POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 29items · current page 1–29 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 구룡-군북T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-10
Sources EV-52ad41787095a775acefcb11
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_d1b2181077ec8b7b
stable_project_keyprjtDef:232396:ESB
project_definition232396
first_region_codeESB
manual_source_formatfalse
project_name154kV 구룡-군북T/L 건설사업
project_name_list154kV 구룡-군북송전선로 건설사업
purpose구룡S/S 계통보강을 통한 공급신뢰도 향상
project_region_detail경상남도 의령군,함안군
project_period_raw2024.04~2029.10
project_scale_rawACSR 410㎟ × 2C, 4C / ACSR 480㎟ × 2C
responsible_office_raw남부건설본부/직할
equipment_type가공송전
headquarters남부건설본부
office직할
current_stage_raw사업승인-공사착수전
snapshot_count2
active_snapshot_count2
snapshot_ids
  • ksnap_3b21f157522c9f00
  • ksnap_7d1f2dd24a8e3071
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_d1b2181077ec8b7b

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_d1b2181077ec8b7b

Sources EV-52ad41787095a775acefcb11
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 c843801b19dff874d53cec84502c9cffa8f3a561844112c4d581c718a9d22f6b
Source schedule candidates · KOR · kepco_planned

154kV 구룡-군북T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232396|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7d1f2dd24a8e3071

Sources EV-c8bf0d421e6b605c4447b062
Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622
행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5
Source schedule candidates · KOR · kepco_planned

154kV 구룡-군북T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-07
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232396|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7d1f2dd24a8e3071

Sources EV-c8bf0d421e6b605c4447b062
Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622
행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5
Source schedule candidates · KOR · kepco_planned

154kV 구룡-군북T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-11
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232396|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7d1f2dd24a8e3071

Sources EV-c8bf0d421e6b605c4447b062
Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622
행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5
Source schedule candidates · KOR · kepco_planned

154kV 구룡-군북T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-07
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232396|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7d1f2dd24a8e3071

Sources EV-c8bf0d421e6b605c4447b062
Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622
행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5
Source schedule candidates · KOR · kepco_planned

154kV 구룡-군북T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2016-02
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232396|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7d1f2dd24a8e3071

Sources EV-c8bf0d421e6b605c4447b062
Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622
행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5
Source schedule candidates · KOR · kepco_planned

154kV 구룡-군북T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2029-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232396|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_3b21f157522c9f00

Sources EV-845bb56ead1c962add5caaea
Evidence SHA-256 9f0b1d16c4da4f3269b5ba2f20dbe4d80a8ee3cc737940c8866fa34ea2c245f7
행 SHA-256 ffc1c7a86af17dc9efeda4677cce7594ee26e07256f3f4dca8f84bfae6e5c47b
Source schedule candidates · KOR · kepco_planned

154kV 구룡-군북T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeimplementation_plan_approval
date2026-03
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232396|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7d1f2dd24a8e3071

Sources EV-c8bf0d421e6b605c4447b062
Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622
행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5
Source schedule candidates · KOR · kepco_planned

154kV 구룡-군북T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232396|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7d1f2dd24a8e3071

Sources EV-c8bf0d421e6b605c4447b062
Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622
행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5
Source schedule candidates · KOR · kepco_planned

154kV 구룡-군북T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2024-04
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232396|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_3b21f157522c9f00

Sources EV-845bb56ead1c962add5caaea
Evidence SHA-256 9f0b1d16c4da4f3269b5ba2f20dbe4d80a8ee3cc737940c8866fa34ea2c245f7
행 SHA-256 ffc1c7a86af17dc9efeda4677cce7594ee26e07256f3f4dca8f84bfae6e5c47b
Source schedule candidates · KOR · kepco_planned

154kV 구룡-군북T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232396|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7d1f2dd24a8e3071

Sources EV-c8bf0d421e6b605c4447b062
Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622
행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5
Source schedule candidates · KOR · kepco_planned

154kV 구룡-군북T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232396|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7d1f2dd24a8e3071

Sources EV-c8bf0d421e6b605c4447b062
Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622
행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5
Source schedule candidates · KOR · kepco_planned

154kV 구룡-군북T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2023-05
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232396|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7d1f2dd24a8e3071

Sources EV-c8bf0d421e6b605c4447b062
Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622
행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5
Source schedule candidates · KOR · kepco_planned

154kV 구룡-군북T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-05
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232396|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7d1f2dd24a8e3071

Sources EV-c8bf0d421e6b605c4447b062
Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622
행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5
Source schedule candidates · KOR · kepco_planned

154kV 구룡-군북T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2017-11
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232396|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7d1f2dd24a8e3071

Sources EV-c8bf0d421e6b605c4447b062
Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622
행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5
Source schedule candidates · KOR · kepco_planned

154kV 구룡-군북T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-12
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232396|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7d1f2dd24a8e3071

Sources EV-c8bf0d421e6b605c4447b062
Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622
행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5
Source schedule candidates · KOR · kepco_planned

154kV 구룡-군북T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2017-07
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232396|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7d1f2dd24a8e3071

Sources EV-c8bf0d421e6b605c4447b062
Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622
행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5
Source schedule candidates · KOR · kepco_planned

154kV 구룡-군북T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-05
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232396|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7d1f2dd24a8e3071

Sources EV-c8bf0d421e6b605c4447b062
Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622
행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5
Source schedule candidates · KOR · kepco_planned

154kV 구룡-군북T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-11
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232396|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7d1f2dd24a8e3071

Sources EV-c8bf0d421e6b605c4447b062
Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622
행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5
Source schedule candidates · KOR · kepco_planned

154kV 구룡-군북T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2029-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202610|232396|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7d1f2dd24a8e3071

Sources EV-c8bf0d421e6b605c4447b062
Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622
행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5
Source schedule candidates · KOR · kepco_planned

154kV 구룡-군북T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2024-04
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202610|232396|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7d1f2dd24a8e3071

Sources EV-c8bf0d421e6b605c4447b062
Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622
행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5
Source schedule candidates · KOR · kepco_planned

154kV 구룡-군북T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2017-07
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232396|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7d1f2dd24a8e3071

Sources EV-c8bf0d421e6b605c4447b062
Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622
행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5
Source schedule candidates · KOR · kepco_planned

154kV 구룡-군북T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-02
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232396|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7d1f2dd24a8e3071

Sources EV-c8bf0d421e6b605c4447b062
Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622
행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5
Source schedule candidates · KOR · kepco_planned

154kV 구룡-군북T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2022-08
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232396|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7d1f2dd24a8e3071

Sources EV-c8bf0d421e6b605c4447b062
Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622
행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5
Source schedule candidates · KOR · kepco_planned

154kV 구룡-군북T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232396|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7d1f2dd24a8e3071

Sources EV-c8bf0d421e6b605c4447b062
Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622
행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5
Source schedule candidates · KOR · kepco_planned

154kV 구룡-군북T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2017-11
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202610|232396|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7d1f2dd24a8e3071

Sources EV-c8bf0d421e6b605c4447b062
Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622
행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5
Source snapshots by date · KOR · kepco_planned

154kV 구룡-군북T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_3b21f157522c9f00
stable_project_idkproj_d1b2181077ec8b7b
source_key202609|232396|ESB
basic_ym202609
source_stage_raw사업승인-공사착수전
project_name_list154kV 구룡-군북송전선로 건설사업
project_name_detail154kV 구룡-군북T/L 건설사업
region_summary_raw경상남도 의령군등 2 지역
equipment_type_raw가공송전
headquarters_raw남부건설본부
office_raw직할
section_fields
Project purpose
  • 구룡S/S 계통보강을 통한 공급신뢰도 향상
Project region
  • 경상남도 의령군,함안군
Project period
  • 2024.04~2029.10
사업 규모
  • ACSR 410㎟ × 2C, 4C / ACSR 480㎟ × 2C
담당 사업소
  • 남부건설본부/직할
계획확정
  • 제11차 장기송변전설비계획 반영(2025.05)
입지선정
  • 전력입지영향평가 용역 착수: 2016.02 입지선정위원회 구성시기: 참여 위원 수 : 지장유무 조회: 2023.02~2023.05 경과지(부지) 확정: 2022.08
환경/재해 영향평가
  • 환경영향평가: 2017.07 ~ 2025.07 재해영향평가: 2017.07 ~ 2025.07
주민의견 수렴
  • 지자체 공고 열람: 2024.04 ~ 2024.04 설명회·공청회: 2024.04 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
  • line - '16. 6 ∼ '16. 8 : 입지선정위원회 위원위촉 - '16. 9 ∼ '17. 4 : 입지선정위원회 5회 개최 - '17. 6 ~ '17. 9 : 최적 후보경과지 마을별 간담회 개최(의령 8개, 함안 15개) - '17.11 : 송전선로 건설 반대대책위(방어산 9개마을) 간담회 시행 - '21.11 : 군북변전소 입지확정위원회 회의결과 및 부지확정 알림 - '22. 6 : 군북변전소 주민설명회(송전 포함) 시행 - '22. 8 : 입지확정위원회 시행(최적 경과지 결정) - '23. 2 : 군북면장 및 마을이장(박곡, 수곡, 가덕) 대상 사업설명회 시
전원개발사업 실시계획 승인
  • 2026.03
사업설계
  • 설계용역: 기본설계: 2025.04 ~ 2025.04 실시설계: 2025.05 ~ 2025.12 설계담당자: [redacted]
- '13. 6 : 제6차 장기송배전설비계획에 구룡-가야 송전선로 건설사업 반영 - '16. 6 ∼ '16. 8 : 입지선정위원회 위원위촉 - '16. 9 ∼ '17. 4 : 입지선정위원회 5회 개최 - '17. 6 ~ '17. 9 : 최적 후보경과지 마을별 간담회 개최(의령 8개, 함안 15개) - '17. 7 : 송전선로건설 반대대책위원회 발족 - '17. 9 : 송전선로 건설사업 공론화 관련 간담회 개최 - '17.11 : 송전선로 건설 반대대책위(방어산 9개마을) 간담회 시행 - '18. 9 : 제8차 장기송변전설비계획에 군북변전소 건설사업 반영 - '21.11 : 군북변전소 입지확정위원회 회의결과 및 부지확정 알림 - '22. 6 : 군북변전소 주민설명회(송전 포함) 시행 - '22. 8 : 입지확정위원회 시행(최적 경과지 결정) - '23. 2 : 군북면장 및 마을이장(박곡, 수곡, 가덕) 대상 사업설명회 시행 확정경과지 지장유무 조회(함안군, 의령군청) - '23. 3 : 확정경과지 지장유무 조회(한국도로공사, 낙동강유역환경청) - '24. 4 : 사업시행계획서 제출(산업부, 지자체) 및 주민설명회 개최(의령군, 함안군) - '24. 7 : 실시계획 승인 신청 - '26. 3 : 실시계획 승인 완료 - '26. 7 : 도급공사 공고 - '26. 12 : 공사 착공 - '28. 10 : 선로 가압
future_plan_redacted□ 향후계획 - '13. 6 : 제6차 장기송배전설비계획에 구룡-가야 송전선로 건설사업 반영 - '16. 6 ∼ '16. 8 : 입지선정위원회 위원위촉 - '16. 9 ∼ '17. 4 : 입지선정위원회 5회 개최 - '17. 6 ~ '17. 9 : 최적 후보경과지 마을별 간담회 개최(의령 8개, 함안 15개) - '17. 7 : 송전선로건설 반대대책위원회 발족 - '17. 9 : 송전선로 건설사업 공론화 관련 간담회 개최 - '17.11 : 송전선로 건설 반대대책위(방어산 9개마을) 간담회 시행 - '18. 9 : 제8차 장기송변전설비계획에 군북변전소 건설사업 반영 - '21.11 : 군북변전소 입지확정위원회 회의결과 및 부지확정 알림 - '22. 6 : 군북변전소 주민설명회(송전 포함) 시행 - '22. 8 : 입지확정위원회 시행(최적 경과지 결정) - '23. 2 : 군북면장 및 마을이장(박곡, 수곡, 가덕) 대상 사업설명회 시행 확정경과지 지장유무 조회(함안군, 의령군청) - '23. 3 : 확정경과지 지장유무 조회(한국도로공사, 낙동강유역환경청) - '24. 4 : 사업시행계획서 제출(산업부, 지자체) 및 주민설명회 개최(의령군, 함안군) - '24. 7 : 실시계획 승인 신청 - '26. 3 : 실시계획 승인 완료 - '26. 7 : 도급공사 공고 - '26. 12 : 공사 착공 - '28. 10 : 선로 가압
attachment_count0
source_detail_sha2569f0b1d16c4da4f3269b5ba2f20dbe4d80a8ee3cc737940c8866fa34ea2c245f7
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|232396|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_3b21f157522c9f00

Sources EV-845bb56ead1c962add5caaea
Evidence SHA-256 9f0b1d16c4da4f3269b5ba2f20dbe4d80a8ee3cc737940c8866fa34ea2c245f7
행 SHA-256 ffc1c7a86af17dc9efeda4677cce7594ee26e07256f3f4dca8f84bfae6e5c47b
Source snapshots by date · KOR · kepco_planned

154kV 구룡-군북T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_7d1f2dd24a8e3071
stable_project_idkproj_d1b2181077ec8b7b
source_key202610|232396|ESB
basic_ym202610
source_stage_raw사업승인-공사착수전
project_name_list154kV 구룡-군북송전선로 건설사업
project_name_detail154kV 구룡-군북T/L 건설사업
region_summary_raw경상남도 의령군등 2 지역
equipment_type_raw가공송전
headquarters_raw남부건설본부
office_raw직할
section_fields
Project purpose
  • 구룡S/S 계통보강을 통한 공급신뢰도 향상
Project region
  • 경상남도 의령군,함안군
Project period
  • 2024.04~2029.10
사업 규모
  • ACSR 410㎟ × 2C, 4C / ACSR 480㎟ × 2C
담당 사업소
  • 남부건설본부/직할
계획확정
  • 제11차 장기송변전설비계획 반영(2025.05)
입지선정
  • 전력입지영향평가 용역 착수: 2016.02 입지선정위원회 구성시기: 참여 위원 수 : 지장유무 조회: 2023.02~2023.05 경과지(부지) 확정: 2022.08
환경/재해 영향평가
  • 환경영향평가: 2017.07 ~ 2025.07 재해영향평가: 2017.07 ~ 2025.07
주민의견 수렴
  • 지자체 공고 열람: 2024.04 ~ 2024.04 설명회·공청회: 2024.04 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
  • line - '16. 6 ∼ '16. 8 : 입지선정위원회 위원위촉 - '16. 9 ∼ '17. 4 : 입지선정위원회 5회 개최 - '17. 6 ~ '17. 9 : 최적 후보경과지 마을별 간담회 개최(의령 8개, 함안 15개) - '17.11 : 송전선로 건설 반대대책위(방어산 9개마을) 간담회 시행 - '21.11 : 군북변전소 입지확정위원회 회의결과 및 부지확정 알림 - '22. 6 : 군북변전소 주민설명회(송전 포함) 시행 - '22. 8 : 입지확정위원회 시행(최적 경과지 결정) - '23. 2 : 군북면장 및 마을이장(박곡, 수곡, 가덕) 대상 사업설명회 시행 - '24. 4 : 의령군 대상 주민설명회 시 - '24. 6 : 함안군 군북면 마을 대상 주민설명회 시
전원개발사업 실시계획 승인
  • 2026.03
사업설계
  • 설계용역: 기본설계: 2025.04 ~ 2025.04 실시설계: 2025.05 ~ 2025.12 설계담당자: [redacted]
- '13. 6 : 제6차 장기송배전설비계획에 구룡-가야 송전선로 건설사업 반영 - '16. 6 ∼ '16. 8 : 입지선정위원회 위원위촉 - '16. 9 ∼ '17. 4 : 입지선정위원회 5회 개최 - '17. 6 ~ '17. 9 : 최적 후보경과지 마을별 간담회 개최(의령 8개, 함안 15개) - '17. 7 : 송전선로건설 반대대책위원회 발족 - '17. 9 : 송전선로 건설사업 공론화 관련 간담회 개최 - '17.11 : 송전선로 건설 반대대책위(방어산 9개마을) 간담회 시행 - '18. 9 : 제8차 장기송변전설비계획에 군북변전소 건설사업 반영 - '21.11 : 군북변전소 입지확정위원회 회의결과 및 부지확정 알림 - '22. 6 : 군북변전소 주민설명회(송전 포함) 시행 - '22. 8 : 입지확정위원회 시행(최적 경과지 결정) - '23. 2 : 군북면장 및 마을이장(박곡, 수곡, 가덕) 대상 사업설명회 시행 확정경과지 지장유무 조회(함안군, 의령군청) - '23. 3 : 확정경과지 지장유무 조회(한국도로공사, 낙동강유역환경청) - '24. 4 : 사업시행계획서 제출(산업부, 지자체) 및 주민설명회 개최(의령군, 함안군) - '24. 7 : 실시계획 승인 신청 - '26. 3 : 실시계획 승인 완료 - '26. 7 : 도급공사 공고 - '26. 12 : 공사 착공 - '28. 10 : 선로 가압
future_plan_redacted□ 향후계획 - '13. 6 : 제6차 장기송배전설비계획에 구룡-가야 송전선로 건설사업 반영 - '16. 6 ∼ '16. 8 : 입지선정위원회 위원위촉 - '16. 9 ∼ '17. 4 : 입지선정위원회 5회 개최 - '17. 6 ~ '17. 9 : 최적 후보경과지 마을별 간담회 개최(의령 8개, 함안 15개) - '17. 7 : 송전선로건설 반대대책위원회 발족 - '17. 9 : 송전선로 건설사업 공론화 관련 간담회 개최 - '17.11 : 송전선로 건설 반대대책위(방어산 9개마을) 간담회 시행 - '18. 9 : 제8차 장기송변전설비계획에 군북변전소 건설사업 반영 - '21.11 : 군북변전소 입지확정위원회 회의결과 및 부지확정 알림 - '22. 6 : 군북변전소 주민설명회(송전 포함) 시행 - '22. 8 : 입지확정위원회 시행(최적 경과지 결정) - '23. 2 : 군북면장 및 마을이장(박곡, 수곡, 가덕) 대상 사업설명회 시행 확정경과지 지장유무 조회(함안군, 의령군청) - '23. 3 : 확정경과지 지장유무 조회(한국도로공사, 낙동강유역환경청) - '24. 4 : 사업시행계획서 제출(산업부, 지자체) 및 주민설명회 개최(의령군, 함안군) - '24. 7 : 실시계획 승인 신청 - '26. 3 : 실시계획 승인 완료 - '26. 7 : 도급공사 공고 - '26. 12 : 공사 착공 - '28. 10 : 선로 가압
attachment_count0
source_detail_sha256662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202610
source_record_id202610|232396|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7d1f2dd24a8e3071

Sources EV-c8bf0d421e6b605c4447b062
Evidence SHA-256 662974ad86c54c542f12c9cabf62049cb1b23020f6fe6828b8be3a466302d622
행 SHA-256 1e1035d1ba6caa3945621d85f4b91bf6c4d8322578c503743629930b41cb53b5
Source snapshots by date · KOR · kepco_planned

154kV 구룡-군북T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_d1b2181077ec8b7b
stable_project_keyprjtDef:232396:ESB
project_definition232396
first_region_codeESB
manual_source_formatfalse
project_name154kV 구룡-군북T/L 건설사업
project_name_list154kV 구룡-군북송전선로 건설사업
purpose구룡S/S 계통보강을 통한 공급신뢰도 향상
project_region_detail경상남도 의령군,함안군
project_period_raw2024.04~2029.10
project_scale_rawACSR 410㎟ × 2C, 4C / ACSR 480㎟ × 2C
responsible_office_raw남부건설본부/직할
equipment_type가공송전
headquarters남부건설본부
office직할
current_stage_raw사업승인-공사착수전
snapshot_count2
active_snapshot_count2
snapshot_ids
  • ksnap_3b21f157522c9f00
  • ksnap_7d1f2dd24a8e3071
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_d1b2181077ec8b7b

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_d1b2181077ec8b7b

Sources EV-52ad41787095a775acefcb11
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 c843801b19dff874d53cec84502c9cffa8f3a561844112c4d581c718a9d22f6b

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel