POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 36items · current page 1–36 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-1210c0744cd35631853be47c
Detailed source fields Original source field Published value or condition stable_project_id kproj_d6b08b9a5dc76977 stable_project_key prjtDef:231334:ESB project_definition 231334 first_region_code ESB manual_source_format false project_name 154kV 남공주S/S 건설사업 project_name_list 154kV 남공주S/S 건설사 purpose 남공주산업단지 부하공급 및 인근변전소 부하분담 project_region_detail 충청남도 공주시 project_period_raw 2014.02~2025.10 project_scale_raw 45/60MVA X 2BANK responsible_office_raw 중부건설본부/직할 equipment_type 변전 headquarters 중부건설본부 office 직할 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_d6b08b9a5dc76977
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_d6b08b9a5dc76977
Sources EV-1210c0744cd35631853be47c Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 3f9463854a14a5eb5c1e76493649dfdc6b842f7f92c581be69aa25f1fde8ed42 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2014-02 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231334|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7c5fb5c4cae6154a
Sources EV-b0b7cf2ca5a4bba0bbf83309 Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc 행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231334|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7c5fb5c4cae6154a
Sources EV-b0b7cf2ca5a4bba0bbf83309 Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc 행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2019-08 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231334|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7c5fb5c4cae6154a
Sources EV-b0b7cf2ca5a4bba0bbf83309 Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc 행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type plan_change date 2023-03-30 date_precision day assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231334|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7c5fb5c4cae6154a
Sources EV-b0b7cf2ca5a4bba0bbf83309 Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc 행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-09 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231334|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7c5fb5c4cae6154a
Sources EV-b0b7cf2ca5a4bba0bbf83309 Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc 행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-07 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231334|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7c5fb5c4cae6154a
Sources EV-b0b7cf2ca5a4bba0bbf83309 Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc 행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2019-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231334|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7c5fb5c4cae6154a
Sources EV-b0b7cf2ca5a4bba0bbf83309 Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc 행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231334|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7c5fb5c4cae6154a
Sources EV-b0b7cf2ca5a4bba0bbf83309 Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc 행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type plan_change date 2023-03 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231334|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7c5fb5c4cae6154a
Sources EV-b0b7cf2ca5a4bba0bbf83309 Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc 행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-08 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231334|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7c5fb5c4cae6154a
Sources EV-b0b7cf2ca5a4bba0bbf83309 Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc 행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2024-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231334|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7c5fb5c4cae6154a
Sources EV-b0b7cf2ca5a4bba0bbf83309 Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc 행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-09 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231334|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7c5fb5c4cae6154a
Sources EV-b0b7cf2ca5a4bba0bbf83309 Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc 행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2021-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231334|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7c5fb5c4cae6154a
Sources EV-b0b7cf2ca5a4bba0bbf83309 Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc 행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-02 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231334|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7c5fb5c4cae6154a
Sources EV-b0b7cf2ca5a4bba0bbf83309 Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc 행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2013-07 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231334|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7c5fb5c4cae6154a
Sources EV-b0b7cf2ca5a4bba0bbf83309 Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc 행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-08 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231334|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7c5fb5c4cae6154a
Sources EV-b0b7cf2ca5a4bba0bbf83309 Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc 행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type plan_change date 2020-11 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231334|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7c5fb5c4cae6154a
Sources EV-b0b7cf2ca5a4bba0bbf83309 Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc 행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2020-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231334|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7c5fb5c4cae6154a
Sources EV-b0b7cf2ca5a4bba0bbf83309 Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc 행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-02 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231334|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7c5fb5c4cae6154a
Sources EV-b0b7cf2ca5a4bba0bbf83309 Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc 행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2015-07 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231334|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7c5fb5c4cae6154a
Sources EV-b0b7cf2ca5a4bba0bbf83309 Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc 행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231334|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7c5fb5c4cae6154a
Sources EV-b0b7cf2ca5a4bba0bbf83309 Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc 행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2025-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231334|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7c5fb5c4cae6154a
Sources EV-b0b7cf2ca5a4bba0bbf83309 Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc 행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2019-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231334|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7c5fb5c4cae6154a
Sources EV-b0b7cf2ca5a4bba0bbf83309 Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc 행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231334|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7c5fb5c4cae6154a
Sources EV-b0b7cf2ca5a4bba0bbf83309 Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc 행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-08 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231334|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7c5fb5c4cae6154a
Sources EV-b0b7cf2ca5a4bba0bbf83309 Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc 행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-03 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231334|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7c5fb5c4cae6154a
Sources EV-b0b7cf2ca5a4bba0bbf83309 Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc 행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2014-09 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231334|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7c5fb5c4cae6154a
Sources EV-b0b7cf2ca5a4bba0bbf83309 Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc 행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-09 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231334|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7c5fb5c4cae6154a
Sources EV-b0b7cf2ca5a4bba0bbf83309 Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc 행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-03 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231334|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7c5fb5c4cae6154a
Sources EV-b0b7cf2ca5a4bba0bbf83309 Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc 행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231334|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7c5fb5c4cae6154a
Sources EV-b0b7cf2ca5a4bba0bbf83309 Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc 행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231334|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7c5fb5c4cae6154a
Sources EV-b0b7cf2ca5a4bba0bbf83309 Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc 행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-07 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231334|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7c5fb5c4cae6154a
Sources EV-b0b7cf2ca5a4bba0bbf83309 Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc 행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-03-20 date_precision day assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231334|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7c5fb5c4cae6154a
Sources EV-b0b7cf2ca5a4bba0bbf83309 Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc 행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_7c5fb5c4cae6154a stable_project_id kproj_d6b08b9a5dc76977 source_key 202609|231334|ESB basic_ym 202609 source_stage_raw 공사착수-사업완료전 project_name_list 154kV 남공주S/S 건설사 project_name_detail 154kV 남공주S/S 건설사업 region_summary_raw 충청남도 공주시등 1 지역 equipment_type_raw 변전 headquarters_raw 중부건설본부 office_raw 직할 section_fields Project purpose 남공주산업단지 부하공급 및 인근변전소 부하분담 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 기본설계: 2023.07 ~ 2023.09 실시설계: 2023.09 ~ 2024.04 설계담당자: [redacted] 건설공사 개요 공사 착공: 공사 기간: 감독자: [redacted], 실적): 100, 84 □ '13.07 : 6차 장기 송변전설비계획 반영('19.04) □ '14.09 : 역세권 개발지연, 남공주산단 축소에 따른 준공목표 조정('19.04 → '21.10) □ '15.07 : 역세권 및 남공주산단 지연에 따른 준공목표 조정('21.10 → '22.04) □ '19.08 : 남공주산단내 부지반영 요청(→계룡건설) □ '20.05 ∼ 08 : 입지선정실무위원회 1차·2차 회의 시행 □ '20.11 : 남공주 산단 내 부지 할애 협의 완료(↔계룡건설) ○ 산업단지 실시계획 변경 승인 후 토지 분양 계약 체결 예정 □ ’21.03 : 입지확정위원회 시행(남공주산업단지 일원) 23.03.20) □ ’23.03 : 남공주 산단 계획변경 승인고시(충청남도고시『제2023-157호』23.3.30) □ ‘23.03 : 용지매수 의뢰(→ 경영지원부) □ ‘23.08 : 기본설계 심의위원회 구성 및 시행 □ ‘23.08 : 기본설계 심의결과 보고 □ ‘23.09 : 기본설계 확정 시행 및 보고 □ ‘24.06 : 감리용역 및 주자재 발주 □ ‘24.07 : 일반도급 계약 완료 □ ‘24.08 : 170kV GIS, 책임감리용역 계약완료 □ ‘24.10 : 착공전 청렴·품질·안전회의 및 관계부서 공정회의 시행 □ ‘25.02 : 접지선 포설 및 MESH 접지 포설 □ ‘25.05 : M.tr실, 벽체 등 접지선 포설 / 바닥층 내선 배관 등 □ ‘25.06 : GIS 기초공사, 접지 및 내선 부대 공사 등 시행 등 □ ‘26.02 : 주자재 반입 future_plan_redacted □ 향후계획 □ '13.07 : 6차 장기 송변전설비계획 반영('19.04) □ '14.09 : 역세권 개발지연, 남공주산단 축소에 따른 준공목표 조정('19.04 → '21.10) □ '15.07 : 역세권 및 남공주산단 지연에 따른 준공목표 조정('21.10 → '22.04) □ '19.08 : 남공주산단내 부지반영 요청(→계룡건설) □ '20.05 ∼ 08 : 입지선정실무위원회 1차·2차 회의 시행 □ '20.11 : 남공주 산단 내 부지 할애 협의 완료(↔계룡건설) ○ 산업단지 실시계획 변경 승인 후 토지 분양 계약 체결 예정 □ ’21.03 : 입지확정위원회 시행(남공주산업단지 일원) 23.03.20) □ ’23.03 : 남공주 산단 계획변경 승인고시(충청남도고시『제2023-157호』23.3.30) □ ‘23.03 : 용지매수 의뢰(→ 경영지원부) □ ‘23.08 : 기본설계 심의위원회 구성 및 시행 □ ‘23.08 : 기본설계 심의결과 보고 □ ‘23.09 : 기본설계 확정 시행 및 보고 □ ‘24.06 : 감리용역 및 주자재 발주 □ ‘24.07 : 일반도급 계약 완료 □ ‘24.08 : 170kV GIS, 책임감리용역 계약완료 □ ‘24.10 : 착공전 청렴·품질·안전회의 및 관계부서 공정회의 시행 □ ‘25.02 : 접지선 포설 및 MESH 접지 포설 □ ‘25.05 : M.tr실, 벽체 등 접지선 포설 / 바닥층 내선 배관 등 □ ‘25.06 : GIS 기초공사, 접지 및 내선 부대 공사 등 시행 등 □ ‘26.02 : 주자재 반입 attachment_count 0 source_detail_sha256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231334|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_7c5fb5c4cae6154a
Sources EV-b0b7cf2ca5a4bba0bbf83309 Evidence SHA-256 e3b1cbc838e886d46cb2da50e3449a6b7257bbe04001da1a67cadc4ab2fbe3cc 행 SHA-256 d44a5a97550c7e915cea8a46c4677cb96c20e52134956b7f7bc3d0797ad24ffd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_d6b08b9a5dc76977 stable_project_key prjtDef:231334:ESB project_definition 231334 first_region_code ESB manual_source_format false project_name 154kV 남공주S/S 건설사업 project_name_list 154kV 남공주S/S 건설사 purpose 남공주산업단지 부하공급 및 인근변전소 부하분담 project_region_detail 충청남도 공주시 project_period_raw 2014.02~2025.10 project_scale_raw 45/60MVA X 2BANK responsible_office_raw 중부건설본부/직할 equipment_type 변전 headquarters 중부건설본부 office 직할 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_d6b08b9a5dc76977
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_d6b08b9a5dc76977
Sources EV-1210c0744cd35631853be47c Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 3f9463854a14a5eb5c1e76493649dfdc6b842f7f92c581be69aa25f1fde8ed42 Observations for this power asset History for this project