POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 21items · current page 1–21 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 남비응S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-4d6a50757bc53daf8078828f
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_95d98c1c9faba632
stable_project_keyprjtDef:231421:ESB
project_definition231421
first_region_codeESB
manual_source_formatfalse
project_name154kV 남비응S/S 건설사업
project_name_list154kV 남비응S/S 건설사업
purpose새만금산업단지 신규부하 공급
project_region_detail전북특별자치도 군산시
project_period_raw2015.10~2027.12
project_scale_raw170KV GIS × 9CCT
responsible_office_raw중부건설본부/전북건설지사
equipment_type변전
headquarters중부건설본부
office전북건설지사
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_cefaf3868c56ee74
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_95d98c1c9faba632

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_95d98c1c9faba632

Sources EV-4d6a50757bc53daf8078828f
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 9c5880fae97269fa9394b193000dcbe9d8707a9ef1648d29788747575642689c
Source schedule candidates · KOR · kepco_planned

154kV 남비응S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-05
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231421|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_cefaf3868c56ee74

Sources EV-9d4a26719bd3593746f57943
Evidence SHA-256 58c7dc54503189d3ca87cac20d4860d56e5f04e3c770156eca4773183567f19b
행 SHA-256 67a08586bc8290ad7385d1ebafd316d7bf9cf2f817229f81ffac4a033cda2a22
Source schedule candidates · KOR · kepco_planned

154kV 남비응S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-06
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231421|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_cefaf3868c56ee74

Sources EV-9d4a26719bd3593746f57943
Evidence SHA-256 58c7dc54503189d3ca87cac20d4860d56e5f04e3c770156eca4773183567f19b
행 SHA-256 67a08586bc8290ad7385d1ebafd316d7bf9cf2f817229f81ffac4a033cda2a22
Source schedule candidates · KOR · kepco_planned

154kV 남비응S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2018-01
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231421|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_cefaf3868c56ee74

Sources EV-9d4a26719bd3593746f57943
Evidence SHA-256 58c7dc54503189d3ca87cac20d4860d56e5f04e3c770156eca4773183567f19b
행 SHA-256 67a08586bc8290ad7385d1ebafd316d7bf9cf2f817229f81ffac4a033cda2a22
Source schedule candidates · KOR · kepco_planned

154kV 남비응S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_completion
date2025-02
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231421|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_cefaf3868c56ee74

Sources EV-9d4a26719bd3593746f57943
Evidence SHA-256 58c7dc54503189d3ca87cac20d4860d56e5f04e3c770156eca4773183567f19b
행 SHA-256 67a08586bc8290ad7385d1ebafd316d7bf9cf2f817229f81ffac4a033cda2a22
Source schedule candidates · KOR · kepco_planned

154kV 남비응S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-03
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231421|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_cefaf3868c56ee74

Sources EV-9d4a26719bd3593746f57943
Evidence SHA-256 58c7dc54503189d3ca87cac20d4860d56e5f04e3c770156eca4773183567f19b
행 SHA-256 67a08586bc8290ad7385d1ebafd316d7bf9cf2f817229f81ffac4a033cda2a22
Source schedule candidates · KOR · kepco_planned

154kV 남비응S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-03
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231421|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_cefaf3868c56ee74

Sources EV-9d4a26719bd3593746f57943
Evidence SHA-256 58c7dc54503189d3ca87cac20d4860d56e5f04e3c770156eca4773183567f19b
행 SHA-256 67a08586bc8290ad7385d1ebafd316d7bf9cf2f817229f81ffac4a033cda2a22
Source schedule candidates · KOR · kepco_planned

154kV 남비응S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2015-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231421|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_cefaf3868c56ee74

Sources EV-9d4a26719bd3593746f57943
Evidence SHA-256 58c7dc54503189d3ca87cac20d4860d56e5f04e3c770156eca4773183567f19b
행 SHA-256 67a08586bc8290ad7385d1ebafd316d7bf9cf2f817229f81ffac4a033cda2a22
Source schedule candidates · KOR · kepco_planned

154kV 남비응S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2025-06
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231421|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_cefaf3868c56ee74

Sources EV-9d4a26719bd3593746f57943
Evidence SHA-256 58c7dc54503189d3ca87cac20d4860d56e5f04e3c770156eca4773183567f19b
행 SHA-256 67a08586bc8290ad7385d1ebafd316d7bf9cf2f817229f81ffac4a033cda2a22
Source schedule candidates · KOR · kepco_planned

154kV 남비응S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-02
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231421|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_cefaf3868c56ee74

Sources EV-9d4a26719bd3593746f57943
Evidence SHA-256 58c7dc54503189d3ca87cac20d4860d56e5f04e3c770156eca4773183567f19b
행 SHA-256 67a08586bc8290ad7385d1ebafd316d7bf9cf2f817229f81ffac4a033cda2a22
Source schedule candidates · KOR · kepco_planned

154kV 남비응S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2025-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231421|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_cefaf3868c56ee74

Sources EV-9d4a26719bd3593746f57943
Evidence SHA-256 58c7dc54503189d3ca87cac20d4860d56e5f04e3c770156eca4773183567f19b
행 SHA-256 67a08586bc8290ad7385d1ebafd316d7bf9cf2f817229f81ffac4a033cda2a22
Source schedule candidates · KOR · kepco_planned

154kV 남비응S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231421|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_cefaf3868c56ee74

Sources EV-9d4a26719bd3593746f57943
Evidence SHA-256 58c7dc54503189d3ca87cac20d4860d56e5f04e3c770156eca4773183567f19b
행 SHA-256 67a08586bc8290ad7385d1ebafd316d7bf9cf2f817229f81ffac4a033cda2a22
Source schedule candidates · KOR · kepco_planned

154kV 남비응S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-11
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231421|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_cefaf3868c56ee74

Sources EV-9d4a26719bd3593746f57943
Evidence SHA-256 58c7dc54503189d3ca87cac20d4860d56e5f04e3c770156eca4773183567f19b
행 SHA-256 67a08586bc8290ad7385d1ebafd316d7bf9cf2f817229f81ffac4a033cda2a22
Source schedule candidates · KOR · kepco_planned

154kV 남비응S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-06
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231421|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_cefaf3868c56ee74

Sources EV-9d4a26719bd3593746f57943
Evidence SHA-256 58c7dc54503189d3ca87cac20d4860d56e5f04e3c770156eca4773183567f19b
행 SHA-256 67a08586bc8290ad7385d1ebafd316d7bf9cf2f817229f81ffac4a033cda2a22
Source schedule candidates · KOR · kepco_planned

154kV 남비응S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeenergization
date2026-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231421|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_cefaf3868c56ee74

Sources EV-9d4a26719bd3593746f57943
Evidence SHA-256 58c7dc54503189d3ca87cac20d4860d56e5f04e3c770156eca4773183567f19b
행 SHA-256 67a08586bc8290ad7385d1ebafd316d7bf9cf2f817229f81ffac4a033cda2a22
Source schedule candidates · KOR · kepco_planned

154kV 남비응S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2015-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231421|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_cefaf3868c56ee74

Sources EV-9d4a26719bd3593746f57943
Evidence SHA-256 58c7dc54503189d3ca87cac20d4860d56e5f04e3c770156eca4773183567f19b
행 SHA-256 67a08586bc8290ad7385d1ebafd316d7bf9cf2f817229f81ffac4a033cda2a22
Source schedule candidates · KOR · kepco_planned

154kV 남비응S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2027-04
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231421|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_cefaf3868c56ee74

Sources EV-9d4a26719bd3593746f57943
Evidence SHA-256 58c7dc54503189d3ca87cac20d4860d56e5f04e3c770156eca4773183567f19b
행 SHA-256 67a08586bc8290ad7385d1ebafd316d7bf9cf2f817229f81ffac4a033cda2a22
Source schedule candidates · KOR · kepco_planned

154kV 남비응S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231421|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_cefaf3868c56ee74

Sources EV-9d4a26719bd3593746f57943
Evidence SHA-256 58c7dc54503189d3ca87cac20d4860d56e5f04e3c770156eca4773183567f19b
행 SHA-256 67a08586bc8290ad7385d1ebafd316d7bf9cf2f817229f81ffac4a033cda2a22
Source schedule candidates · KOR · kepco_planned

154kV 남비응S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2027-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231421|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_cefaf3868c56ee74

Sources EV-9d4a26719bd3593746f57943
Evidence SHA-256 58c7dc54503189d3ca87cac20d4860d56e5f04e3c770156eca4773183567f19b
행 SHA-256 67a08586bc8290ad7385d1ebafd316d7bf9cf2f817229f81ffac4a033cda2a22
Source snapshots by date · KOR · kepco_planned

154kV 남비응S/S 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_cefaf3868c56ee74
stable_project_idkproj_95d98c1c9faba632
source_key202609|231421|ESB
basic_ym202609
source_stage_raw공사착수-사업완료전
project_name_list154kV 남비응S/S 건설사업
project_name_detail154kV 남비응S/S 건설사업
region_summary_raw전북특별자치도 군산시등 1 지역
equipment_type_raw변전
headquarters_raw중부건설본부
office_raw전북건설지사
section_fields
Project purpose
  • 새만금산업단지 신규부하 공급
Project region
  • 전북특별자치도 군산시
Project period
  • 2015.10~2027.12
사업 규모
  • 170KV GIS × 9CCT
담당 사업소
  • 중부건설본부/전북건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 2024.03 ~ 2024.05 실시설계: 2024.06 ~ 2025.02 설계담당자: [redacted]
건설공사 개요
  • 공사 착공: 2025.06 공사 기간: 2025.06 ~ 2027.04 감독자: [redacted], 실적): 94, 70
[추진실적] □‘15.10 : 제7차 장기 송변전설비계획 사업반영 □‘18.01 ~‘22.03 : 새만금산단 조성공사 지연에 따른 사업대기 □‘23.11 : 입지확정위원회 구성 및 심의 시행 □‘24.05 : 기본설계 심의 완료 □‘24.10 : 편입부지 매수완료 □‘25.02 : 변전 실시설계 완료 □‘25.06 : 변전공사 착공 [향후계획] □‘26.12 : 변전소 가압
future_plan_redacted□ 향후계획 [추진실적] □‘15.10 : 제7차 장기 송변전설비계획 사업반영 □‘18.01 ~‘22.03 : 새만금산단 조성공사 지연에 따른 사업대기 □‘23.11 : 입지확정위원회 구성 및 심의 시행 □‘24.05 : 기본설계 심의 완료 □‘24.10 : 편입부지 매수완료 □‘25.02 : 변전 실시설계 완료 □‘25.06 : 변전공사 착공 [향후계획] □‘26.12 : 변전소 가압
attachment_count0
source_detail_sha25658c7dc54503189d3ca87cac20d4860d56e5f04e3c770156eca4773183567f19b
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231421|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_cefaf3868c56ee74

Sources EV-9d4a26719bd3593746f57943
Evidence SHA-256 58c7dc54503189d3ca87cac20d4860d56e5f04e3c770156eca4773183567f19b
행 SHA-256 67a08586bc8290ad7385d1ebafd316d7bf9cf2f817229f81ffac4a033cda2a22
Source snapshots by date · KOR · kepco_planned

154kV 남비응S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_95d98c1c9faba632
stable_project_keyprjtDef:231421:ESB
project_definition231421
first_region_codeESB
manual_source_formatfalse
project_name154kV 남비응S/S 건설사업
project_name_list154kV 남비응S/S 건설사업
purpose새만금산업단지 신규부하 공급
project_region_detail전북특별자치도 군산시
project_period_raw2015.10~2027.12
project_scale_raw170KV GIS × 9CCT
responsible_office_raw중부건설본부/전북건설지사
equipment_type변전
headquarters중부건설본부
office전북건설지사
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_cefaf3868c56ee74
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_95d98c1c9faba632

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_95d98c1c9faba632

Sources EV-4d6a50757bc53daf8078828f
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 9c5880fae97269fa9394b193000dcbe9d8707a9ef1648d29788747575642689c

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel