POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 36items · current page 1–36 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 남공주S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-1210c0744cd35631853be47c
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_d6b08b9a5dc76977
stable_project_keyprjtDef:231334:ESB
project_definition231334
first_region_codeESB
manual_source_formatfalse
project_name154kV 남공주S/S 건설사업
project_name_list154kV 남공주S/S 건설사
purpose남공주산업단지 부하공급 및 인근변전소 부하분담
project_region_detail충청남도 공주시
project_period_raw2014.02~2025.10
project_scale_raw45/60MVA X 2BANK
responsible_office_raw중부건설본부/직할
equipment_type변전
headquarters중부건설본부
office직할
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_7c5fb5c4cae6154a
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_d6b08b9a5dc76977

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_d6b08b9a5dc76977

Sources EV-1210c0744cd35631853be47c
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 3f9463854a14a5eb5c1e76493649dfdc6b842f7f92c581be69aa25f1fde8ed42
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2014-02
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2019-08
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeplan_change
date2023-03-30
date_precisionday
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-09
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-07
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2019-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeplan_change
date2023-03
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-08
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2024-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-09
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2021-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-02
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2013-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-08
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeplan_change
date2020-11
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2020-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-02
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2015-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2025-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2019-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-08
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-03
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2014-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-03
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source schedule candidates · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-03-20
date_precisionday
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231334|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source snapshots by date · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_7c5fb5c4cae6154a
stable_project_idkproj_d6b08b9a5dc76977
source_key202609|231334|ESB
basic_ym202609
source_stage_raw공사착수-사업완료전
project_name_list154kV 남공주S/S 건설사
project_name_detail154kV 남공주S/S 건설사업
region_summary_raw충청남도 공주시등 1 지역
equipment_type_raw변전
headquarters_raw중부건설본부
office_raw직할
section_fields
Project purpose
  • 남공주산업단지 부하공급 및 인근변전소 부하분담
Project region
  • 충청남도 공주시
Project period
  • 2014.02~2025.10
사업 규모
  • 45/60MVA X 2BANK
담당 사업소
  • 중부건설본부/직할
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 2023.07 ~ 2023.09 실시설계: 2023.09 ~ 2024.04 설계담당자: [redacted]
건설공사 개요
  • 공사 착공: 공사 기간: 감독자: [redacted], 실적): 100, 84
□ '13.07 : 6차 장기 송변전설비계획 반영('19.04) □ '14.09 : 역세권 개발지연, 남공주산단 축소에 따른 준공목표 조정('19.04 → '21.10) □ '15.07 : 역세권 및 남공주산단 지연에 따른 준공목표 조정('21.10 → '22.04) □ '19.08 : 남공주산단내 부지반영 요청(→계룡건설) □ '20.05 ∼ 08 : 입지선정실무위원회 1차·2차 회의 시행 □ '20.11 : 남공주 산단 내 부지 할애 협의 완료(↔계룡건설) ○ 산업단지 실시계획 변경 승인 후 토지 분양 계약 체결 예정 □ ’21.03 : 입지확정위원회 시행(남공주산업단지 일원) 23.03.20) □ ’23.03 : 남공주 산단 계획변경 승인고시(충청남도고시『제2023-157호』23.3.30) □ ‘23.03 : 용지매수 의뢰(→ 경영지원부) □ ‘23.08 : 기본설계 심의위원회 구성 및 시행 □ ‘23.08 : 기본설계 심의결과 보고 □ ‘23.09 : 기본설계 확정 시행 및 보고 □ ‘24.06 : 감리용역 및 주자재 발주 □ ‘24.07 : 일반도급 계약 완료 □ ‘24.08 : 170kV GIS, 책임감리용역 계약완료 □ ‘24.10 : 착공전 청렴·품질·안전회의 및 관계부서 공정회의 시행 □ ‘25.02 : 접지선 포설 및 MESH 접지 포설 □ ‘25.05 : M.tr실, 벽체 등 접지선 포설 / 바닥층 내선 배관 등 □ ‘25.06 : GIS 기초공사, 접지 및 내선 부대 공사 등 시행 등 □ ‘26.02 : 주자재 반입
future_plan_redacted□ 향후계획 □ '13.07 : 6차 장기 송변전설비계획 반영('19.04) □ '14.09 : 역세권 개발지연, 남공주산단 축소에 따른 준공목표 조정('19.04 → '21.10) □ '15.07 : 역세권 및 남공주산단 지연에 따른 준공목표 조정('21.10 → '22.04) □ '19.08 : 남공주산단내 부지반영 요청(→계룡건설) □ '20.05 ∼ 08 : 입지선정실무위원회 1차·2차 회의 시행 □ '20.11 : 남공주 산단 내 부지 할애 협의 완료(↔계룡건설) ○ 산업단지 실시계획 변경 승인 후 토지 분양 계약 체결 예정 □ ’21.03 : 입지확정위원회 시행(남공주산업단지 일원) 23.03.20) □ ’23.03 : 남공주 산단 계획변경 승인고시(충청남도고시『제2023-157호』23.3.30) □ ‘23.03 : 용지매수 의뢰(→ 경영지원부) □ ‘23.08 : 기본설계 심의위원회 구성 및 시행 □ ‘23.08 : 기본설계 심의결과 보고 □ ‘23.09 : 기본설계 확정 시행 및 보고 □ ‘24.06 : 감리용역 및 주자재 발주 □ ‘24.07 : 일반도급 계약 완료 □ ‘24.08 : 170kV GIS, 책임감리용역 계약완료 □ ‘24.10 : 착공전 청렴·품질·안전회의 및 관계부서 공정회의 시행 □ ‘25.02 : 접지선 포설 및 MESH 접지 포설 □ ‘25.05 : M.tr실, 벽체 등 접지선 포설 / 바닥층 내선 배관 등 □ ‘25.06 : GIS 기초공사, 접지 및 내선 부대 공사 등 시행 등 □ ‘26.02 : 주자재 반입
attachment_count0
source_detail_sha256e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231334|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_7c5fb5c4cae6154a

Sources EV-b0b7cf2ca5a4bba0bbf83309
Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc
행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd
Source snapshots by date · KOR · kepco_planned

154kV 남공주S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_d6b08b9a5dc76977
stable_project_keyprjtDef:231334:ESB
project_definition231334
first_region_codeESB
manual_source_formatfalse
project_name154kV 남공주S/S 건설사업
project_name_list154kV 남공주S/S 건설사
purpose남공주산업단지 부하공급 및 인근변전소 부하분담
project_region_detail충청남도 공주시
project_period_raw2014.02~2025.10
project_scale_raw45/60MVA X 2BANK
responsible_office_raw중부건설본부/직할
equipment_type변전
headquarters중부건설본부
office직할
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_7c5fb5c4cae6154a
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_d6b08b9a5dc76977

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_d6b08b9a5dc76977

Sources EV-1210c0744cd35631853be47c
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 3f9463854a14a5eb5c1e76493649dfdc6b842f7f92c581be69aa25f1fde8ed42

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel