POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 19items · current page 1–19 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-d5e212e1a7767e86c0c5da71
Detailed source fields Original source field Published value or condition stable_project_id kproj_712cf9284d8085e0 stable_project_key prjtDef:231669:ESB project_definition 231669 first_region_code ESB manual_source_format false project_name 154kV 남천안S/S 건설사업 project_name_list 154kV 남천안S/S 건설사업 purpose 변전설비 적기확충으로 안정적 전력공급 project_region_detail 충청남도 천안시 동남구 project_period_raw 2023.08~2030.12 project_scale_raw 단상 15/20MVA 3대, 2BANK responsible_office_raw 중부건설본부/직할 equipment_type 변전 headquarters 중부건설본부 office 직할 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_712cf9284d8085e0
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_712cf9284d8085e0
Sources EV-d5e212e1a7767e86c0c5da71 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 e86bf88ffc275957eba19786f0bcd269d88923b19767c67ccd140ab35db9229a Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2023-08 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231669|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_f31466462f0f78d6
Sources EV-65f7e251fe4abddf4244a956 Evidence SHA-256 8983da6b1daa4b290dc10ff72565dc2a09cd206497cf96f9af07f0186ecbe3f6 행 SHA-256 333d4bdb548628ff8b065b07f80a34e54a2862a639afd29698f49ef8c0f32c7b Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231669|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_f31466462f0f78d6
Sources EV-65f7e251fe4abddf4244a956 Evidence SHA-256 8983da6b1daa4b290dc10ff72565dc2a09cd206497cf96f9af07f0186ecbe3f6 행 SHA-256 333d4bdb548628ff8b065b07f80a34e54a2862a639afd29698f49ef8c0f32c7b Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-03 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231669|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_f31466462f0f78d6
Sources EV-65f7e251fe4abddf4244a956 Evidence SHA-256 8983da6b1daa4b290dc10ff72565dc2a09cd206497cf96f9af07f0186ecbe3f6 행 SHA-256 333d4bdb548628ff8b065b07f80a34e54a2862a639afd29698f49ef8c0f32c7b Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-09 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231669|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_f31466462f0f78d6
Sources EV-65f7e251fe4abddf4244a956 Evidence SHA-256 8983da6b1daa4b290dc10ff72565dc2a09cd206497cf96f9af07f0186ecbe3f6 행 SHA-256 333d4bdb548628ff8b065b07f80a34e54a2862a639afd29698f49ef8c0f32c7b Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231669|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_f31466462f0f78d6
Sources EV-65f7e251fe4abddf4244a956 Evidence SHA-256 8983da6b1daa4b290dc10ff72565dc2a09cd206497cf96f9af07f0186ecbe3f6 행 SHA-256 333d4bdb548628ff8b065b07f80a34e54a2862a639afd29698f49ef8c0f32c7b Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-08 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231669|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_f31466462f0f78d6
Sources EV-65f7e251fe4abddf4244a956 Evidence SHA-256 8983da6b1daa4b290dc10ff72565dc2a09cd206497cf96f9af07f0186ecbe3f6 행 SHA-256 333d4bdb548628ff8b065b07f80a34e54a2862a639afd29698f49ef8c0f32c7b Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2030-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231669|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_f31466462f0f78d6
Sources EV-65f7e251fe4abddf4244a956 Evidence SHA-256 8983da6b1daa4b290dc10ff72565dc2a09cd206497cf96f9af07f0186ecbe3f6 행 SHA-256 333d4bdb548628ff8b065b07f80a34e54a2862a639afd29698f49ef8c0f32c7b Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231669|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_f31466462f0f78d6
Sources EV-65f7e251fe4abddf4244a956 Evidence SHA-256 8983da6b1daa4b290dc10ff72565dc2a09cd206497cf96f9af07f0186ecbe3f6 행 SHA-256 333d4bdb548628ff8b065b07f80a34e54a2862a639afd29698f49ef8c0f32c7b Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-07 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231669|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_f31466462f0f78d6
Sources EV-65f7e251fe4abddf4244a956 Evidence SHA-256 8983da6b1daa4b290dc10ff72565dc2a09cd206497cf96f9af07f0186ecbe3f6 행 SHA-256 333d4bdb548628ff8b065b07f80a34e54a2862a639afd29698f49ef8c0f32c7b Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-08 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231669|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_f31466462f0f78d6
Sources EV-65f7e251fe4abddf4244a956 Evidence SHA-256 8983da6b1daa4b290dc10ff72565dc2a09cd206497cf96f9af07f0186ecbe3f6 행 SHA-256 333d4bdb548628ff8b065b07f80a34e54a2862a639afd29698f49ef8c0f32c7b Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-02 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231669|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_f31466462f0f78d6
Sources EV-65f7e251fe4abddf4244a956 Evidence SHA-256 8983da6b1daa4b290dc10ff72565dc2a09cd206497cf96f9af07f0186ecbe3f6 행 SHA-256 333d4bdb548628ff8b065b07f80a34e54a2862a639afd29698f49ef8c0f32c7b Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-01 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231669|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_f31466462f0f78d6
Sources EV-65f7e251fe4abddf4244a956 Evidence SHA-256 8983da6b1daa4b290dc10ff72565dc2a09cd206497cf96f9af07f0186ecbe3f6 행 SHA-256 333d4bdb548628ff8b065b07f80a34e54a2862a639afd29698f49ef8c0f32c7b Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231669|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_f31466462f0f78d6
Sources EV-65f7e251fe4abddf4244a956 Evidence SHA-256 8983da6b1daa4b290dc10ff72565dc2a09cd206497cf96f9af07f0186ecbe3f6 행 SHA-256 333d4bdb548628ff8b065b07f80a34e54a2862a639afd29698f49ef8c0f32c7b Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231669|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_f31466462f0f78d6
Sources EV-65f7e251fe4abddf4244a956 Evidence SHA-256 8983da6b1daa4b290dc10ff72565dc2a09cd206497cf96f9af07f0186ecbe3f6 행 SHA-256 333d4bdb548628ff8b065b07f80a34e54a2862a639afd29698f49ef8c0f32c7b Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-02 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231669|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_f31466462f0f78d6
Sources EV-65f7e251fe4abddf4244a956 Evidence SHA-256 8983da6b1daa4b290dc10ff72565dc2a09cd206497cf96f9af07f0186ecbe3f6 행 SHA-256 333d4bdb548628ff8b065b07f80a34e54a2862a639afd29698f49ef8c0f32c7b Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231669|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_f31466462f0f78d6
Sources EV-65f7e251fe4abddf4244a956 Evidence SHA-256 8983da6b1daa4b290dc10ff72565dc2a09cd206497cf96f9af07f0186ecbe3f6 행 SHA-256 333d4bdb548628ff8b065b07f80a34e54a2862a639afd29698f49ef8c0f32c7b Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_f31466462f0f78d6 stable_project_id kproj_712cf9284d8085e0 source_key 202609|231669|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 남천안S/S 건설사업 project_name_detail 154kV 남천안S/S 건설사업 region_summary_raw 충청남도 천안시 동남구등 1 지역 equipment_type_raw 변전 headquarters_raw 중부건설본부 office_raw 직할 section_fields 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: □ '23.05 : 제10차 장기 송변전설비계획 최초 반영 □ '23.12. 산단 내 사업부지 반영 협의[→ 천안 구성 도시첨단산단] □ '24.6∼8. 택지개발지구 내 후보부지 선정을 위한 지자체·의회 사업설명 □ '24.08 : 천안지역 기관장회의시 택지지구內 부지반영 필요성 설명(천안지사) □ '24.08 : 천안시 주관 천안지역 변전소 공급능력 및 부족용량 대책 협의 ○ 천안시장 : 택지지구內 반영곤란, 산단지역으로 변전소 부지 검토필요 □ '24.10 : 천안 구성 도시첨단산업단지 승인신청('25. 5 승인예정) □ '25.03 : 천안 구성 도시첨단산단(변전소 후보지) 조성계획 취소 □ '25.07 : 입지확보 대책회의(천안지사, 중부건설, 계통운영) ○ 천안S/S 유휴부지 先 활용 및 천안시에 변전소 부지 요청보다 차량정비센터 이전부지 제공 요청·협의가 현실적 대안 □ '25.09~10 : 천안전력지사 유휴부지 활용 관련 본사 PCS 회의 시행(1, 2차) □ ‘25.01 : 입지선정실무위원회 시행 ○ 회의결과 : 남천안변전소 건설 부지로 천안전력지사 유휴부지 적정 □ ‘26.02 : 건폐율 기준 충족을 위한 연접부지(국유지) 확보 관련 협의 ○ 천안시 부지 매각 및 도시계획시설결정 협의(↔ 천안시) ○ 기획재정부 부지(천안시 구성동 270-4) 매각 협의(↔한국자산관리공사) □ ’26.02 : 154kV 1.5CB형 변전소 신모델 개발 2단계 품질회의 결과 수신(←남부건설본부) □ ’26.04 : 천안시 주도 도시계획시설결정(변경) 관련 천안시 협조 요청 공문 송부 및 수신 ○ 천안시 관련부서 및 유관기관(한국자산관리공사) 협의의견 수신 □ ’26.04 : 도시계획시설결정(변경) 입안자료 초안 제출 및 천안시 공문 송부 future_plan_redacted □ 향후계획 □ '23.05 : 제10차 장기 송변전설비계획 최초 반영 □ '23.12. 산단 내 사업부지 반영 협의[→ 천안 구성 도시첨단산단] □ '24.6∼8. 택지개발지구 내 후보부지 선정을 위한 지자체·의회 사업설명 □ '24.08 : 천안지역 기관장회의시 택지지구內 부지반영 필요성 설명(천안지사) □ '24.08 : 천안시 주관 천안지역 변전소 공급능력 및 부족용량 대책 협의 ○ 천안시장 : 택지지구內 반영곤란, 산단지역으로 변전소 부지 검토필요 □ '24.10 : 천안 구성 도시첨단산업단지 승인신청('25. 5 승인예정) □ '25.03 : 천안 구성 도시첨단산단(변전소 후보지) 조성계획 취소 □ '25.07 : 입지확보 대책회의(천안지사, 중부건설, 계통운영) ○ 천안S/S 유휴부지 先 활용 및 천안시에 변전소 부지 요청보다 차량정비센터 이전부지 제공 요청·협의가 현실적 대안 □ '25.09~10 : 천안전력지사 유휴부지 활용 관련 본사 PCS 회의 시행(1, 2차) □ ‘25.01 : 입지선정실무위원회 시행 ○ 회의결과 : 남천안변전소 건설 부지로 천안전력지사 유휴부지 적정 □ ‘26.02 : 건폐율 기준 충족을 위한 연접부지(국유지) 확보 관련 협의 ○ 천안시 부지 매각 및 도시계획시설결정 협의(↔ 천안시) ○ 기획재정부 부지(천안시 구성동 270-4) 매각 협의(↔한국자산관리공사) □ ’26.02 : 154kV 1.5CB형 변전소 신모델 개발 2단계 품질회의 결과 수신(←남부건설본부) □ ’26.04 : 천안시 주도 도시계획시설결정(변경) 관련 천안시 협조 요청 공문 송부 및 수신 ○ 천안시 관련부서 및 유관기관(한국자산관리공사) 협의의견 수신 □ ’26.04 : 도시계획시설결정(변경) 입안자료 초안 제출 및 천안시 공문 송부 attachment_count 0 source_detail_sha256 8983da6b1daa4b290dc10ff72565dc2a09cd206497cf96f9af07f0186ecbe3f6 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231669|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_f31466462f0f78d6
Sources EV-65f7e251fe4abddf4244a956 Evidence SHA-256 8983da6b1daa4b290dc10ff72565dc2a09cd206497cf96f9af07f0186ecbe3f6 행 SHA-256 333d4bdb548628ff8b065b07f80a34e54a2862a639afd29698f49ef8c0f32c7b Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_712cf9284d8085e0 stable_project_key prjtDef:231669:ESB project_definition 231669 first_region_code ESB manual_source_format false project_name 154kV 남천안S/S 건설사업 project_name_list 154kV 남천안S/S 건설사업 purpose 변전설비 적기확충으로 안정적 전력공급 project_region_detail 충청남도 천안시 동남구 project_period_raw 2023.08~2030.12 project_scale_raw 단상 15/20MVA 3대, 2BANK responsible_office_raw 중부건설본부/직할 equipment_type 변전 headquarters 중부건설본부 office 직할 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_712cf9284d8085e0
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_712cf9284d8085e0
Sources EV-d5e212e1a7767e86c0c5da71 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 e86bf88ffc275957eba19786f0bcd269d88923b19767c67ccd140ab35db9229a Observations for this power asset History for this project