POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 201,406items · current page 1201–1300 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-03-20 date_precision day assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231334|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7c5fb5c4cae6154a
Sources EV-b0b7cf2ca5a4bba0bbf83309 Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc 행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_7c5fb5c4cae6154a stable_project_id kproj_d6b08b9a5dc76977 source_key 202609|231334|ESB basic_ym 202609 source_stage_raw 공사착수-사업완료전 project_name_list 154kV 남공주S/S 건설사 project_name_detail 154kV 남공주S/S 건설사업 region_summary_raw 충청남도 공주시등 1 지역 equipment_type_raw 변전 headquarters_raw 중부건설본부 office_raw 직할 section_fields Project purpose 남공주산업단지 부하공급 및 인근변전소 부하분담 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 기본설계: 2023.07 ~ 2023.09 실시설계: 2023.09 ~ 2024.04 설계담당자: [redacted] 건설공사 개요 공사 착공: 공사 기간: 감독자: [redacted], 실적): 100, 84 □ '13.07 : 6차 장기 송변전설비계획 반영('19.04) □ '14.09 : 역세권 개발지연, 남공주산단 축소에 따른 준공목표 조정('19.04 → '21.10) □ '15.07 : 역세권 및 남공주산단 지연에 따른 준공목표 조정('21.10 → '22.04) □ '19.08 : 남공주산단내 부지반영 요청(→계룡건설) □ '20.05 ∼ 08 : 입지선정실무위원회 1차·2차 회의 시행 □ '20.11 : 남공주 산단 내 부지 할애 협의 완료(↔계룡건설) ○ 산업단지 실시계획 변경 승인 후 토지 분양 계약 체결 예정 □ ’21.03 : 입지확정위원회 시행(남공주산업단지 일원) 23.03.20) □ ’23.03 : 남공주 산단 계획변경 승인고시(충청남도고시『제2023-157호』23.3.30) □ ‘23.03 : 용지매수 의뢰(→ 경영지원부) □ ‘23.08 : 기본설계 심의위원회 구성 및 시행 □ ‘23.08 : 기본설계 심의결과 보고 □ ‘23.09 : 기본설계 확정 시행 및 보고 □ ‘24.06 : 감리용역 및 주자재 발주 □ ‘24.07 : 일반도급 계약 완료 □ ‘24.08 : 170kV GIS, 책임감리용역 계약완료 □ ‘24.10 : 착공전 청렴·품질·안전회의 및 관계부서 공정회의 시행 □ ‘25.02 : 접지선 포설 및 MESH 접지 포설 □ ‘25.05 : M.tr실, 벽체 등 접지선 포설 / 바닥층 내선 배관 등 □ ‘25.06 : GIS 기초공사, 접지 및 내선 부대 공사 등 시행 등 □ ‘26.02 : 주자재 반입 future_plan_redacted □ 향후계획 □ '13.07 : 6차 장기 송변전설비계획 반영('19.04) □ '14.09 : 역세권 개발지연, 남공주산단 축소에 따른 준공목표 조정('19.04 → '21.10) □ '15.07 : 역세권 및 남공주산단 지연에 따른 준공목표 조정('21.10 → '22.04) □ '19.08 : 남공주산단내 부지반영 요청(→계룡건설) □ '20.05 ∼ 08 : 입지선정실무위원회 1차·2차 회의 시행 □ '20.11 : 남공주 산단 내 부지 할애 협의 완료(↔계룡건설) ○ 산업단지 실시계획 변경 승인 후 토지 분양 계약 체결 예정 □ ’21.03 : 입지확정위원회 시행(남공주산업단지 일원) 23.03.20) □ ’23.03 : 남공주 산단 계획변경 승인고시(충청남도고시『제2023-157호』23.3.30) □ ‘23.03 : 용지매수 의뢰(→ 경영지원부) □ ‘23.08 : 기본설계 심의위원회 구성 및 시행 □ ‘23.08 : 기본설계 심의결과 보고 □ ‘23.09 : 기본설계 확정 시행 및 보고 □ ‘24.06 : 감리용역 및 주자재 발주 □ ‘24.07 : 일반도급 계약 완료 □ ‘24.08 : 170kV GIS, 책임감리용역 계약완료 □ ‘24.10 : 착공전 청렴·품질·안전회의 및 관계부서 공정회의 시행 □ ‘25.02 : 접지선 포설 및 MESH 접지 포설 □ ‘25.05 : M.tr실, 벽체 등 접지선 포설 / 바닥층 내선 배관 등 □ ‘25.06 : GIS 기초공사, 접지 및 내선 부대 공사 등 시행 등 □ ‘26.02 : 주자재 반입 attachment_count 0 source_detail_sha256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231334|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7c5fb5c4cae6154a
Sources EV-b0b7cf2ca5a4bba0bbf83309 Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc 행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_d6b08b9a5dc76977 stable_project_key prjtDef:231334:ESB project_definition 231334 first_region_code ESB manual_source_format false project_name 154kV 남공주S/S 건설사업 project_name_list 154kV 남공주S/S 건설사 purpose 남공주산업단지 부하공급 및 인근변전소 부하분담 project_region_detail 충청남도 공주시 project_period_raw 2014.02~2025.10 project_scale_raw 45/60MVA X 2BANK responsible_office_raw 중부건설본부/직할 equipment_type 변전 headquarters 중부건설본부 office 직할 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_d6b08b9a5dc76977
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_d6b08b9a5dc76977
Sources EV-1210c0744cd35631853be47c Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 3f9463854a14a5eb5c1e76493649dfdc6b842f7f92c581be69aa25f1fde8ed42 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-9483ee93159e655eeed09ba6
Detailed source fields Original source field Published value or condition stable_project_id kproj_b2888cb5aea4e25c stable_project_key prjtDef:232369:ESB project_definition 232369 first_region_code ESB manual_source_format false project_name 154kV 남공주분기T/L 건설사업 project_name_list 154kV 남공주분기 송전선로 건설사업 purpose 남공주 일반산업단지 신규부하 공급 project_region_detail 충청남도 공주시 project_period_raw 2019.10~2025.10 project_scale_raw ACSR 410㎟×2B×4C×8.727M responsible_office_raw 중부건설본부/직할 equipment_type 가공송전 headquarters 중부건설본부 office 직할 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_b2888cb5aea4e25c
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_b2888cb5aea4e25c
Sources EV-9483ee93159e655eeed09ba6 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 b10027ade06d13c73f63a1baf045a2cd9e674da447b6b5f633dafaa6f797cd9a Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2019-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232369|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_265f1ab419027ae4
Sources EV-67c8b56f13f6d7cf79493a96 Evidence SHA-256 f2b5a924461d75c6d818a6ce402b8082c417cc2e4308196a14a18f0e6fab8e66 행 SHA-256 dfcb66076e1af032424ce193b62b992c1cfcf4f91a2dd437f063022dc3ed90d1 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2025-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232369|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_265f1ab419027ae4
Sources EV-67c8b56f13f6d7cf79493a96 Evidence SHA-256 f2b5a924461d75c6d818a6ce402b8082c417cc2e4308196a14a18f0e6fab8e66 행 SHA-256 dfcb66076e1af032424ce193b62b992c1cfcf4f91a2dd437f063022dc3ed90d1 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_265f1ab419027ae4 stable_project_id kproj_b2888cb5aea4e25c source_key 202609|232369|ESB basic_ym 202609 source_stage_raw 공사착수-사업완료전 project_name_list 154kV 남공주분기 송전선로 건설사업 project_name_detail 154kV 남공주분기T/L 건설사업 region_summary_raw 충청남도 공주시등 1 지역 equipment_type_raw 가공송전 headquarters_raw 중부건설본부 office_raw 직할 section_fields 입지선정 전력입지영향평가 용역 착수: 2019.11 입지선정위원회 구성시기: 2020.05 참여 위원 수 : 19 지장유무 조회: 2021.10~2021.12 경과지(부지) 확정: 2022.10 환경/재해 영향평가 환경영향평가: 2022.10 ~ 2024.02 재해영향평가: 2021.10 ~ 2024.03 주민의견 수렴 지자체 공고 열람: 2023.05 ~ 2023.06 설명회·공청회: 2023.06 자체설명회: 2022.02 ~ 2023.08 사업설계 설계용역: 2021.12 ~ 2022.10 기본설계: 2024.01 ~ 2024.01 실시설계: 2024.02 ~ 2024.10 설계담당자: [redacted] 건설공사 개요 공사 착공: 2025.05 공사 기간: 2025.05 ~ 2026.12 감독자: [redacted], 실적): 100, 59 □ ’25.05 : 공사 착공 및 시공측량 □ ’25.06 : 현장사무실 및 자재야적장부지 확보, 진입로 및 작업장부지 소유주 협의 □ ’25.07 : No.2~6 진입로 및 작업장부지 입목조사 및 인허가 서류작성 □ ’25.08 : No.2~6 진입로 및 작업장부지 인허가 신청, No.12,13 진입로개설방안 검토 □ ’25.09 : No.2~6 작업준비, 애자금구류등 사급자재 발주 □ ’25.10 : No.2~6 작업장 및 진입로 인허가 협의 □ ’25.11 : No.2~6 작업장 및 진입로 인허가 협의, 철탑부지 민원협의 □ ’26.01 : 소규모 환경ㆍ재해영향평가 대상사업 착공통보서 제출 □ ’26.02 : 공주천연가스발전소 적기 상업운전을 위한 건설사업 주요현안 공유 등 관계자 회의 시행(한국서부발전 전기제어부) □ ’26.03 : 한국산업안전보건공단 유해ㆍ위험방지계획서 승인 □ ’26.03 : 예정공정표 승인 □ ’26.03 : No.2,6,7 개발행위허가 및 국유림, 산지일시사용 신청 □ ’26.04 : No.1 개발행위허가 및 국유림, 산지일시사용 신청 □ ’26.06 : 장경간 기술검토 및 설계용역 시행(No.22~23, 금강횡단개소) □ ’26.06 : 공주천연가스발전소 계통연계관련 공기단축 추진전략 수립 □ ’26.06 : 특별 공정관리T/F 구성 및 운영 / 착수회의 시행(6/24) □ ’26.07 : 적기가압 관련 공정관리 협의체 구성 및 운영 / 착수회의 시행(7/21) □ ’26.07 : 특별지원사업 협의서 체결(이인면 만수리) □ ’26.07 : 전원개발사업 실시계획 변경신고(본사→기후부) □ ’26.07 : 특별 공정관리T/F 2차회의 시행(7/30) □ ’26.03~07:철탑기초공사 시공中 future_plan_redacted □ 향후계획 □ ’25.05 : 공사 착공 및 시공측량 □ ’25.06 : 현장사무실 및 자재야적장부지 확보, 진입로 및 작업장부지 소유주 협의 □ ’25.07 : No.2~6 진입로 및 작업장부지 입목조사 및 인허가 서류작성 □ ’25.08 : No.2~6 진입로 및 작업장부지 인허가 신청, No.12,13 진입로개설방안 검토 □ ’25.09 : No.2~6 작업준비, 애자금구류등 사급자재 발주 □ ’25.10 : No.2~6 작업장 및 진입로 인허가 협의 □ ’25.11 : No.2~6 작업장 및 진입로 인허가 협의, 철탑부지 민원협의 □ ’26.01 : 소규모 환경ㆍ재해영향평가 대상사업 착공통보서 제출 □ ’26.02 : 공주천연가스발전소 적기 상업운전을 위한 건설사업 주요현안 공유 등 관계자 회의 시행(한국서부발전 전기제어부) □ ’26.03 : 한국산업안전보건공단 유해ㆍ위험방지계획서 승인 □ ’26.03 : 예정공정표 승인 □ ’26.03 : No.2,6,7 개발행위허가 및 국유림, 산지일시사용 신청 □ ’26.04 : No.1 개발행위허가 및 국유림, 산지일시사용 신청 □ ’26.06 : 장경간 기술검토 및 설계용역 시행(No.22~23, 금강횡단개소) □ ’26.06 : 공주천연가스발전소 계통연계관련 공기단축 추진전략 수립 □ ’26.06 : 특별 공정관리T/F 구성 및 운영 / 착수회의 시행(6/24) □ ’26.07 : 적기가압 관련 공정관리 협의체 구성 및 운영 / 착수회의 시행(7/21) □ ’26.07 : 특별지원사업 협의서 체결(이인면 만수리) □ ’26.07 : 전원개발사업 실시계획 변경신고(본사→기후부) □ ’26.07 : 특별 공정관리T/F 2차회의 시행(7/30) □ ’26.03~07:철탑기초공사 시공中 attachment_count 0 source_detail_sha256 f2b5a924461d75c6d818a6ce402b8082c417cc2e4308196a14a18f0e6fab8e66 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|232369|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_265f1ab419027ae4
Sources EV-67c8b56f13f6d7cf79493a96 Evidence SHA-256 f2b5a924461d75c6d818a6ce402b8082c417cc2e4308196a14a18f0e6fab8e66 행 SHA-256 dfcb66076e1af032424ce193b62b992c1cfcf4f91a2dd437f063022dc3ed90d1 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_b2888cb5aea4e25c stable_project_key prjtDef:232369:ESB project_definition 232369 first_region_code ESB manual_source_format false project_name 154kV 남공주분기T/L 건설사업 project_name_list 154kV 남공주분기 송전선로 건설사업 purpose 남공주 일반산업단지 신규부하 공급 project_region_detail 충청남도 공주시 project_period_raw 2019.10~2025.10 project_scale_raw ACSR 410㎟×2B×4C×8.727M responsible_office_raw 중부건설본부/직할 equipment_type 가공송전 headquarters 중부건설본부 office 직할 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_b2888cb5aea4e25c
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_b2888cb5aea4e25c
Sources EV-9483ee93159e655eeed09ba6 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 b10027ade06d13c73f63a1baf045a2cd9e674da447b6b5f633dafaa6f797cd9a Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-83ffa01a7528ff165ffb797e
Detailed source fields Original source field Published value or condition stable_project_id kproj_38b843146a64ec32 stable_project_key prjtDef:233634:ESB project_definition 233634 first_region_code ESB manual_source_format false project_name 154kV 남광명분기 지중T/L 건설사업 project_name_list 154kV 남광명분기 지중송전선로 건설사업 purpose 광명·시흥 테크노벨리 등 대규모 개발 전력공급 project_region_detail 경기도 광명시 project_period_raw 2026.10~2027.12 project_scale_raw 154KV XLPE 1,200㎟, 4C-0.6KM responsible_office_raw 경인건설본부/남서울인천건설지사 equipment_type 지중송전 headquarters 경인건설본부 office 남서울인천건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_38b843146a64ec32
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_38b843146a64ec32
Sources EV-83ffa01a7528ff165ffb797e Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 5bcb1344ee7dccabd38c3cc58b499917c1821a42d3b2b36b41c986a611337480 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2027-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233634|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7868fbd5730aa3eb
Sources EV-8fbacf03385541bedb4bf92b Evidence SHA-256 39dc47e57f25fa1d74535db3d23dbd08da3b66c8b143fecea5a1bfdc7f0f198c 행 SHA-256 d4831f6e96c449e49340785d860ed0125e02814e1de2518ad56bc2cf7f3aac88 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2026-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233634|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7868fbd5730aa3eb
Sources EV-8fbacf03385541bedb4bf92b Evidence SHA-256 39dc47e57f25fa1d74535db3d23dbd08da3b66c8b143fecea5a1bfdc7f0f198c 행 SHA-256 d4831f6e96c449e49340785d860ed0125e02814e1de2518ad56bc2cf7f3aac88 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_7868fbd5730aa3eb stable_project_id kproj_38b843146a64ec32 source_key 202609|233634|ESB basic_ym 202609 source_stage_raw 사업승인-공사착수전 project_name_list 154kV 남광명분기 지중송전선로 건설사업 project_name_detail 154kV 남광명분기 지중T/L 건설사업 region_summary_raw 경기도 광명시등 1 지역 equipment_type_raw 지중송전 headquarters_raw 경인건설본부 office_raw 남서울인천건설지사 section_fields Project purpose 광명·시흥 테크노벨리 등 대규모 개발 전력공급 사업 규모 154KV XLPE 1,200㎟, 4C-0.6KM 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 기본설계: 실시설계: 설계담당자: [redacted] future_plan_redacted □ 향후계획 attachment_count 0 source_detail_sha256 39dc47e57f25fa1d74535db3d23dbd08da3b66c8b143fecea5a1bfdc7f0f198c first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|233634|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7868fbd5730aa3eb
Sources EV-8fbacf03385541bedb4bf92b Evidence SHA-256 39dc47e57f25fa1d74535db3d23dbd08da3b66c8b143fecea5a1bfdc7f0f198c 행 SHA-256 d4831f6e96c449e49340785d860ed0125e02814e1de2518ad56bc2cf7f3aac88 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_38b843146a64ec32 stable_project_key prjtDef:233634:ESB project_definition 233634 first_region_code ESB manual_source_format false project_name 154kV 남광명분기 지중T/L 건설사업 project_name_list 154kV 남광명분기 지중송전선로 건설사업 purpose 광명·시흥 테크노벨리 등 대규모 개발 전력공급 project_region_detail 경기도 광명시 project_period_raw 2026.10~2027.12 project_scale_raw 154KV XLPE 1,200㎟, 4C-0.6KM responsible_office_raw 경인건설본부/남서울인천건설지사 equipment_type 지중송전 headquarters 경인건설본부 office 남서울인천건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_38b843146a64ec32
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_38b843146a64ec32
Sources EV-83ffa01a7528ff165ffb797e Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 5bcb1344ee7dccabd38c3cc58b499917c1821a42d3b2b36b41c986a611337480 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-f0d68c45d97941e85bea24e6
Detailed source fields Original source field Published value or condition stable_project_id kproj_95c6c6dcda051e09 stable_project_key prjtDef:233516:ESB project_definition 233516 first_region_code ESB manual_source_format false project_name 154kV 남대구-효목 지중T/L 건설사업 project_name_list 154kV 남대구-효목 지중 송전선로 건설사업 purpose 대구지역 154KV 계통보강(신경산-대구권) project_region_detail 대구광역시 수성구 project_period_raw 2027.03~2028.01 project_scale_raw 154㎸ XLPE 1,200㎟, 2C × 0.90㎞ responsible_office_raw 남부건설본부/대구경북건설지사 equipment_type 지중송전 headquarters 남부건설본부 office 대구경북건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_95c6c6dcda051e09
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_95c6c6dcda051e09
Sources EV-f0d68c45d97941e85bea24e6 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 249b0b14b15f19788b5d02328ee25d7948762f11e6c8b49dee530c3d9976b2da Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2027-03 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233516|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_4c501020a08603d0
Sources EV-be11afe35a46d122b411be71 Evidence SHA-256 8c60ab68b07981b3492fb97f9edf974f4aef106e79695838d42ce9eea2ce46d3 행 SHA-256 1f2c2b940049d0434323b8641f2356f62f2062bd8aca5d0fee9f6a476c8873bd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2028-01 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233516|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_4c501020a08603d0
Sources EV-be11afe35a46d122b411be71 Evidence SHA-256 8c60ab68b07981b3492fb97f9edf974f4aef106e79695838d42ce9eea2ce46d3 행 SHA-256 1f2c2b940049d0434323b8641f2356f62f2062bd8aca5d0fee9f6a476c8873bd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_4c501020a08603d0 stable_project_id kproj_95c6c6dcda051e09 source_key 202609|233516|ESB basic_ym 202609 source_stage_raw 사업승인-공사착수전 project_name_list 154kV 남대구-효목 지중 송전선로 건설사업 project_name_detail 154kV 남대구-효목 지중T/L 건설사업 region_summary_raw 대구광역시 수성구등 1 지역 equipment_type_raw 지중송전 headquarters_raw 남부건설본부 office_raw 대구경북건설지사 section_fields 사업 규모 154㎸ XLPE 1,200㎟, 2C × 0.90㎞ 계획확정 제07차 장기송변전설비계획 반영(2015.10) 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 기본설계: 2021.08 ~ 2021.12 실시설계: 2021.12 ~ 2022.03 설계담당자: [redacted] future_plan_redacted □ 향후계획 o 공사 재착수 - 26.12월 가압 추진 attachment_count 0 source_detail_sha256 8c60ab68b07981b3492fb97f9edf974f4aef106e79695838d42ce9eea2ce46d3 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|233516|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_4c501020a08603d0
Sources EV-be11afe35a46d122b411be71 Evidence SHA-256 8c60ab68b07981b3492fb97f9edf974f4aef106e79695838d42ce9eea2ce46d3 행 SHA-256 1f2c2b940049d0434323b8641f2356f62f2062bd8aca5d0fee9f6a476c8873bd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_95c6c6dcda051e09 stable_project_key prjtDef:233516:ESB project_definition 233516 first_region_code ESB manual_source_format false project_name 154kV 남대구-효목 지중T/L 건설사업 project_name_list 154kV 남대구-효목 지중 송전선로 건설사업 purpose 대구지역 154KV 계통보강(신경산-대구권) project_region_detail 대구광역시 수성구 project_period_raw 2027.03~2028.01 project_scale_raw 154㎸ XLPE 1,200㎟, 2C × 0.90㎞ responsible_office_raw 남부건설본부/대구경북건설지사 equipment_type 지중송전 headquarters 남부건설본부 office 대구경북건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_95c6c6dcda051e09
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_95c6c6dcda051e09
Sources EV-f0d68c45d97941e85bea24e6 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 249b0b14b15f19788b5d02328ee25d7948762f11e6c8b49dee530c3d9976b2da Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-4d6a50757bc53daf8078828f
Detailed source fields Original source field Published value or condition stable_project_id kproj_95d98c1c9faba632 stable_project_key prjtDef:231421:ESB project_definition 231421 first_region_code ESB manual_source_format false project_name 154kV 남비응S/S 건설사업 project_name_list 154kV 남비응S/S 건설사업 purpose 새만금산업단지 신규부하 공급 project_region_detail 전북특별자치도 군산시 project_period_raw 2015.10~2027.12 project_scale_raw 170KV GIS × 9CCT responsible_office_raw 중부건설본부/전북건설지사 equipment_type 변전 headquarters 중부건설본부 office 전북건설지사 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_95d98c1c9faba632
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_95d98c1c9faba632
Sources EV-4d6a50757bc53daf8078828f Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 9c5880fae97269fa9394b193000dcbe9d8707a9ef1648d29788747575642689c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-05 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231421|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_cefaf3868c56ee74
Sources EV-9d4a26719bd3593746f57943 Evidence SHA-256 58c7dc54503189d3ca87cac20d4860d56e5f04e3c770156eca4773183567f19b 행 SHA-256 67a08586bc8290ad7385d1ebafd316d7bf9cf2f817229f81ffac4a033cda2a22 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-06 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231421|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_cefaf3868c56ee74
Sources EV-9d4a26719bd3593746f57943 Evidence SHA-256 58c7dc54503189d3ca87cac20d4860d56e5f04e3c770156eca4773183567f19b 행 SHA-256 67a08586bc8290ad7385d1ebafd316d7bf9cf2f817229f81ffac4a033cda2a22 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2018-01 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231421|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_cefaf3868c56ee74
Sources EV-9d4a26719bd3593746f57943 Evidence SHA-256 58c7dc54503189d3ca87cac20d4860d56e5f04e3c770156eca4773183567f19b 행 SHA-256 67a08586bc8290ad7385d1ebafd316d7bf9cf2f817229f81ffac4a033cda2a22 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type design_completion date 2025-02 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231421|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_cefaf3868c56ee74
Sources EV-9d4a26719bd3593746f57943 Evidence SHA-256 58c7dc54503189d3ca87cac20d4860d56e5f04e3c770156eca4773183567f19b 행 SHA-256 67a08586bc8290ad7385d1ebafd316d7bf9cf2f817229f81ffac4a033cda2a22 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-03 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231421|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_cefaf3868c56ee74
Sources EV-9d4a26719bd3593746f57943 Evidence SHA-256 58c7dc54503189d3ca87cac20d4860d56e5f04e3c770156eca4773183567f19b 행 SHA-256 67a08586bc8290ad7385d1ebafd316d7bf9cf2f817229f81ffac4a033cda2a22 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-03 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231421|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_cefaf3868c56ee74
Sources EV-9d4a26719bd3593746f57943 Evidence SHA-256 58c7dc54503189d3ca87cac20d4860d56e5f04e3c770156eca4773183567f19b 행 SHA-256 67a08586bc8290ad7385d1ebafd316d7bf9cf2f817229f81ffac4a033cda2a22 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2015-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231421|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_cefaf3868c56ee74
Sources EV-9d4a26719bd3593746f57943 Evidence SHA-256 58c7dc54503189d3ca87cac20d4860d56e5f04e3c770156eca4773183567f19b 행 SHA-256 67a08586bc8290ad7385d1ebafd316d7bf9cf2f817229f81ffac4a033cda2a22 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2025-06 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231421|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_cefaf3868c56ee74
Sources EV-9d4a26719bd3593746f57943 Evidence SHA-256 58c7dc54503189d3ca87cac20d4860d56e5f04e3c770156eca4773183567f19b 행 SHA-256 67a08586bc8290ad7385d1ebafd316d7bf9cf2f817229f81ffac4a033cda2a22 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-02 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231421|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_cefaf3868c56ee74
Sources EV-9d4a26719bd3593746f57943 Evidence SHA-256 58c7dc54503189d3ca87cac20d4860d56e5f04e3c770156eca4773183567f19b 행 SHA-256 67a08586bc8290ad7385d1ebafd316d7bf9cf2f817229f81ffac4a033cda2a22 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2025-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231421|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_cefaf3868c56ee74
Sources EV-9d4a26719bd3593746f57943 Evidence SHA-256 58c7dc54503189d3ca87cac20d4860d56e5f04e3c770156eca4773183567f19b 행 SHA-256 67a08586bc8290ad7385d1ebafd316d7bf9cf2f817229f81ffac4a033cda2a22 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231421|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_cefaf3868c56ee74
Sources EV-9d4a26719bd3593746f57943 Evidence SHA-256 58c7dc54503189d3ca87cac20d4860d56e5f04e3c770156eca4773183567f19b 행 SHA-256 67a08586bc8290ad7385d1ebafd316d7bf9cf2f817229f81ffac4a033cda2a22 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-11 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231421|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_cefaf3868c56ee74
Sources EV-9d4a26719bd3593746f57943 Evidence SHA-256 58c7dc54503189d3ca87cac20d4860d56e5f04e3c770156eca4773183567f19b 행 SHA-256 67a08586bc8290ad7385d1ebafd316d7bf9cf2f817229f81ffac4a033cda2a22 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-06 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231421|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_cefaf3868c56ee74
Sources EV-9d4a26719bd3593746f57943 Evidence SHA-256 58c7dc54503189d3ca87cac20d4860d56e5f04e3c770156eca4773183567f19b 행 SHA-256 67a08586bc8290ad7385d1ebafd316d7bf9cf2f817229f81ffac4a033cda2a22 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type energization date 2026-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231421|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_cefaf3868c56ee74
Sources EV-9d4a26719bd3593746f57943 Evidence SHA-256 58c7dc54503189d3ca87cac20d4860d56e5f04e3c770156eca4773183567f19b 행 SHA-256 67a08586bc8290ad7385d1ebafd316d7bf9cf2f817229f81ffac4a033cda2a22 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2015-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231421|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_cefaf3868c56ee74
Sources EV-9d4a26719bd3593746f57943 Evidence SHA-256 58c7dc54503189d3ca87cac20d4860d56e5f04e3c770156eca4773183567f19b 행 SHA-256 67a08586bc8290ad7385d1ebafd316d7bf9cf2f817229f81ffac4a033cda2a22 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2027-04 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231421|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_cefaf3868c56ee74
Sources EV-9d4a26719bd3593746f57943 Evidence SHA-256 58c7dc54503189d3ca87cac20d4860d56e5f04e3c770156eca4773183567f19b 행 SHA-256 67a08586bc8290ad7385d1ebafd316d7bf9cf2f817229f81ffac4a033cda2a22 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231421|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_cefaf3868c56ee74
Sources EV-9d4a26719bd3593746f57943 Evidence SHA-256 58c7dc54503189d3ca87cac20d4860d56e5f04e3c770156eca4773183567f19b 행 SHA-256 67a08586bc8290ad7385d1ebafd316d7bf9cf2f817229f81ffac4a033cda2a22 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2027-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231421|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_cefaf3868c56ee74
Sources EV-9d4a26719bd3593746f57943 Evidence SHA-256 58c7dc54503189d3ca87cac20d4860d56e5f04e3c770156eca4773183567f19b 행 SHA-256 67a08586bc8290ad7385d1ebafd316d7bf9cf2f817229f81ffac4a033cda2a22 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_cefaf3868c56ee74 stable_project_id kproj_95d98c1c9faba632 source_key 202609|231421|ESB basic_ym 202609 source_stage_raw 공사착수-사업완료전 project_name_list 154kV 남비응S/S 건설사업 project_name_detail 154kV 남비응S/S 건설사업 region_summary_raw 전북특별자치도 군산시등 1 지역 equipment_type_raw 변전 headquarters_raw 중부건설본부 office_raw 전북건설지사 section_fields 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 기본설계: 2024.03 ~ 2024.05 실시설계: 2024.06 ~ 2025.02 설계담당자: [redacted] 건설공사 개요 공사 착공: 2025.06 공사 기간: 2025.06 ~ 2027.04 감독자: [redacted], 실적): 94, 70 [추진실적] □‘15.10 : 제7차 장기 송변전설비계획 사업반영 □‘18.01 ~‘22.03 : 새만금산단 조성공사 지연에 따른 사업대기 □‘23.11 : 입지확정위원회 구성 및 심의 시행 □‘24.05 : 기본설계 심의 완료 □‘24.10 : 편입부지 매수완료 □‘25.02 : 변전 실시설계 완료 □‘25.06 : 변전공사 착공 [향후계획] □‘26.12 : 변전소 가압 future_plan_redacted □ 향후계획 [추진실적] □‘15.10 : 제7차 장기 송변전설비계획 사업반영 □‘18.01 ~‘22.03 : 새만금산단 조성공사 지연에 따른 사업대기 □‘23.11 : 입지확정위원회 구성 및 심의 시행 □‘24.05 : 기본설계 심의 완료 □‘24.10 : 편입부지 매수완료 □‘25.02 : 변전 실시설계 완료 □‘25.06 : 변전공사 착공 [향후계획] □‘26.12 : 변전소 가압 attachment_count 0 source_detail_sha256 58c7dc54503189d3ca87cac20d4860d56e5f04e3c770156eca4773183567f19b first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231421|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_cefaf3868c56ee74
Sources EV-9d4a26719bd3593746f57943 Evidence SHA-256 58c7dc54503189d3ca87cac20d4860d56e5f04e3c770156eca4773183567f19b 행 SHA-256 67a08586bc8290ad7385d1ebafd316d7bf9cf2f817229f81ffac4a033cda2a22 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_95d98c1c9faba632 stable_project_key prjtDef:231421:ESB project_definition 231421 first_region_code ESB manual_source_format false project_name 154kV 남비응S/S 건설사업 project_name_list 154kV 남비응S/S 건설사업 purpose 새만금산업단지 신규부하 공급 project_region_detail 전북특별자치도 군산시 project_period_raw 2015.10~2027.12 project_scale_raw 170KV GIS × 9CCT responsible_office_raw 중부건설본부/전북건설지사 equipment_type 변전 headquarters 중부건설본부 office 전북건설지사 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_95d98c1c9faba632
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_95d98c1c9faba632
Sources EV-4d6a50757bc53daf8078828f Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 9c5880fae97269fa9394b193000dcbe9d8707a9ef1648d29788747575642689c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-6f2b470674b79cdf3353937b
Detailed source fields Original source field Published value or condition stable_project_id kproj_9ab0d0c5e25ef076 stable_project_key prjtDef:233513:ESB project_definition 233513 first_region_code ESB manual_source_format false project_name 154kV 남비응분기 지중T/L 건설사업 project_name_list 154kV 남비응분기 지중T/L 건설사업 purpose 인근변전소 부하부담(비응,비응#2) project_region_detail 전북특별자치도 군산시 project_period_raw 2023.01~2027.12 project_scale_raw 154㎸ XLPE 2,000㎟, 2C-2.0㎞ responsible_office_raw 중부건설본부/전북건설지사 equipment_type 지중송전 headquarters 중부건설본부 office 전북건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_9ab0d0c5e25ef076
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_9ab0d0c5e25ef076
Sources EV-6f2b470674b79cdf3353937b Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 bf491919578ab55c3a247b094c380e4bedc0c470151c323a485e7ba1a7d487b6 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2024-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233513|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_4d942f5c6630acab
Sources EV-74b359f08d8785e5d92b6bb8 Evidence SHA-256 9257387385352d964cc11f2fbcdaad109ba2391be271d9410390f561917ca6ee 행 SHA-256 b718010436ba990b7141fd714a0132137c86474100b206dafd7271c2559c516e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2015-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233513|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_4d942f5c6630acab
Sources EV-74b359f08d8785e5d92b6bb8 Evidence SHA-256 9257387385352d964cc11f2fbcdaad109ba2391be271d9410390f561917ca6ee 행 SHA-256 b718010436ba990b7141fd714a0132137c86474100b206dafd7271c2559c516e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type plan_change date 2023-02 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233513|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_4d942f5c6630acab
Sources EV-74b359f08d8785e5d92b6bb8 Evidence SHA-256 9257387385352d964cc11f2fbcdaad109ba2391be271d9410390f561917ca6ee 행 SHA-256 b718010436ba990b7141fd714a0132137c86474100b206dafd7271c2559c516e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233513|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_4d942f5c6630acab
Sources EV-74b359f08d8785e5d92b6bb8 Evidence SHA-256 9257387385352d964cc11f2fbcdaad109ba2391be271d9410390f561917ca6ee 행 SHA-256 b718010436ba990b7141fd714a0132137c86474100b206dafd7271c2559c516e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2023-01 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233513|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_4d942f5c6630acab
Sources EV-74b359f08d8785e5d92b6bb8 Evidence SHA-256 9257387385352d964cc11f2fbcdaad109ba2391be271d9410390f561917ca6ee 행 SHA-256 b718010436ba990b7141fd714a0132137c86474100b206dafd7271c2559c516e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2017-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233513|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_4d942f5c6630acab
Sources EV-74b359f08d8785e5d92b6bb8 Evidence SHA-256 9257387385352d964cc11f2fbcdaad109ba2391be271d9410390f561917ca6ee 행 SHA-256 b718010436ba990b7141fd714a0132137c86474100b206dafd7271c2559c516e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2015-10 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|233513|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_4d942f5c6630acab
Sources EV-74b359f08d8785e5d92b6bb8 Evidence SHA-256 9257387385352d964cc11f2fbcdaad109ba2391be271d9410390f561917ca6ee 행 SHA-256 b718010436ba990b7141fd714a0132137c86474100b206dafd7271c2559c516e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2027-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233513|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_4d942f5c6630acab
Sources EV-74b359f08d8785e5d92b6bb8 Evidence SHA-256 9257387385352d964cc11f2fbcdaad109ba2391be271d9410390f561917ca6ee 행 SHA-256 b718010436ba990b7141fd714a0132137c86474100b206dafd7271c2559c516e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2028-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233513|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_4d942f5c6630acab
Sources EV-74b359f08d8785e5d92b6bb8 Evidence SHA-256 9257387385352d964cc11f2fbcdaad109ba2391be271d9410390f561917ca6ee 행 SHA-256 b718010436ba990b7141fd714a0132137c86474100b206dafd7271c2559c516e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_4d942f5c6630acab stable_project_id kproj_9ab0d0c5e25ef076 source_key 202609|233513|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 남비응분기 지중T/L 건설사업 project_name_detail 154kV 남비응분기 지중T/L 건설사업 region_summary_raw 전북특별자치도 군산시등 1 지역 equipment_type_raw 지중송전 headquarters_raw 중부건설본부 office_raw 전북건설지사 section_fields 사업 규모 154㎸ XLPE 2,000㎟, 2C-2.0㎞ 계획확정 제07차 장기송변전설비계획 반영(2015.10) 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: □ '15.10 제7차 장기송변전 설비계획 반영 □ '17.10 새만금 간척사업 매립 지연으로 준공목표 조정 □ '23.02 설비계획 적정성 검토에 따른 계통계획 변경(동비응-비응#3 → 비응#3분기) □ '24.06 설비계획 적정성 검토에 따른 준공목표 변경('28.12 → '26.12) future_plan_redacted □ 향후계획 □ '15.10 제7차 장기송변전 설비계획 반영 □ '17.10 새만금 간척사업 매립 지연으로 준공목표 조정 □ '23.02 설비계획 적정성 검토에 따른 계통계획 변경(동비응-비응#3 → 비응#3분기) □ '24.06 설비계획 적정성 검토에 따른 준공목표 변경('28.12 → '26.12) attachment_count 0 source_detail_sha256 9257387385352d964cc11f2fbcdaad109ba2391be271d9410390f561917ca6ee first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|233513|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_4d942f5c6630acab
Sources EV-74b359f08d8785e5d92b6bb8 Evidence SHA-256 9257387385352d964cc11f2fbcdaad109ba2391be271d9410390f561917ca6ee 행 SHA-256 b718010436ba990b7141fd714a0132137c86474100b206dafd7271c2559c516e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_9ab0d0c5e25ef076 stable_project_key prjtDef:233513:ESB project_definition 233513 first_region_code ESB manual_source_format false project_name 154kV 남비응분기 지중T/L 건설사업 project_name_list 154kV 남비응분기 지중T/L 건설사업 purpose 인근변전소 부하부담(비응,비응#2) project_region_detail 전북특별자치도 군산시 project_period_raw 2023.01~2027.12 project_scale_raw 154㎸ XLPE 2,000㎟, 2C-2.0㎞ responsible_office_raw 중부건설본부/전북건설지사 equipment_type 지중송전 headquarters 중부건설본부 office 전북건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_9ab0d0c5e25ef076
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_9ab0d0c5e25ef076
Sources EV-6f2b470674b79cdf3353937b Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 bf491919578ab55c3a247b094c380e4bedc0c470151c323a485e7ba1a7d487b6 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-0fec602fd4d298f9ce059c1c
Detailed source fields Original source field Published value or condition stable_project_id kproj_fe8fa323b8dc94b2 stable_project_key prjtDef:231667:ESB project_definition 231667 first_region_code ESB manual_source_format false project_name 154kV 남산(구.직산#2)S/S 건설사업 project_name_list 154kV 남산S/S 건설사업 purpose 천안지역 산단 등 신규부하 공급 project_region_detail 충청남도 천안시 서북구 project_period_raw 2023.06~2030.07 project_scale_raw 154KV M.TR 2BANK(최종4BANK) responsible_office_raw 중부건설본부/직할 equipment_type 변전 headquarters 중부건설본부 office 직할 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_fe8fa323b8dc94b2
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_fe8fa323b8dc94b2
Sources EV-0fec602fd4d298f9ce059c1c Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 608fe8316aca4f48b7d0560aec972b673a116db9d51fdcbb37de9c8c4bcd84e0 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2030-07 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231667|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6ce8be56445b9e4b
Sources EV-0261ed92381f3e6a086a470c Evidence SHA-256 84396e38bca4bde5154dc5dd4594e87d6550fac4c14a1cd72c1061c204521a9a 행 SHA-256 950dde05a2b6f70958c24d5938a35884d57aff7d308a031fe7e91bc371611158 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2023-06 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231667|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6ce8be56445b9e4b
Sources EV-0261ed92381f3e6a086a470c Evidence SHA-256 84396e38bca4bde5154dc5dd4594e87d6550fac4c14a1cd72c1061c204521a9a 행 SHA-256 950dde05a2b6f70958c24d5938a35884d57aff7d308a031fe7e91bc371611158 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_6ce8be56445b9e4b stable_project_id kproj_fe8fa323b8dc94b2 source_key 202609|231667|ESB basic_ym 202609 source_stage_raw 사업승인-공사착수전 project_name_list 154kV 남산S/S 건설사업 project_name_detail 154kV 남산(구.직산#2)S/S 건설사업 region_summary_raw 충청남도 천안시 서북구등 1 지역 equipment_type_raw 변전 headquarters_raw 중부건설본부 office_raw 직할 section_fields 사업 규모 154KV M.TR 2BANK(최종4BANK) 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 기본설계: 실시설계: 설계담당자: [redacted] □진행경과 ○ '23.12. 직산#2S/S 입지선정실무위원회/입지확정위원회 구성 및 시행 - 변전소 명칭(직산#2→남산), 인출입선로구성(신설지중) 등 확정 ○ '24. 1. 154kV 남산(구.직산#2)S/S 입지확정 및 결과보고, 용지매수의뢰 - 매매계약체결 및 계약금 지불(1.17), 중도금 지불(3.19) * 잔금지불 : 산단 조성 완료 시(’25.6.예정) ○ '24. 8. 남산변전소 준공목표 단축관련 사업관계자 협의시행(8/8) ○ '24. 9. 천안 북부지역 전력공급능력 확보를 위한 관계기관 회의 ○ '25. 10 잔금 납부 및 용지매수 완료 ○ ’25.12 천안테크노파크 일반산단 개발계획변경 완료 지연(예상 ’26.4월) - 개발계획변경 승인 확인 후 부지인수인계 예정 □향후계획 ○ '28.11 : 변전공사 착공 ○ '30.07 : 준공 및 가압 future_plan_redacted □ 향후계획 □진행경과 ○ '23.12. 직산#2S/S 입지선정실무위원회/입지확정위원회 구성 및 시행 - 변전소 명칭(직산#2→남산), 인출입선로구성(신설지중) 등 확정 ○ '24. 1. 154kV 남산(구.직산#2)S/S 입지확정 및 결과보고, 용지매수의뢰 - 매매계약체결 및 계약금 지불(1.17), 중도금 지불(3.19) * 잔금지불 : 산단 조성 완료 시(’25.6.예정) ○ '24. 8. 남산변전소 준공목표 단축관련 사업관계자 협의시행(8/8) ○ '24. 9. 천안 북부지역 전력공급능력 확보를 위한 관계기관 회의 ○ '25. 10 잔금 납부 및 용지매수 완료 ○ ’25.12 천안테크노파크 일반산단 개발계획변경 완료 지연(예상 ’26.4월) - 개발계획변경 승인 확인 후 부지인수인계 예정 □향후계획 ○ '28.11 : 변전공사 착공 ○ '30.07 : 준공 및 가압 attachment_count 0 source_detail_sha256 84396e38bca4bde5154dc5dd4594e87d6550fac4c14a1cd72c1061c204521a9a first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231667|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6ce8be56445b9e4b
Sources EV-0261ed92381f3e6a086a470c Evidence SHA-256 84396e38bca4bde5154dc5dd4594e87d6550fac4c14a1cd72c1061c204521a9a 행 SHA-256 950dde05a2b6f70958c24d5938a35884d57aff7d308a031fe7e91bc371611158 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_fe8fa323b8dc94b2 stable_project_key prjtDef:231667:ESB project_definition 231667 first_region_code ESB manual_source_format false project_name 154kV 남산(구.직산#2)S/S 건설사업 project_name_list 154kV 남산S/S 건설사업 purpose 천안지역 산단 등 신규부하 공급 project_region_detail 충청남도 천안시 서북구 project_period_raw 2023.06~2030.07 project_scale_raw 154KV M.TR 2BANK(최종4BANK) responsible_office_raw 중부건설본부/직할 equipment_type 변전 headquarters 중부건설본부 office 직할 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_fe8fa323b8dc94b2
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_fe8fa323b8dc94b2
Sources EV-0fec602fd4d298f9ce059c1c Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 608fe8316aca4f48b7d0560aec972b673a116db9d51fdcbb37de9c8c4bcd84e0 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-89a2051f328feb7747bd6b83
Detailed source fields Original source field Published value or condition stable_project_id kproj_71de2d0fe5653e27 stable_project_key prjtDef:231722:ESB project_definition 231722 first_region_code ESB manual_source_format false project_name 154kV 남서운S/S 건설사업 project_name_list 154kV 남서운변전소 건설사업 purpose 변전설비 적기확충으로 안정적 전력공급 project_region_detail Anseong, Gyeonggi Province project_period_raw project_scale_raw 154/23KV 15/20MVA X 3대 2BANK responsible_office_raw 경인건설본부/경기건설지사 equipment_type 변전 headquarters 경인건설본부 office 경기건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_71de2d0fe5653e27
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_71de2d0fe5653e27
Sources EV-89a2051f328feb7747bd6b83 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 6d62931745e13a36ad868ad48c75b29e12ee0c0d9a03e3d507204bce65feeec7 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_bea755c57c4f70dd stable_project_id kproj_71de2d0fe5653e27 source_key 202609|231722|ESB basic_ym 202609 source_stage_raw 사업승인-공사착수전 project_name_list 154kV 남서운변전소 건설사업 project_name_detail 154kV 남서운S/S 건설사업 region_summary_raw 경기도 안성시등 1 지역 equipment_type_raw 변전 headquarters_raw 경인건설본부 office_raw 경기건설지사 section_fields Project region Anseong, Gyeonggi Province 사업 규모 154/23KV 15/20MVA X 3대 2BANK 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 기본설계: 실시설계: 설계담당자: [redacted] □ '31.10 : 변전소 토건공사 착공 □ '32. 2 : 변전소 건설공사 착공 future_plan_redacted □ 향후계획 □ '31.10 : 변전소 토건공사 착공 □ '32. 2 : 변전소 건설공사 착공 attachment_count 0 source_detail_sha256 3d6a28c5953337ab56648fe37adad78d2f46dd826d96e4247fd58c5e5bbecf09 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231722|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_bea755c57c4f70dd
Sources EV-85014429e4ede1ad66553297 Evidence SHA-256 3d6a28c5953337ab56648fe37adad78d2f46dd826d96e4247fd58c5e5bbecf09 행 SHA-256 a52a802390cac15759a7d301641bd37f3115fae7e2a7e95a37cc180e618dac99 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_71de2d0fe5653e27 stable_project_key prjtDef:231722:ESB project_definition 231722 first_region_code ESB manual_source_format false project_name 154kV 남서운S/S 건설사업 project_name_list 154kV 남서운변전소 건설사업 purpose 변전설비 적기확충으로 안정적 전력공급 project_region_detail Anseong, Gyeonggi Province project_period_raw project_scale_raw 154/23KV 15/20MVA X 3대 2BANK responsible_office_raw 경인건설본부/경기건설지사 equipment_type 변전 headquarters 경인건설본부 office 경기건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_71de2d0fe5653e27
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_71de2d0fe5653e27
Sources EV-89a2051f328feb7747bd6b83 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 6d62931745e13a36ad868ad48c75b29e12ee0c0d9a03e3d507204bce65feeec7 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-4b581f31d996e0bb5b5f20d2
Detailed source fields Original source field Published value or condition stable_project_id kproj_c82cfb42038076f7 stable_project_key prjtDef:232638:ESB project_definition 232638 first_region_code ESB manual_source_format false project_name 154kV 남양주-평내T/L 건설사업 project_name_list 154kV 남양주-평내 송전선로 건설사업 purpose 3기신도시, 택지지구 조성에 따른 공급능력 확보 project_region_detail Namyangju City, Gyeonggi Province project_period_raw 2023.05~2029.06 project_scale_raw ACSR 410㎟×2B×2C×7KM responsible_office_raw 경인건설본부/직할 equipment_type 가공송전 headquarters 경인건설본부 office 직할 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_c82cfb42038076f7
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_c82cfb42038076f7
Sources EV-4b581f31d996e0bb5b5f20d2 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 a971944766da6d7a56a9c1bd6ed4bcbf6e174b4716264a25c1c8756e8fcec2b3 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2023-05 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232638|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_a4db677a2204f8da
Sources EV-6ea378243076cb841796b173 Evidence SHA-256 5f8f4632cd00154f37fe09f560d23f29acaa0acede357238e2ba4a5c2ba57ea2 행 SHA-256 2d2541ffb0af82e9556b8602d8ef2c22a964e3fa26a2b5f10d47d23de45870fc Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2029-06 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232638|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_a4db677a2204f8da
Sources EV-6ea378243076cb841796b173 Evidence SHA-256 5f8f4632cd00154f37fe09f560d23f29acaa0acede357238e2ba4a5c2ba57ea2 행 SHA-256 2d2541ffb0af82e9556b8602d8ef2c22a964e3fa26a2b5f10d47d23de45870fc Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-05 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232638|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_a4db677a2204f8da
Sources EV-6ea378243076cb841796b173 Evidence SHA-256 5f8f4632cd00154f37fe09f560d23f29acaa0acede357238e2ba4a5c2ba57ea2 행 SHA-256 2d2541ffb0af82e9556b8602d8ef2c22a964e3fa26a2b5f10d47d23de45870fc Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2024-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232638|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_a4db677a2204f8da
Sources EV-6ea378243076cb841796b173 Evidence SHA-256 5f8f4632cd00154f37fe09f560d23f29acaa0acede357238e2ba4a5c2ba57ea2 행 SHA-256 2d2541ffb0af82e9556b8602d8ef2c22a964e3fa26a2b5f10d47d23de45870fc Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232638|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_a4db677a2204f8da
Sources EV-6ea378243076cb841796b173 Evidence SHA-256 5f8f4632cd00154f37fe09f560d23f29acaa0acede357238e2ba4a5c2ba57ea2 행 SHA-256 2d2541ffb0af82e9556b8602d8ef2c22a964e3fa26a2b5f10d47d23de45870fc Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_a4db677a2204f8da stable_project_id kproj_c82cfb42038076f7 source_key 202609|232638|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 남양주-평내 송전선로 건설사업 project_name_detail 154kV 남양주-평내T/L 건설사업 region_summary_raw 경기도 남양주시등 1 지역 equipment_type_raw 가공송전 headquarters_raw 경인건설본부 office_raw 직할 section_fields Project purpose 3기신도시, 택지지구 조성에 따른 공급능력 확보 Project region Namyangju City, Gyeonggi Province 계획확정 제10차 장기송변전설비계획 반영(2023.05) 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: [추진실적] □ '23.05 : 제 10차 장기송변전설비계획 신규 사업 반영 □ '24.04 ~ : 남양주 변전소 부지 확정 및 평내 변전소 입지선정 대기 [향후계획] □ 평내 변전소 부지 확정 후 주민주도형 전력영향평가 및 설계측량용역 발주 future_plan_redacted □ 향후계획 [추진실적] □ '23.05 : 제 10차 장기송변전설비계획 신규 사업 반영 □ '24.04 ~ : 남양주 변전소 부지 확정 및 평내 변전소 입지선정 대기 [향후계획] □ 평내 변전소 부지 확정 후 주민주도형 전력영향평가 및 설계측량용역 발주 attachment_count 0 source_detail_sha256 5f8f4632cd00154f37fe09f560d23f29acaa0acede357238e2ba4a5c2ba57ea2 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|232638|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_a4db677a2204f8da
Sources EV-6ea378243076cb841796b173 Evidence SHA-256 5f8f4632cd00154f37fe09f560d23f29acaa0acede357238e2ba4a5c2ba57ea2 행 SHA-256 2d2541ffb0af82e9556b8602d8ef2c22a964e3fa26a2b5f10d47d23de45870fc Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_c82cfb42038076f7 stable_project_key prjtDef:232638:ESB project_definition 232638 first_region_code ESB manual_source_format false project_name 154kV 남양주-평내T/L 건설사업 project_name_list 154kV 남양주-평내 송전선로 건설사업 purpose 3기신도시, 택지지구 조성에 따른 공급능력 확보 project_region_detail Namyangju City, Gyeonggi Province project_period_raw 2023.05~2029.06 project_scale_raw ACSR 410㎟×2B×2C×7KM responsible_office_raw 경인건설본부/직할 equipment_type 가공송전 headquarters 경인건설본부 office 직할 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_c82cfb42038076f7
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_c82cfb42038076f7
Sources EV-4b581f31d996e0bb5b5f20d2 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 a971944766da6d7a56a9c1bd6ed4bcbf6e174b4716264a25c1c8756e8fcec2b3 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-0ded4efb2ecc854a000c3bd1
Detailed source fields Original source field Published value or condition stable_project_id kproj_856469262b626c5b stable_project_key prjtDef:234829:ESB project_definition 234829 first_region_code ESB manual_source_format false project_name 154kV 남오창분기 전력구 건설사업 project_name_list 154kV 남오창분기 전력구 건설사업 purpose 오창,국사,서오창 부하분담 필요 project_region_detail 충청북도 청주시 흥덕구 project_period_raw 2026.02~2032.04 project_scale_raw 154KV XLPE 2500X4C, L=3.3KM responsible_office_raw 중부건설본부/직할 equipment_type 전력구 headquarters 중부건설본부 office 직할 current_stage_raw snapshot_count 1 active_snapshot_count 0 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text source_record_id stable_project_id:kproj_856469262b626c5b
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_856469262b626c5b
Sources EV-0ded4efb2ecc854a000c3bd1 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 c7dfcc71b475398c02457fe2b4b924cfa68c62522da96da7d6eb77b16daeba35 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2026-02 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234829|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7f468075a02ca561
Sources EV-26c414a2575e6dd78eff1305 Evidence SHA-256 27a6ce4db0356f7c2a8bef1ff27f89b5f904582422ece4cd55434efd306d336a 행 SHA-256 1ea35308fdb3c555d12960f1125c0e785be5810001d262d122b8f9707893e21d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|234829|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7f468075a02ca561
Sources EV-26c414a2575e6dd78eff1305 Evidence SHA-256 27a6ce4db0356f7c2a8bef1ff27f89b5f904582422ece4cd55434efd306d336a 행 SHA-256 1ea35308fdb3c555d12960f1125c0e785be5810001d262d122b8f9707893e21d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2032-04 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234829|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7f468075a02ca561
Sources EV-26c414a2575e6dd78eff1305 Evidence SHA-256 27a6ce4db0356f7c2a8bef1ff27f89b5f904582422ece4cd55434efd306d336a 행 SHA-256 1ea35308fdb3c555d12960f1125c0e785be5810001d262d122b8f9707893e21d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_7f468075a02ca561 stable_project_id kproj_856469262b626c5b source_key 202609|234829|ESB basic_ym 202609 source_stage_raw project_name_list 154kV 남오창분기 전력구 건설사업 project_name_detail 154kV 남오창분기 전력구 건설사업 region_summary_raw 충청북도 청주시 흥덕구등 1 지역 equipment_type_raw 전력구 headquarters_raw 중부건설본부 office_raw 직할 section_fields 사업 규모 154KV XLPE 2500X4C, L=3.3KM 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: -25.05 제 11차 장기 송변전설비계획 수립 future_plan_redacted □ 향후계획 -25.05 제 11차 장기 송변전설비계획 수립 attachment_count 0 source_detail_sha256 27a6ce4db0356f7c2a8bef1ff27f89b5f904582422ece4cd55434efd306d336a first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|234829|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7f468075a02ca561
Sources EV-26c414a2575e6dd78eff1305 Evidence SHA-256 27a6ce4db0356f7c2a8bef1ff27f89b5f904582422ece4cd55434efd306d336a 행 SHA-256 1ea35308fdb3c555d12960f1125c0e785be5810001d262d122b8f9707893e21d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_856469262b626c5b stable_project_key prjtDef:234829:ESB project_definition 234829 first_region_code ESB manual_source_format false project_name 154kV 남오창분기 전력구 건설사업 project_name_list 154kV 남오창분기 전력구 건설사업 purpose 오창,국사,서오창 부하분담 필요 project_region_detail 충청북도 청주시 흥덕구 project_period_raw 2026.02~2032.04 project_scale_raw 154KV XLPE 2500X4C, L=3.3KM responsible_office_raw 중부건설본부/직할 equipment_type 전력구 headquarters 중부건설본부 office 직할 current_stage_raw snapshot_count 1 active_snapshot_count 0 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text source_record_id stable_project_id:kproj_856469262b626c5b
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_856469262b626c5b
Sources EV-0ded4efb2ecc854a000c3bd1 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 c7dfcc71b475398c02457fe2b4b924cfa68c62522da96da7d6eb77b16daeba35 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-4fc2f30d3ad44ed3b6e32b34
Detailed source fields Original source field Published value or condition stable_project_id kproj_4d324d07f1cbe12a stable_project_key prjtDef:231650:ESB project_definition 231650 first_region_code ESB manual_source_format false project_name 154kV 남원#2S/S 건설사업 project_name_list 154kV 북남원S/S 건설사업 purpose 남원지역 재생E 접속지연 해소 project_region_detail 전북특별자치도 남원시 project_period_raw 2024.07~2030.12 project_scale_raw 154KV MTR 80MVA X 2BANK, 170KV GIS×8CCT responsible_office_raw 중부건설본부/전북건설지사 equipment_type 변전 headquarters 중부건설본부 office 전북건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_4d324d07f1cbe12a
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_4d324d07f1cbe12a
Sources EV-4fc2f30d3ad44ed3b6e32b34 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 df4c965a5cfa7fbbc1d3fd702e01b4cca71780d4384e2808e2e5bfdc5eba9201 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-02 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231650|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ed8f63b53fc97034
Sources EV-567aa6ac3ef969a5e2dc907a Evidence SHA-256 34390f5b0d13274f5e2eda5f34192d1713ec1e7271db885f95ea55895d6b0638 행 SHA-256 81b21d6c057b52b099807991e2fcb120adbda3128e5a5e3f8193de367ed1ccc1 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-09 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231650|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ed8f63b53fc97034
Sources EV-567aa6ac3ef969a5e2dc907a Evidence SHA-256 34390f5b0d13274f5e2eda5f34192d1713ec1e7271db885f95ea55895d6b0638 행 SHA-256 81b21d6c057b52b099807991e2fcb120adbda3128e5a5e3f8193de367ed1ccc1 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2029-01 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231650|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ed8f63b53fc97034
Sources EV-567aa6ac3ef969a5e2dc907a Evidence SHA-256 34390f5b0d13274f5e2eda5f34192d1713ec1e7271db885f95ea55895d6b0638 행 SHA-256 81b21d6c057b52b099807991e2fcb120adbda3128e5a5e3f8193de367ed1ccc1 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2024-07 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231650|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ed8f63b53fc97034
Sources EV-567aa6ac3ef969a5e2dc907a Evidence SHA-256 34390f5b0d13274f5e2eda5f34192d1713ec1e7271db885f95ea55895d6b0638 행 SHA-256 81b21d6c057b52b099807991e2fcb120adbda3128e5a5e3f8193de367ed1ccc1 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2029-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231650|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ed8f63b53fc97034
Sources EV-567aa6ac3ef969a5e2dc907a Evidence SHA-256 34390f5b0d13274f5e2eda5f34192d1713ec1e7271db885f95ea55895d6b0638 행 SHA-256 81b21d6c057b52b099807991e2fcb120adbda3128e5a5e3f8193de367ed1ccc1 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231650|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ed8f63b53fc97034
Sources EV-567aa6ac3ef969a5e2dc907a Evidence SHA-256 34390f5b0d13274f5e2eda5f34192d1713ec1e7271db885f95ea55895d6b0638 행 SHA-256 81b21d6c057b52b099807991e2fcb120adbda3128e5a5e3f8193de367ed1ccc1 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2030-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231650|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ed8f63b53fc97034
Sources EV-567aa6ac3ef969a5e2dc907a Evidence SHA-256 34390f5b0d13274f5e2eda5f34192d1713ec1e7271db885f95ea55895d6b0638 행 SHA-256 81b21d6c057b52b099807991e2fcb120adbda3128e5a5e3f8193de367ed1ccc1 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2027-02 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231650|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ed8f63b53fc97034
Sources EV-567aa6ac3ef969a5e2dc907a Evidence SHA-256 34390f5b0d13274f5e2eda5f34192d1713ec1e7271db885f95ea55895d6b0638 행 SHA-256 81b21d6c057b52b099807991e2fcb120adbda3128e5a5e3f8193de367ed1ccc1 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_ed8f63b53fc97034 stable_project_id kproj_4d324d07f1cbe12a source_key 202609|231650|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 북남원S/S 건설사업 project_name_detail 154kV 남원#2S/S 건설사업 region_summary_raw 전북특별자치도 남원시등 1 지역 equipment_type_raw 변전 headquarters_raw 중부건설본부 office_raw 전북건설지사 section_fields 사업 규모 154KV MTR 80MVA X 2BANK, 170KV GIS×8CCT 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: [진행경과] □ '23.06 : 제10차 장기송변전설비계획 신규 반영 [향후계획] □ '25.09 : 변전소 입지확정 □ '26.02 : 실시계획 신청 □ '27.02 : 용지매수 착수 □ '29.01 : 토건공사 착공 □ '29.04 : 변전공사 착공 future_plan_redacted □ 향후계획 [진행경과] □ '23.06 : 제10차 장기송변전설비계획 신규 반영 [향후계획] □ '25.09 : 변전소 입지확정 □ '26.02 : 실시계획 신청 □ '27.02 : 용지매수 착수 □ '29.01 : 토건공사 착공 □ '29.04 : 변전공사 착공 attachment_count 0 source_detail_sha256 34390f5b0d13274f5e2eda5f34192d1713ec1e7271db885f95ea55895d6b0638 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231650|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_ed8f63b53fc97034
Sources EV-567aa6ac3ef969a5e2dc907a Evidence SHA-256 34390f5b0d13274f5e2eda5f34192d1713ec1e7271db885f95ea55895d6b0638 행 SHA-256 81b21d6c057b52b099807991e2fcb120adbda3128e5a5e3f8193de367ed1ccc1 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_4d324d07f1cbe12a stable_project_key prjtDef:231650:ESB project_definition 231650 first_region_code ESB manual_source_format false project_name 154kV 남원#2S/S 건설사업 project_name_list 154kV 북남원S/S 건설사업 purpose 남원지역 재생E 접속지연 해소 project_region_detail 전북특별자치도 남원시 project_period_raw 2024.07~2030.12 project_scale_raw 154KV MTR 80MVA X 2BANK, 170KV GIS×8CCT responsible_office_raw 중부건설본부/전북건설지사 equipment_type 변전 headquarters 중부건설본부 office 전북건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_4d324d07f1cbe12a
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_4d324d07f1cbe12a
Sources EV-4fc2f30d3ad44ed3b6e32b34 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 df4c965a5cfa7fbbc1d3fd702e01b4cca71780d4384e2808e2e5bfdc5eba9201 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-2c5b9835b88bfae291df51da
Detailed source fields Original source field Published value or condition stable_project_id kproj_ce4678c2a679509b stable_project_key prjtDef:234733:ESB project_definition 234733 first_region_code ESB manual_source_format false project_name 154kV 남천안-불당 전력구 건설사업 project_name_list 천안지역 전기공급시설 전력구공사(남천안-불당) purpose 천안지역 전력공급능력 확보 project_region_detail 충청남도 천안시 동남구 project_period_raw 2025.02~2030.12 project_scale_raw 154KV XLPE 2500(D)X2C, L=4.0KM responsible_office_raw 중부건설본부/직할 equipment_type 전력구 headquarters 중부건설본부 office 직할 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_ce4678c2a679509b
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_ce4678c2a679509b
Sources EV-2c5b9835b88bfae291df51da Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 9eecc6235fabd6e902edd1a527d8c6eaaeb3c6200cbb807fd0911647a0d44573 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2025-02 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234733|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_38d206743bb614e7
Sources EV-02646cf2e07cdaccfdf4cf1d Evidence SHA-256 ffcf4812b2dd445b582bcce73dce8deb16495dd556e4715b72148395fd979fcc 행 SHA-256 c3db59c0f63eb4840d4d71c7d6520ebd6b3a5dc4bc9668b8af2d7a52bb897a45 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2030-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234733|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_38d206743bb614e7
Sources EV-02646cf2e07cdaccfdf4cf1d Evidence SHA-256 ffcf4812b2dd445b582bcce73dce8deb16495dd556e4715b72148395fd979fcc 행 SHA-256 c3db59c0f63eb4840d4d71c7d6520ebd6b3a5dc4bc9668b8af2d7a52bb897a45 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|234733|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_38d206743bb614e7
Sources EV-02646cf2e07cdaccfdf4cf1d Evidence SHA-256 ffcf4812b2dd445b582bcce73dce8deb16495dd556e4715b72148395fd979fcc 행 SHA-256 c3db59c0f63eb4840d4d71c7d6520ebd6b3a5dc4bc9668b8af2d7a52bb897a45 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_38d206743bb614e7 stable_project_id kproj_ce4678c2a679509b source_key 202609|234733|ESB basic_ym 202609 source_stage_raw 사업승인-공사착수전 project_name_list 천안지역 전기공급시설 전력구공사(남천안-불당) project_name_detail 154kV 남천안-불당 전력구 건설사업 region_summary_raw 충청남도 천안시 동남구등 1 지역 equipment_type_raw 전력구 headquarters_raw 중부건설본부 office_raw 직할 section_fields 사업 규모 154KV XLPE 2500(D)X2C, L=4.0KM 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 기본설계: 실시설계: 설계담당자: [redacted] -23.05 제10차 장기 송변전설비계획 수립 future_plan_redacted □ 향후계획 -23.05 제10차 장기 송변전설비계획 수립 attachment_count 0 source_detail_sha256 ffcf4812b2dd445b582bcce73dce8deb16495dd556e4715b72148395fd979fcc first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|234733|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_38d206743bb614e7
Sources EV-02646cf2e07cdaccfdf4cf1d Evidence SHA-256 ffcf4812b2dd445b582bcce73dce8deb16495dd556e4715b72148395fd979fcc 행 SHA-256 c3db59c0f63eb4840d4d71c7d6520ebd6b3a5dc4bc9668b8af2d7a52bb897a45 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_ce4678c2a679509b stable_project_key prjtDef:234733:ESB project_definition 234733 first_region_code ESB manual_source_format false project_name 154kV 남천안-불당 전력구 건설사업 project_name_list 천안지역 전기공급시설 전력구공사(남천안-불당) purpose 천안지역 전력공급능력 확보 project_region_detail 충청남도 천안시 동남구 project_period_raw 2025.02~2030.12 project_scale_raw 154KV XLPE 2500(D)X2C, L=4.0KM responsible_office_raw 중부건설본부/직할 equipment_type 전력구 headquarters 중부건설본부 office 직할 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_ce4678c2a679509b
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_ce4678c2a679509b
Sources EV-2c5b9835b88bfae291df51da Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 9eecc6235fabd6e902edd1a527d8c6eaaeb3c6200cbb807fd0911647a0d44573 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-caa373b067893eb1bd31a171
Detailed source fields Original source field Published value or condition stable_project_id kproj_bc02fca210627a12 stable_project_key prjtDef:234730:ESB project_definition 234730 first_region_code ESB manual_source_format false project_name 154kV 남천안-천안 전력구 건설사업 project_name_list 천안지역 전기공급시설 전력구공사(남천안-천안) purpose 천안지역 전력공급능력 확보 project_region_detail 충청남도 천안시 동남구 project_period_raw 2024.04~2029.10 project_scale_raw 154KV XLPE 2500(D)X2C, L=3.0KM responsible_office_raw 중부건설본부/직할 equipment_type 전력구 headquarters 중부건설본부 office 직할 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_bc02fca210627a12
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_bc02fca210627a12
Sources EV-caa373b067893eb1bd31a171 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 057a326f2a948032575e7948435d1f815126b0e3c7e0a02fb804cd8600a0ce3a Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2029-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234730|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_346a6b12e8db67f0
Sources EV-ecefd27e8d85165f953de9b0 Evidence SHA-256 e4556a9850ff8b9e52447b49ed0d6cc45fce2eba0b061386bc690fbc3544f4e7 행 SHA-256 b534bda40f27b2533532dff7e8eabe3db93cfe9df3cb118e6dd6ab4bf46c95fa Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|234730|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_346a6b12e8db67f0
Sources EV-ecefd27e8d85165f953de9b0 Evidence SHA-256 e4556a9850ff8b9e52447b49ed0d6cc45fce2eba0b061386bc690fbc3544f4e7 행 SHA-256 b534bda40f27b2533532dff7e8eabe3db93cfe9df3cb118e6dd6ab4bf46c95fa Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2024-04 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234730|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_346a6b12e8db67f0
Sources EV-ecefd27e8d85165f953de9b0 Evidence SHA-256 e4556a9850ff8b9e52447b49ed0d6cc45fce2eba0b061386bc690fbc3544f4e7 행 SHA-256 b534bda40f27b2533532dff7e8eabe3db93cfe9df3cb118e6dd6ab4bf46c95fa Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_346a6b12e8db67f0 stable_project_id kproj_bc02fca210627a12 source_key 202609|234730|ESB basic_ym 202609 source_stage_raw 사업승인-공사착수전 project_name_list 천안지역 전기공급시설 전력구공사(남천안-천안) project_name_detail 154kV 남천안-천안 전력구 건설사업 region_summary_raw 충청남도 천안시 동남구등 1 지역 equipment_type_raw 전력구 headquarters_raw 중부건설본부 office_raw 직할 section_fields 사업 규모 154KV XLPE 2500(D)X2C, L=3.0KM 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 기본설계: 실시설계: 설계담당자: [redacted] future_plan_redacted □ 향후계획 -23.05 제10차 장기 송변전설비계획 수 attachment_count 0 source_detail_sha256 e4556a9850ff8b9e52447b49ed0d6cc45fce2eba0b061386bc690fbc3544f4e7 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|234730|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_346a6b12e8db67f0
Sources EV-ecefd27e8d85165f953de9b0 Evidence SHA-256 e4556a9850ff8b9e52447b49ed0d6cc45fce2eba0b061386bc690fbc3544f4e7 행 SHA-256 b534bda40f27b2533532dff7e8eabe3db93cfe9df3cb118e6dd6ab4bf46c95fa Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_bc02fca210627a12 stable_project_key prjtDef:234730:ESB project_definition 234730 first_region_code ESB manual_source_format false project_name 154kV 남천안-천안 전력구 건설사업 project_name_list 천안지역 전기공급시설 전력구공사(남천안-천안) purpose 천안지역 전력공급능력 확보 project_region_detail 충청남도 천안시 동남구 project_period_raw 2024.04~2029.10 project_scale_raw 154KV XLPE 2500(D)X2C, L=3.0KM responsible_office_raw 중부건설본부/직할 equipment_type 전력구 headquarters 중부건설본부 office 직할 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_bc02fca210627a12
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_bc02fca210627a12
Sources EV-caa373b067893eb1bd31a171 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 057a326f2a948032575e7948435d1f815126b0e3c7e0a02fb804cd8600a0ce3a Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-d5e212e1a7767e86c0c5da71
Detailed source fields Original source field Published value or condition stable_project_id kproj_712cf9284d8085e0 stable_project_key prjtDef:231669:ESB project_definition 231669 first_region_code ESB manual_source_format false project_name 154kV 남천안S/S 건설사업 project_name_list 154kV 남천안S/S 건설사업 purpose 변전설비 적기확충으로 안정적 전력공급 project_region_detail 충청남도 천안시 동남구 project_period_raw 2023.08~2030.12 project_scale_raw 단상 15/20MVA 3대, 2BANK responsible_office_raw 중부건설본부/직할 equipment_type 변전 headquarters 중부건설본부 office 직할 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_712cf9284d8085e0
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_712cf9284d8085e0
Sources EV-d5e212e1a7767e86c0c5da71 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 e86bf88ffc275957eba19786f0bcd269d88923b19767c67ccd140ab35db9229a Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2023-08 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231669|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_f31466462f0f78d6
Sources EV-65f7e251fe4abddf4244a956 Evidence SHA-256 8983da6b1daa4b290dc10ff72565dc2a09cd206497cf96f9af07f0186ecbe3f6 행 SHA-256 333d4bdb548628ff8b065b07f80a34e54a2862a639afd29698f49ef8c0f32c7b Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231669|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_f31466462f0f78d6
Sources EV-65f7e251fe4abddf4244a956 Evidence SHA-256 8983da6b1daa4b290dc10ff72565dc2a09cd206497cf96f9af07f0186ecbe3f6 행 SHA-256 333d4bdb548628ff8b065b07f80a34e54a2862a639afd29698f49ef8c0f32c7b Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-03 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231669|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_f31466462f0f78d6
Sources EV-65f7e251fe4abddf4244a956 Evidence SHA-256 8983da6b1daa4b290dc10ff72565dc2a09cd206497cf96f9af07f0186ecbe3f6 행 SHA-256 333d4bdb548628ff8b065b07f80a34e54a2862a639afd29698f49ef8c0f32c7b Observations for this power asset History for this project Previous Next