Power assets and projects · KOR · kepco_planned

154kV 남산(구.직산#2)S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-0fec602fd4d298f9ce059c1c
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_fe8fa323b8dc94b2
stable_project_keyprjtDef:231667:ESB
project_definition231667
first_region_codeESB
manual_source_formatfalse
project_name154kV 남산(구.직산#2)S/S 건설사업
project_name_list154kV 남산S/S 건설사업
purpose천안지역 산단 등 신규부하 공급
project_region_detail충청남도 천안시 서북구
project_period_raw2023.06~2030.07
project_scale_raw154KV M.TR 2BANK(최종4BANK)
responsible_office_raw중부건설본부/직할
equipment_type변전
headquarters중부건설본부
office직할
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_6ce8be56445b9e4b
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_fe8fa323b8dc94b2

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_fe8fa323b8dc94b2

Sources EV-0fec602fd4d298f9ce059c1c
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 608fe8316aca4f48b7d0560aec972b673a116db9d51fdcbb37de9c8c4bcd84e0
Source schedule candidates · KOR · kepco_planned

154kV 남산(구.직산#2)S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2030-07
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231667|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6ce8be56445b9e4b

Sources EV-0261ed92381f3e6a086a470c
Evidence SHA-256 84396e38bca4bde5154dc5dd4594e87d6550fac4c14a1cd72c1061c204521a9a
행 SHA-256 950dde05a2b6f70958c24d5938a35884d57aff7d308a031fe7e91bc371611158
Source schedule candidates · KOR · kepco_planned

154kV 남산(구.직산#2)S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2023-06
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231667|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6ce8be56445b9e4b

Sources EV-0261ed92381f3e6a086a470c
Evidence SHA-256 84396e38bca4bde5154dc5dd4594e87d6550fac4c14a1cd72c1061c204521a9a
행 SHA-256 950dde05a2b6f70958c24d5938a35884d57aff7d308a031fe7e91bc371611158
Source snapshots by date · KOR · kepco_planned

154kV 남산(구.직산#2)S/S 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_6ce8be56445b9e4b
stable_project_idkproj_fe8fa323b8dc94b2
source_key202609|231667|ESB
basic_ym202609
source_stage_raw사업승인-공사착수전
project_name_list154kV 남산S/S 건설사업
project_name_detail154kV 남산(구.직산#2)S/S 건설사업
region_summary_raw충청남도 천안시 서북구등 1 지역
equipment_type_raw변전
headquarters_raw중부건설본부
office_raw직할
section_fields
Project purpose
  • 천안지역 산단 등 신규부하 공급
Project region
  • 충청남도 천안시 서북구
Project period
  • 2023.06~2030.07
사업 규모
  • 154KV M.TR 2BANK(최종4BANK)
담당 사업소
  • 중부건설본부/직할
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 실시설계: 설계담당자: [redacted]
□진행경과 ○ '23.12. 직산#2S/S 입지선정실무위원회/입지확정위원회 구성 및 시행 - 변전소 명칭(직산#2→남산), 인출입선로구성(신설지중) 등 확정 ○ '24. 1. 154kV 남산(구.직산#2)S/S 입지확정 및 결과보고, 용지매수의뢰 - 매매계약체결 및 계약금 지불(1.17), 중도금 지불(3.19) * 잔금지불 : 산단 조성 완료 시(’25.6.예정) ○ '24. 8. 남산변전소 준공목표 단축관련 사업관계자 협의시행(8/8) ○ '24. 9. 천안 북부지역 전력공급능력 확보를 위한 관계기관 회의 ○ '25. 10 잔금 납부 및 용지매수 완료 ○ ’25.12 천안테크노파크 일반산단 개발계획변경 완료 지연(예상 ’26.4월) - 개발계획변경 승인 확인 후 부지인수인계 예정 □향후계획 ○ '28.11 : 변전공사 착공 ○ '30.07 : 준공 및 가압
future_plan_redacted□ 향후계획 □진행경과 ○ '23.12. 직산#2S/S 입지선정실무위원회/입지확정위원회 구성 및 시행 - 변전소 명칭(직산#2→남산), 인출입선로구성(신설지중) 등 확정 ○ '24. 1. 154kV 남산(구.직산#2)S/S 입지확정 및 결과보고, 용지매수의뢰 - 매매계약체결 및 계약금 지불(1.17), 중도금 지불(3.19) * 잔금지불 : 산단 조성 완료 시(’25.6.예정) ○ '24. 8. 남산변전소 준공목표 단축관련 사업관계자 협의시행(8/8) ○ '24. 9. 천안 북부지역 전력공급능력 확보를 위한 관계기관 회의 ○ '25. 10 잔금 납부 및 용지매수 완료 ○ ’25.12 천안테크노파크 일반산단 개발계획변경 완료 지연(예상 ’26.4월) - 개발계획변경 승인 확인 후 부지인수인계 예정 □향후계획 ○ '28.11 : 변전공사 착공 ○ '30.07 : 준공 및 가압
attachment_count0
source_detail_sha25684396e38bca4bde5154dc5dd4594e87d6550fac4c14a1cd72c1061c204521a9a
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231667|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6ce8be56445b9e4b

Sources EV-0261ed92381f3e6a086a470c
Evidence SHA-256 84396e38bca4bde5154dc5dd4594e87d6550fac4c14a1cd72c1061c204521a9a
행 SHA-256 950dde05a2b6f70958c24d5938a35884d57aff7d308a031fe7e91bc371611158
Source snapshots by date · KOR · kepco_planned

154kV 남산(구.직산#2)S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_fe8fa323b8dc94b2
stable_project_keyprjtDef:231667:ESB
project_definition231667
first_region_codeESB
manual_source_formatfalse
project_name154kV 남산(구.직산#2)S/S 건설사업
project_name_list154kV 남산S/S 건설사업
purpose천안지역 산단 등 신규부하 공급
project_region_detail충청남도 천안시 서북구
project_period_raw2023.06~2030.07
project_scale_raw154KV M.TR 2BANK(최종4BANK)
responsible_office_raw중부건설본부/직할
equipment_type변전
headquarters중부건설본부
office직할
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_6ce8be56445b9e4b
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_fe8fa323b8dc94b2

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_fe8fa323b8dc94b2

Sources EV-0fec602fd4d298f9ce059c1c
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 608fe8316aca4f48b7d0560aec972b673a116db9d51fdcbb37de9c8c4bcd84e0

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel