POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 24items · current page 1–24 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 군산-함열T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-7058a68f36e70da3feafc77b
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_49187ad8f42d952b
stable_project_keyprjtDef:232581:ESB
project_definition232581
first_region_codeESB
manual_source_formatfalse
project_name154kV 군산-함열T/L 건설사업
project_name_list154kV 군산-함열 송전선로 건설사업
purpose새만금 지역 신재생발전 및 익산,군산지역 계통보강
project_region_detail전북특별자치도 군산시,익산시
project_period_raw2021.09~2028.12
project_scale_rawACSR 410㎟×2B×2C, 약 15KM
responsible_office_raw중부건설본부/전북건설지사
equipment_type가공송전
headquarters중부건설본부
office전북건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_b67a11ad23bdffd9
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_49187ad8f42d952b

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_49187ad8f42d952b

Sources EV-7058a68f36e70da3feafc77b
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 d9a367c0465c795a083435ea57bd526afd95ba682d0f362cec4607627320ce94
Source schedule candidates · KOR · kepco_planned

154kV 군산-함열T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232581|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b67a11ad23bdffd9

Sources EV-f74ceeffd58737564278bd27
Evidence SHA-256 0d745fff1a8e9bfaea588da0f9ee4a31c9ee7462edc4dca02b453fcb0d705a2a
행 SHA-256 3ab3a9c0718111dbda54a09e4543b215df255c7ad8c75b6d7e72de8602045b00
Source schedule candidates · KOR · kepco_planned

154kV 군산-함열T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232581|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b67a11ad23bdffd9

Sources EV-f74ceeffd58737564278bd27
Evidence SHA-256 0d745fff1a8e9bfaea588da0f9ee4a31c9ee7462edc4dca02b453fcb0d705a2a
행 SHA-256 3ab3a9c0718111dbda54a09e4543b215df255c7ad8c75b6d7e72de8602045b00
Source schedule candidates · KOR · kepco_planned

154kV 군산-함열T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232581|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b67a11ad23bdffd9

Sources EV-f74ceeffd58737564278bd27
Evidence SHA-256 0d745fff1a8e9bfaea588da0f9ee4a31c9ee7462edc4dca02b453fcb0d705a2a
행 SHA-256 3ab3a9c0718111dbda54a09e4543b215df255c7ad8c75b6d7e72de8602045b00
Source schedule candidates · KOR · kepco_planned

154kV 군산-함열T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232581|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b67a11ad23bdffd9

Sources EV-f74ceeffd58737564278bd27
Evidence SHA-256 0d745fff1a8e9bfaea588da0f9ee4a31c9ee7462edc4dca02b453fcb0d705a2a
행 SHA-256 3ab3a9c0718111dbda54a09e4543b215df255c7ad8c75b6d7e72de8602045b00
Source schedule candidates · KOR · kepco_planned

154kV 군산-함열T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2009-02
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232581|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b67a11ad23bdffd9

Sources EV-f74ceeffd58737564278bd27
Evidence SHA-256 0d745fff1a8e9bfaea588da0f9ee4a31c9ee7462edc4dca02b453fcb0d705a2a
행 SHA-256 3ab3a9c0718111dbda54a09e4543b215df255c7ad8c75b6d7e72de8602045b00
Source schedule candidates · KOR · kepco_planned

154kV 군산-함열T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232581|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b67a11ad23bdffd9

Sources EV-f74ceeffd58737564278bd27
Evidence SHA-256 0d745fff1a8e9bfaea588da0f9ee4a31c9ee7462edc4dca02b453fcb0d705a2a
행 SHA-256 3ab3a9c0718111dbda54a09e4543b215df255c7ad8c75b6d7e72de8602045b00
Source schedule candidates · KOR · kepco_planned

154kV 군산-함열T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232581|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b67a11ad23bdffd9

Sources EV-f74ceeffd58737564278bd27
Evidence SHA-256 0d745fff1a8e9bfaea588da0f9ee4a31c9ee7462edc4dca02b453fcb0d705a2a
행 SHA-256 3ab3a9c0718111dbda54a09e4543b215df255c7ad8c75b6d7e72de8602045b00
Source schedule candidates · KOR · kepco_planned

154kV 군산-함열T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232581|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b67a11ad23bdffd9

Sources EV-f74ceeffd58737564278bd27
Evidence SHA-256 0d745fff1a8e9bfaea588da0f9ee4a31c9ee7462edc4dca02b453fcb0d705a2a
행 SHA-256 3ab3a9c0718111dbda54a09e4543b215df255c7ad8c75b6d7e72de8602045b00
Source schedule candidates · KOR · kepco_planned

154kV 군산-함열T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-04
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232581|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b67a11ad23bdffd9

Sources EV-f74ceeffd58737564278bd27
Evidence SHA-256 0d745fff1a8e9bfaea588da0f9ee4a31c9ee7462edc4dca02b453fcb0d705a2a
행 SHA-256 3ab3a9c0718111dbda54a09e4543b215df255c7ad8c75b6d7e72de8602045b00
Source schedule candidates · KOR · kepco_planned

154kV 군산-함열T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-11
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232581|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b67a11ad23bdffd9

Sources EV-f74ceeffd58737564278bd27
Evidence SHA-256 0d745fff1a8e9bfaea588da0f9ee4a31c9ee7462edc4dca02b453fcb0d705a2a
행 SHA-256 3ab3a9c0718111dbda54a09e4543b215df255c7ad8c75b6d7e72de8602045b00
Source schedule candidates · KOR · kepco_planned

154kV 군산-함열T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2028-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232581|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b67a11ad23bdffd9

Sources EV-f74ceeffd58737564278bd27
Evidence SHA-256 0d745fff1a8e9bfaea588da0f9ee4a31c9ee7462edc4dca02b453fcb0d705a2a
행 SHA-256 3ab3a9c0718111dbda54a09e4543b215df255c7ad8c75b6d7e72de8602045b00
Source schedule candidates · KOR · kepco_planned

154kV 군산-함열T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2024-09
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232581|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b67a11ad23bdffd9

Sources EV-f74ceeffd58737564278bd27
Evidence SHA-256 0d745fff1a8e9bfaea588da0f9ee4a31c9ee7462edc4dca02b453fcb0d705a2a
행 SHA-256 3ab3a9c0718111dbda54a09e4543b215df255c7ad8c75b6d7e72de8602045b00
Source schedule candidates · KOR · kepco_planned

154kV 군산-함열T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-09
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232581|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b67a11ad23bdffd9

Sources EV-f74ceeffd58737564278bd27
Evidence SHA-256 0d745fff1a8e9bfaea588da0f9ee4a31c9ee7462edc4dca02b453fcb0d705a2a
행 SHA-256 3ab3a9c0718111dbda54a09e4543b215df255c7ad8c75b6d7e72de8602045b00
Source schedule candidates · KOR · kepco_planned

154kV 군산-함열T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2009-02
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232581|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b67a11ad23bdffd9

Sources EV-f74ceeffd58737564278bd27
Evidence SHA-256 0d745fff1a8e9bfaea588da0f9ee4a31c9ee7462edc4dca02b453fcb0d705a2a
행 SHA-256 3ab3a9c0718111dbda54a09e4543b215df255c7ad8c75b6d7e72de8602045b00
Source schedule candidates · KOR · kepco_planned

154kV 군산-함열T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-11
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232581|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b67a11ad23bdffd9

Sources EV-f74ceeffd58737564278bd27
Evidence SHA-256 0d745fff1a8e9bfaea588da0f9ee4a31c9ee7462edc4dca02b453fcb0d705a2a
행 SHA-256 3ab3a9c0718111dbda54a09e4543b215df255c7ad8c75b6d7e72de8602045b00
Source schedule candidates · KOR · kepco_planned

154kV 군산-함열T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-08
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232581|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b67a11ad23bdffd9

Sources EV-f74ceeffd58737564278bd27
Evidence SHA-256 0d745fff1a8e9bfaea588da0f9ee4a31c9ee7462edc4dca02b453fcb0d705a2a
행 SHA-256 3ab3a9c0718111dbda54a09e4543b215df255c7ad8c75b6d7e72de8602045b00
Source schedule candidates · KOR · kepco_planned

154kV 군산-함열T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeimplementation_plan_approval
date2026-08
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232581|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b67a11ad23bdffd9

Sources EV-f74ceeffd58737564278bd27
Evidence SHA-256 0d745fff1a8e9bfaea588da0f9ee4a31c9ee7462edc4dca02b453fcb0d705a2a
행 SHA-256 3ab3a9c0718111dbda54a09e4543b215df255c7ad8c75b6d7e72de8602045b00
Source schedule candidates · KOR · kepco_planned

154kV 군산-함열T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2021-09
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232581|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b67a11ad23bdffd9

Sources EV-f74ceeffd58737564278bd27
Evidence SHA-256 0d745fff1a8e9bfaea588da0f9ee4a31c9ee7462edc4dca02b453fcb0d705a2a
행 SHA-256 3ab3a9c0718111dbda54a09e4543b215df255c7ad8c75b6d7e72de8602045b00
Source schedule candidates · KOR · kepco_planned

154kV 군산-함열T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2024-09
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232581|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b67a11ad23bdffd9

Sources EV-f74ceeffd58737564278bd27
Evidence SHA-256 0d745fff1a8e9bfaea588da0f9ee4a31c9ee7462edc4dca02b453fcb0d705a2a
행 SHA-256 3ab3a9c0718111dbda54a09e4543b215df255c7ad8c75b6d7e72de8602045b00
Source schedule candidates · KOR · kepco_planned

154kV 군산-함열T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232581|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b67a11ad23bdffd9

Sources EV-f74ceeffd58737564278bd27
Evidence SHA-256 0d745fff1a8e9bfaea588da0f9ee4a31c9ee7462edc4dca02b453fcb0d705a2a
행 SHA-256 3ab3a9c0718111dbda54a09e4543b215df255c7ad8c75b6d7e72de8602045b00
Source schedule candidates · KOR · kepco_planned

154kV 군산-함열T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232581|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b67a11ad23bdffd9

Sources EV-f74ceeffd58737564278bd27
Evidence SHA-256 0d745fff1a8e9bfaea588da0f9ee4a31c9ee7462edc4dca02b453fcb0d705a2a
행 SHA-256 3ab3a9c0718111dbda54a09e4543b215df255c7ad8c75b6d7e72de8602045b00
Source snapshots by date · KOR · kepco_planned

154kV 군산-함열T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_b67a11ad23bdffd9
stable_project_idkproj_49187ad8f42d952b
source_key202609|232581|ESB
basic_ym202609
source_stage_raw계획확정-사업승인전
project_name_list154kV 군산-함열 송전선로 건설사업
project_name_detail154kV 군산-함열T/L 건설사업
region_summary_raw전북특별자치도 군산시등 2 지역
equipment_type_raw가공송전
headquarters_raw중부건설본부
office_raw전북건설지사
section_fields
Project purpose
  • 새만금 지역 신재생발전 및 익산,군산지역 계통보강
Project region
  • 전북특별자치도 군산시,익산시
Project period
  • 2021.09~2028.12
사업 규모
  • ACSR 410㎟×2B×2C, 약 15KM
담당 사업소
  • 중부건설본부/전북건설지사
계획확정
  • 제09차 장기송변전설비계획 반영()
입지선정
  • 전력입지영향평가 용역 착수: 2022.04 입지선정위원회 구성시기: 2024.09 참여 위원 수 : 35 경과지(부지) 확정: 2024.09
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 2024.11 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
[진행경과] '21.09 : 제9차 장기송변전설비계획 반영 '22.05~08 : 예정 경과대역 읍면대상 사전설명회 시행 '22.10 : 입지선정위원회 구성 완료 '22.11~'23.08 : 1~6차 입지선정위원회 시행 - 최적경과대역 확정(6차) '24.05 : 입지선정위원회 재구성 완료 '24.06 : 7차 입지선정위원회 시행 '24.07 : 8차 입지선정위원회 시행 '24.09 : 9차 입지선정위원회 시행(최적경과지 선정) '25.06 : 측량 완료 '25.09 : 주민설명회 완료 - 09.22(군산 서수행정복지센터), 09.26(익산 함열 농업기술센터) '26.08 : 실시계획승인고
future_plan_redacted□ 향후계획 [진행경과] '21.09 : 제9차 장기송변전설비계획 반영 '22.05~08 : 예정 경과대역 읍면대상 사전설명회 시행 '22.10 : 입지선정위원회 구성 완료 '22.11~'23.08 : 1~6차 입지선정위원회 시행 - 최적경과대역 확정(6차) '24.05 : 입지선정위원회 재구성 완료 '24.06 : 7차 입지선정위원회 시행 '24.07 : 8차 입지선정위원회 시행 '24.09 : 9차 입지선정위원회 시행(최적경과지 선정) '25.06 : 측량 완료 '25.09 : 주민설명회 완료 - 09.22(군산 서수행정복지센터), 09.26(익산 함열 농업기술센터) '26.08 : 실시계획승인고
attachment_count0
source_detail_sha2560d745fff1a8e9bfaea588da0f9ee4a31c9ee7462edc4dca02b453fcb0d705a2a
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|232581|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b67a11ad23bdffd9

Sources EV-f74ceeffd58737564278bd27
Evidence SHA-256 0d745fff1a8e9bfaea588da0f9ee4a31c9ee7462edc4dca02b453fcb0d705a2a
행 SHA-256 3ab3a9c0718111dbda54a09e4543b215df255c7ad8c75b6d7e72de8602045b00
Source snapshots by date · KOR · kepco_planned

154kV 군산-함열T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_49187ad8f42d952b
stable_project_keyprjtDef:232581:ESB
project_definition232581
first_region_codeESB
manual_source_formatfalse
project_name154kV 군산-함열T/L 건설사업
project_name_list154kV 군산-함열 송전선로 건설사업
purpose새만금 지역 신재생발전 및 익산,군산지역 계통보강
project_region_detail전북특별자치도 군산시,익산시
project_period_raw2021.09~2028.12
project_scale_rawACSR 410㎟×2B×2C, 약 15KM
responsible_office_raw중부건설본부/전북건설지사
equipment_type가공송전
headquarters중부건설본부
office전북건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_b67a11ad23bdffd9
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_49187ad8f42d952b

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_49187ad8f42d952b

Sources EV-7058a68f36e70da3feafc77b
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 d9a367c0465c795a083435ea57bd526afd95ba682d0f362cec4607627320ce94

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel