Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 5items · current page 1–5 · Source records, not unique facilities.
Power assets and projects · KOR · kepco_planned
154kV 광석(물왕)S/S 건설사업
Power project · Construction project
Metric or condition
Source value
Basis, scope and stage
project_name_voltage_label
154 kV
literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-eab8001f13ba914cbeb0a08d
Sources EV-9c62393f18d4121cd7a89819 Evidence SHA-256 f89c193baf228f2d17ddc1922a274204e49fe0c5bbb077cd1d21de3b1e61dc95 행 SHA-256 4d9d69b6603f1dc0fe47b2cb34fc6cd7f352b5b2be08ce4885341f5cec39e44dSource snapshots by date · KOR · kepco_planned
154kV 광석(물왕)S/S 건설사업
Project · historical source snapshot
Metric or condition
Source value
Basis, scope and stage
Detailed source fields
Original source field
Published value or condition
snapshot_id
ksnap_152c962a53f5f57b
stable_project_id
kproj_8b9d96c0e45f45f7
source_key
202609|231302|ESB
basic_ym
202609
source_stage_raw
사업승인-공사착수전
project_name_list
154kV 광석S/S 건설사업
project_name_detail
154kV 광석(물왕)S/S 건설사업
region_summary_raw
경기도 시흥시등 1 지역
equipment_type_raw
변전
headquarters_raw
경인건설본부
office_raw
남서울인천건설지사
section_fields
Project purpose
시흥시 장현,목감택지개발지구내 전력공급
Project region
경기도 시흥시
Project period
2017.01~2027.12
사업 규모
154KV MTR 60MVA×2BANK, 170KV GIS×10CCT
담당 사업소
경인건설본부/남서울인천건설지사
계획확정
입지선정
전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
Sources EV-9c62393f18d4121cd7a89819 Evidence SHA-256 f89c193baf228f2d17ddc1922a274204e49fe0c5bbb077cd1d21de3b1e61dc95 행 SHA-256 4d9d69b6603f1dc0fe47b2cb34fc6cd7f352b5b2be08ce4885341f5cec39e44dSource snapshots by date · KOR · kepco_planned