POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 11items · current page 1–11 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 남원#2S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-4fc2f30d3ad44ed3b6e32b34
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_4d324d07f1cbe12a
stable_project_keyprjtDef:231650:ESB
project_definition231650
first_region_codeESB
manual_source_formatfalse
project_name154kV 남원#2S/S 건설사업
project_name_list154kV 북남원S/S 건설사업
purpose남원지역 재생E 접속지연 해소
project_region_detail전북특별자치도 남원시
project_period_raw2024.07~2030.12
project_scale_raw154KV MTR 80MVA X 2BANK, 170KV GIS×8CCT
responsible_office_raw중부건설본부/전북건설지사
equipment_type변전
headquarters중부건설본부
office전북건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_ed8f63b53fc97034
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_4d324d07f1cbe12a

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_4d324d07f1cbe12a

Sources EV-4fc2f30d3ad44ed3b6e32b34
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 df4c965a5cfa7fbbc1d3fd702e01b4cca71780d4384e2808e2e5bfdc5eba9201
Source schedule candidates · KOR · kepco_planned

154kV 남원#2S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-02
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231650|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_ed8f63b53fc97034

Sources EV-567aa6ac3ef969a5e2dc907a
Evidence SHA-256 34390f5b0d13274f5e2eda5f34192d1713ec1e7271db885f95ea55895d6b0638
행 SHA-256 81b21d6c057b52b099807991e2fcb120adbda3128e5a5e3f8193de367ed1ccc1
Source schedule candidates · KOR · kepco_planned

154kV 남원#2S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231650|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_ed8f63b53fc97034

Sources EV-567aa6ac3ef969a5e2dc907a
Evidence SHA-256 34390f5b0d13274f5e2eda5f34192d1713ec1e7271db885f95ea55895d6b0638
행 SHA-256 81b21d6c057b52b099807991e2fcb120adbda3128e5a5e3f8193de367ed1ccc1
Source schedule candidates · KOR · kepco_planned

154kV 남원#2S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2029-01
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231650|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_ed8f63b53fc97034

Sources EV-567aa6ac3ef969a5e2dc907a
Evidence SHA-256 34390f5b0d13274f5e2eda5f34192d1713ec1e7271db885f95ea55895d6b0638
행 SHA-256 81b21d6c057b52b099807991e2fcb120adbda3128e5a5e3f8193de367ed1ccc1
Source schedule candidates · KOR · kepco_planned

154kV 남원#2S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2024-07
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231650|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_ed8f63b53fc97034

Sources EV-567aa6ac3ef969a5e2dc907a
Evidence SHA-256 34390f5b0d13274f5e2eda5f34192d1713ec1e7271db885f95ea55895d6b0638
행 SHA-256 81b21d6c057b52b099807991e2fcb120adbda3128e5a5e3f8193de367ed1ccc1
Source schedule candidates · KOR · kepco_planned

154kV 남원#2S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2029-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231650|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_ed8f63b53fc97034

Sources EV-567aa6ac3ef969a5e2dc907a
Evidence SHA-256 34390f5b0d13274f5e2eda5f34192d1713ec1e7271db885f95ea55895d6b0638
행 SHA-256 81b21d6c057b52b099807991e2fcb120adbda3128e5a5e3f8193de367ed1ccc1
Source schedule candidates · KOR · kepco_planned

154kV 남원#2S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231650|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_ed8f63b53fc97034

Sources EV-567aa6ac3ef969a5e2dc907a
Evidence SHA-256 34390f5b0d13274f5e2eda5f34192d1713ec1e7271db885f95ea55895d6b0638
행 SHA-256 81b21d6c057b52b099807991e2fcb120adbda3128e5a5e3f8193de367ed1ccc1
Source schedule candidates · KOR · kepco_planned

154kV 남원#2S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2030-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231650|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_ed8f63b53fc97034

Sources EV-567aa6ac3ef969a5e2dc907a
Evidence SHA-256 34390f5b0d13274f5e2eda5f34192d1713ec1e7271db885f95ea55895d6b0638
행 SHA-256 81b21d6c057b52b099807991e2fcb120adbda3128e5a5e3f8193de367ed1ccc1
Source schedule candidates · KOR · kepco_planned

154kV 남원#2S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2027-02
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231650|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_ed8f63b53fc97034

Sources EV-567aa6ac3ef969a5e2dc907a
Evidence SHA-256 34390f5b0d13274f5e2eda5f34192d1713ec1e7271db885f95ea55895d6b0638
행 SHA-256 81b21d6c057b52b099807991e2fcb120adbda3128e5a5e3f8193de367ed1ccc1
Source snapshots by date · KOR · kepco_planned

154kV 남원#2S/S 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_ed8f63b53fc97034
stable_project_idkproj_4d324d07f1cbe12a
source_key202609|231650|ESB
basic_ym202609
source_stage_raw계획확정-사업승인전
project_name_list154kV 북남원S/S 건설사업
project_name_detail154kV 남원#2S/S 건설사업
region_summary_raw전북특별자치도 남원시등 1 지역
equipment_type_raw변전
headquarters_raw중부건설본부
office_raw전북건설지사
section_fields
Project purpose
  • 남원지역 재생E 접속지연 해소
Project region
  • 전북특별자치도 남원시
Project period
  • 2024.07~2030.12
사업 규모
  • 154KV MTR 80MVA X 2BANK, 170KV GIS×8CCT
담당 사업소
  • 중부건설본부/전북건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
[진행경과] □ '23.06 : 제10차 장기송변전설비계획 신규 반영 [향후계획] □ '25.09 : 변전소 입지확정 □ '26.02 : 실시계획 신청 □ '27.02 : 용지매수 착수 □ '29.01 : 토건공사 착공 □ '29.04 : 변전공사 착공
future_plan_redacted□ 향후계획 [진행경과] □ '23.06 : 제10차 장기송변전설비계획 신규 반영 [향후계획] □ '25.09 : 변전소 입지확정 □ '26.02 : 실시계획 신청 □ '27.02 : 용지매수 착수 □ '29.01 : 토건공사 착공 □ '29.04 : 변전공사 착공
attachment_count0
source_detail_sha25634390f5b0d13274f5e2eda5f34192d1713ec1e7271db885f95ea55895d6b0638
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231650|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_ed8f63b53fc97034

Sources EV-567aa6ac3ef969a5e2dc907a
Evidence SHA-256 34390f5b0d13274f5e2eda5f34192d1713ec1e7271db885f95ea55895d6b0638
행 SHA-256 81b21d6c057b52b099807991e2fcb120adbda3128e5a5e3f8193de367ed1ccc1
Source snapshots by date · KOR · kepco_planned

154kV 남원#2S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_4d324d07f1cbe12a
stable_project_keyprjtDef:231650:ESB
project_definition231650
first_region_codeESB
manual_source_formatfalse
project_name154kV 남원#2S/S 건설사업
project_name_list154kV 북남원S/S 건설사업
purpose남원지역 재생E 접속지연 해소
project_region_detail전북특별자치도 남원시
project_period_raw2024.07~2030.12
project_scale_raw154KV MTR 80MVA X 2BANK, 170KV GIS×8CCT
responsible_office_raw중부건설본부/전북건설지사
equipment_type변전
headquarters중부건설본부
office전북건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_ed8f63b53fc97034
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_4d324d07f1cbe12a

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_4d324d07f1cbe12a

Sources EV-4fc2f30d3ad44ed3b6e32b34
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 df4c965a5cfa7fbbc1d3fd702e01b4cca71780d4384e2808e2e5bfdc5eba9201

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel