This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 8items · current page 1–8 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 남양주-평내T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-4b581f31d996e0bb5b5f20d2
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_c82cfb42038076f7
stable_project_keyprjtDef:232638:ESB
project_definition232638
first_region_codeESB
manual_source_formatfalse
project_name154kV 남양주-평내T/L 건설사업
project_name_list154kV 남양주-평내 송전선로 건설사업
purpose3기신도시, 택지지구 조성에 따른 공급능력 확보
project_region_detailNamyangju City, Gyeonggi Province
project_period_raw2023.05~2029.06
project_scale_rawACSR 410㎟×2B×2C×7KM
responsible_office_raw경인건설본부/직할
equipment_type가공송전
headquarters경인건설본부
office직할
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_a4db677a2204f8da
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_c82cfb42038076f7

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_c82cfb42038076f7

Sources EV-4b581f31d996e0bb5b5f20d2
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 a971944766da6d7a56a9c1bd6ed4bcbf6e174b4716264a25c1c8756e8fcec2b3
Source schedule candidates · KOR · kepco_planned

154kV 남양주-평내T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2023-05
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232638|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a4db677a2204f8da

Sources EV-6ea378243076cb841796b173
Evidence SHA-256 5f8f4632cd00154f37fe09f560d23f29acaa0acede357238e2ba4a5c2ba57ea2
행 SHA-256 2d2541ffb0af82e9556b8602d8ef2c22a964e3fa26a2b5f10d47d23de45870fc
Source schedule candidates · KOR · kepco_planned

154kV 남양주-평내T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2029-06
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232638|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a4db677a2204f8da

Sources EV-6ea378243076cb841796b173
Evidence SHA-256 5f8f4632cd00154f37fe09f560d23f29acaa0acede357238e2ba4a5c2ba57ea2
행 SHA-256 2d2541ffb0af82e9556b8602d8ef2c22a964e3fa26a2b5f10d47d23de45870fc
Source schedule candidates · KOR · kepco_planned

154kV 남양주-평내T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-05
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232638|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a4db677a2204f8da

Sources EV-6ea378243076cb841796b173
Evidence SHA-256 5f8f4632cd00154f37fe09f560d23f29acaa0acede357238e2ba4a5c2ba57ea2
행 SHA-256 2d2541ffb0af82e9556b8602d8ef2c22a964e3fa26a2b5f10d47d23de45870fc
Source schedule candidates · KOR · kepco_planned

154kV 남양주-평내T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2024-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232638|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a4db677a2204f8da

Sources EV-6ea378243076cb841796b173
Evidence SHA-256 5f8f4632cd00154f37fe09f560d23f29acaa0acede357238e2ba4a5c2ba57ea2
행 SHA-256 2d2541ffb0af82e9556b8602d8ef2c22a964e3fa26a2b5f10d47d23de45870fc
Source schedule candidates · KOR · kepco_planned

154kV 남양주-평내T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232638|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a4db677a2204f8da

Sources EV-6ea378243076cb841796b173
Evidence SHA-256 5f8f4632cd00154f37fe09f560d23f29acaa0acede357238e2ba4a5c2ba57ea2
행 SHA-256 2d2541ffb0af82e9556b8602d8ef2c22a964e3fa26a2b5f10d47d23de45870fc
Source snapshots by date · KOR · kepco_planned

154kV 남양주-평내T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_a4db677a2204f8da
stable_project_idkproj_c82cfb42038076f7
source_key202609|232638|ESB
basic_ym202609
source_stage_raw계획확정-사업승인전
project_name_list154kV 남양주-평내 송전선로 건설사업
project_name_detail154kV 남양주-평내T/L 건설사업
region_summary_raw경기도 남양주시등 1 지역
equipment_type_raw가공송전
headquarters_raw경인건설본부
office_raw직할
section_fields
Project purpose
  • 3기신도시, 택지지구 조성에 따른 공급능력 확보
Project region
  • Namyangju City, Gyeonggi Province
Project period
  • 2023.05~2029.06
사업 규모
  • ACSR 410㎟×2B×2C×7KM
담당 사업소
  • 경인건설본부/직할
계획확정
  • 제10차 장기송변전설비계획 반영(2023.05)
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
[추진실적] □ '23.05 : 제 10차 장기송변전설비계획 신규 사업 반영 □ '24.04 ~ : 남양주 변전소 부지 확정 및 평내 변전소 입지선정 대기 [향후계획] □ 평내 변전소 부지 확정 후 주민주도형 전력영향평가 및 설계측량용역 발주
future_plan_redacted□ 향후계획 [추진실적] □ '23.05 : 제 10차 장기송변전설비계획 신규 사업 반영 □ '24.04 ~ : 남양주 변전소 부지 확정 및 평내 변전소 입지선정 대기 [향후계획] □ 평내 변전소 부지 확정 후 주민주도형 전력영향평가 및 설계측량용역 발주
attachment_count0
source_detail_sha2565f8f4632cd00154f37fe09f560d23f29acaa0acede357238e2ba4a5c2ba57ea2
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|232638|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a4db677a2204f8da

Sources EV-6ea378243076cb841796b173
Evidence SHA-256 5f8f4632cd00154f37fe09f560d23f29acaa0acede357238e2ba4a5c2ba57ea2
행 SHA-256 2d2541ffb0af82e9556b8602d8ef2c22a964e3fa26a2b5f10d47d23de45870fc
Source snapshots by date · KOR · kepco_planned

154kV 남양주-평내T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_c82cfb42038076f7
stable_project_keyprjtDef:232638:ESB
project_definition232638
first_region_codeESB
manual_source_formatfalse
project_name154kV 남양주-평내T/L 건설사업
project_name_list154kV 남양주-평내 송전선로 건설사업
purpose3기신도시, 택지지구 조성에 따른 공급능력 확보
project_region_detailNamyangju City, Gyeonggi Province
project_period_raw2023.05~2029.06
project_scale_rawACSR 410㎟×2B×2C×7KM
responsible_office_raw경인건설본부/직할
equipment_type가공송전
headquarters경인건설본부
office직할
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_a4db677a2204f8da
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_c82cfb42038076f7

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_c82cfb42038076f7

Sources EV-4b581f31d996e0bb5b5f20d2
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 a971944766da6d7a56a9c1bd6ed4bcbf6e174b4716264a25c1c8756e8fcec2b3

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel