POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 14items · current page 1–14 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 군공-내초#3 지중T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-b9d894b6757fb01c5b015276
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_a846c198ebc98872
stable_project_keyprjtDef:233655:ESB
project_definition233655
first_region_codeESB
manual_source_formatfalse
project_name154kV 군공-내초#3 지중T/L 건설사업
project_name_list154kV 군공-내초#3 지중송전선로 건설사업
purpose군산지역 발전단 집중에 따른 과부하 해소
project_region_detail전북특별자치도 군산시
project_period_raw2021.10~2029.12
project_scale_rawXLPE2000㎟X1C, 5.0KM
responsible_office_raw중부건설본부/전북건설지사
equipment_type지중송전
headquarters중부건설본부
office전북건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_27c7cf549d1f92da
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_a846c198ebc98872

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_a846c198ebc98872

Sources EV-b9d894b6757fb01c5b015276
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 c773a0324d4d177b15e1901315e176f5f0b23038b6553399f5e977bf5843b468
Source schedule candidates · KOR · kepco_planned

154kV 군공-내초#3 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2027-08
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233655|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_27c7cf549d1f92da

Sources EV-8bb18db91a15df66c969e517
Evidence SHA-256 cfeedff1c69c63367c447e0dd21e4d9e3dadb236fa2cff228483c6e7ded4491f
행 SHA-256 c8501d8d557ad5bd6fbd1e634fd0250481495882d9ea0acdd6a9a5dd1f510c33
Source schedule candidates · KOR · kepco_planned

154kV 군공-내초#3 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233655|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_27c7cf549d1f92da

Sources EV-8bb18db91a15df66c969e517
Evidence SHA-256 cfeedff1c69c63367c447e0dd21e4d9e3dadb236fa2cff228483c6e7ded4491f
행 SHA-256 c8501d8d557ad5bd6fbd1e634fd0250481495882d9ea0acdd6a9a5dd1f510c33
Source schedule candidates · KOR · kepco_planned

154kV 군공-내초#3 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233655|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_27c7cf549d1f92da

Sources EV-8bb18db91a15df66c969e517
Evidence SHA-256 cfeedff1c69c63367c447e0dd21e4d9e3dadb236fa2cff228483c6e7ded4491f
행 SHA-256 c8501d8d557ad5bd6fbd1e634fd0250481495882d9ea0acdd6a9a5dd1f510c33
Source schedule candidates · KOR · kepco_planned

154kV 군공-내초#3 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2029-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|233655|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_27c7cf549d1f92da

Sources EV-8bb18db91a15df66c969e517
Evidence SHA-256 cfeedff1c69c63367c447e0dd21e4d9e3dadb236fa2cff228483c6e7ded4491f
행 SHA-256 c8501d8d557ad5bd6fbd1e634fd0250481495882d9ea0acdd6a9a5dd1f510c33
Source schedule candidates · KOR · kepco_planned

154kV 군공-내초#3 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2024-06-13
date_precisionday
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233655|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_27c7cf549d1f92da

Sources EV-8bb18db91a15df66c969e517
Evidence SHA-256 cfeedff1c69c63367c447e0dd21e4d9e3dadb236fa2cff228483c6e7ded4491f
행 SHA-256 c8501d8d557ad5bd6fbd1e634fd0250481495882d9ea0acdd6a9a5dd1f510c33
Source schedule candidates · KOR · kepco_planned

154kV 군공-내초#3 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2021-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|233655|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_27c7cf549d1f92da

Sources EV-8bb18db91a15df66c969e517
Evidence SHA-256 cfeedff1c69c63367c447e0dd21e4d9e3dadb236fa2cff228483c6e7ded4491f
행 SHA-256 c8501d8d557ad5bd6fbd1e634fd0250481495882d9ea0acdd6a9a5dd1f510c33
Source schedule candidates · KOR · kepco_planned

154kV 군공-내초#3 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2025-02-14
date_precisionday
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233655|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_27c7cf549d1f92da

Sources EV-8bb18db91a15df66c969e517
Evidence SHA-256 cfeedff1c69c63367c447e0dd21e4d9e3dadb236fa2cff228483c6e7ded4491f
행 SHA-256 c8501d8d557ad5bd6fbd1e634fd0250481495882d9ea0acdd6a9a5dd1f510c33
Source schedule candidates · KOR · kepco_planned

154kV 군공-내초#3 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-08
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233655|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_27c7cf549d1f92da

Sources EV-8bb18db91a15df66c969e517
Evidence SHA-256 cfeedff1c69c63367c447e0dd21e4d9e3dadb236fa2cff228483c6e7ded4491f
행 SHA-256 c8501d8d557ad5bd6fbd1e634fd0250481495882d9ea0acdd6a9a5dd1f510c33
Source schedule candidates · KOR · kepco_planned

154kV 군공-내초#3 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233655|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_27c7cf549d1f92da

Sources EV-8bb18db91a15df66c969e517
Evidence SHA-256 cfeedff1c69c63367c447e0dd21e4d9e3dadb236fa2cff228483c6e7ded4491f
행 SHA-256 c8501d8d557ad5bd6fbd1e634fd0250481495882d9ea0acdd6a9a5dd1f510c33
Source schedule candidates · KOR · kepco_planned

154kV 군공-내초#3 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233655|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_27c7cf549d1f92da

Sources EV-8bb18db91a15df66c969e517
Evidence SHA-256 cfeedff1c69c63367c447e0dd21e4d9e3dadb236fa2cff228483c6e7ded4491f
행 SHA-256 c8501d8d557ad5bd6fbd1e634fd0250481495882d9ea0acdd6a9a5dd1f510c33
Source schedule candidates · KOR · kepco_planned

154kV 군공-내초#3 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2022-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233655|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_27c7cf549d1f92da

Sources EV-8bb18db91a15df66c969e517
Evidence SHA-256 cfeedff1c69c63367c447e0dd21e4d9e3dadb236fa2cff228483c6e7ded4491f
행 SHA-256 c8501d8d557ad5bd6fbd1e634fd0250481495882d9ea0acdd6a9a5dd1f510c33
Source snapshots by date · KOR · kepco_planned

154kV 군공-내초#3 지중T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_27c7cf549d1f92da
stable_project_idkproj_a846c198ebc98872
source_key202609|233655|ESB
basic_ym202609
source_stage_raw사업승인-공사착수전
project_name_list154kV 군공-내초#3 지중송전선로 건설사업
project_name_detail154kV 군공-내초#3 지중T/L 건설사업
region_summary_raw전북특별자치도 군산시등 1 지역
equipment_type_raw지중송전
headquarters_raw중부건설본부
office_raw전북건설지사
section_fields
Project purpose
  • 군산지역 발전단 집중에 따른 과부하 해소
Project region
  • 전북특별자치도 군산시
Project period
  • 2021.10~2029.12
사업 규모
  • XLPE2000㎟X1C, 5.0KM
담당 사업소
  • 중부건설본부/전북건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 실시설계: 설계담당자: [redacted]
[진행경과] □ ‘21.09. 제9차 장기송변전설비계획 신규사업 반영 □ ’21.10. 예비관로(기설) 활용을 위한 관련부서 회의(계통, 운영) □ ’22.06. 예비관로 건전성 확인 주체 협의 □ ‘22.12. 예비관로 도통시험공사 착공 □ ‘23.08. 예비관로 도통시험 관련부서 회의 결과 통보 □ ’23.12. 예비관로 사용불가 판정 회신 □ ‘24.06.13 : 단기 적정성(‘23년 ~ ‘25년) 검토에 따른 사업계획 확정 - 준공목표 : ‘23년 12월 → ‘26년 12월 □ ‘25.02.14 : 중장기 적정성(‘26년 이후) 검토에 따른 준공목표 변경 - 준공목표 : ‘26년 12월 → ‘28년 12월 [향후계획] □ ‘27.08. : 케이블공사 설계착수
future_plan_redacted□ 향후계획 [진행경과] □ ‘21.09. 제9차 장기송변전설비계획 신규사업 반영 □ ’21.10. 예비관로(기설) 활용을 위한 관련부서 회의(계통, 운영) □ ’22.06. 예비관로 건전성 확인 주체 협의 □ ‘22.12. 예비관로 도통시험공사 착공 □ ‘23.08. 예비관로 도통시험 관련부서 회의 결과 통보 □ ’23.12. 예비관로 사용불가 판정 회신 □ ‘24.06.13 : 단기 적정성(‘23년 ~ ‘25년) 검토에 따른 사업계획 확정 - 준공목표 : ‘23년 12월 → ‘26년 12월 □ ‘25.02.14 : 중장기 적정성(‘26년 이후) 검토에 따른 준공목표 변경 - 준공목표 : ‘26년 12월 → ‘28년 12월 [향후계획] □ ‘27.08. : 케이블공사 설계착수
attachment_count0
source_detail_sha256cfeedff1c69c63367c447e0dd21e4d9e3dadb236fa2cff228483c6e7ded4491f
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|233655|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_27c7cf549d1f92da

Sources EV-8bb18db91a15df66c969e517
Evidence SHA-256 cfeedff1c69c63367c447e0dd21e4d9e3dadb236fa2cff228483c6e7ded4491f
행 SHA-256 c8501d8d557ad5bd6fbd1e634fd0250481495882d9ea0acdd6a9a5dd1f510c33
Source snapshots by date · KOR · kepco_planned

154kV 군공-내초#3 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_a846c198ebc98872
stable_project_keyprjtDef:233655:ESB
project_definition233655
first_region_codeESB
manual_source_formatfalse
project_name154kV 군공-내초#3 지중T/L 건설사업
project_name_list154kV 군공-내초#3 지중송전선로 건설사업
purpose군산지역 발전단 집중에 따른 과부하 해소
project_region_detail전북특별자치도 군산시
project_period_raw2021.10~2029.12
project_scale_rawXLPE2000㎟X1C, 5.0KM
responsible_office_raw중부건설본부/전북건설지사
equipment_type지중송전
headquarters중부건설본부
office전북건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_27c7cf549d1f92da
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_a846c198ebc98872

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_a846c198ebc98872

Sources EV-b9d894b6757fb01c5b015276
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 c773a0324d4d177b15e1901315e176f5f0b23038b6553399f5e977bf5843b468

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel