Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 5items · current page 1–5 · Source records, not unique facilities.
Power assets and projects · KOR · kepco_planned
154kV 남광명분기 지중T/L 건설사업
Power project · Construction project
Metric or condition
Source value
Basis, scope and stage
project_name_voltage_label
154 kV
literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-83ffa01a7528ff165ffb797e
Sources EV-8fbacf03385541bedb4bf92b Evidence SHA-256 39dc47e57f25fa1d74535db3d23dbd08da3b66c8b143fecea5a1bfdc7f0f198c 행 SHA-256 d4831f6e96c449e49340785d860ed0125e02814e1de2518ad56bc2cf7f3aac88Source snapshots by date · KOR · kepco_planned
154kV 남광명분기 지중T/L 건설사업
Project · historical source snapshot
Metric or condition
Source value
Basis, scope and stage
Detailed source fields
Original source field
Published value or condition
snapshot_id
ksnap_7868fbd5730aa3eb
stable_project_id
kproj_38b843146a64ec32
source_key
202609|233634|ESB
basic_ym
202609
source_stage_raw
사업승인-공사착수전
project_name_list
154kV 남광명분기 지중송전선로 건설사업
project_name_detail
154kV 남광명분기 지중T/L 건설사업
region_summary_raw
경기도 광명시등 1 지역
equipment_type_raw
지중송전
headquarters_raw
경인건설본부
office_raw
남서울인천건설지사
section_fields
Project purpose
광명·시흥 테크노벨리 등 대규모 개발 전력공급
Project region
경기도 광명시
Project period
2026.10~2027.12
사업 규모
154KV XLPE 1,200㎟, 4C-0.6KM
담당 사업소
경인건설본부/남서울인천건설지사
계획확정
입지선정
전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
Sources EV-8fbacf03385541bedb4bf92b Evidence SHA-256 39dc47e57f25fa1d74535db3d23dbd08da3b66c8b143fecea5a1bfdc7f0f198c 행 SHA-256 d4831f6e96c449e49340785d860ed0125e02814e1de2518ad56bc2cf7f3aac88Source snapshots by date · KOR · kepco_planned