POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 19items · current page 1–19 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 남천안S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-d5e212e1a7767e86c0c5da71
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_712cf9284d8085e0
stable_project_keyprjtDef:231669:ESB
project_definition231669
first_region_codeESB
manual_source_formatfalse
project_name154kV 남천안S/S 건설사업
project_name_list154kV 남천안S/S 건설사업
purpose변전설비 적기확충으로 안정적 전력공급
project_region_detail충청남도 천안시 동남구
project_period_raw2023.08~2030.12
project_scale_raw단상 15/20MVA 3대, 2BANK
responsible_office_raw중부건설본부/직할
equipment_type변전
headquarters중부건설본부
office직할
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_f31466462f0f78d6
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_712cf9284d8085e0

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_712cf9284d8085e0

Sources EV-d5e212e1a7767e86c0c5da71
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 e86bf88ffc275957eba19786f0bcd269d88923b19767c67ccd140ab35db9229a
Source schedule candidates · KOR · kepco_planned

154kV 남천안S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2023-08
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231669|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_f31466462f0f78d6

Sources EV-65f7e251fe4abddf4244a956
Evidence SHA-256 8983da6b1daa4b290dc10ff72565dc2a09cd206497cf96f9af07f0186ecbe3f6
행 SHA-256 333d4bdb548628ff8b065b07f80a34e54a2862a639afd29698f49ef8c0f32c7b
Source schedule candidates · KOR · kepco_planned

154kV 남천안S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231669|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_f31466462f0f78d6

Sources EV-65f7e251fe4abddf4244a956
Evidence SHA-256 8983da6b1daa4b290dc10ff72565dc2a09cd206497cf96f9af07f0186ecbe3f6
행 SHA-256 333d4bdb548628ff8b065b07f80a34e54a2862a639afd29698f49ef8c0f32c7b
Source schedule candidates · KOR · kepco_planned

154kV 남천안S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-03
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231669|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_f31466462f0f78d6

Sources EV-65f7e251fe4abddf4244a956
Evidence SHA-256 8983da6b1daa4b290dc10ff72565dc2a09cd206497cf96f9af07f0186ecbe3f6
행 SHA-256 333d4bdb548628ff8b065b07f80a34e54a2862a639afd29698f49ef8c0f32c7b
Source schedule candidates · KOR · kepco_planned

154kV 남천안S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231669|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_f31466462f0f78d6

Sources EV-65f7e251fe4abddf4244a956
Evidence SHA-256 8983da6b1daa4b290dc10ff72565dc2a09cd206497cf96f9af07f0186ecbe3f6
행 SHA-256 333d4bdb548628ff8b065b07f80a34e54a2862a639afd29698f49ef8c0f32c7b
Source schedule candidates · KOR · kepco_planned

154kV 남천안S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231669|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_f31466462f0f78d6

Sources EV-65f7e251fe4abddf4244a956
Evidence SHA-256 8983da6b1daa4b290dc10ff72565dc2a09cd206497cf96f9af07f0186ecbe3f6
행 SHA-256 333d4bdb548628ff8b065b07f80a34e54a2862a639afd29698f49ef8c0f32c7b
Source schedule candidates · KOR · kepco_planned

154kV 남천안S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-08
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231669|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_f31466462f0f78d6

Sources EV-65f7e251fe4abddf4244a956
Evidence SHA-256 8983da6b1daa4b290dc10ff72565dc2a09cd206497cf96f9af07f0186ecbe3f6
행 SHA-256 333d4bdb548628ff8b065b07f80a34e54a2862a639afd29698f49ef8c0f32c7b
Source schedule candidates · KOR · kepco_planned

154kV 남천안S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2030-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231669|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_f31466462f0f78d6

Sources EV-65f7e251fe4abddf4244a956
Evidence SHA-256 8983da6b1daa4b290dc10ff72565dc2a09cd206497cf96f9af07f0186ecbe3f6
행 SHA-256 333d4bdb548628ff8b065b07f80a34e54a2862a639afd29698f49ef8c0f32c7b
Source schedule candidates · KOR · kepco_planned

154kV 남천안S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231669|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_f31466462f0f78d6

Sources EV-65f7e251fe4abddf4244a956
Evidence SHA-256 8983da6b1daa4b290dc10ff72565dc2a09cd206497cf96f9af07f0186ecbe3f6
행 SHA-256 333d4bdb548628ff8b065b07f80a34e54a2862a639afd29698f49ef8c0f32c7b
Source schedule candidates · KOR · kepco_planned

154kV 남천안S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231669|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_f31466462f0f78d6

Sources EV-65f7e251fe4abddf4244a956
Evidence SHA-256 8983da6b1daa4b290dc10ff72565dc2a09cd206497cf96f9af07f0186ecbe3f6
행 SHA-256 333d4bdb548628ff8b065b07f80a34e54a2862a639afd29698f49ef8c0f32c7b
Source schedule candidates · KOR · kepco_planned

154kV 남천안S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-08
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231669|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_f31466462f0f78d6

Sources EV-65f7e251fe4abddf4244a956
Evidence SHA-256 8983da6b1daa4b290dc10ff72565dc2a09cd206497cf96f9af07f0186ecbe3f6
행 SHA-256 333d4bdb548628ff8b065b07f80a34e54a2862a639afd29698f49ef8c0f32c7b
Source schedule candidates · KOR · kepco_planned

154kV 남천안S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-02
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231669|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_f31466462f0f78d6

Sources EV-65f7e251fe4abddf4244a956
Evidence SHA-256 8983da6b1daa4b290dc10ff72565dc2a09cd206497cf96f9af07f0186ecbe3f6
행 SHA-256 333d4bdb548628ff8b065b07f80a34e54a2862a639afd29698f49ef8c0f32c7b
Source schedule candidates · KOR · kepco_planned

154kV 남천안S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-01
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231669|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_f31466462f0f78d6

Sources EV-65f7e251fe4abddf4244a956
Evidence SHA-256 8983da6b1daa4b290dc10ff72565dc2a09cd206497cf96f9af07f0186ecbe3f6
행 SHA-256 333d4bdb548628ff8b065b07f80a34e54a2862a639afd29698f49ef8c0f32c7b
Source schedule candidates · KOR · kepco_planned

154kV 남천안S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231669|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_f31466462f0f78d6

Sources EV-65f7e251fe4abddf4244a956
Evidence SHA-256 8983da6b1daa4b290dc10ff72565dc2a09cd206497cf96f9af07f0186ecbe3f6
행 SHA-256 333d4bdb548628ff8b065b07f80a34e54a2862a639afd29698f49ef8c0f32c7b
Source schedule candidates · KOR · kepco_planned

154kV 남천안S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231669|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_f31466462f0f78d6

Sources EV-65f7e251fe4abddf4244a956
Evidence SHA-256 8983da6b1daa4b290dc10ff72565dc2a09cd206497cf96f9af07f0186ecbe3f6
행 SHA-256 333d4bdb548628ff8b065b07f80a34e54a2862a639afd29698f49ef8c0f32c7b
Source schedule candidates · KOR · kepco_planned

154kV 남천안S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-02
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231669|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_f31466462f0f78d6

Sources EV-65f7e251fe4abddf4244a956
Evidence SHA-256 8983da6b1daa4b290dc10ff72565dc2a09cd206497cf96f9af07f0186ecbe3f6
행 SHA-256 333d4bdb548628ff8b065b07f80a34e54a2862a639afd29698f49ef8c0f32c7b
Source schedule candidates · KOR · kepco_planned

154kV 남천안S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231669|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_f31466462f0f78d6

Sources EV-65f7e251fe4abddf4244a956
Evidence SHA-256 8983da6b1daa4b290dc10ff72565dc2a09cd206497cf96f9af07f0186ecbe3f6
행 SHA-256 333d4bdb548628ff8b065b07f80a34e54a2862a639afd29698f49ef8c0f32c7b
Source snapshots by date · KOR · kepco_planned

154kV 남천안S/S 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_f31466462f0f78d6
stable_project_idkproj_712cf9284d8085e0
source_key202609|231669|ESB
basic_ym202609
source_stage_raw계획확정-사업승인전
project_name_list154kV 남천안S/S 건설사업
project_name_detail154kV 남천안S/S 건설사업
region_summary_raw충청남도 천안시 동남구등 1 지역
equipment_type_raw변전
headquarters_raw중부건설본부
office_raw직할
section_fields
Project purpose
  • 변전설비 적기확충으로 안정적 전력공급
Project region
  • 충청남도 천안시 동남구
Project period
  • 2023.08~2030.12
사업 규모
  • 단상 15/20MVA 3대, 2BANK
담당 사업소
  • 중부건설본부/직할
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
□ '23.05 : 제10차 장기 송변전설비계획 최초 반영 □ '23.12. 산단 내 사업부지 반영 협의[→ 천안 구성 도시첨단산단] □ '24.6∼8. 택지개발지구 내 후보부지 선정을 위한 지자체·의회 사업설명 □ '24.08 : 천안지역 기관장회의시 택지지구內 부지반영 필요성 설명(천안지사) □ '24.08 : 천안시 주관 천안지역 변전소 공급능력 및 부족용량 대책 협의 ○ 천안시장 : 택지지구內 반영곤란, 산단지역으로 변전소 부지 검토필요 □ '24.10 : 천안 구성 도시첨단산업단지 승인신청('25. 5 승인예정) □ '25.03 : 천안 구성 도시첨단산단(변전소 후보지) 조성계획 취소 □ '25.07 : 입지확보 대책회의(천안지사, 중부건설, 계통운영) ○ 천안S/S 유휴부지 先 활용 및 천안시에 변전소 부지 요청보다 차량정비센터 이전부지 제공 요청·협의가 현실적 대안 □ '25.09~10 : 천안전력지사 유휴부지 활용 관련 본사 PCS 회의 시행(1, 2차) □ ‘25.01 : 입지선정실무위원회 시행 ○ 회의결과 : 남천안변전소 건설 부지로 천안전력지사 유휴부지 적정 □ ‘26.02 : 건폐율 기준 충족을 위한 연접부지(국유지) 확보 관련 협의 ○ 천안시 부지 매각 및 도시계획시설결정 협의(↔ 천안시) ○ 기획재정부 부지(천안시 구성동 270-4) 매각 협의(↔한국자산관리공사) □ ’26.02 : 154kV 1.5CB형 변전소 신모델 개발 2단계 품질회의 결과 수신(←남부건설본부) □ ’26.04 : 천안시 주도 도시계획시설결정(변경) 관련 천안시 협조 요청 공문 송부 및 수신 ○ 천안시 관련부서 및 유관기관(한국자산관리공사) 협의의견 수신 □ ’26.04 : 도시계획시설결정(변경) 입안자료 초안 제출 및 천안시 공문 송부
future_plan_redacted□ 향후계획 □ '23.05 : 제10차 장기 송변전설비계획 최초 반영 □ '23.12. 산단 내 사업부지 반영 협의[→ 천안 구성 도시첨단산단] □ '24.6∼8. 택지개발지구 내 후보부지 선정을 위한 지자체·의회 사업설명 □ '24.08 : 천안지역 기관장회의시 택지지구內 부지반영 필요성 설명(천안지사) □ '24.08 : 천안시 주관 천안지역 변전소 공급능력 및 부족용량 대책 협의 ○ 천안시장 : 택지지구內 반영곤란, 산단지역으로 변전소 부지 검토필요 □ '24.10 : 천안 구성 도시첨단산업단지 승인신청('25. 5 승인예정) □ '25.03 : 천안 구성 도시첨단산단(변전소 후보지) 조성계획 취소 □ '25.07 : 입지확보 대책회의(천안지사, 중부건설, 계통운영) ○ 천안S/S 유휴부지 先 활용 및 천안시에 변전소 부지 요청보다 차량정비센터 이전부지 제공 요청·협의가 현실적 대안 □ '25.09~10 : 천안전력지사 유휴부지 활용 관련 본사 PCS 회의 시행(1, 2차) □ ‘25.01 : 입지선정실무위원회 시행 ○ 회의결과 : 남천안변전소 건설 부지로 천안전력지사 유휴부지 적정 □ ‘26.02 : 건폐율 기준 충족을 위한 연접부지(국유지) 확보 관련 협의 ○ 천안시 부지 매각 및 도시계획시설결정 협의(↔ 천안시) ○ 기획재정부 부지(천안시 구성동 270-4) 매각 협의(↔한국자산관리공사) □ ’26.02 : 154kV 1.5CB형 변전소 신모델 개발 2단계 품질회의 결과 수신(←남부건설본부) □ ’26.04 : 천안시 주도 도시계획시설결정(변경) 관련 천안시 협조 요청 공문 송부 및 수신 ○ 천안시 관련부서 및 유관기관(한국자산관리공사) 협의의견 수신 □ ’26.04 : 도시계획시설결정(변경) 입안자료 초안 제출 및 천안시 공문 송부
attachment_count0
source_detail_sha2568983da6b1daa4b290dc10ff72565dc2a09cd206497cf96f9af07f0186ecbe3f6
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231669|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_f31466462f0f78d6

Sources EV-65f7e251fe4abddf4244a956
Evidence SHA-256 8983da6b1daa4b290dc10ff72565dc2a09cd206497cf96f9af07f0186ecbe3f6
행 SHA-256 333d4bdb548628ff8b065b07f80a34e54a2862a639afd29698f49ef8c0f32c7b
Source snapshots by date · KOR · kepco_planned

154kV 남천안S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_712cf9284d8085e0
stable_project_keyprjtDef:231669:ESB
project_definition231669
first_region_codeESB
manual_source_formatfalse
project_name154kV 남천안S/S 건설사업
project_name_list154kV 남천안S/S 건설사업
purpose변전설비 적기확충으로 안정적 전력공급
project_region_detail충청남도 천안시 동남구
project_period_raw2023.08~2030.12
project_scale_raw단상 15/20MVA 3대, 2BANK
responsible_office_raw중부건설본부/직할
equipment_type변전
headquarters중부건설본부
office직할
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_f31466462f0f78d6
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_712cf9284d8085e0

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_712cf9284d8085e0

Sources EV-d5e212e1a7767e86c0c5da71
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 e86bf88ffc275957eba19786f0bcd269d88923b19767c67ccd140ab35db9229a

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel