POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 201,406items · current page 1101–1200 · Source records, not unique facilities.

Source schedule candidates · KOR · kepco_planned

154kV 남고창S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231471|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_24e8b04b41de8031

Sources EV-675b08da70c73af171bb4ee6
Evidence SHA-256 4a51416375c119780c5497822234b7bcd3d9416ac21181797a2e511a3ed01f5a
행 SHA-256 75f1b78c1815bb335e5be9e44bf769d73ea05c740e38e8485d276db5b80e67f8
Source schedule candidates · KOR · kepco_planned

154kV 남고창S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2027-01
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231471|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_24e8b04b41de8031

Sources EV-675b08da70c73af171bb4ee6
Evidence SHA-256 4a51416375c119780c5497822234b7bcd3d9416ac21181797a2e511a3ed01f5a
행 SHA-256 75f1b78c1815bb335e5be9e44bf769d73ea05c740e38e8485d276db5b80e67f8
Source schedule candidates · KOR · kepco_planned

154kV 남고창S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-02
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231471|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_24e8b04b41de8031

Sources EV-675b08da70c73af171bb4ee6
Evidence SHA-256 4a51416375c119780c5497822234b7bcd3d9416ac21181797a2e511a3ed01f5a
행 SHA-256 75f1b78c1815bb335e5be9e44bf769d73ea05c740e38e8485d276db5b80e67f8
Source schedule candidates · KOR · kepco_planned

154kV 남고창S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-02
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231471|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_24e8b04b41de8031

Sources EV-675b08da70c73af171bb4ee6
Evidence SHA-256 4a51416375c119780c5497822234b7bcd3d9416ac21181797a2e511a3ed01f5a
행 SHA-256 75f1b78c1815bb335e5be9e44bf769d73ea05c740e38e8485d276db5b80e67f8
Source snapshots by date · KOR · kepco_planned

154kV 남고창S/S 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_24e8b04b41de8031
stable_project_idkproj_d386b04932a3b78f
source_key202609|231471|ESB
basic_ym202609
source_stage_raw사업승인-공사착수전
project_name_list154kV 남고창변전소 건설사업
project_name_detail154kV 남고창S/S 건설사업
region_summary_raw전북특별자치도 고창군등 1 지역
equipment_type_raw변전
headquarters_raw중부건설본부
office_raw전북건설지사
section_fields
Project purpose
  • 고창지역 내 분산형전원 연계용량 확보
Project region
  • 전북특별자치도 고창군
Project period
  • 2018.08~2028.12
사업 규모
  • 154KV M.TR(80MVA) X 2BANK, 170KV GIS X 10CCT
담당 사업소
  • 중부건설본부/전북건설지사
계획확정
  • 제08차 장기송변전설비계획 반영(2018.07)
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 2022.12 ~ 2023.02 실시설계: 설계담당자: [redacted]
[추진실적] □‘18.08 : 제8차 장기 송변전설비계획 사업반영 □‘20.03 ~‘21.11 : 입지선정위원회 운영 및 부지확정 □‘22.05 : 재생E 연계 대용량변전소 적용 □‘22.07 : 편입부지 소유권 이전 완료 □‘23.02 : 기본설계 심의 완료 □‘22.08 ~‘24.02 : 대용량 표준변전소 모델개발 및 경관심의 완료 □‘24.02 : 변전 주자재 계약 완료 [향후계획] □‘27.01 : 공사 착공 □‘28.12 : 변전소 가압
future_plan_redacted□ 향후계획 [추진실적] □‘18.08 : 제8차 장기 송변전설비계획 사업반영 □‘20.03 ~‘21.11 : 입지선정위원회 운영 및 부지확정 □‘22.05 : 재생E 연계 대용량변전소 적용 □‘22.07 : 편입부지 소유권 이전 완료 □‘23.02 : 기본설계 심의 완료 □‘22.08 ~‘24.02 : 대용량 표준변전소 모델개발 및 경관심의 완료 □‘24.02 : 변전 주자재 계약 완료 [향후계획] □‘27.01 : 공사 착공 □‘28.12 : 변전소 가압
attachment_count0
source_detail_sha2564a51416375c119780c5497822234b7bcd3d9416ac21181797a2e511a3ed01f5a
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231471|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_24e8b04b41de8031

Sources EV-675b08da70c73af171bb4ee6
Evidence SHA-256 4a51416375c119780c5497822234b7bcd3d9416ac21181797a2e511a3ed01f5a
행 SHA-256 75f1b78c1815bb335e5be9e44bf769d73ea05c740e38e8485d276db5b80e67f8
Source snapshots by date · KOR · kepco_planned

154kV 남고창S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_d386b04932a3b78f
stable_project_keyprjtDef:231471:ESB
project_definition231471
first_region_codeESB
manual_source_formatfalse
project_name154kV 남고창S/S 건설사업
project_name_list154kV 남고창변전소 건설사업
purpose고창지역 내 분산형전원 연계용량 확보
project_region_detail전북특별자치도 고창군
project_period_raw2018.08~2028.12
project_scale_raw154KV M.TR(80MVA) X 2BANK, 170KV GIS X 10CCT
responsible_office_raw중부건설본부/전북건설지사
equipment_type변전
headquarters중부건설본부
office전북건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_24e8b04b41de8031
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_d386b04932a3b78f

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_d386b04932a3b78f

Sources EV-4e3b6744b5984b47988f754d
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 36b73ce7e13807772c60ad458c04ca73ada517299398b122827da1b387029ce2
Power assets and projects · KOR · kepco_planned

154kV 남고창분기 지중T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-413dc3562f4198a13acf1e2e
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_f8b8f6ef18381003
stable_project_keyprjtDef:233871:ESB
project_definition233871
first_region_codeESB
manual_source_formatfalse
project_name154kV 남고창분기 지중T/L 건설사업
project_name_list154kV 남고창분기 지중송전선로 건설사업
purpose남고창S/S 계통보강
project_region_detail전북특별자치도 고창군
project_period_raw2024.01~2028.12
project_scale_rawXLPE2,000㎟, 4C×0.1㎞
responsible_office_raw중부건설본부/전북건설지사
equipment_type지중송전
headquarters중부건설본부
office전북건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_43332e018e87560e
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_f8b8f6ef18381003

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_f8b8f6ef18381003

Sources EV-413dc3562f4198a13acf1e2e
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 7c3c3c906c1af2fba03917188b222e3bad9c27603b027e030e8050bbd1d91a09
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-07
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233871|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_43332e018e87560e

Sources EV-937965d803e2266c0cc8388b
Evidence SHA-256 c957ccc0e7c565a0a3480722fcf087f823eaa3da415d4fccdd7a868064996724
행 SHA-256 b27e05b857153c0061b49ab7fb96e6522527811f40aa400132abf45baa41dc57
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2018-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233871|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_43332e018e87560e

Sources EV-937965d803e2266c0cc8388b
Evidence SHA-256 c957ccc0e7c565a0a3480722fcf087f823eaa3da415d4fccdd7a868064996724
행 SHA-256 b27e05b857153c0061b49ab7fb96e6522527811f40aa400132abf45baa41dc57
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2024-01
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|233871|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_43332e018e87560e

Sources EV-937965d803e2266c0cc8388b
Evidence SHA-256 c957ccc0e7c565a0a3480722fcf087f823eaa3da415d4fccdd7a868064996724
행 SHA-256 b27e05b857153c0061b49ab7fb96e6522527811f40aa400132abf45baa41dc57
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-07-27
date_precisionday
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233871|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_43332e018e87560e

Sources EV-937965d803e2266c0cc8388b
Evidence SHA-256 c957ccc0e7c565a0a3480722fcf087f823eaa3da415d4fccdd7a868064996724
행 SHA-256 b27e05b857153c0061b49ab7fb96e6522527811f40aa400132abf45baa41dc57
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2025-02
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233871|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_43332e018e87560e

Sources EV-937965d803e2266c0cc8388b
Evidence SHA-256 c957ccc0e7c565a0a3480722fcf087f823eaa3da415d4fccdd7a868064996724
행 SHA-256 b27e05b857153c0061b49ab7fb96e6522527811f40aa400132abf45baa41dc57
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_completion
date2028-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233871|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_43332e018e87560e

Sources EV-937965d803e2266c0cc8388b
Evidence SHA-256 c957ccc0e7c565a0a3480722fcf087f823eaa3da415d4fccdd7a868064996724
행 SHA-256 b27e05b857153c0061b49ab7fb96e6522527811f40aa400132abf45baa41dc57
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_completion
date2024-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233871|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_43332e018e87560e

Sources EV-937965d803e2266c0cc8388b
Evidence SHA-256 c957ccc0e7c565a0a3480722fcf087f823eaa3da415d4fccdd7a868064996724
행 SHA-256 b27e05b857153c0061b49ab7fb96e6522527811f40aa400132abf45baa41dc57
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2028-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233871|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_43332e018e87560e

Sources EV-937965d803e2266c0cc8388b
Evidence SHA-256 c957ccc0e7c565a0a3480722fcf087f823eaa3da415d4fccdd7a868064996724
행 SHA-256 b27e05b857153c0061b49ab7fb96e6522527811f40aa400132abf45baa41dc57
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-02
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233871|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_43332e018e87560e

Sources EV-937965d803e2266c0cc8388b
Evidence SHA-256 c957ccc0e7c565a0a3480722fcf087f823eaa3da415d4fccdd7a868064996724
행 SHA-256 b27e05b857153c0061b49ab7fb96e6522527811f40aa400132abf45baa41dc57
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2024-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233871|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_43332e018e87560e

Sources EV-937965d803e2266c0cc8388b
Evidence SHA-256 c957ccc0e7c565a0a3480722fcf087f823eaa3da415d4fccdd7a868064996724
행 SHA-256 b27e05b857153c0061b49ab7fb96e6522527811f40aa400132abf45baa41dc57
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2028-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|233871|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_43332e018e87560e

Sources EV-937965d803e2266c0cc8388b
Evidence SHA-256 c957ccc0e7c565a0a3480722fcf087f823eaa3da415d4fccdd7a868064996724
행 SHA-256 b27e05b857153c0061b49ab7fb96e6522527811f40aa400132abf45baa41dc57
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2022-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233871|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_43332e018e87560e

Sources EV-937965d803e2266c0cc8388b
Evidence SHA-256 c957ccc0e7c565a0a3480722fcf087f823eaa3da415d4fccdd7a868064996724
행 SHA-256 b27e05b857153c0061b49ab7fb96e6522527811f40aa400132abf45baa41dc57
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2025-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233871|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_43332e018e87560e

Sources EV-937965d803e2266c0cc8388b
Evidence SHA-256 c957ccc0e7c565a0a3480722fcf087f823eaa3da415d4fccdd7a868064996724
행 SHA-256 b27e05b857153c0061b49ab7fb96e6522527811f40aa400132abf45baa41dc57
Source snapshots by date · KOR · kepco_planned

154kV 남고창분기 지중T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_43332e018e87560e
stable_project_idkproj_f8b8f6ef18381003
source_key202609|233871|ESB
basic_ym202609
source_stage_raw사업승인-공사착수전
project_name_list154kV 남고창분기 지중송전선로 건설사업
project_name_detail154kV 남고창분기 지중T/L 건설사업
region_summary_raw전북특별자치도 고창군등 1 지역
equipment_type_raw지중송전
headquarters_raw중부건설본부
office_raw전북건설지사
section_fields
Project purpose
  • 남고창S/S 계통보강
Project region
  • 전북특별자치도 고창군
Project period
  • 2024.01~2028.12
사업 규모
  • XLPE2,000㎟, 4C×0.1㎞
담당 사업소
  • 중부건설본부/전북건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 2024.02 ~ 2024.07 실시설계: 설계담당자: [redacted]
[진행경과] □ '18.07 제8차 장기송변전설비계획 신규사업 반영 □ '22.07 남고창변전소 부지 확정 - 관련문서 전북건(송변)-1143(2022.7.27.) □ '24.06 송변전 설비계획 적정성 검토에 따른 준공목표 변경 - 준공목표 : '25년 2월 → '25년 12월 □ '24.07 지중사업 기본설계 완료 및 확정 □ '25.02 중장기 송변전설비계획 적정성 검토에 따른 준공목표 변경 - 준공목표 : ’25.12 → ‘28.12 [향후계획] □ '28.04 케이블공사 설계완료
future_plan_redacted□ 향후계획 [진행경과] □ '18.07 제8차 장기송변전설비계획 신규사업 반영 □ '22.07 남고창변전소 부지 확정 - 관련문서 전북건(송변)-1143(2022.7.27.) □ '24.06 송변전 설비계획 적정성 검토에 따른 준공목표 변경 - 준공목표 : '25년 2월 → '25년 12월 □ '24.07 지중사업 기본설계 완료 및 확정 □ '25.02 중장기 송변전설비계획 적정성 검토에 따른 준공목표 변경 - 준공목표 : ’25.12 → ‘28.12 [향후계획] □ '28.04 케이블공사 설계완료
attachment_count0
source_detail_sha256c957ccc0e7c565a0a3480722fcf087f823eaa3da415d4fccdd7a868064996724
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|233871|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_43332e018e87560e

Sources EV-937965d803e2266c0cc8388b
Evidence SHA-256 c957ccc0e7c565a0a3480722fcf087f823eaa3da415d4fccdd7a868064996724
행 SHA-256 b27e05b857153c0061b49ab7fb96e6522527811f40aa400132abf45baa41dc57
Source snapshots by date · KOR · kepco_planned

154kV 남고창분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_f8b8f6ef18381003
stable_project_keyprjtDef:233871:ESB
project_definition233871
first_region_codeESB
manual_source_formatfalse
project_name154kV 남고창분기 지중T/L 건설사업
project_name_list154kV 남고창분기 지중송전선로 건설사업
purpose남고창S/S 계통보강
project_region_detail전북특별자치도 고창군
project_period_raw2024.01~2028.12
project_scale_rawXLPE2,000㎟, 4C×0.1㎞
responsible_office_raw중부건설본부/전북건설지사
equipment_type지중송전
headquarters중부건설본부
office전북건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_43332e018e87560e
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_f8b8f6ef18381003

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_f8b8f6ef18381003

Sources EV-413dc3562f4198a13acf1e2e
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 7c3c3c906c1af2fba03917188b222e3bad9c27603b027e030e8050bbd1d91a09
Power assets and projects · KOR · kepco_planned

154kV 남고창분기T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-464203744b97e37e217ba3c2
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_9e92755a92d2313a
stable_project_keyprjtDef:232561:ESB
project_definition232561
first_region_codeESB
manual_source_formatfalse
project_name154kV 남고창분기T/L 건설사업
project_name_list154kV 남고창분기 송전선로 건설사업
purpose고창지역 분산형전원 접속능력 확보
project_region_detail전북특별자치도 고창군
project_period_raw2018.06~2028.12
project_scale_rawPIAC 330㎟×S × 4C, 0.352KM
responsible_office_raw중부건설본부/전북건설지사
equipment_type가공송전
headquarters중부건설본부
office전북건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_58098edb6d80bbb8
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_9e92755a92d2313a

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_9e92755a92d2313a

Sources EV-464203744b97e37e217ba3c2
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 2536662e7d39c605c45192f53a314745e3286ccac6a3926476c316f6c04b9c11
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2028-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232561|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_58098edb6d80bbb8

Sources EV-9506f0f6e523911a9cce9ecf
Evidence SHA-256 7e8690684e0cc437794c6d16f2edda2e1c63d61bf5dee2ae95960cba790d3ad5
행 SHA-256 9499fac69f2638182ccf98d4c1fb84b6f8f665ce51474c20861656dfdbe9147a
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232561|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_58098edb6d80bbb8

Sources EV-9506f0f6e523911a9cce9ecf
Evidence SHA-256 7e8690684e0cc437794c6d16f2edda2e1c63d61bf5dee2ae95960cba790d3ad5
행 SHA-256 9499fac69f2638182ccf98d4c1fb84b6f8f665ce51474c20861656dfdbe9147a
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2018-06
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232561|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_58098edb6d80bbb8

Sources EV-9506f0f6e523911a9cce9ecf
Evidence SHA-256 7e8690684e0cc437794c6d16f2edda2e1c63d61bf5dee2ae95960cba790d3ad5
행 SHA-256 9499fac69f2638182ccf98d4c1fb84b6f8f665ce51474c20861656dfdbe9147a
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-10
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232561|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_58098edb6d80bbb8

Sources EV-9506f0f6e523911a9cce9ecf
Evidence SHA-256 7e8690684e0cc437794c6d16f2edda2e1c63d61bf5dee2ae95960cba790d3ad5
행 SHA-256 9499fac69f2638182ccf98d4c1fb84b6f8f665ce51474c20861656dfdbe9147a
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeplan_change
date2026-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232561|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_58098edb6d80bbb8

Sources EV-9506f0f6e523911a9cce9ecf
Evidence SHA-256 7e8690684e0cc437794c6d16f2edda2e1c63d61bf5dee2ae95960cba790d3ad5
행 SHA-256 9499fac69f2638182ccf98d4c1fb84b6f8f665ce51474c20861656dfdbe9147a
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeplan_change
date2026-08
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232561|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_58098edb6d80bbb8

Sources EV-9506f0f6e523911a9cce9ecf
Evidence SHA-256 7e8690684e0cc437794c6d16f2edda2e1c63d61bf5dee2ae95960cba790d3ad5
행 SHA-256 9499fac69f2638182ccf98d4c1fb84b6f8f665ce51474c20861656dfdbe9147a
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeimplementation_plan_approval
date2023-10
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232561|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_58098edb6d80bbb8

Sources EV-9506f0f6e523911a9cce9ecf
Evidence SHA-256 7e8690684e0cc437794c6d16f2edda2e1c63d61bf5dee2ae95960cba790d3ad5
행 SHA-256 9499fac69f2638182ccf98d4c1fb84b6f8f665ce51474c20861656dfdbe9147a
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeplan_change
date2024-05
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232561|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_58098edb6d80bbb8

Sources EV-9506f0f6e523911a9cce9ecf
Evidence SHA-256 7e8690684e0cc437794c6d16f2edda2e1c63d61bf5dee2ae95960cba790d3ad5
행 SHA-256 9499fac69f2638182ccf98d4c1fb84b6f8f665ce51474c20861656dfdbe9147a
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-06
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232561|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_58098edb6d80bbb8

Sources EV-9506f0f6e523911a9cce9ecf
Evidence SHA-256 7e8690684e0cc437794c6d16f2edda2e1c63d61bf5dee2ae95960cba790d3ad5
행 SHA-256 9499fac69f2638182ccf98d4c1fb84b6f8f665ce51474c20861656dfdbe9147a
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2027-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232561|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_58098edb6d80bbb8

Sources EV-9506f0f6e523911a9cce9ecf
Evidence SHA-256 7e8690684e0cc437794c6d16f2edda2e1c63d61bf5dee2ae95960cba790d3ad5
행 SHA-256 9499fac69f2638182ccf98d4c1fb84b6f8f665ce51474c20861656dfdbe9147a
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-07
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232561|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_58098edb6d80bbb8

Sources EV-9506f0f6e523911a9cce9ecf
Evidence SHA-256 7e8690684e0cc437794c6d16f2edda2e1c63d61bf5dee2ae95960cba790d3ad5
행 SHA-256 9499fac69f2638182ccf98d4c1fb84b6f8f665ce51474c20861656dfdbe9147a
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2021-06
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232561|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_58098edb6d80bbb8

Sources EV-9506f0f6e523911a9cce9ecf
Evidence SHA-256 7e8690684e0cc437794c6d16f2edda2e1c63d61bf5dee2ae95960cba790d3ad5
행 SHA-256 9499fac69f2638182ccf98d4c1fb84b6f8f665ce51474c20861656dfdbe9147a
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-03
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232561|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_58098edb6d80bbb8

Sources EV-9506f0f6e523911a9cce9ecf
Evidence SHA-256 7e8690684e0cc437794c6d16f2edda2e1c63d61bf5dee2ae95960cba790d3ad5
행 SHA-256 9499fac69f2638182ccf98d4c1fb84b6f8f665ce51474c20861656dfdbe9147a
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-05
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232561|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_58098edb6d80bbb8

Sources EV-9506f0f6e523911a9cce9ecf
Evidence SHA-256 7e8690684e0cc437794c6d16f2edda2e1c63d61bf5dee2ae95960cba790d3ad5
행 SHA-256 9499fac69f2638182ccf98d4c1fb84b6f8f665ce51474c20861656dfdbe9147a
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-09
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232561|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_58098edb6d80bbb8

Sources EV-9506f0f6e523911a9cce9ecf
Evidence SHA-256 7e8690684e0cc437794c6d16f2edda2e1c63d61bf5dee2ae95960cba790d3ad5
행 SHA-256 9499fac69f2638182ccf98d4c1fb84b6f8f665ce51474c20861656dfdbe9147a
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-01
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232561|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_58098edb6d80bbb8

Sources EV-9506f0f6e523911a9cce9ecf
Evidence SHA-256 7e8690684e0cc437794c6d16f2edda2e1c63d61bf5dee2ae95960cba790d3ad5
행 SHA-256 9499fac69f2638182ccf98d4c1fb84b6f8f665ce51474c20861656dfdbe9147a
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2018-06
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232561|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_58098edb6d80bbb8

Sources EV-9506f0f6e523911a9cce9ecf
Evidence SHA-256 7e8690684e0cc437794c6d16f2edda2e1c63d61bf5dee2ae95960cba790d3ad5
행 SHA-256 9499fac69f2638182ccf98d4c1fb84b6f8f665ce51474c20861656dfdbe9147a
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-06
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232561|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_58098edb6d80bbb8

Sources EV-9506f0f6e523911a9cce9ecf
Evidence SHA-256 7e8690684e0cc437794c6d16f2edda2e1c63d61bf5dee2ae95960cba790d3ad5
행 SHA-256 9499fac69f2638182ccf98d4c1fb84b6f8f665ce51474c20861656dfdbe9147a
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2021-10
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232561|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_58098edb6d80bbb8

Sources EV-9506f0f6e523911a9cce9ecf
Evidence SHA-256 7e8690684e0cc437794c6d16f2edda2e1c63d61bf5dee2ae95960cba790d3ad5
행 SHA-256 9499fac69f2638182ccf98d4c1fb84b6f8f665ce51474c20861656dfdbe9147a
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2020-08
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232561|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_58098edb6d80bbb8

Sources EV-9506f0f6e523911a9cce9ecf
Evidence SHA-256 7e8690684e0cc437794c6d16f2edda2e1c63d61bf5dee2ae95960cba790d3ad5
행 SHA-256 9499fac69f2638182ccf98d4c1fb84b6f8f665ce51474c20861656dfdbe9147a
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2019-05
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232561|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_58098edb6d80bbb8

Sources EV-9506f0f6e523911a9cce9ecf
Evidence SHA-256 7e8690684e0cc437794c6d16f2edda2e1c63d61bf5dee2ae95960cba790d3ad5
행 SHA-256 9499fac69f2638182ccf98d4c1fb84b6f8f665ce51474c20861656dfdbe9147a
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-03
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232561|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_58098edb6d80bbb8

Sources EV-9506f0f6e523911a9cce9ecf
Evidence SHA-256 7e8690684e0cc437794c6d16f2edda2e1c63d61bf5dee2ae95960cba790d3ad5
행 SHA-256 9499fac69f2638182ccf98d4c1fb84b6f8f665ce51474c20861656dfdbe9147a
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-11
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232561|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_58098edb6d80bbb8

Sources EV-9506f0f6e523911a9cce9ecf
Evidence SHA-256 7e8690684e0cc437794c6d16f2edda2e1c63d61bf5dee2ae95960cba790d3ad5
행 SHA-256 9499fac69f2638182ccf98d4c1fb84b6f8f665ce51474c20861656dfdbe9147a
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-05
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232561|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_58098edb6d80bbb8

Sources EV-9506f0f6e523911a9cce9ecf
Evidence SHA-256 7e8690684e0cc437794c6d16f2edda2e1c63d61bf5dee2ae95960cba790d3ad5
행 SHA-256 9499fac69f2638182ccf98d4c1fb84b6f8f665ce51474c20861656dfdbe9147a
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-08
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232561|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_58098edb6d80bbb8

Sources EV-9506f0f6e523911a9cce9ecf
Evidence SHA-256 7e8690684e0cc437794c6d16f2edda2e1c63d61bf5dee2ae95960cba790d3ad5
행 SHA-256 9499fac69f2638182ccf98d4c1fb84b6f8f665ce51474c20861656dfdbe9147a
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2020-08
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232561|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_58098edb6d80bbb8

Sources EV-9506f0f6e523911a9cce9ecf
Evidence SHA-256 7e8690684e0cc437794c6d16f2edda2e1c63d61bf5dee2ae95960cba790d3ad5
행 SHA-256 9499fac69f2638182ccf98d4c1fb84b6f8f665ce51474c20861656dfdbe9147a
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeimplementation_plan_approval
date2022-05
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232561|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_58098edb6d80bbb8

Sources EV-9506f0f6e523911a9cce9ecf
Evidence SHA-256 7e8690684e0cc437794c6d16f2edda2e1c63d61bf5dee2ae95960cba790d3ad5
행 SHA-256 9499fac69f2638182ccf98d4c1fb84b6f8f665ce51474c20861656dfdbe9147a
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-12
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232561|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_58098edb6d80bbb8

Sources EV-9506f0f6e523911a9cce9ecf
Evidence SHA-256 7e8690684e0cc437794c6d16f2edda2e1c63d61bf5dee2ae95960cba790d3ad5
행 SHA-256 9499fac69f2638182ccf98d4c1fb84b6f8f665ce51474c20861656dfdbe9147a
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2025-02
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232561|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_58098edb6d80bbb8

Sources EV-9506f0f6e523911a9cce9ecf
Evidence SHA-256 7e8690684e0cc437794c6d16f2edda2e1c63d61bf5dee2ae95960cba790d3ad5
행 SHA-256 9499fac69f2638182ccf98d4c1fb84b6f8f665ce51474c20861656dfdbe9147a
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-08
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232561|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_58098edb6d80bbb8

Sources EV-9506f0f6e523911a9cce9ecf
Evidence SHA-256 7e8690684e0cc437794c6d16f2edda2e1c63d61bf5dee2ae95960cba790d3ad5
행 SHA-256 9499fac69f2638182ccf98d4c1fb84b6f8f665ce51474c20861656dfdbe9147a
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2025-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232561|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_58098edb6d80bbb8

Sources EV-9506f0f6e523911a9cce9ecf
Evidence SHA-256 7e8690684e0cc437794c6d16f2edda2e1c63d61bf5dee2ae95960cba790d3ad5
행 SHA-256 9499fac69f2638182ccf98d4c1fb84b6f8f665ce51474c20861656dfdbe9147a
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-05
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232561|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_58098edb6d80bbb8

Sources EV-9506f0f6e523911a9cce9ecf
Evidence SHA-256 7e8690684e0cc437794c6d16f2edda2e1c63d61bf5dee2ae95960cba790d3ad5
행 SHA-256 9499fac69f2638182ccf98d4c1fb84b6f8f665ce51474c20861656dfdbe9147a
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2028-12
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232561|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_58098edb6d80bbb8

Sources EV-9506f0f6e523911a9cce9ecf
Evidence SHA-256 7e8690684e0cc437794c6d16f2edda2e1c63d61bf5dee2ae95960cba790d3ad5
행 SHA-256 9499fac69f2638182ccf98d4c1fb84b6f8f665ce51474c20861656dfdbe9147a
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeimplementation_plan_approval
date2026-07
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232561|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_58098edb6d80bbb8

Sources EV-9506f0f6e523911a9cce9ecf
Evidence SHA-256 7e8690684e0cc437794c6d16f2edda2e1c63d61bf5dee2ae95960cba790d3ad5
행 SHA-256 9499fac69f2638182ccf98d4c1fb84b6f8f665ce51474c20861656dfdbe9147a
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeplan_change
date2024-12
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232561|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_58098edb6d80bbb8

Sources EV-9506f0f6e523911a9cce9ecf
Evidence SHA-256 7e8690684e0cc437794c6d16f2edda2e1c63d61bf5dee2ae95960cba790d3ad5
행 SHA-256 9499fac69f2638182ccf98d4c1fb84b6f8f665ce51474c20861656dfdbe9147a
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-03
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232561|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_58098edb6d80bbb8

Sources EV-9506f0f6e523911a9cce9ecf
Evidence SHA-256 7e8690684e0cc437794c6d16f2edda2e1c63d61bf5dee2ae95960cba790d3ad5
행 SHA-256 9499fac69f2638182ccf98d4c1fb84b6f8f665ce51474c20861656dfdbe9147a
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232561|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_58098edb6d80bbb8

Sources EV-9506f0f6e523911a9cce9ecf
Evidence SHA-256 7e8690684e0cc437794c6d16f2edda2e1c63d61bf5dee2ae95960cba790d3ad5
행 SHA-256 9499fac69f2638182ccf98d4c1fb84b6f8f665ce51474c20861656dfdbe9147a
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-06
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232561|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_58098edb6d80bbb8

Sources EV-9506f0f6e523911a9cce9ecf
Evidence SHA-256 7e8690684e0cc437794c6d16f2edda2e1c63d61bf5dee2ae95960cba790d3ad5
행 SHA-256 9499fac69f2638182ccf98d4c1fb84b6f8f665ce51474c20861656dfdbe9147a
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeplan_change
date2026-07
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232561|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_58098edb6d80bbb8

Sources EV-9506f0f6e523911a9cce9ecf
Evidence SHA-256 7e8690684e0cc437794c6d16f2edda2e1c63d61bf5dee2ae95960cba790d3ad5
행 SHA-256 9499fac69f2638182ccf98d4c1fb84b6f8f665ce51474c20861656dfdbe9147a
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-06
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232561|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_58098edb6d80bbb8

Sources EV-9506f0f6e523911a9cce9ecf
Evidence SHA-256 7e8690684e0cc437794c6d16f2edda2e1c63d61bf5dee2ae95960cba790d3ad5
행 SHA-256 9499fac69f2638182ccf98d4c1fb84b6f8f665ce51474c20861656dfdbe9147a
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-05
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232561|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_58098edb6d80bbb8

Sources EV-9506f0f6e523911a9cce9ecf
Evidence SHA-256 7e8690684e0cc437794c6d16f2edda2e1c63d61bf5dee2ae95960cba790d3ad5
행 SHA-256 9499fac69f2638182ccf98d4c1fb84b6f8f665ce51474c20861656dfdbe9147a
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-12
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232561|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_58098edb6d80bbb8

Sources EV-9506f0f6e523911a9cce9ecf
Evidence SHA-256 7e8690684e0cc437794c6d16f2edda2e1c63d61bf5dee2ae95960cba790d3ad5
행 SHA-256 9499fac69f2638182ccf98d4c1fb84b6f8f665ce51474c20861656dfdbe9147a
Source snapshots by date · KOR · kepco_planned

154kV 남고창분기T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_58098edb6d80bbb8
stable_project_idkproj_9e92755a92d2313a
source_key202609|232561|ESB
basic_ym202609
source_stage_raw사업승인-공사착수전
project_name_list154kV 남고창분기 송전선로 건설사업
project_name_detail154kV 남고창분기T/L 건설사업
region_summary_raw전북특별자치도 고창군등 1 지역
equipment_type_raw가공송전
headquarters_raw중부건설본부
office_raw전북건설지사
section_fields
Project purpose
  • 고창지역 분산형전원 접속능력 확보
Project region
  • 전북특별자치도 고창군
Project period
  • 2018.06~2028.12
사업 규모
  • PIAC 330㎟×S × 4C, 0.352KM
담당 사업소
  • 중부건설본부/전북건설지사
계획확정
  • 제08차 장기송변전설비계획 반영(2019.05)
입지선정
  • 전력입지영향평가 용역 착수: 2020.08 입지선정위원회 구성시기: 2021.03 참여 위원 수 : 13 지장유무 조회: 2021.06~2021.06 경과지(부지) 확정: 2021.10
환경/재해 영향평가
  • 환경영향평가: 2022.04 ~ 2022.12 재해영향평가: 2022.04 ~ 2023.08
주민의견 수렴
  • 지자체 공고 열람: 2022.05 ~ 2022.05 설명회·공청회: 2022.05 자체설명회: 2021.06 ~ 2021.06
입지선정 및 주민의견 수렴 주요 내용
  • □ '18.06 : 제8차 장기 송변전설비계획 반영 □ '20.08 : 전력영향평가 용역 착수 □ '21.03 ~ 06 : 입지선정위원회 개최(4회) □ '21.06 : 사전 주민설명회 개최 □ '21.09 : 상생협의체 구성 및 회의 시행(3회) □ '21.10 : 입지확정위원회 개최 (입지 최종 확정) □ '22.05 : 사업시행계획 공고·열람 및 주민설명회 시행 □ '22.05 : 전원개발사업 실시계획 승인 신청 □ '23.10 : 전원개발사업 실시계획 승인 고시 □ '24.05 : 전원개발사업 실시계획 변경승인 신청 - 사유 : 전원설비(철탑)의 위치 변경 □ '24.12 : 전원개발사업 실시계획 변경승인 고시 □ '25.02 : 설비계획 변경에 따른 준공목표 변경('25.12 → '28.12) □ '26.07 : 전원개발사업 실시계획 변경신고 - 사유 : 사업시행기간 변경 □ '26.07 : 사업시행계획 공고·열람 및 주민설명회 시행 - 사유 : 송전선로 시공방안 변경
전원개발사업 실시계획 승인
  • 2026.07
사업설계
  • 설계용역: 기본설계: 2022.11 ~ 2022.12 실시설계: 2023.01 ~ 2024.08 설계담당자: [redacted]
□ '26.08 : 전원개발사업 실시계획 변경승인(2차) 준비 - 사유 : 송전선로 시공방안 변경(휴전 제약에 따른 휴전작업 최소화) □ '26.09 : 전원개발사업 실시계획 변경승인 신청 □ '27.07 : 송전선로 공사 착공
future_plan_redacted□ 향후계획 □ '26.08 : 전원개발사업 실시계획 변경승인(2차) 준비 - 사유 : 송전선로 시공방안 변경(휴전 제약에 따른 휴전작업 최소화) □ '26.09 : 전원개발사업 실시계획 변경승인 신청 □ '27.07 : 송전선로 공사 착공
attachment_count0
source_detail_sha2567e8690684e0cc437794c6d16f2edda2e1c63d61bf5dee2ae95960cba790d3ad5
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|232561|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_58098edb6d80bbb8

Sources EV-9506f0f6e523911a9cce9ecf
Evidence SHA-256 7e8690684e0cc437794c6d16f2edda2e1c63d61bf5dee2ae95960cba790d3ad5
행 SHA-256 9499fac69f2638182ccf98d4c1fb84b6f8f665ce51474c20861656dfdbe9147a
Source snapshots by date · KOR · kepco_planned

154kV 남고창분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_9e92755a92d2313a
stable_project_keyprjtDef:232561:ESB
project_definition232561
first_region_codeESB
manual_source_formatfalse
project_name154kV 남고창분기T/L 건설사업
project_name_list154kV 남고창분기 송전선로 건설사업
purpose고창지역 분산형전원 접속능력 확보
project_region_detail전북특별자치도 고창군
project_period_raw2018.06~2028.12
project_scale_rawPIAC 330㎟×S × 4C, 0.352KM
responsible_office_raw중부건설본부/전북건설지사
equipment_type가공송전
headquarters중부건설본부
office전북건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_58098edb6d80bbb8
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_9e92755a92d2313a

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_9e92755a92d2313a

Sources EV-464203744b97e37e217ba3c2
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 2536662e7d39c605c45192f53a314745e3286ccac6a3926476c316f6c04b9c11
Power assets and projects · KOR · kepco_planned

154kV 남공주S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-1210c0744cd35631853be47c
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_d6b08b9a5dc76977
stable_project_keyprjtDef:231334:ESB
project_definition231334
first_region_codeESB
manual_source_formatfalse
project_name154kV 남공주S/S 건설사업
project_name_list154kV 남공주S/S 건설사
purpose남공주산업단지 부하공급 및 인근변전소 부하분담
project_region_detail충청남도 공주시
project_period_raw2014.02~2025.10
project_scale_raw45/60MVA X 2BANK
responsible_office_raw중부건설본부/직할
equipment_type변전
headquarters중부건설본부
office직할
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_7c5fb5c4cae6154a
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_d6b08b9a5dc76977

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_d6b08b9a5dc76977

Sources EV-1210c0744cd35631853be47c
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 3f9463854a14a5eb5c1e76493649dfdc6b842f7f92c581be69aa25f1fde8ed42
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2014-02
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2019-08
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeplan_change
date2023-03-30
date_precisionday
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-09
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-07
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2019-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeplan_change
date2023-03
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-08
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2024-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-09
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2021-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-02
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2013-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-08
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeplan_change
date2020-11
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2020-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-02
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2015-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2025-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2019-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-08
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-03
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2014-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-03
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel