POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 8items · current page 1–8 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 광주이천(가칭) 변전소 및 관련분기 송전선로 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date Not stated
Sources EV-75497b997b2103e61680a1d0
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_adbcd7cda9c92aed
stable_project_keymanual:7:0:-
project_definition0
first_region_code
manual_source_formattrue
project_name154kV 광주이천(가칭) 변전소 및 관련분기 송전선로 건설사업
project_name_list154kV 광주이천(가칭) 변전소 및 관련분기 송전선로 건설사업
purpose
project_region_detail경기도 광주시,이천시
project_period_raw2023.05~
project_scale_raw
responsible_office_raw경인건설본부/경기건설지사
equipment_type변전
headquarters경인건설본부
office경기건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_d2bddb5cdf769843
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_adbcd7cda9c92aed

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source Not stated · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_adbcd7cda9c92aed

Sources EV-75497b997b2103e61680a1d0
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 4c462e8a3aa2978cd289f9ba4cf7a563ae58129f975ad0893cd8ccaad30d9177
Source schedule candidates · KOR · kepco_planned

154kV 광주이천(가칭) 변전소 및 관련분기 송전선로 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2023-05
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key7|0|
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source Not stated · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d2bddb5cdf769843

Sources EV-d8ca3ce8fa62c230344eef72
Evidence SHA-256 a1d337cea7b47094ed7ac076e7a1999b317f7c0ce05b6d124bc14f58dc725fcd
행 SHA-256 c955fa95b45c5ed3902c98ac20640a0391f2362c972315741d07628eb67a9932
Source schedule candidates · KOR · kepco_planned

154kV 광주이천(가칭) 변전소 및 관련분기 송전선로 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2026-01
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key7|0|
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source Not stated · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d2bddb5cdf769843

Sources EV-d8ca3ce8fa62c230344eef72
Evidence SHA-256 a1d337cea7b47094ed7ac076e7a1999b317f7c0ce05b6d124bc14f58dc725fcd
행 SHA-256 c955fa95b45c5ed3902c98ac20640a0391f2362c972315741d07628eb67a9932
Source schedule candidates · KOR · kepco_planned

154kV 광주이천(가칭) 변전소 및 관련분기 송전선로 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2023-05
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key7|0|
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source Not stated · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d2bddb5cdf769843

Sources EV-d8ca3ce8fa62c230344eef72
Evidence SHA-256 a1d337cea7b47094ed7ac076e7a1999b317f7c0ce05b6d124bc14f58dc725fcd
행 SHA-256 c955fa95b45c5ed3902c98ac20640a0391f2362c972315741d07628eb67a9932
Source schedule candidates · KOR · kepco_planned

154kV 광주이천(가칭) 변전소 및 관련분기 송전선로 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-01
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key7|0|
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source Not stated · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d2bddb5cdf769843

Sources EV-d8ca3ce8fa62c230344eef72
Evidence SHA-256 a1d337cea7b47094ed7ac076e7a1999b317f7c0ce05b6d124bc14f58dc725fcd
행 SHA-256 c955fa95b45c5ed3902c98ac20640a0391f2362c972315741d07628eb67a9932
Source schedule candidates · KOR · kepco_planned

154kV 광주이천(가칭) 변전소 및 관련분기 송전선로 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-01
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key7|0|
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source Not stated · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d2bddb5cdf769843

Sources EV-d8ca3ce8fa62c230344eef72
Evidence SHA-256 a1d337cea7b47094ed7ac076e7a1999b317f7c0ce05b6d124bc14f58dc725fcd
행 SHA-256 c955fa95b45c5ed3902c98ac20640a0391f2362c972315741d07628eb67a9932
Source snapshots by date · KOR · kepco_planned

154kV 광주이천(가칭) 변전소 및 관련분기 송전선로 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_d2bddb5cdf769843
stable_project_idkproj_adbcd7cda9c92aed
source_key7|0|
basic_ym7
source_stage_raw계획확정-사업승인전
project_name_list154kV 광주이천(가칭) 변전소 및 관련분기 송전선로 건설사업
project_name_detail154kV 광주이천(가칭) 변전소 및 관련분기 송전선로 건설사업
region_summary_raw경기도 광주시등 2 지역
equipment_type_raw변전
headquarters_raw경인건설본부
office_raw경기건설지사
section_fields
Project purpose
Project region
  • 경기도 광주시,이천시
Project period
  • 2023.05~
사업 규모
담당 사업소
  • 경인건설본부/경기건설지사
계획확정
  • 제10차 장기송변전설비계획 반영(10)
입지선정
  • 전력입지영향평가 용역 착수: 2025.01 입지선정위원회 구성시기: 2026.01 참여 위원 수 : 21 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
  • 입지선정위원회 구성 및 활동 중
line 입지선정위원회 6차회의 시
future_plan_redactedline □ 향후계획 입지선정위원회 6차회의 시
attachment_count5
source_detail_sha256a1d337cea7b47094ed7ac076e7a1999b317f7c0ce05b6d124bc14f58dc725fcd
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period7
source_record_id7|0|

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source Not stated · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d2bddb5cdf769843

Sources EV-d8ca3ce8fa62c230344eef72
Evidence SHA-256 a1d337cea7b47094ed7ac076e7a1999b317f7c0ce05b6d124bc14f58dc725fcd
행 SHA-256 c955fa95b45c5ed3902c98ac20640a0391f2362c972315741d07628eb67a9932
Source snapshots by date · KOR · kepco_planned

154kV 광주이천(가칭) 변전소 및 관련분기 송전선로 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_adbcd7cda9c92aed
stable_project_keymanual:7:0:-
project_definition0
first_region_code
manual_source_formattrue
project_name154kV 광주이천(가칭) 변전소 및 관련분기 송전선로 건설사업
project_name_list154kV 광주이천(가칭) 변전소 및 관련분기 송전선로 건설사업
purpose
project_region_detail경기도 광주시,이천시
project_period_raw2023.05~
project_scale_raw
responsible_office_raw경인건설본부/경기건설지사
equipment_type변전
headquarters경인건설본부
office경기건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_d2bddb5cdf769843
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_adbcd7cda9c92aed

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source Not stated · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_adbcd7cda9c92aed

Sources EV-75497b997b2103e61680a1d0
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 4c462e8a3aa2978cd289f9ba4cf7a563ae58129f975ad0893cd8ccaad30d9177

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel