POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 16items · current page 1–16 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 남고창분기 지중T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-413dc3562f4198a13acf1e2e
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_f8b8f6ef18381003
stable_project_keyprjtDef:233871:ESB
project_definition233871
first_region_codeESB
manual_source_formatfalse
project_name154kV 남고창분기 지중T/L 건설사업
project_name_list154kV 남고창분기 지중송전선로 건설사업
purpose남고창S/S 계통보강
project_region_detail전북특별자치도 고창군
project_period_raw2024.01~2028.12
project_scale_rawXLPE2,000㎟, 4C×0.1㎞
responsible_office_raw중부건설본부/전북건설지사
equipment_type지중송전
headquarters중부건설본부
office전북건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_43332e018e87560e
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_f8b8f6ef18381003

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_f8b8f6ef18381003

Sources EV-413dc3562f4198a13acf1e2e
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 7c3c3c906c1af2fba03917188b222e3bad9c27603b027e030e8050bbd1d91a09
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-07
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233871|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_43332e018e87560e

Sources EV-937965d803e2266c0cc8388b
Evidence SHA-256 c957ccc0e7c565a0a3480722fcf087f823eaa3da415d4fccdd7a868064996724
행 SHA-256 b27e05b857153c0061b49ab7fb96e6522527811f40aa400132abf45baa41dc57
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2018-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233871|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_43332e018e87560e

Sources EV-937965d803e2266c0cc8388b
Evidence SHA-256 c957ccc0e7c565a0a3480722fcf087f823eaa3da415d4fccdd7a868064996724
행 SHA-256 b27e05b857153c0061b49ab7fb96e6522527811f40aa400132abf45baa41dc57
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2024-01
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|233871|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_43332e018e87560e

Sources EV-937965d803e2266c0cc8388b
Evidence SHA-256 c957ccc0e7c565a0a3480722fcf087f823eaa3da415d4fccdd7a868064996724
행 SHA-256 b27e05b857153c0061b49ab7fb96e6522527811f40aa400132abf45baa41dc57
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-07-27
date_precisionday
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233871|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_43332e018e87560e

Sources EV-937965d803e2266c0cc8388b
Evidence SHA-256 c957ccc0e7c565a0a3480722fcf087f823eaa3da415d4fccdd7a868064996724
행 SHA-256 b27e05b857153c0061b49ab7fb96e6522527811f40aa400132abf45baa41dc57
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2025-02
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233871|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_43332e018e87560e

Sources EV-937965d803e2266c0cc8388b
Evidence SHA-256 c957ccc0e7c565a0a3480722fcf087f823eaa3da415d4fccdd7a868064996724
행 SHA-256 b27e05b857153c0061b49ab7fb96e6522527811f40aa400132abf45baa41dc57
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_completion
date2028-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233871|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_43332e018e87560e

Sources EV-937965d803e2266c0cc8388b
Evidence SHA-256 c957ccc0e7c565a0a3480722fcf087f823eaa3da415d4fccdd7a868064996724
행 SHA-256 b27e05b857153c0061b49ab7fb96e6522527811f40aa400132abf45baa41dc57
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_completion
date2024-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233871|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_43332e018e87560e

Sources EV-937965d803e2266c0cc8388b
Evidence SHA-256 c957ccc0e7c565a0a3480722fcf087f823eaa3da415d4fccdd7a868064996724
행 SHA-256 b27e05b857153c0061b49ab7fb96e6522527811f40aa400132abf45baa41dc57
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2028-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233871|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_43332e018e87560e

Sources EV-937965d803e2266c0cc8388b
Evidence SHA-256 c957ccc0e7c565a0a3480722fcf087f823eaa3da415d4fccdd7a868064996724
행 SHA-256 b27e05b857153c0061b49ab7fb96e6522527811f40aa400132abf45baa41dc57
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-02
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233871|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_43332e018e87560e

Sources EV-937965d803e2266c0cc8388b
Evidence SHA-256 c957ccc0e7c565a0a3480722fcf087f823eaa3da415d4fccdd7a868064996724
행 SHA-256 b27e05b857153c0061b49ab7fb96e6522527811f40aa400132abf45baa41dc57
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2024-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233871|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_43332e018e87560e

Sources EV-937965d803e2266c0cc8388b
Evidence SHA-256 c957ccc0e7c565a0a3480722fcf087f823eaa3da415d4fccdd7a868064996724
행 SHA-256 b27e05b857153c0061b49ab7fb96e6522527811f40aa400132abf45baa41dc57
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2028-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|233871|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_43332e018e87560e

Sources EV-937965d803e2266c0cc8388b
Evidence SHA-256 c957ccc0e7c565a0a3480722fcf087f823eaa3da415d4fccdd7a868064996724
행 SHA-256 b27e05b857153c0061b49ab7fb96e6522527811f40aa400132abf45baa41dc57
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2022-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233871|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_43332e018e87560e

Sources EV-937965d803e2266c0cc8388b
Evidence SHA-256 c957ccc0e7c565a0a3480722fcf087f823eaa3da415d4fccdd7a868064996724
행 SHA-256 b27e05b857153c0061b49ab7fb96e6522527811f40aa400132abf45baa41dc57
Source schedule candidates · KOR · kepco_planned

154kV 남고창분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2025-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233871|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_43332e018e87560e

Sources EV-937965d803e2266c0cc8388b
Evidence SHA-256 c957ccc0e7c565a0a3480722fcf087f823eaa3da415d4fccdd7a868064996724
행 SHA-256 b27e05b857153c0061b49ab7fb96e6522527811f40aa400132abf45baa41dc57
Source snapshots by date · KOR · kepco_planned

154kV 남고창분기 지중T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_43332e018e87560e
stable_project_idkproj_f8b8f6ef18381003
source_key202609|233871|ESB
basic_ym202609
source_stage_raw사업승인-공사착수전
project_name_list154kV 남고창분기 지중송전선로 건설사업
project_name_detail154kV 남고창분기 지중T/L 건설사업
region_summary_raw전북특별자치도 고창군등 1 지역
equipment_type_raw지중송전
headquarters_raw중부건설본부
office_raw전북건설지사
section_fields
Project purpose
  • 남고창S/S 계통보강
Project region
  • 전북특별자치도 고창군
Project period
  • 2024.01~2028.12
사업 규모
  • XLPE2,000㎟, 4C×0.1㎞
담당 사업소
  • 중부건설본부/전북건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 2024.02 ~ 2024.07 실시설계: 설계담당자: [redacted]
[진행경과] □ '18.07 제8차 장기송변전설비계획 신규사업 반영 □ '22.07 남고창변전소 부지 확정 - 관련문서 전북건(송변)-1143(2022.7.27.) □ '24.06 송변전 설비계획 적정성 검토에 따른 준공목표 변경 - 준공목표 : '25년 2월 → '25년 12월 □ '24.07 지중사업 기본설계 완료 및 확정 □ '25.02 중장기 송변전설비계획 적정성 검토에 따른 준공목표 변경 - 준공목표 : ’25.12 → ‘28.12 [향후계획] □ '28.04 케이블공사 설계완료
future_plan_redacted□ 향후계획 [진행경과] □ '18.07 제8차 장기송변전설비계획 신규사업 반영 □ '22.07 남고창변전소 부지 확정 - 관련문서 전북건(송변)-1143(2022.7.27.) □ '24.06 송변전 설비계획 적정성 검토에 따른 준공목표 변경 - 준공목표 : '25년 2월 → '25년 12월 □ '24.07 지중사업 기본설계 완료 및 확정 □ '25.02 중장기 송변전설비계획 적정성 검토에 따른 준공목표 변경 - 준공목표 : ’25.12 → ‘28.12 [향후계획] □ '28.04 케이블공사 설계완료
attachment_count0
source_detail_sha256c957ccc0e7c565a0a3480722fcf087f823eaa3da415d4fccdd7a868064996724
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|233871|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_43332e018e87560e

Sources EV-937965d803e2266c0cc8388b
Evidence SHA-256 c957ccc0e7c565a0a3480722fcf087f823eaa3da415d4fccdd7a868064996724
행 SHA-256 b27e05b857153c0061b49ab7fb96e6522527811f40aa400132abf45baa41dc57
Source snapshots by date · KOR · kepco_planned

154kV 남고창분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_f8b8f6ef18381003
stable_project_keyprjtDef:233871:ESB
project_definition233871
first_region_codeESB
manual_source_formatfalse
project_name154kV 남고창분기 지중T/L 건설사업
project_name_list154kV 남고창분기 지중송전선로 건설사업
purpose남고창S/S 계통보강
project_region_detail전북특별자치도 고창군
project_period_raw2024.01~2028.12
project_scale_rawXLPE2,000㎟, 4C×0.1㎞
responsible_office_raw중부건설본부/전북건설지사
equipment_type지중송전
headquarters중부건설본부
office전북건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_43332e018e87560e
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_f8b8f6ef18381003

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_f8b8f6ef18381003

Sources EV-413dc3562f4198a13acf1e2e
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 7c3c3c906c1af2fba03917188b222e3bad9c27603b027e030e8050bbd1d91a09

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel