POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 14items · current page 1–14 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-b9d894b6757fb01c5b015276
Detailed source fields Original source field Published value or condition stable_project_id kproj_a846c198ebc98872 stable_project_key prjtDef:233655:ESB project_definition 233655 first_region_code ESB manual_source_format false project_name 154kV 군공-내초#3 지중T/L 건설사업 project_name_list 154kV 군공-내초#3 지중송전선로 건설사업 purpose 군산지역 발전단 집중에 따른 과부하 해소 project_region_detail 전북특별자치도 군산시 project_period_raw 2021.10~2029.12 project_scale_raw XLPE2000㎟X1C, 5.0KM responsible_office_raw 중부건설본부/전북건설지사 equipment_type 지중송전 headquarters 중부건설본부 office 전북건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_a846c198ebc98872
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_a846c198ebc98872
Sources EV-b9d894b6757fb01c5b015276 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 c773a0324d4d177b15e1901315e176f5f0b23038b6553399f5e977bf5843b468 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2027-08 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233655|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_27c7cf549d1f92da
Sources EV-8bb18db91a15df66c969e517 Evidence SHA-256 cfeedff1c69c63367c447e0dd21e4d9e3dadb236fa2cff228483c6e7ded4491f 행 SHA-256 c8501d8d557ad5bd6fbd1e634fd0250481495882d9ea0acdd6a9a5dd1f510c33 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-09 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233655|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_27c7cf549d1f92da
Sources EV-8bb18db91a15df66c969e517 Evidence SHA-256 cfeedff1c69c63367c447e0dd21e4d9e3dadb236fa2cff228483c6e7ded4491f 행 SHA-256 c8501d8d557ad5bd6fbd1e634fd0250481495882d9ea0acdd6a9a5dd1f510c33 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233655|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_27c7cf549d1f92da
Sources EV-8bb18db91a15df66c969e517 Evidence SHA-256 cfeedff1c69c63367c447e0dd21e4d9e3dadb236fa2cff228483c6e7ded4491f 행 SHA-256 c8501d8d557ad5bd6fbd1e634fd0250481495882d9ea0acdd6a9a5dd1f510c33 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2029-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233655|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_27c7cf549d1f92da
Sources EV-8bb18db91a15df66c969e517 Evidence SHA-256 cfeedff1c69c63367c447e0dd21e4d9e3dadb236fa2cff228483c6e7ded4491f 행 SHA-256 c8501d8d557ad5bd6fbd1e634fd0250481495882d9ea0acdd6a9a5dd1f510c33 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2024-06-13 date_precision day assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233655|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_27c7cf549d1f92da
Sources EV-8bb18db91a15df66c969e517 Evidence SHA-256 cfeedff1c69c63367c447e0dd21e4d9e3dadb236fa2cff228483c6e7ded4491f 행 SHA-256 c8501d8d557ad5bd6fbd1e634fd0250481495882d9ea0acdd6a9a5dd1f510c33 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2021-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233655|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_27c7cf549d1f92da
Sources EV-8bb18db91a15df66c969e517 Evidence SHA-256 cfeedff1c69c63367c447e0dd21e4d9e3dadb236fa2cff228483c6e7ded4491f 행 SHA-256 c8501d8d557ad5bd6fbd1e634fd0250481495882d9ea0acdd6a9a5dd1f510c33 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2025-02-14 date_precision day assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233655|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_27c7cf549d1f92da
Sources EV-8bb18db91a15df66c969e517 Evidence SHA-256 cfeedff1c69c63367c447e0dd21e4d9e3dadb236fa2cff228483c6e7ded4491f 행 SHA-256 c8501d8d557ad5bd6fbd1e634fd0250481495882d9ea0acdd6a9a5dd1f510c33 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-08 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233655|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_27c7cf549d1f92da
Sources EV-8bb18db91a15df66c969e517 Evidence SHA-256 cfeedff1c69c63367c447e0dd21e4d9e3dadb236fa2cff228483c6e7ded4491f 행 SHA-256 c8501d8d557ad5bd6fbd1e634fd0250481495882d9ea0acdd6a9a5dd1f510c33 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233655|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_27c7cf549d1f92da
Sources EV-8bb18db91a15df66c969e517 Evidence SHA-256 cfeedff1c69c63367c447e0dd21e4d9e3dadb236fa2cff228483c6e7ded4491f 행 SHA-256 c8501d8d557ad5bd6fbd1e634fd0250481495882d9ea0acdd6a9a5dd1f510c33 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233655|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_27c7cf549d1f92da
Sources EV-8bb18db91a15df66c969e517 Evidence SHA-256 cfeedff1c69c63367c447e0dd21e4d9e3dadb236fa2cff228483c6e7ded4491f 행 SHA-256 c8501d8d557ad5bd6fbd1e634fd0250481495882d9ea0acdd6a9a5dd1f510c33 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2022-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233655|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_27c7cf549d1f92da
Sources EV-8bb18db91a15df66c969e517 Evidence SHA-256 cfeedff1c69c63367c447e0dd21e4d9e3dadb236fa2cff228483c6e7ded4491f 행 SHA-256 c8501d8d557ad5bd6fbd1e634fd0250481495882d9ea0acdd6a9a5dd1f510c33 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_27c7cf549d1f92da stable_project_id kproj_a846c198ebc98872 source_key 202609|233655|ESB basic_ym 202609 source_stage_raw 사업승인-공사착수전 project_name_list 154kV 군공-내초#3 지중송전선로 건설사업 project_name_detail 154kV 군공-내초#3 지중T/L 건설사업 region_summary_raw 전북특별자치도 군산시등 1 지역 equipment_type_raw 지중송전 headquarters_raw 중부건설본부 office_raw 전북건설지사 section_fields 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 기본설계: 실시설계: 설계담당자: [redacted] [진행경과] □ ‘21.09. 제9차 장기송변전설비계획 신규사업 반영 □ ’21.10. 예비관로(기설) 활용을 위한 관련부서 회의(계통, 운영) □ ’22.06. 예비관로 건전성 확인 주체 협의 □ ‘22.12. 예비관로 도통시험공사 착공 □ ‘23.08. 예비관로 도통시험 관련부서 회의 결과 통보 □ ’23.12. 예비관로 사용불가 판정 회신 □ ‘24.06.13 : 단기 적정성(‘23년 ~ ‘25년) 검토에 따른 사업계획 확정 - 준공목표 : ‘23년 12월 → ‘26년 12월 □ ‘25.02.14 : 중장기 적정성(‘26년 이후) 검토에 따른 준공목표 변경 - 준공목표 : ‘26년 12월 → ‘28년 12월 [향후계획] □ ‘27.08. : 케이블공사 설계착수 future_plan_redacted □ 향후계획 [진행경과] □ ‘21.09. 제9차 장기송변전설비계획 신규사업 반영 □ ’21.10. 예비관로(기설) 활용을 위한 관련부서 회의(계통, 운영) □ ’22.06. 예비관로 건전성 확인 주체 협의 □ ‘22.12. 예비관로 도통시험공사 착공 □ ‘23.08. 예비관로 도통시험 관련부서 회의 결과 통보 □ ’23.12. 예비관로 사용불가 판정 회신 □ ‘24.06.13 : 단기 적정성(‘23년 ~ ‘25년) 검토에 따른 사업계획 확정 - 준공목표 : ‘23년 12월 → ‘26년 12월 □ ‘25.02.14 : 중장기 적정성(‘26년 이후) 검토에 따른 준공목표 변경 - 준공목표 : ‘26년 12월 → ‘28년 12월 [향후계획] □ ‘27.08. : 케이블공사 설계착수 attachment_count 0 source_detail_sha256 cfeedff1c69c63367c447e0dd21e4d9e3dadb236fa2cff228483c6e7ded4491f first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|233655|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_27c7cf549d1f92da
Sources EV-8bb18db91a15df66c969e517 Evidence SHA-256 cfeedff1c69c63367c447e0dd21e4d9e3dadb236fa2cff228483c6e7ded4491f 행 SHA-256 c8501d8d557ad5bd6fbd1e634fd0250481495882d9ea0acdd6a9a5dd1f510c33 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_a846c198ebc98872 stable_project_key prjtDef:233655:ESB project_definition 233655 first_region_code ESB manual_source_format false project_name 154kV 군공-내초#3 지중T/L 건설사업 project_name_list 154kV 군공-내초#3 지중송전선로 건설사업 purpose 군산지역 발전단 집중에 따른 과부하 해소 project_region_detail 전북특별자치도 군산시 project_period_raw 2021.10~2029.12 project_scale_raw XLPE2000㎟X1C, 5.0KM responsible_office_raw 중부건설본부/전북건설지사 equipment_type 지중송전 headquarters 중부건설본부 office 전북건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_a846c198ebc98872
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_a846c198ebc98872