POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 12items · current page 1–12 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-6f2b470674b79cdf3353937b
Detailed source fields Original source field Published value or condition stable_project_id kproj_9ab0d0c5e25ef076 stable_project_key prjtDef:233513:ESB project_definition 233513 first_region_code ESB manual_source_format false project_name 154kV 남비응분기 지중T/L 건설사업 project_name_list 154kV 남비응분기 지중T/L 건설사업 purpose 인근변전소 부하부담(비응,비응#2) project_region_detail 전북특별자치도 군산시 project_period_raw 2023.01~2027.12 project_scale_raw 154㎸ XLPE 2,000㎟, 2C-2.0㎞ responsible_office_raw 중부건설본부/전북건설지사 equipment_type 지중송전 headquarters 중부건설본부 office 전북건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_9ab0d0c5e25ef076
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_9ab0d0c5e25ef076
Sources EV-6f2b470674b79cdf3353937b Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 bf491919578ab55c3a247b094c380e4bedc0c470151c323a485e7ba1a7d487b6 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2024-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233513|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_4d942f5c6630acab
Sources EV-74b359f08d8785e5d92b6bb8 Evidence SHA-256 9257387385352d964cc11f2fbcdaad109ba2391be271d9410390f561917ca6ee 행 SHA-256 b718010436ba990b7141fd714a0132137c86474100b206dafd7271c2559c516e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2015-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233513|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_4d942f5c6630acab
Sources EV-74b359f08d8785e5d92b6bb8 Evidence SHA-256 9257387385352d964cc11f2fbcdaad109ba2391be271d9410390f561917ca6ee 행 SHA-256 b718010436ba990b7141fd714a0132137c86474100b206dafd7271c2559c516e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type plan_change date 2023-02 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233513|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_4d942f5c6630acab
Sources EV-74b359f08d8785e5d92b6bb8 Evidence SHA-256 9257387385352d964cc11f2fbcdaad109ba2391be271d9410390f561917ca6ee 행 SHA-256 b718010436ba990b7141fd714a0132137c86474100b206dafd7271c2559c516e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233513|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_4d942f5c6630acab
Sources EV-74b359f08d8785e5d92b6bb8 Evidence SHA-256 9257387385352d964cc11f2fbcdaad109ba2391be271d9410390f561917ca6ee 행 SHA-256 b718010436ba990b7141fd714a0132137c86474100b206dafd7271c2559c516e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2023-01 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233513|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_4d942f5c6630acab
Sources EV-74b359f08d8785e5d92b6bb8 Evidence SHA-256 9257387385352d964cc11f2fbcdaad109ba2391be271d9410390f561917ca6ee 행 SHA-256 b718010436ba990b7141fd714a0132137c86474100b206dafd7271c2559c516e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2017-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233513|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_4d942f5c6630acab
Sources EV-74b359f08d8785e5d92b6bb8 Evidence SHA-256 9257387385352d964cc11f2fbcdaad109ba2391be271d9410390f561917ca6ee 행 SHA-256 b718010436ba990b7141fd714a0132137c86474100b206dafd7271c2559c516e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2015-10 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|233513|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_4d942f5c6630acab
Sources EV-74b359f08d8785e5d92b6bb8 Evidence SHA-256 9257387385352d964cc11f2fbcdaad109ba2391be271d9410390f561917ca6ee 행 SHA-256 b718010436ba990b7141fd714a0132137c86474100b206dafd7271c2559c516e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2027-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233513|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_4d942f5c6630acab
Sources EV-74b359f08d8785e5d92b6bb8 Evidence SHA-256 9257387385352d964cc11f2fbcdaad109ba2391be271d9410390f561917ca6ee 행 SHA-256 b718010436ba990b7141fd714a0132137c86474100b206dafd7271c2559c516e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2028-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233513|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_4d942f5c6630acab
Sources EV-74b359f08d8785e5d92b6bb8 Evidence SHA-256 9257387385352d964cc11f2fbcdaad109ba2391be271d9410390f561917ca6ee 행 SHA-256 b718010436ba990b7141fd714a0132137c86474100b206dafd7271c2559c516e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_4d942f5c6630acab stable_project_id kproj_9ab0d0c5e25ef076 source_key 202609|233513|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 남비응분기 지중T/L 건설사업 project_name_detail 154kV 남비응분기 지중T/L 건설사업 region_summary_raw 전북특별자치도 군산시등 1 지역 equipment_type_raw 지중송전 headquarters_raw 중부건설본부 office_raw 전북건설지사 section_fields 사업 규모 154㎸ XLPE 2,000㎟, 2C-2.0㎞ 계획확정 제07차 장기송변전설비계획 반영(2015.10) 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: □ '15.10 제7차 장기송변전 설비계획 반영 □ '17.10 새만금 간척사업 매립 지연으로 준공목표 조정 □ '23.02 설비계획 적정성 검토에 따른 계통계획 변경(동비응-비응#3 → 비응#3분기) □ '24.06 설비계획 적정성 검토에 따른 준공목표 변경('28.12 → '26.12) future_plan_redacted □ 향후계획 □ '15.10 제7차 장기송변전 설비계획 반영 □ '17.10 새만금 간척사업 매립 지연으로 준공목표 조정 □ '23.02 설비계획 적정성 검토에 따른 계통계획 변경(동비응-비응#3 → 비응#3분기) □ '24.06 설비계획 적정성 검토에 따른 준공목표 변경('28.12 → '26.12) attachment_count 0 source_detail_sha256 9257387385352d964cc11f2fbcdaad109ba2391be271d9410390f561917ca6ee first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|233513|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_4d942f5c6630acab
Sources EV-74b359f08d8785e5d92b6bb8 Evidence SHA-256 9257387385352d964cc11f2fbcdaad109ba2391be271d9410390f561917ca6ee 행 SHA-256 b718010436ba990b7141fd714a0132137c86474100b206dafd7271c2559c516e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_9ab0d0c5e25ef076 stable_project_key prjtDef:233513:ESB project_definition 233513 first_region_code ESB manual_source_format false project_name 154kV 남비응분기 지중T/L 건설사업 project_name_list 154kV 남비응분기 지중T/L 건설사업 purpose 인근변전소 부하부담(비응,비응#2) project_region_detail 전북특별자치도 군산시 project_period_raw 2023.01~2027.12 project_scale_raw 154㎸ XLPE 2,000㎟, 2C-2.0㎞ responsible_office_raw 중부건설본부/전북건설지사 equipment_type 지중송전 headquarters 중부건설본부 office 전북건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_9ab0d0c5e25ef076
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_9ab0d0c5e25ef076
Sources EV-6f2b470674b79cdf3353937b Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 bf491919578ab55c3a247b094c380e4bedc0c470151c323a485e7ba1a7d487b6 Observations for this power asset History for this project