83f961bd40d54a5c0d58 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 2c7557ba7daddb479bc454c3abd56b93fb5a3c72fe311262a5ecb9f795ffd1e3 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-40fb8d8146e4211ecc3caba5
Detailed source fields Original source field Published value or condition stable_project_id kproj_919ee3cba9c4a9ca stable_project_key prjtDef:232648:ESB project_definition 232648 first_region_code ESB manual_source_format false project_name 154kV 군위#2분기 건설사업 project_name_list 154kV 군위#2분기 송전선로 건설사업 purpose 군위지역 신재생전원 접속용량 확보 project_region_detail 대구광역시 군위군 project_period_raw project_scale_raw ACSR 330㎟×S×4C, 약 9㎞ responsible_office_raw 남부건설본부/대구경북건설지사 equipment_type 가공송전 headquarters 남부건설본부 office 대구경북건설지사 current_stage_raw snapshot_count 1 active_snapshot_count 0 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text source_record_id stable_project_id:kproj_919ee3cba9c4a9ca
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_919ee3cba9c4a9ca
Sources EV-40fb8d8146e4211ecc3caba5 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 36676f31dafd40171ee41fad020a20aa9932368c7bd5be8d038c16311cf1acd0 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_7e8a1b09490b6fb1 stable_project_id kproj_919ee3cba9c4a9ca source_key 202609|232648|ESB basic_ym 202609 source_stage_raw project_name_list 154kV 군위#2분기 송전선로 건설사업 project_name_detail 154kV 군위#2분기 건설사업 region_summary_raw 대구광역시 군위군등 1 지역 equipment_type_raw 가공송전 headquarters_raw 남부건설본부 office_raw 대구경북건설지사 section_fields 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: future_plan_redacted □ 향후계획 attachment_count 0 source_detail_sha256 c4cdd6ccbe7f73018c894a271ff88c9926b1fb6ad4f64cf1a9918018daa866d8 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|232648|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7e8a1b09490b6fb1
Sources EV-a5200e681997c43b16207193 Evidence SHA-256 c4cdd6ccbe7f73018c894a271ff88c9926b1fb6ad4f64cf1a9918018daa866d8 행 SHA-256 bbaa01adf4942f6d2d12ed57655bba5ceef3c6138f3877cbae0a3f2909917066 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_919ee3cba9c4a9ca stable_project_key prjtDef:232648:ESB project_definition 232648 first_region_code ESB manual_source_format false project_name 154kV 군위#2분기 건설사업 project_name_list 154kV 군위#2분기 송전선로 건설사업 purpose 군위지역 신재생전원 접속용량 확보 project_region_detail 대구광역시 군위군 project_period_raw project_scale_raw ACSR 330㎟×S×4C, 약 9㎞ responsible_office_raw 남부건설본부/대구경북건설지사 equipment_type 가공송전 headquarters 남부건설본부 office 대구경북건설지사 current_stage_raw snapshot_count 1 active_snapshot_count 0 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text source_record_id stable_project_id:kproj_919ee3cba9c4a9ca
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_919ee3cba9c4a9ca
Sources EV-40fb8d8146e4211ecc3caba5 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 36676f31dafd40171ee41fad020a20aa9932368c7bd5be8d038c16311cf1acd0 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-55a1ce8c27485ea48e38053d
Detailed source fields Original source field Published value or condition stable_project_id kproj_35b6930477f4c504 stable_project_key prjtDef:234374:ESB project_definition 234374 first_region_code ESB manual_source_format false project_name 154kV 군장-비응#4 전력구 건설사업 project_name_list 군산지역 전기공급시설 전력구공사(군장-서비응) purpose 새만금 국가산업단지 신규 부하 전력공급 project_region_detail 전북특별자치도 군산시 project_period_raw 2025.01~2028.09 project_scale_raw 2회선 관로 4.4KM, 전력구 0.9KM, 압입 0.1KM responsible_office_raw 중부건설본부/전북건설지사 equipment_type 전력구 headquarters 중부건설본부 office 전북건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_35b6930477f4c504
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_35b6930477f4c504
Sources EV-55a1ce8c27485ea48e38053d Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 8ff20b1f27943e1670e2d63f56eb2358578400b31560f2905884efc13089c6e4 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-03 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|234374|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_f616eb3ba3dc1b7c
Sources EV-d84ca7fb5bfd922ca7b7c28d Evidence SHA-256 71f4348e33fda4f675b4a8c37023f745001a8f007282f6a350f0dbda4ecca690 행 SHA-256 b062edcfd6b393325870f3b7ed75dd7d14293c8f967c1adcd280dda70a9cbb13 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2028-09 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234374|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_f616eb3ba3dc1b7c
Sources EV-d84ca7fb5bfd922ca7b7c28d Evidence SHA-256 71f4348e33fda4f675b4a8c37023f745001a8f007282f6a350f0dbda4ecca690 행 SHA-256 b062edcfd6b393325870f3b7ed75dd7d14293c8f967c1adcd280dda70a9cbb13 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-11 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|234374|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_f616eb3ba3dc1b7c
Sources EV-d84ca7fb5bfd922ca7b7c28d Evidence SHA-256 71f4348e33fda4f675b4a8c37023f745001a8f007282f6a350f0dbda4ecca690 행 SHA-256 b062edcfd6b393325870f3b7ed75dd7d14293c8f967c1adcd280dda70a9cbb13 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2024-11 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|234374|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_f616eb3ba3dc1b7c
Sources EV-d84ca7fb5bfd922ca7b7c28d Evidence SHA-256 71f4348e33fda4f675b4a8c37023f745001a8f007282f6a350f0dbda4ecca690 행 SHA-256 b062edcfd6b393325870f3b7ed75dd7d14293c8f967c1adcd280dda70a9cbb13 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-09 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|234374|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_f616eb3ba3dc1b7c
Sources EV-d84ca7fb5bfd922ca7b7c28d Evidence SHA-256 71f4348e33fda4f675b4a8c37023f745001a8f007282f6a350f0dbda4ecca690 행 SHA-256 b062edcfd6b393325870f3b7ed75dd7d14293c8f967c1adcd280dda70a9cbb13 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2025-01 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234374|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_f616eb3ba3dc1b7c
Sources EV-d84ca7fb5bfd922ca7b7c28d Evidence SHA-256 71f4348e33fda4f675b4a8c37023f745001a8f007282f6a350f0dbda4ecca690 행 SHA-256 b062edcfd6b393325870f3b7ed75dd7d14293c8f967c1adcd280dda70a9cbb13 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-11 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|234374|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_f616eb3ba3dc1b7c
Sources EV-d84ca7fb5bfd922ca7b7c28d Evidence SHA-256 71f4348e33fda4f675b4a8c37023f745001a8f007282f6a350f0dbda4ecca690 행 SHA-256 b062edcfd6b393325870f3b7ed75dd7d14293c8f967c1adcd280dda70a9cbb13 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type design_completion date 2025-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|234374|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_f616eb3ba3dc1b7c
Sources EV-d84ca7fb5bfd922ca7b7c28d Evidence SHA-256 71f4348e33fda4f675b4a8c37023f745001a8f007282f6a350f0dbda4ecca690 행 SHA-256 b062edcfd6b393325870f3b7ed75dd7d14293c8f967c1adcd280dda70a9cbb13 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-03 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|234374|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_f616eb3ba3dc1b7c
Sources EV-d84ca7fb5bfd922ca7b7c28d Evidence SHA-256 71f4348e33fda4f675b4a8c37023f745001a8f007282f6a350f0dbda4ecca690 행 SHA-256 b062edcfd6b393325870f3b7ed75dd7d14293c8f967c1adcd280dda70a9cbb13 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-03 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|234374|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_f616eb3ba3dc1b7c
Sources EV-d84ca7fb5bfd922ca7b7c28d Evidence SHA-256 71f4348e33fda4f675b4a8c37023f745001a8f007282f6a350f0dbda4ecca690 행 SHA-256 b062edcfd6b393325870f3b7ed75dd7d14293c8f967c1adcd280dda70a9cbb13 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-11 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|234374|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_f616eb3ba3dc1b7c
Sources EV-d84ca7fb5bfd922ca7b7c28d Evidence SHA-256 71f4348e33fda4f675b4a8c37023f745001a8f007282f6a350f0dbda4ecca690 행 SHA-256 b062edcfd6b393325870f3b7ed75dd7d14293c8f967c1adcd280dda70a9cbb13 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-05 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|234374|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_f616eb3ba3dc1b7c
Sources EV-d84ca7fb5bfd922ca7b7c28d Evidence SHA-256 71f4348e33fda4f675b4a8c37023f745001a8f007282f6a350f0dbda4ecca690 행 SHA-256 b062edcfd6b393325870f3b7ed75dd7d14293c8f967c1adcd280dda70a9cbb13 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_f616eb3ba3dc1b7c stable_project_id kproj_35b6930477f4c504 source_key 202609|234374|ESB basic_ym 202609 source_stage_raw 사업승인-공사착수전 project_name_list 군산지역 전기공급시설 전력구공사(군장-서비응) project_name_detail 154kV 군장-비응#4 전력구 건설사업 region_summary_raw 전북특별자치도 군산시등 1 지역 equipment_type_raw 전력구 headquarters_raw 중부건설본부 office_raw 전북건설지사 section_fields 사업 규모 2회선 관로 4.4KM, 전력구 0.9KM, 압입 0.1KM 계획확정 제11차 장기송변전설비계획 반영(2025.05) 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 2024.11 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 2024.11 ~ 2026.03 기본설계: 2024.11 ~ 2026.03 실시설계: 2025.09 ~ 2026.03 설계담당자: [redacted] □'24.11 : 기본계획 수립 □'25.05 : 실시설계 완료 future_plan_redacted □ 향후계획 □'24.11 : 기본계획 수립 □'25.05 : 실시설계 완료 attachment_count 0 source_detail_sha256 71f4348e33fda4f675b4a8c37023f745001a8f007282f6a350f0dbda4ecca690 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|234374|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_f616eb3ba3dc1b7c
Sources EV-d84ca7fb5bfd922ca7b7c28d Evidence SHA-256 71f4348e33fda4f675b4a8c37023f745001a8f007282f6a350f0dbda4ecca690 행 SHA-256 b062edcfd6b393325870f3b7ed75dd7d14293c8f967c1adcd280dda70a9cbb13 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_35b6930477f4c504 stable_project_key prjtDef:234374:ESB project_definition 234374 first_region_code ESB manual_source_format false project_name 154kV 군장-비응#4 전력구 건설사업 project_name_list 군산지역 전기공급시설 전력구공사(군장-서비응) purpose 새만금 국가산업단지 신규 부하 전력공급 project_region_detail 전북특별자치도 군산시 project_period_raw 2025.01~2028.09 project_scale_raw 2회선 관로 4.4KM, 전력구 0.9KM, 압입 0.1KM responsible_office_raw 중부건설본부/전북건설지사 equipment_type 전력구 headquarters 중부건설본부 office 전북건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_35b6930477f4c504
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_35b6930477f4c504
Sources EV-55a1ce8c27485ea48e38053d Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 8ff20b1f27943e1670e2d63f56eb2358578400b31560f2905884efc13089c6e4 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-91980397868d23a31fe42205
Detailed source fields Original source field Published value or condition stable_project_id kproj_c6d41c9c879fea64 stable_project_key prjtDef:233914:ESB project_definition 233914 first_region_code ESB manual_source_format false project_name 154kV 군장-비응#4 지중T/L 건설사업 project_name_list 154kV 군장-비응#4 지중T/L 건설사업 purpose 새만금 국가산업단지 전력공급능력 확보 project_region_detail 전북특별자치도 군산시 project_period_raw 2026.06~2028.09 project_scale_raw 154KV XLPE 2000㎟, 2C × 5.0㎞ responsible_office_raw 중부건설본부/전북건설지사 equipment_type 지중송전 headquarters 중부건설본부 office 전북건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_c6d41c9c879fea64
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_c6d41c9c879fea64
Sources EV-91980397868d23a31fe42205 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 d042211dd58316273ddce470df7ab2eefef5bbdf85b12a548a472b03f4656ad4 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2028-09 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233914|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_5850673bb62201f1
Sources EV-3b8853988c4aef670c00f289 Evidence SHA-256 18c9aa48b59d36b56e473a3e08f8b6d4ee186f649ef52a9d544fcc8c3ea2e42a 행 SHA-256 43df859f45dfe58d75e7d517e3be25ba5909a4ca6da68213e3b2d592529f01c7 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-05 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|233914|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_5850673bb62201f1
Sources EV-3b8853988c4aef670c00f289 Evidence SHA-256 18c9aa48b59d36b56e473a3e08f8b6d4ee186f649ef52a9d544fcc8c3ea2e42a 행 SHA-256 43df859f45dfe58d75e7d517e3be25ba5909a4ca6da68213e3b2d592529f01c7 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2026-06 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233914|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_5850673bb62201f1
Sources EV-3b8853988c4aef670c00f289 Evidence SHA-256 18c9aa48b59d36b56e473a3e08f8b6d4ee186f649ef52a9d544fcc8c3ea2e42a 행 SHA-256 43df859f45dfe58d75e7d517e3be25ba5909a4ca6da68213e3b2d592529f01c7 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_5850673bb62201f1 stable_project_id kproj_c6d41c9c879fea64 source_key 202609|233914|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 군장-비응#4 지중T/L 건설사업 project_name_detail 154kV 군장-비응#4 지중T/L 건설사업 region_summary_raw 전북특별자치도 군산시등 1 지역 equipment_type_raw 지중송전 headquarters_raw 중부건설본부 office_raw 전북건설지사 section_fields 사업 규모 154KV XLPE 2000㎟, 2C × 5.0㎞ 계획확정 제11차 장기송변전설비계획 반영(2025.05) 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: future_plan_redacted □ 향후계획 attachment_count 0 source_detail_sha256 18c9aa48b59d36b56e473a3e08f8b6d4ee186f649ef52a9d544fcc8c3ea2e42a first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|233914|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_5850673bb62201f1
Sources EV-3b8853988c4aef670c00f289 Evidence SHA-256 18c9aa48b59d36b56e473a3e08f8b6d4ee186f649ef52a9d544fcc8c3ea2e42a 행 SHA-256 43df859f45dfe58d75e7d517e3be25ba5909a4ca6da68213e3b2d592529f01c7 Observations for this power asset History for this project Previous Next