POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 6items · current page 1–6 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-91980397868d23a31fe42205
Detailed source fields Original source field Published value or condition stable_project_id kproj_c6d41c9c879fea64 stable_project_key prjtDef:233914:ESB project_definition 233914 first_region_code ESB manual_source_format false project_name 154kV 군장-비응#4 지중T/L 건설사업 project_name_list 154kV 군장-비응#4 지중T/L 건설사업 purpose 새만금 국가산업단지 전력공급능력 확보 project_region_detail 전북특별자치도 군산시 project_period_raw 2026.06~2028.09 project_scale_raw 154KV XLPE 2000㎟, 2C × 5.0㎞ responsible_office_raw 중부건설본부/전북건설지사 equipment_type 지중송전 headquarters 중부건설본부 office 전북건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_c6d41c9c879fea64
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_c6d41c9c879fea64
Sources EV-91980397868d23a31fe42205 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 d042211dd58316273ddce470df7ab2eefef5bbdf85b12a548a472b03f4656ad4 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2028-09 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233914|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_5850673bb62201f1
Sources EV-3b8853988c4aef670c00f289 Evidence SHA-256 18c9aa48b59d36b56e473a3e08f8b6d4ee186f649ef52a9d544fcc8c3ea2e42a 행 SHA-256 43df859f45dfe58d75e7d517e3be25ba5909a4ca6da68213e3b2d592529f01c7 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-05 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|233914|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_5850673bb62201f1
Sources EV-3b8853988c4aef670c00f289 Evidence SHA-256 18c9aa48b59d36b56e473a3e08f8b6d4ee186f649ef52a9d544fcc8c3ea2e42a 행 SHA-256 43df859f45dfe58d75e7d517e3be25ba5909a4ca6da68213e3b2d592529f01c7 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2026-06 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233914|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_5850673bb62201f1
Sources EV-3b8853988c4aef670c00f289 Evidence SHA-256 18c9aa48b59d36b56e473a3e08f8b6d4ee186f649ef52a9d544fcc8c3ea2e42a 행 SHA-256 43df859f45dfe58d75e7d517e3be25ba5909a4ca6da68213e3b2d592529f01c7 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_5850673bb62201f1 stable_project_id kproj_c6d41c9c879fea64 source_key 202609|233914|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 군장-비응#4 지중T/L 건설사업 project_name_detail 154kV 군장-비응#4 지중T/L 건설사업 region_summary_raw 전북특별자치도 군산시등 1 지역 equipment_type_raw 지중송전 headquarters_raw 중부건설본부 office_raw 전북건설지사 section_fields 사업 규모 154KV XLPE 2000㎟, 2C × 5.0㎞ 계획확정 제11차 장기송변전설비계획 반영(2025.05) 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: future_plan_redacted □ 향후계획 attachment_count 0 source_detail_sha256 18c9aa48b59d36b56e473a3e08f8b6d4ee186f649ef52a9d544fcc8c3ea2e42a first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|233914|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_5850673bb62201f1
Sources EV-3b8853988c4aef670c00f289 Evidence SHA-256 18c9aa48b59d36b56e473a3e08f8b6d4ee186f649ef52a9d544fcc8c3ea2e42a 행 SHA-256 43df859f45dfe58d75e7d517e3be25ba5909a4ca6da68213e3b2d592529f01c7 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_c6d41c9c879fea64 stable_project_key prjtDef:233914:ESB project_definition 233914 first_region_code ESB manual_source_format false project_name 154kV 군장-비응#4 지중T/L 건설사업 project_name_list 154kV 군장-비응#4 지중T/L 건설사업 purpose 새만금 국가산업단지 전력공급능력 확보 project_region_detail 전북특별자치도 군산시 project_period_raw 2026.06~2028.09 project_scale_raw 154KV XLPE 2000㎟, 2C × 5.0㎞ responsible_office_raw 중부건설본부/전북건설지사 equipment_type 지중송전 headquarters 중부건설본부 office 전북건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_c6d41c9c879fea64
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_c6d41c9c879fea64
Sources EV-91980397868d23a31fe42205 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 d042211dd58316273ddce470df7ab2eefef5bbdf85b12a548a472b03f4656ad4 Observations for this power asset History for this project