Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 5items · current page 1–5 · Source records, not unique facilities.
Power assets and projects · KOR · kepco_planned
154kV 군북S/S 건설사업
Power project · Construction project
Metric or condition
Source value
Basis, scope and stage
project_name_voltage_label
154 kV
literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-015b5eb0ad81d2122ea4cb39
Sources EV-62dd15b0760d9ec98ce79105 Evidence SHA-256 4f871e0531cc995e87e31a8122f89df47f76df034fb6468ddf36ae1f0ebff32c 행 SHA-256 96673582432f818dfebbfd631aa564a2aef0e9abf2618cbcafc2914a9085ac9cSource snapshots by date · KOR · kepco_planned
154kV 군북S/S 건설사업
Project · historical source snapshot
Metric or condition
Source value
Basis, scope and stage
Detailed source fields
Original source field
Published value or condition
snapshot_id
ksnap_58d2877256760de7
stable_project_id
kproj_51881c742a2f82ad
source_key
202609|231450|ESB
basic_ym
202609
source_stage_raw
사업승인-공사착수전
project_name_list
154kV 군북S/S 건설사업
project_name_detail
154kV 군북S/S 건설사업
region_summary_raw
경상남도 의령군등 1 지역
equipment_type_raw
변전
headquarters_raw
남부건설본부
office_raw
직할
section_fields
Project purpose
변전설비 적기확충으로 안정적 전력공급
Project region
경상남도 의령군
Project period
2018.06~2028.10
사업 규모
154KV M.TR(45/60MVA)×2BANK
담당 사업소
남부건설본부/직할
계획확정
입지선정
전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 2021.06 참여 위원 수 : 15 지장유무 조회: 2021.05~2021.08 경과지(부지) 확정: 2021.11