POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 6items · current page 1–6 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 남천안-불당 전력구 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-2c5b9835b88bfae291df51da
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_ce4678c2a679509b
stable_project_keyprjtDef:234733:ESB
project_definition234733
first_region_codeESB
manual_source_formatfalse
project_name154kV 남천안-불당 전력구 건설사업
project_name_list천안지역 전기공급시설 전력구공사(남천안-불당)
purpose천안지역 전력공급능력 확보
project_region_detail충청남도 천안시 동남구
project_period_raw2025.02~2030.12
project_scale_raw154KV XLPE 2500(D)X2C, L=4.0KM
responsible_office_raw중부건설본부/직할
equipment_type전력구
headquarters중부건설본부
office직할
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_38d206743bb614e7
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_ce4678c2a679509b

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_ce4678c2a679509b

Sources EV-2c5b9835b88bfae291df51da
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 9eecc6235fabd6e902edd1a527d8c6eaaeb3c6200cbb807fd0911647a0d44573
Source schedule candidates · KOR · kepco_planned

154kV 남천안-불당 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2025-02
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|234733|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_38d206743bb614e7

Sources EV-02646cf2e07cdaccfdf4cf1d
Evidence SHA-256 ffcf4812b2dd445b582bcce73dce8deb16495dd556e4715b72148395fd979fcc
행 SHA-256 c3db59c0f63eb4840d4d71c7d6520ebd6b3a5dc4bc9668b8af2d7a52bb897a45
Source schedule candidates · KOR · kepco_planned

154kV 남천안-불당 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2030-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|234733|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_38d206743bb614e7

Sources EV-02646cf2e07cdaccfdf4cf1d
Evidence SHA-256 ffcf4812b2dd445b582bcce73dce8deb16495dd556e4715b72148395fd979fcc
행 SHA-256 c3db59c0f63eb4840d4d71c7d6520ebd6b3a5dc4bc9668b8af2d7a52bb897a45
Source schedule candidates · KOR · kepco_planned

154kV 남천안-불당 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234733|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_38d206743bb614e7

Sources EV-02646cf2e07cdaccfdf4cf1d
Evidence SHA-256 ffcf4812b2dd445b582bcce73dce8deb16495dd556e4715b72148395fd979fcc
행 SHA-256 c3db59c0f63eb4840d4d71c7d6520ebd6b3a5dc4bc9668b8af2d7a52bb897a45
Source snapshots by date · KOR · kepco_planned

154kV 남천안-불당 전력구 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_38d206743bb614e7
stable_project_idkproj_ce4678c2a679509b
source_key202609|234733|ESB
basic_ym202609
source_stage_raw사업승인-공사착수전
project_name_list천안지역 전기공급시설 전력구공사(남천안-불당)
project_name_detail154kV 남천안-불당 전력구 건설사업
region_summary_raw충청남도 천안시 동남구등 1 지역
equipment_type_raw전력구
headquarters_raw중부건설본부
office_raw직할
section_fields
Project purpose
  • 천안지역 전력공급능력 확보
Project region
  • 충청남도 천안시 동남구
Project period
  • 2025.02~2030.12
사업 규모
  • 154KV XLPE 2500(D)X2C, L=4.0KM
담당 사업소
  • 중부건설본부/직할
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 실시설계: 설계담당자: [redacted]
-23.05 제10차 장기 송변전설비계획 수립
future_plan_redacted□ 향후계획 -23.05 제10차 장기 송변전설비계획 수립
attachment_count0
source_detail_sha256ffcf4812b2dd445b582bcce73dce8deb16495dd556e4715b72148395fd979fcc
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|234733|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_38d206743bb614e7

Sources EV-02646cf2e07cdaccfdf4cf1d
Evidence SHA-256 ffcf4812b2dd445b582bcce73dce8deb16495dd556e4715b72148395fd979fcc
행 SHA-256 c3db59c0f63eb4840d4d71c7d6520ebd6b3a5dc4bc9668b8af2d7a52bb897a45
Source snapshots by date · KOR · kepco_planned

154kV 남천안-불당 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_ce4678c2a679509b
stable_project_keyprjtDef:234733:ESB
project_definition234733
first_region_codeESB
manual_source_formatfalse
project_name154kV 남천안-불당 전력구 건설사업
project_name_list천안지역 전기공급시설 전력구공사(남천안-불당)
purpose천안지역 전력공급능력 확보
project_region_detail충청남도 천안시 동남구
project_period_raw2025.02~2030.12
project_scale_raw154KV XLPE 2500(D)X2C, L=4.0KM
responsible_office_raw중부건설본부/직할
equipment_type전력구
headquarters중부건설본부
office직할
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_38d206743bb614e7
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_ce4678c2a679509b

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_ce4678c2a679509b

Sources EV-2c5b9835b88bfae291df51da
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 9eecc6235fabd6e902edd1a527d8c6eaaeb3c6200cbb807fd0911647a0d44573

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel