POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 8items · current page 1–8 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-4b581f31d996e0bb5b5f20d2
Detailed source fields Original source field Published value or condition stable_project_id kproj_c82cfb42038076f7 stable_project_key prjtDef:232638:ESB project_definition 232638 first_region_code ESB manual_source_format false project_name 154kV 남양주-평내T/L 건설사업 project_name_list 154kV 남양주-평내 송전선로 건설사업 purpose 3기신도시, 택지지구 조성에 따른 공급능력 확보 project_region_detail Namyangju City, Gyeonggi Province project_period_raw 2023.05~2029.06 project_scale_raw ACSR 410㎟×2B×2C×7KM responsible_office_raw 경인건설본부/직할 equipment_type 가공송전 headquarters 경인건설본부 office 직할 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_c82cfb42038076f7
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_c82cfb42038076f7
Sources EV-4b581f31d996e0bb5b5f20d2 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 a971944766da6d7a56a9c1bd6ed4bcbf6e174b4716264a25c1c8756e8fcec2b3 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2023-05 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232638|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_a4db677a2204f8da
Sources EV-6ea378243076cb841796b173 Evidence SHA-256 5f8f4632cd00154f37fe09f560d23f29acaa0acede357238e2ba4a5c2ba57ea2 행 SHA-256 2d2541ffb0af82e9556b8602d8ef2c22a964e3fa26a2b5f10d47d23de45870fc Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2029-06 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232638|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_a4db677a2204f8da
Sources EV-6ea378243076cb841796b173 Evidence SHA-256 5f8f4632cd00154f37fe09f560d23f29acaa0acede357238e2ba4a5c2ba57ea2 행 SHA-256 2d2541ffb0af82e9556b8602d8ef2c22a964e3fa26a2b5f10d47d23de45870fc Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-05 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232638|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_a4db677a2204f8da
Sources EV-6ea378243076cb841796b173 Evidence SHA-256 5f8f4632cd00154f37fe09f560d23f29acaa0acede357238e2ba4a5c2ba57ea2 행 SHA-256 2d2541ffb0af82e9556b8602d8ef2c22a964e3fa26a2b5f10d47d23de45870fc Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2024-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232638|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_a4db677a2204f8da
Sources EV-6ea378243076cb841796b173 Evidence SHA-256 5f8f4632cd00154f37fe09f560d23f29acaa0acede357238e2ba4a5c2ba57ea2 행 SHA-256 2d2541ffb0af82e9556b8602d8ef2c22a964e3fa26a2b5f10d47d23de45870fc Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232638|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_a4db677a2204f8da
Sources EV-6ea378243076cb841796b173 Evidence SHA-256 5f8f4632cd00154f37fe09f560d23f29acaa0acede357238e2ba4a5c2ba57ea2 행 SHA-256 2d2541ffb0af82e9556b8602d8ef2c22a964e3fa26a2b5f10d47d23de45870fc Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_a4db677a2204f8da stable_project_id kproj_c82cfb42038076f7 source_key 202609|232638|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 남양주-평내 송전선로 건설사업 project_name_detail 154kV 남양주-평내T/L 건설사업 region_summary_raw 경기도 남양주시등 1 지역 equipment_type_raw 가공송전 headquarters_raw 경인건설본부 office_raw 직할 section_fields Project purpose 3기신도시, 택지지구 조성에 따른 공급능력 확보 Project region Namyangju City, Gyeonggi Province 계획확정 제10차 장기송변전설비계획 반영(2023.05) 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: [추진실적] □ '23.05 : 제 10차 장기송변전설비계획 신규 사업 반영 □ '24.04 ~ : 남양주 변전소 부지 확정 및 평내 변전소 입지선정 대기 [향후계획] □ 평내 변전소 부지 확정 후 주민주도형 전력영향평가 및 설계측량용역 발주 future_plan_redacted □ 향후계획 [추진실적] □ '23.05 : 제 10차 장기송변전설비계획 신규 사업 반영 □ '24.04 ~ : 남양주 변전소 부지 확정 및 평내 변전소 입지선정 대기 [향후계획] □ 평내 변전소 부지 확정 후 주민주도형 전력영향평가 및 설계측량용역 발주 attachment_count 0 source_detail_sha256 5f8f4632cd00154f37fe09f560d23f29acaa0acede357238e2ba4a5c2ba57ea2 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|232638|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_a4db677a2204f8da
Sources EV-6ea378243076cb841796b173 Evidence SHA-256 5f8f4632cd00154f37fe09f560d23f29acaa0acede357238e2ba4a5c2ba57ea2 행 SHA-256 2d2541ffb0af82e9556b8602d8ef2c22a964e3fa26a2b5f10d47d23de45870fc Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_c82cfb42038076f7 stable_project_key prjtDef:232638:ESB project_definition 232638 first_region_code ESB manual_source_format false project_name 154kV 남양주-평내T/L 건설사업 project_name_list 154kV 남양주-평내 송전선로 건설사업 purpose 3기신도시, 택지지구 조성에 따른 공급능력 확보 project_region_detail Namyangju City, Gyeonggi Province project_period_raw 2023.05~2029.06 project_scale_raw ACSR 410㎟×2B×2C×7KM responsible_office_raw 경인건설본부/직할 equipment_type 가공송전 headquarters 경인건설본부 office 직할 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_c82cfb42038076f7
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_c82cfb42038076f7
Sources EV-4b581f31d996e0bb5b5f20d2 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 a971944766da6d7a56a9c1bd6ed4bcbf6e174b4716264a25c1c8756e8fcec2b3 Observations for this power asset History for this project