POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 13items · current page 1–13 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 군산-함열 지중T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-adac9dd63c9b056dfea268a6
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_f0f1cb7e290626ae
stable_project_keyprjtDef:233654:ESB
project_definition233654
first_region_codeESB
manual_source_formatfalse
project_name154kV 군산-함열 지중T/L 건설사업
project_name_list154kV 군산-함열 지중T/L 건설사업
purpose새만금지역 신재생발전 접속용량 확보
project_region_detail전북특별자치도 익산시,군산시
project_period_raw2021.10~2027.12
project_scale_raw154㎸ XLPE 2500㎟, 2C × 9.0㎞
responsible_office_raw중부건설본부/전북건설지사
equipment_type지중송전
headquarters중부건설본부
office전북건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_e289dc5ee7a4bc0f
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_f0f1cb7e290626ae

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_f0f1cb7e290626ae

Sources EV-adac9dd63c9b056dfea268a6
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 f66209857a7effaac278ba2300adfb6ec1543394f7a9e9336610ac07f30b80da
Source schedule candidates · KOR · kepco_planned

154kV 군산-함열 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-05-28
date_precisionday
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233654|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e289dc5ee7a4bc0f

Sources EV-dd7b21ac96bd6a850db2cb3a
Evidence SHA-256 29f4e58b58c7d66c6ff6cc8ee7c7d27381c1f60eb7d39c4c7accddf21548c3d0
행 SHA-256 dfb0fadf4ddee0ae3cc791e61af6b66a947e8bd331baf2fe505401f9f2f69d49
Source schedule candidates · KOR · kepco_planned

154kV 군산-함열 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_start
date2025-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233654|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e289dc5ee7a4bc0f

Sources EV-dd7b21ac96bd6a850db2cb3a
Evidence SHA-256 29f4e58b58c7d66c6ff6cc8ee7c7d27381c1f60eb7d39c4c7accddf21548c3d0
행 SHA-256 dfb0fadf4ddee0ae3cc791e61af6b66a947e8bd331baf2fe505401f9f2f69d49
Source schedule candidates · KOR · kepco_planned

154kV 군산-함열 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2021-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|233654|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e289dc5ee7a4bc0f

Sources EV-dd7b21ac96bd6a850db2cb3a
Evidence SHA-256 29f4e58b58c7d66c6ff6cc8ee7c7d27381c1f60eb7d39c4c7accddf21548c3d0
행 SHA-256 dfb0fadf4ddee0ae3cc791e61af6b66a947e8bd331baf2fe505401f9f2f69d49
Source schedule candidates · KOR · kepco_planned

154kV 군산-함열 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-01-04
date_precisionday
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233654|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e289dc5ee7a4bc0f

Sources EV-dd7b21ac96bd6a850db2cb3a
Evidence SHA-256 29f4e58b58c7d66c6ff6cc8ee7c7d27381c1f60eb7d39c4c7accddf21548c3d0
행 SHA-256 dfb0fadf4ddee0ae3cc791e61af6b66a947e8bd331baf2fe505401f9f2f69d49
Source schedule candidates · KOR · kepco_planned

154kV 군산-함열 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233654|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e289dc5ee7a4bc0f

Sources EV-dd7b21ac96bd6a850db2cb3a
Evidence SHA-256 29f4e58b58c7d66c6ff6cc8ee7c7d27381c1f60eb7d39c4c7accddf21548c3d0
행 SHA-256 dfb0fadf4ddee0ae3cc791e61af6b66a947e8bd331baf2fe505401f9f2f69d49
Source schedule candidates · KOR · kepco_planned

154kV 군산-함열 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-12-01
date_precisionday
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233654|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e289dc5ee7a4bc0f

Sources EV-dd7b21ac96bd6a850db2cb3a
Evidence SHA-256 29f4e58b58c7d66c6ff6cc8ee7c7d27381c1f60eb7d39c4c7accddf21548c3d0
행 SHA-256 dfb0fadf4ddee0ae3cc791e61af6b66a947e8bd331baf2fe505401f9f2f69d49
Source schedule candidates · KOR · kepco_planned

154kV 군산-함열 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-03-06
date_precisionday
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233654|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e289dc5ee7a4bc0f

Sources EV-dd7b21ac96bd6a850db2cb3a
Evidence SHA-256 29f4e58b58c7d66c6ff6cc8ee7c7d27381c1f60eb7d39c4c7accddf21548c3d0
행 SHA-256 dfb0fadf4ddee0ae3cc791e61af6b66a947e8bd331baf2fe505401f9f2f69d49
Source schedule candidates · KOR · kepco_planned

154kV 군산-함열 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2027-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|233654|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e289dc5ee7a4bc0f

Sources EV-dd7b21ac96bd6a850db2cb3a
Evidence SHA-256 29f4e58b58c7d66c6ff6cc8ee7c7d27381c1f60eb7d39c4c7accddf21548c3d0
행 SHA-256 dfb0fadf4ddee0ae3cc791e61af6b66a947e8bd331baf2fe505401f9f2f69d49
Source schedule candidates · KOR · kepco_planned

154kV 군산-함열 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-01-03
date_precisionday
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233654|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e289dc5ee7a4bc0f

Sources EV-dd7b21ac96bd6a850db2cb3a
Evidence SHA-256 29f4e58b58c7d66c6ff6cc8ee7c7d27381c1f60eb7d39c4c7accddf21548c3d0
행 SHA-256 dfb0fadf4ddee0ae3cc791e61af6b66a947e8bd331baf2fe505401f9f2f69d49
Source schedule candidates · KOR · kepco_planned

154kV 군산-함열 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233654|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e289dc5ee7a4bc0f

Sources EV-dd7b21ac96bd6a850db2cb3a
Evidence SHA-256 29f4e58b58c7d66c6ff6cc8ee7c7d27381c1f60eb7d39c4c7accddf21548c3d0
행 SHA-256 dfb0fadf4ddee0ae3cc791e61af6b66a947e8bd331baf2fe505401f9f2f69d49
Source snapshots by date · KOR · kepco_planned

154kV 군산-함열 지중T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_e289dc5ee7a4bc0f
stable_project_idkproj_f0f1cb7e290626ae
source_key202609|233654|ESB
basic_ym202609
source_stage_raw계획확정-사업승인전
project_name_list154kV 군산-함열 지중T/L 건설사업
project_name_detail154kV 군산-함열 지중T/L 건설사업
region_summary_raw전북특별자치도 군산시등 2 지역
equipment_type_raw지중송전
headquarters_raw중부건설본부
office_raw전북건설지사
section_fields
Project purpose
  • 새만금지역 신재생발전 접속용량 확보
Project region
  • 전북특별자치도 익산시,군산시
Project period
  • 2021.10~2027.12
사업 규모
  • 154㎸ XLPE 2500㎟, 2C × 9.0㎞
담당 사업소
  • 중부건설본부/전북건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
[시행근거] □ ‘23.06 일부 지중화 시공성 검토 □ ’23.07 제5차 입지선정위원회 시행(가공송전) □ ’23.12.01 케이블 직매식 공법 적용을 위한 제작사 의견수렴 회의 시행 □ ’24.01.04 직매공법 개선 관련 전문가 회의 시행 - 관련문서 : 전북건(송변)-19(2024.1.3.) □ ’24.03.06 토목공사 설계부서 합동 현장 점검 및 경과지 검토 □ ’25.05.28 전력구공사 기본설계심의 [ 향후계획]> □ '25.07 기본설계 착수
future_plan_redacted□ 향후계획 [시행근거] □ ‘23.06 일부 지중화 시공성 검토 □ ’23.07 제5차 입지선정위원회 시행(가공송전) □ ’23.12.01 케이블 직매식 공법 적용을 위한 제작사 의견수렴 회의 시행 □ ’24.01.04 직매공법 개선 관련 전문가 회의 시행 - 관련문서 : 전북건(송변)-19(2024.1.3.) □ ’24.03.06 토목공사 설계부서 합동 현장 점검 및 경과지 검토 □ ’25.05.28 전력구공사 기본설계심의 [ 향후계획]> □ '25.07 기본설계 착수
attachment_count0
source_detail_sha25629f4e58b58c7d66c6ff6cc8ee7c7d27381c1f60eb7d39c4c7accddf21548c3d0
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|233654|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e289dc5ee7a4bc0f

Sources EV-dd7b21ac96bd6a850db2cb3a
Evidence SHA-256 29f4e58b58c7d66c6ff6cc8ee7c7d27381c1f60eb7d39c4c7accddf21548c3d0
행 SHA-256 dfb0fadf4ddee0ae3cc791e61af6b66a947e8bd331baf2fe505401f9f2f69d49
Source snapshots by date · KOR · kepco_planned

154kV 군산-함열 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_f0f1cb7e290626ae
stable_project_keyprjtDef:233654:ESB
project_definition233654
first_region_codeESB
manual_source_formatfalse
project_name154kV 군산-함열 지중T/L 건설사업
project_name_list154kV 군산-함열 지중T/L 건설사업
purpose새만금지역 신재생발전 접속용량 확보
project_region_detail전북특별자치도 익산시,군산시
project_period_raw2021.10~2027.12
project_scale_raw154㎸ XLPE 2500㎟, 2C × 9.0㎞
responsible_office_raw중부건설본부/전북건설지사
equipment_type지중송전
headquarters중부건설본부
office전북건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_e289dc5ee7a4bc0f
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_f0f1cb7e290626ae

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_f0f1cb7e290626ae

Sources EV-adac9dd63c9b056dfea268a6
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 f66209857a7effaac278ba2300adfb6ec1543394f7a9e9336610ac07f30b80da

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel