POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 201,406items · current page 1701–1800 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2020-09 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|234572|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b27669106d385753
Sources EV-78659abfcd752f9e18c4e9ec Evidence SHA-256 3ef5a635fc086120a0b26b550796544df7d8823ac8e335c7a225748ee78c5f98 행 SHA-256 b947e5377cc92a1c2581b934062caeda37dc00af04e62f833d8f1ba7e9c0a449 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_b27669106d385753 stable_project_id kproj_5f4da17fccc1f832 source_key 202609|234572|ESB basic_ym 202609 source_stage_raw 사업승인-공사착수전 project_name_list 부산 강서지역 전기공급시설 전력구공사(델타분기) project_name_detail 154kV 델타분기 전력구 건설사업 region_summary_raw 부산광역시 강서구등 1 지역 equipment_type_raw 전력구 headquarters_raw 남부건설본부 office_raw 직할 section_fields Project purpose 에코델타시티 개발에 따른 전력공급 위한 전력구공사 사업 규모 SHIELD-TBM 2,026M, 전력구 1,970M, 수직구 1개소 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 2020.09 ~ 2024.11 기본설계: 2020.09 ~ 2024.01 실시설계: 2024.07 ~ 설계담당자: [redacted] □ '26.09 : 기본, 실시설계 통합심의 시행 예정 future_plan_redacted □ 향후계획 □ '26.09 : 기본, 실시설계 통합심의 시행 예정 attachment_count 0 source_detail_sha256 3ef5a635fc086120a0b26b550796544df7d8823ac8e335c7a225748ee78c5f98 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|234572|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b27669106d385753
Sources EV-78659abfcd752f9e18c4e9ec Evidence SHA-256 3ef5a635fc086120a0b26b550796544df7d8823ac8e335c7a225748ee78c5f98 행 SHA-256 b947e5377cc92a1c2581b934062caeda37dc00af04e62f833d8f1ba7e9c0a449 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_5f4da17fccc1f832 stable_project_key prjtDef:234572:ESB project_definition 234572 first_region_code ESB manual_source_format false project_name 154kV 델타분기 전력구 건설사업 project_name_list 부산 강서지역 전기공급시설 전력구공사(델타분기) purpose 에코델타시티 개발에 따른 전력공급 위한 전력구공사 project_region_detail 부산광역시 강서구 project_period_raw 2020.03~2030.04 project_scale_raw SHIELD-TBM 2,026M, 전력구 1,970M, 수직구 1개소 responsible_office_raw 남부건설본부/직할 equipment_type 전력구 headquarters 남부건설본부 office 직할 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_5f4da17fccc1f832
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_5f4da17fccc1f832
Sources EV-431475b5a5fd0b8a85411d50 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 997531832b542ff549be4eb0bf04c526b9a58228681a71e05db06e9aa20e2a4f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-40ebb8b07a0d9fdb6701dff3
Detailed source fields Original source field Published value or condition stable_project_id kproj_7d1581a35964f5eb stable_project_key prjtDef:231668:ESB project_definition 231668 first_region_code ESB manual_source_format false project_name 154kV 도고S/S 건설사업 project_name_list 154kV 도고변전소 건설사 purpose 변전설비 적기확충으로 안정적 전력공급 project_region_detail Asan City, South Chungcheong Province project_period_raw 2024.06~2030.12 project_scale_raw 154KV M.TR 2BANK responsible_office_raw 중부건설본부/직할 equipment_type 변전 headquarters 중부건설본부 office 직할 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_7d1581a35964f5eb
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_7d1581a35964f5eb
Sources EV-40ebb8b07a0d9fdb6701dff3 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 850b9ebf31cbc446cb7d6ef194d1a6708c9a10dfcb582156130054d86155a835 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2024-06 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231668|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e1d23e812dd97423
Sources EV-cc4eb3245ec398f900a0b865 Evidence SHA-256 f351db5f8acfb6059ca1a7ad0423b5f39132c9bfdd9e3ab044459d24b3ad0812 행 SHA-256 a45781699a1eeffc93be0b954c59316f4b46b2a77b2e5a33828093d425c5021e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2030-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231668|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e1d23e812dd97423
Sources EV-cc4eb3245ec398f900a0b865 Evidence SHA-256 f351db5f8acfb6059ca1a7ad0423b5f39132c9bfdd9e3ab044459d24b3ad0812 행 SHA-256 a45781699a1eeffc93be0b954c59316f4b46b2a77b2e5a33828093d425c5021e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_e1d23e812dd97423 stable_project_id kproj_7d1581a35964f5eb source_key 202609|231668|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 도고변전소 건설사 project_name_detail 154kV 도고S/S 건설사업 region_summary_raw 충청남도 아산시등 1 지역 equipment_type_raw 변전 headquarters_raw 중부건설본부 office_raw 직할 section_fields Project region Asan City, South Chungcheong Province 계획확정 제10차 장기송변전설비계획 반영(2023.05) 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 1. 주요 추진경과 □ ‘23.05 : 10차 장기 송변전설비계획 수립 □ ‘24.08 : 도고 인허가 지연 관련 관계자 회의 □ ’24.09 : 현장답사에 의한 부지선정 검토 □ ’24.10 : 전력영향평가 용역 발주를 위한 현장답사 □ ’24.12 : 전력영향평가 용역 발주 □ ’25.02 : 도고변전소 전력영향평가 용역 계약 □ ’25.02 : 중장기 적정성 검토결과에 의한 준공목표 변경(’29.09→’30.12) □ ’25.04 : 도고변전소 전력영향평가 용역 착수회의 □ ’25.06 : 도고변전소 전력영향평가 용역 대역 변경 □ ’25.07~08 : 산업단지 내 변전소 부지 반영 협의 □ ’25.08~09 : 산업단지 내 변전소 부지할애 협조 요청 □ ’25.10~11 : 산업단지 내 변전소 부지할애 협의 □ ’25.12 : 입지선정실무위원회 시행 2. 추진 계획 □ ’29.04 : 변전공사 착공 □ ’30.12 : 공사준공 및 인계인수 future_plan_redacted □ 향후계획 1. 주요 추진경과 □ ‘23.05 : 10차 장기 송변전설비계획 수립 □ ‘24.08 : 도고 인허가 지연 관련 관계자 회의 □ ’24.09 : 현장답사에 의한 부지선정 검토 □ ’24.10 : 전력영향평가 용역 발주를 위한 현장답사 □ ’24.12 : 전력영향평가 용역 발주 □ ’25.02 : 도고변전소 전력영향평가 용역 계약 □ ’25.02 : 중장기 적정성 검토결과에 의한 준공목표 변경(’29.09→’30.12) □ ’25.04 : 도고변전소 전력영향평가 용역 착수회의 □ ’25.06 : 도고변전소 전력영향평가 용역 대역 변경 □ ’25.07~08 : 산업단지 내 변전소 부지 반영 협의 □ ’25.08~09 : 산업단지 내 변전소 부지할애 협조 요청 □ ’25.10~11 : 산업단지 내 변전소 부지할애 협의 □ ’25.12 : 입지선정실무위원회 시행 2. 추진 계획 □ ’29.04 : 변전공사 착공 □ ’30.12 : 공사준공 및 인계인수 attachment_count 0 source_detail_sha256 f351db5f8acfb6059ca1a7ad0423b5f39132c9bfdd9e3ab044459d24b3ad0812 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231668|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e1d23e812dd97423
Sources EV-cc4eb3245ec398f900a0b865 Evidence SHA-256 f351db5f8acfb6059ca1a7ad0423b5f39132c9bfdd9e3ab044459d24b3ad0812 행 SHA-256 a45781699a1eeffc93be0b954c59316f4b46b2a77b2e5a33828093d425c5021e Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_7d1581a35964f5eb stable_project_key prjtDef:231668:ESB project_definition 231668 first_region_code ESB manual_source_format false project_name 154kV 도고S/S 건설사업 project_name_list 154kV 도고변전소 건설사 purpose 변전설비 적기확충으로 안정적 전력공급 project_region_detail Asan City, South Chungcheong Province project_period_raw 2024.06~2030.12 project_scale_raw 154KV M.TR 2BANK responsible_office_raw 중부건설본부/직할 equipment_type 변전 headquarters 중부건설본부 office 직할 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_7d1581a35964f5eb
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_7d1581a35964f5eb
Sources EV-40ebb8b07a0d9fdb6701dff3 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 850b9ebf31cbc446cb7d6ef194d1a6708c9a10dfcb582156130054d86155a835 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-dabbc87b3a56e3c39c43f372
Detailed source fields Original source field Published value or condition stable_project_id kproj_7b7d20f0b0667e55 stable_project_key prjtDef:234731:ESB project_definition 234731 first_region_code ESB manual_source_format false project_name 154kV 도고분기 전력구 건설사업 project_name_list 154kV 도고분기 전력구 건설사업 purpose 도고 일반산업단지 조성 등 신규부하 공급능력 확보 project_region_detail Seosan City, South Chungcheong Province project_period_raw 2024.04~2028.02 project_scale_raw 154KV XLPE 2000X4C, L=1.0KM responsible_office_raw 중부건설본부/직할 equipment_type 전력구 headquarters 중부건설본부 office 직할 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_7b7d20f0b0667e55
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_7b7d20f0b0667e55
Sources EV-dabbc87b3a56e3c39c43f372 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 3c6c8f1665965cac5e0a6dcc7d644aac65dcb5b108da8d0e608a675741d65dfb Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2028-02 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234731|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_1488716bec26c168
Sources EV-8508d4fdff3f666b55054500 Evidence SHA-256 76e2820dc6a31676a2df1569f34b48c831e76ccf7938d39b72b1377661283552 행 SHA-256 a8d229f386e506f97d7a47a8826170cca2d7ab325b803360c087b29ed2d2cc41 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2024-04 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234731|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_1488716bec26c168
Sources EV-8508d4fdff3f666b55054500 Evidence SHA-256 76e2820dc6a31676a2df1569f34b48c831e76ccf7938d39b72b1377661283552 행 SHA-256 a8d229f386e506f97d7a47a8826170cca2d7ab325b803360c087b29ed2d2cc41 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_1488716bec26c168 stable_project_id kproj_7b7d20f0b0667e55 source_key 202609|234731|ESB basic_ym 202609 source_stage_raw 사업승인-공사착수전 project_name_list 154kV 도고분기 전력구 건설사업 project_name_detail 154kV 도고분기 전력구 건설사업 region_summary_raw 충청남도 서산시등 1 지역 equipment_type_raw 전력구 headquarters_raw 중부건설본부 office_raw 직할 section_fields Project purpose 도고 일반산업단지 조성 등 신규부하 공급능력 확보 Project region Seosan City, South Chungcheong Province 사업 규모 154KV XLPE 2000X4C, L=1.0KM 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 기본설계: 실시설계: 설계담당자: [redacted] -23.05 제 10차 장기 송변전설비계획 수립 future_plan_redacted □ 향후계획 -23.05 제 10차 장기 송변전설비계획 수립 attachment_count 0 source_detail_sha256 76e2820dc6a31676a2df1569f34b48c831e76ccf7938d39b72b1377661283552 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|234731|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_1488716bec26c168
Sources EV-8508d4fdff3f666b55054500 Evidence SHA-256 76e2820dc6a31676a2df1569f34b48c831e76ccf7938d39b72b1377661283552 행 SHA-256 a8d229f386e506f97d7a47a8826170cca2d7ab325b803360c087b29ed2d2cc41 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_7b7d20f0b0667e55 stable_project_key prjtDef:234731:ESB project_definition 234731 first_region_code ESB manual_source_format false project_name 154kV 도고분기 전력구 건설사업 project_name_list 154kV 도고분기 전력구 건설사업 purpose 도고 일반산업단지 조성 등 신규부하 공급능력 확보 project_region_detail Seosan City, South Chungcheong Province project_period_raw 2024.04~2028.02 project_scale_raw 154KV XLPE 2000X4C, L=1.0KM responsible_office_raw 중부건설본부/직할 equipment_type 전력구 headquarters 중부건설본부 office 직할 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_7b7d20f0b0667e55
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_7b7d20f0b0667e55
Sources EV-dabbc87b3a56e3c39c43f372 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 3c6c8f1665965cac5e0a6dcc7d644aac65dcb5b108da8d0e608a675741d65dfb Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-4b93727e4bf5947b0c5a3643
Detailed source fields Original source field Published value or condition stable_project_id kproj_bfeac01936d4d32f stable_project_key prjtDef:232685:ESB project_definition 232685 first_region_code ESB manual_source_format false project_name 154kV 도고분기T/L C/T 건설사업 project_name_list 154kV 도고분기 송전선로 건설사업 purpose 신규부하 급증에 따른 공급능력 확보 project_region_detail Asan City, South Chungcheong Province project_period_raw 2024.07~2030.12 project_scale_raw ACSR 410㎟ × S × 4C, 1.0KM responsible_office_raw 중부건설본부/직할 equipment_type 가공송전 headquarters 중부건설본부 office 직할 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_bfeac01936d4d32f
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_bfeac01936d4d32f
Sources EV-4b93727e4bf5947b0c5a3643 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 b984b87738053e0ba5c3d6e281706a80cb9569da347e6b915044b3bfb90a8e9c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-06 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232685|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6a93cb1be74926f4
Sources EV-8870f51caa24fda6653cbb7d Evidence SHA-256 c0faadcd901acbb013c1d7cd992466352086ba7a5e6d8801b0d046c28407bb00 행 SHA-256 f0a4f18ced5f14fd7c08ffe8e1667705fd0f2beb51c5c23434a67c6a3f25fd33 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2030-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232685|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6a93cb1be74926f4
Sources EV-8870f51caa24fda6653cbb7d Evidence SHA-256 c0faadcd901acbb013c1d7cd992466352086ba7a5e6d8801b0d046c28407bb00 행 SHA-256 f0a4f18ced5f14fd7c08ffe8e1667705fd0f2beb51c5c23434a67c6a3f25fd33 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-04 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232685|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6a93cb1be74926f4
Sources EV-8870f51caa24fda6653cbb7d Evidence SHA-256 c0faadcd901acbb013c1d7cd992466352086ba7a5e6d8801b0d046c28407bb00 행 SHA-256 f0a4f18ced5f14fd7c08ffe8e1667705fd0f2beb51c5c23434a67c6a3f25fd33 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-11 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232685|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6a93cb1be74926f4
Sources EV-8870f51caa24fda6653cbb7d Evidence SHA-256 c0faadcd901acbb013c1d7cd992466352086ba7a5e6d8801b0d046c28407bb00 행 SHA-256 f0a4f18ced5f14fd7c08ffe8e1667705fd0f2beb51c5c23434a67c6a3f25fd33 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-12 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232685|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6a93cb1be74926f4
Sources EV-8870f51caa24fda6653cbb7d Evidence SHA-256 c0faadcd901acbb013c1d7cd992466352086ba7a5e6d8801b0d046c28407bb00 행 SHA-256 f0a4f18ced5f14fd7c08ffe8e1667705fd0f2beb51c5c23434a67c6a3f25fd33 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-06 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232685|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6a93cb1be74926f4
Sources EV-8870f51caa24fda6653cbb7d Evidence SHA-256 c0faadcd901acbb013c1d7cd992466352086ba7a5e6d8801b0d046c28407bb00 행 SHA-256 f0a4f18ced5f14fd7c08ffe8e1667705fd0f2beb51c5c23434a67c6a3f25fd33 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-12 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232685|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6a93cb1be74926f4
Sources EV-8870f51caa24fda6653cbb7d Evidence SHA-256 c0faadcd901acbb013c1d7cd992466352086ba7a5e6d8801b0d046c28407bb00 행 SHA-256 f0a4f18ced5f14fd7c08ffe8e1667705fd0f2beb51c5c23434a67c6a3f25fd33 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-05 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232685|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6a93cb1be74926f4
Sources EV-8870f51caa24fda6653cbb7d Evidence SHA-256 c0faadcd901acbb013c1d7cd992466352086ba7a5e6d8801b0d046c28407bb00 행 SHA-256 f0a4f18ced5f14fd7c08ffe8e1667705fd0f2beb51c5c23434a67c6a3f25fd33 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2024-07 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232685|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6a93cb1be74926f4
Sources EV-8870f51caa24fda6653cbb7d Evidence SHA-256 c0faadcd901acbb013c1d7cd992466352086ba7a5e6d8801b0d046c28407bb00 행 SHA-256 f0a4f18ced5f14fd7c08ffe8e1667705fd0f2beb51c5c23434a67c6a3f25fd33 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2025-02 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232685|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6a93cb1be74926f4
Sources EV-8870f51caa24fda6653cbb7d Evidence SHA-256 c0faadcd901acbb013c1d7cd992466352086ba7a5e6d8801b0d046c28407bb00 행 SHA-256 f0a4f18ced5f14fd7c08ffe8e1667705fd0f2beb51c5c23434a67c6a3f25fd33 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-09 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232685|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6a93cb1be74926f4
Sources EV-8870f51caa24fda6653cbb7d Evidence SHA-256 c0faadcd901acbb013c1d7cd992466352086ba7a5e6d8801b0d046c28407bb00 행 SHA-256 f0a4f18ced5f14fd7c08ffe8e1667705fd0f2beb51c5c23434a67c6a3f25fd33 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_6a93cb1be74926f4 stable_project_id kproj_bfeac01936d4d32f source_key 202609|232685|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 도고분기 송전선로 건설사업 project_name_detail 154kV 도고분기T/L C/T 건설사업 region_summary_raw 충청남도 아산시등 1 지역 equipment_type_raw 가공송전 headquarters_raw 중부건설본부 office_raw 직할 section_fields Project region Asan City, South Chungcheong Province 사업 규모 ACSR 410㎟ × S × 4C, 1.0KM 입지선정 전력입지영향평가 용역 착수: 2025.02 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 입지선정 및 주민의견 수렴 주요 내용 line [진행경과] □ '23.05 : 제10차 송변전설비계획 사업 반영 □ '24.12 : 전력영향평가 용역 발주 □ '25.04 : 전력영향평가 용역 착수회의 □ '25.06 : 전력영향평가 대역 변경 관계자회의 □ '25.11 : 계통 연계점 변경 계통검토 요청(아산-예산 → 아산-합덕) □ '25.12 : 도고변전소 입지선정실무위원회 시행 □ '26.06 : 도고변전소 입지확정위원회 시 [향후계획] □ '26.09 : 전력입지영향평가 용역 재개 future_plan_redacted □ 향후계획 [향후계획] □ '26.09 : 전력입지영향평가 용역 재개 attachment_count 0 source_detail_sha256 c0faadcd901acbb013c1d7cd992466352086ba7a5e6d8801b0d046c28407bb00 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|232685|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_6a93cb1be74926f4
Sources EV-8870f51caa24fda6653cbb7d Evidence SHA-256 c0faadcd901acbb013c1d7cd992466352086ba7a5e6d8801b0d046c28407bb00 행 SHA-256 f0a4f18ced5f14fd7c08ffe8e1667705fd0f2beb51c5c23434a67c6a3f25fd33 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_bfeac01936d4d32f stable_project_key prjtDef:232685:ESB project_definition 232685 first_region_code ESB manual_source_format false project_name 154kV 도고분기T/L C/T 건설사업 project_name_list 154kV 도고분기 송전선로 건설사업 purpose 신규부하 급증에 따른 공급능력 확보 project_region_detail Asan City, South Chungcheong Province project_period_raw 2024.07~2030.12 project_scale_raw ACSR 410㎟ × S × 4C, 1.0KM responsible_office_raw 중부건설본부/직할 equipment_type 가공송전 headquarters 중부건설본부 office 직할 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_bfeac01936d4d32f
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_bfeac01936d4d32f
Sources EV-4b93727e4bf5947b0c5a3643 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 b984b87738053e0ba5c3d6e281706a80cb9569da347e6b915044b3bfb90a8e9c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-af5a0fff290c4cd48ff12ce2
Detailed source fields Original source field Published value or condition stable_project_id kproj_e715eff9b8d3b9c3 stable_project_key prjtDef:231574:ESB project_definition 231574 first_region_code ESB manual_source_format false project_name 154kV 도일(舊,중장안) 건설사업 project_name_list 154kV 도일S/S 건설사업 purpose 평택시 일대의 안정적 전력공급 project_region_detail Pyeongtaek, Gyeonggi Province project_period_raw 2021.09~2029.10 project_scale_raw 154KV M.TR (45/60MVA) X 2BANK responsible_office_raw 경인건설본부/경기건설지사 equipment_type 변전 headquarters 경인건설본부 office 경기건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_e715eff9b8d3b9c3
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_e715eff9b8d3b9c3
Sources EV-af5a0fff290c4cd48ff12ce2 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 0fe996ad3eee4236703e82a737fbc50e83337c3082f0110856d082233816a5b4 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2021-09 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231574|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_9f258304e2bcd003
Sources EV-7cf2159f5466d19f066d6fb0 Evidence SHA-256 e153ef7b4797d374ad6ddcc8aff775f14b6da918e8b3a80d79b39f765b75a987 행 SHA-256 f994fe29a1ecbb878b77a8ec302a6b786a55250a08e1b702a28bcd2713a0e410 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2029-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231574|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_9f258304e2bcd003
Sources EV-7cf2159f5466d19f066d6fb0 Evidence SHA-256 e153ef7b4797d374ad6ddcc8aff775f14b6da918e8b3a80d79b39f765b75a987 행 SHA-256 f994fe29a1ecbb878b77a8ec302a6b786a55250a08e1b702a28bcd2713a0e410 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_9f258304e2bcd003 stable_project_id kproj_e715eff9b8d3b9c3 source_key 202609|231574|ESB basic_ym 202609 source_stage_raw 사업승인-공사착수전 project_name_list 154kV 도일S/S 건설사업 project_name_detail 154kV 도일(舊,중장안) 건설사업 region_summary_raw 경기도 평택시등 1 지역 equipment_type_raw 변전 headquarters_raw 경인건설본부 office_raw 경기건설지사 section_fields Project region Pyeongtaek, Gyeonggi Province 사업 규모 154KV M.TR (45/60MVA) X 2BANK 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 기본설계: 실시설계: 설계담당자: [redacted] ○ 진행경과 - '21.09 : 제9차 장기송변전설비계획 신규반영 - '23.09 : 변전소 부지 확정[경기도 평택시 도일동 205번지(브레인시티 內)] - '25.01 : 기본설계 완료 ○ 향후계획 - '27.11 : 토건공사 착공 - '28.02 : 변전공사 착공 - '29.10 : 변전소 가압 future_plan_redacted □ 향후계획 ○ 진행경과 - '21.09 : 제9차 장기송변전설비계획 신규반영 - '23.09 : 변전소 부지 확정[경기도 평택시 도일동 205번지(브레인시티 內)] - '25.01 : 기본설계 완료 ○ 향후계획 - '27.11 : 토건공사 착공 - '28.02 : 변전공사 착공 - '29.10 : 변전소 가압 attachment_count 0 source_detail_sha256 e153ef7b4797d374ad6ddcc8aff775f14b6da918e8b3a80d79b39f765b75a987 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231574|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_9f258304e2bcd003
Sources EV-7cf2159f5466d19f066d6fb0 Evidence SHA-256 e153ef7b4797d374ad6ddcc8aff775f14b6da918e8b3a80d79b39f765b75a987 행 SHA-256 f994fe29a1ecbb878b77a8ec302a6b786a55250a08e1b702a28bcd2713a0e410 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_e715eff9b8d3b9c3 stable_project_key prjtDef:231574:ESB project_definition 231574 first_region_code ESB manual_source_format false project_name 154kV 도일(舊,중장안) 건설사업 project_name_list 154kV 도일S/S 건설사업 purpose 평택시 일대의 안정적 전력공급 project_region_detail Pyeongtaek, Gyeonggi Province project_period_raw 2021.09~2029.10 project_scale_raw 154KV M.TR (45/60MVA) X 2BANK responsible_office_raw 경인건설본부/경기건설지사 equipment_type 변전 headquarters 경인건설본부 office 경기건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_e715eff9b8d3b9c3
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_e715eff9b8d3b9c3
Sources EV-af5a0fff290c4cd48ff12ce2 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 0fe996ad3eee4236703e82a737fbc50e83337c3082f0110856d082233816a5b4 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-cc9e58b83dec85bdbe2cb87e
Detailed source fields Original source field Published value or condition stable_project_id kproj_d96988c2722ae59b stable_project_key prjtDef:231561:ESB project_definition 231561 first_region_code ESB manual_source_format false project_name 154kV 동강원(태백#2)S/S 건설사업 project_name_list 154kV 동강원(태백#2)변전소 건설사업 purpose 변전설비 적기확충으로 안정적 전력공급 project_region_detail 강원특별자치도 삼척시 project_period_raw 2025.07~2031.10 project_scale_raw 154/23KV 60MVA * 2BANK responsible_office_raw 중부건설본부/충북강원건설지사 equipment_type 변전 headquarters 중부건설본부 office 충북강원건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_d96988c2722ae59b
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_d96988c2722ae59b
Sources EV-cc9e58b83dec85bdbe2cb87e Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 54e6408f5e0ad6c11064ab7a40c3b72173055d494baf8fd5d8c8d146168c1243 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2031-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231561|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e5295c4b59d645e9
Sources EV-f1f77746047931fc9340babc Evidence SHA-256 2f131a129d4842442d6b0f9e41feb7e990fda96ca4ffa865178eba5700ecabc8 행 SHA-256 8216d3185dd758e2301a20db6f7c2be3aea2475bb971fdd8b253d850e28c89aa Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2025-07 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231561|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e5295c4b59d645e9
Sources EV-f1f77746047931fc9340babc Evidence SHA-256 2f131a129d4842442d6b0f9e41feb7e990fda96ca4ffa865178eba5700ecabc8 행 SHA-256 8216d3185dd758e2301a20db6f7c2be3aea2475bb971fdd8b253d850e28c89aa Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_e5295c4b59d645e9 stable_project_id kproj_d96988c2722ae59b source_key 202609|231561|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 동강원(태백#2)변전소 건설사업 project_name_detail 154kV 동강원(태백#2)S/S 건설사업 region_summary_raw 강원특별자치도 삼척시등 1 지역 equipment_type_raw 변전 headquarters_raw 중부건설본부 office_raw 충북강원건설지사 section_fields 입지선정 전력입지영향평가 용역 착수: 2025.12 입지선정위원회 구성시기: 2026.05 참여 위원 수 : 13 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 입지선정 및 주민의견 수렴 주요 내용 [진행경과] □ ‘25.05 : 제11차 장기 송변전설비계획 신규사업 반영 □ ‘25.08 : 전력입지영향평가 용역 설계 □ ‘25.12 : 전력입지영향평가 용역 계약 및 착수 완료 □ ‘26.04 : 입지선정위원회 구성 완료 (주민대표 10, 전문가 2, 지자체 2, 한전 1) □ ‘26.05 : 입지선정위원회 착수(1차) 회의 시행 - 내용 : 위원장 선출, 입지선정위원회 구성 및 운영 규범 수립·의결 등 □ ‘26.05 : 주민대표 대상 입지선정위원회 2차 회의 전 사전 사업설명 시행 - 내용 : 중요도 설문조사 조사방법 및 세부 절차 안내 □ ‘26.06 : 입지선정위원회 2차 회의 시행 - 내용 : 광역 개황조사 결과 보고, 입지선정을 위한 기준 심의·의결, 중요도 설문조사 시행 등 □ ‘26.07 : 입지선정위원회 3차 회의 시행 - 내용 : 중요도 조사 분석결과 보고, 도출된 후보 지역 안내 및 후보지역 심의·의결 등 □ ‘26.08 : 주민대상 사업 설명회 시행 - 내용 : 입지선정위원회 추진 현황, 후보 지역 및 향후 계획 안내 등 □ ‘26.09 : 입지선정위원회 4차 회의 시행 - 내용 : 예비 후보부지 현황보고, 후보부지 심의·의결 등 [향후계획] □ ‘26.10 : 입지선정위원회 5차 회의 시행 및 후보부지 현장답사 시행 □ ‘26.11 : 부지선정완료 □ ‘28.01 : 실시계획승인 완료 □ ‘29.01 : 용지매수 완료 □ ‘29.11 : 변전설계 완료 □ ‘30.04 : 변전공사 착공 □ ‘31.10 : 변전공사 준공 future_plan_redacted □ 향후계획 [향후계획] □ ‘26.10 : 입지선정위원회 5차 회의 시행 및 후보부지 현장답사 시행 □ ‘26.11 : 부지선정완료 □ ‘28.01 : 실시계획승인 완료 □ ‘29.01 : 용지매수 완료 □ ‘29.11 : 변전설계 완료 □ ‘30.04 : 변전공사 착공 □ ‘31.10 : 변전공사 준공 attachment_count 0 source_detail_sha256 2f131a129d4842442d6b0f9e41feb7e990fda96ca4ffa865178eba5700ecabc8 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231561|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_e5295c4b59d645e9
Sources EV-f1f77746047931fc9340babc Evidence SHA-256 2f131a129d4842442d6b0f9e41feb7e990fda96ca4ffa865178eba5700ecabc8 행 SHA-256 8216d3185dd758e2301a20db6f7c2be3aea2475bb971fdd8b253d850e28c89aa Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_d96988c2722ae59b stable_project_key prjtDef:231561:ESB project_definition 231561 first_region_code ESB manual_source_format false project_name 154kV 동강원(태백#2)S/S 건설사업 project_name_list 154kV 동강원(태백#2)변전소 건설사업 purpose 변전설비 적기확충으로 안정적 전력공급 project_region_detail 강원특별자치도 삼척시 project_period_raw 2025.07~2031.10 project_scale_raw 154/23KV 60MVA * 2BANK responsible_office_raw 중부건설본부/충북강원건설지사 equipment_type 변전 headquarters 중부건설본부 office 충북강원건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_d96988c2722ae59b
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_d96988c2722ae59b
Sources EV-cc9e58b83dec85bdbe2cb87e Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 54e6408f5e0ad6c11064ab7a40c3b72173055d494baf8fd5d8c8d146168c1243 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-51e263b29dfd847939437723
Detailed source fields Original source field Published value or condition stable_project_id kproj_96581b31c84e03e8 stable_project_key prjtDef:232743:ESB project_definition 232743 first_region_code ESB manual_source_format false project_name 154kV 동강원(태백#2)분기 T/L 건설사업 project_name_list 154kV 동강원(태백#2)분기 송전선로 건설사업 purpose 변전설비 적기확충으로 안정적 전력공급 project_region_detail 강원특별자치도 삼척시,태백시 project_period_raw 2025.05~2031.10 project_scale_raw HS/AW 240㎟×2B, 4C- 2KM responsible_office_raw 중부건설본부/충북강원건설지사 equipment_type 가공송전 headquarters 중부건설본부 office 충북강원건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_96581b31c84e03e8
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_96581b31c84e03e8
Sources EV-51e263b29dfd847939437723 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 53c06c0095ac57eb6aa0ebd60771d7976d6278fd6a2766f25c9aa04116dc9609 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2031-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232743|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_bf97ae6201d21f4f
Sources EV-0b24903ca6c4a8e1454baa6f Evidence SHA-256 a1eb83f9b52ce08350cc0359447d9ab81367ed8173ca4a10ba21cdce16a02b7d 행 SHA-256 59c7adaaf5c469fd759acd0c33aa1672781c2d36b1074b6f76e7412d617be786 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2025-05 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232743|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_bf97ae6201d21f4f
Sources EV-0b24903ca6c4a8e1454baa6f Evidence SHA-256 a1eb83f9b52ce08350cc0359447d9ab81367ed8173ca4a10ba21cdce16a02b7d 행 SHA-256 59c7adaaf5c469fd759acd0c33aa1672781c2d36b1074b6f76e7412d617be786 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_bf97ae6201d21f4f stable_project_id kproj_96581b31c84e03e8 source_key 202609|232743|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 동강원(태백#2)분기 송전선로 건설사업 project_name_detail 154kV 동강원(태백#2)분기 T/L 건설사업 region_summary_raw 강원특별자치도 삼척시등 2 지역 equipment_type_raw 가공송전 headquarters_raw 중부건설본부 office_raw 충북강원건설지사 section_fields 계획확정 제11차 장기송변전설비계획 반영(2025.05) 입지선정 전력입지영향평가 용역 착수: 2025.10 입지선정위원회 구성시기: 2026.04 참여 위원 수 : 15 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 입지선정 및 주민의견 수렴 주요 내용 □ ‘25.05 : 제11차 장기송변전설비계획 사업 신규반영 □ ‘25.12 : 전력입지영향평가 용역 계약 및 착수 완료 □ ‘25.12 : 지자체 대상 사업설명회 □ ‘26.02 : 읍·면·동 대상 사업설명회 □ ‘26.04 : 입지선정위원회 구성 완료 □ ‘26.05 : 입지선정위원회 착수(1차) 회의 시행 - 내용 : 위원장 선출, 입지선정위원회 운영기준 수립 □ ‘26.06 : 입지선정위원회 2차 회의 시행 - 내용 : 중요도 설문조사 시행 □ ‘26.07 : 입지선정위원회 3차 회의 시행 - 내용 : 변전소 후보지역 선정 □ ‘26.08 : 후보지역 대상 사업설명회 line □ ‘26.09 : 입지선정위원회 4차 회의 시행 - 내용 : 변전소 후보부지 심의·의결 □ ‘26.10 : 입지선정위원회 5차 회의 시 future_plan_redacted line □ 향후계획 □ ‘26.09 : 입지선정위원회 4차 회의 시행 - 내용 : 변전소 후보부지 심의·의결 □ ‘26.10 : 입지선정위원회 5차 회의 시 attachment_count 0 source_detail_sha256 a1eb83f9b52ce08350cc0359447d9ab81367ed8173ca4a10ba21cdce16a02b7d first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|232743|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_bf97ae6201d21f4f
Sources EV-0b24903ca6c4a8e1454baa6f Evidence SHA-256 a1eb83f9b52ce08350cc0359447d9ab81367ed8173ca4a10ba21cdce16a02b7d 행 SHA-256 59c7adaaf5c469fd759acd0c33aa1672781c2d36b1074b6f76e7412d617be786 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_96581b31c84e03e8 stable_project_key prjtDef:232743:ESB project_definition 232743 first_region_code ESB manual_source_format false project_name 154kV 동강원(태백#2)분기 T/L 건설사업 project_name_list 154kV 동강원(태백#2)분기 송전선로 건설사업 purpose 변전설비 적기확충으로 안정적 전력공급 project_region_detail 강원특별자치도 삼척시,태백시 project_period_raw 2025.05~2031.10 project_scale_raw HS/AW 240㎟×2B, 4C- 2KM responsible_office_raw 중부건설본부/충북강원건설지사 equipment_type 가공송전 headquarters 중부건설본부 office 충북강원건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_96581b31c84e03e8
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_96581b31c84e03e8
Sources EV-51e263b29dfd847939437723 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 53c06c0095ac57eb6aa0ebd60771d7976d6278fd6a2766f25c9aa04116dc9609 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-89c4656b266477e6efbb080a
Detailed source fields Original source field Published value or condition stable_project_id kproj_e3f37f8e5cb512ce stable_project_key prjtDef:231506:ESB project_definition 231506 first_region_code ESB manual_source_format false project_name 154kV 동구미개폐소 건설사업 project_name_list 154kV 동구미개폐소 건설사업 purpose 구미 대용량 고객선로 계통 보강 project_region_detail Gumi City, North Gyeongsang Province project_period_raw 2025.08~2029.09 project_scale_raw 154KV EGIS 10CCT(1.5차단 개폐소) responsible_office_raw 남부건설본부/대구경북건설지사 equipment_type 변전 headquarters 남부건설본부 office 대구경북건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_e3f37f8e5cb512ce
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_e3f37f8e5cb512ce
Sources EV-89c4656b266477e6efbb080a Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 f6c72489c2d4b78e845f425a4e951af33eca3d5f36c9d2e26a8aeb4628d83228 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2028-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231506|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_fe9ca06793de5dd8
Sources EV-c766fba7aa4dee1fc1608272 Evidence SHA-256 3585c6206cdff200caff6356d325a90e9fd9b3f6118deb1ce4bc6a4c0ae63763 행 SHA-256 b24342d44e8e80a995769e270c853ff65f297192180828dcb7e8554f4e7b3ed4 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type design_completion date 2027-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231506|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_fe9ca06793de5dd8
Sources EV-c766fba7aa4dee1fc1608272 Evidence SHA-256 3585c6206cdff200caff6356d325a90e9fd9b3f6118deb1ce4bc6a4c0ae63763 행 SHA-256 b24342d44e8e80a995769e270c853ff65f297192180828dcb7e8554f4e7b3ed4 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2025-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231506|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_fe9ca06793de5dd8
Sources EV-c766fba7aa4dee1fc1608272 Evidence SHA-256 3585c6206cdff200caff6356d325a90e9fd9b3f6118deb1ce4bc6a4c0ae63763 행 SHA-256 b24342d44e8e80a995769e270c853ff65f297192180828dcb7e8554f4e7b3ed4 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2029-09 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231506|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_fe9ca06793de5dd8
Sources EV-c766fba7aa4dee1fc1608272 Evidence SHA-256 3585c6206cdff200caff6356d325a90e9fd9b3f6118deb1ce4bc6a4c0ae63763 행 SHA-256 b24342d44e8e80a995769e270c853ff65f297192180828dcb7e8554f4e7b3ed4 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2028-01 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231506|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_fe9ca06793de5dd8
Sources EV-c766fba7aa4dee1fc1608272 Evidence SHA-256 3585c6206cdff200caff6356d325a90e9fd9b3f6118deb1ce4bc6a4c0ae63763 행 SHA-256 b24342d44e8e80a995769e270c853ff65f297192180828dcb7e8554f4e7b3ed4 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2025-08 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231506|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_fe9ca06793de5dd8
Sources EV-c766fba7aa4dee1fc1608272 Evidence SHA-256 3585c6206cdff200caff6356d325a90e9fd9b3f6118deb1ce4bc6a4c0ae63763 행 SHA-256 b24342d44e8e80a995769e270c853ff65f297192180828dcb7e8554f4e7b3ed4 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_fe9ca06793de5dd8 stable_project_id kproj_e3f37f8e5cb512ce source_key 202609|231506|ESB basic_ym 202609 source_stage_raw 사업승인-공사착수전 project_name_list 154kV 동구미개폐소 건설사업 project_name_detail 154kV 동구미개폐소 건설사업 region_summary_raw 경상북도 구미시등 1 지역 equipment_type_raw 변전 headquarters_raw 남부건설본부 office_raw 대구경북건설지사 section_fields Project region Gumi City, North Gyeongsang Province 사업 규모 154KV EGIS 10CCT(1.5차단 개폐소) 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 기본설계: 실시설계: 설계담당자: [redacted] - 진행경과 ㅇ 25.06 : 제11차 장기송변전설비계획 (준공목표 : ’28.10) - 향후 계획 ㅇ 27.05 : 설계 완료 ㅇ 28.01 : 공사 착공 future_plan_redacted □ 향후계획 - 진행경과 ㅇ 25.06 : 제11차 장기송변전설비계획 (준공목표 : ’28.10) - 향후 계획 ㅇ 27.05 : 설계 완료 ㅇ 28.01 : 공사 착공 attachment_count 0 source_detail_sha256 3585c6206cdff200caff6356d325a90e9fd9b3f6118deb1ce4bc6a4c0ae63763 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231506|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_fe9ca06793de5dd8
Sources EV-c766fba7aa4dee1fc1608272 Evidence SHA-256 3585c6206cdff200caff6356d325a90e9fd9b3f6118deb1ce4bc6a4c0ae63763 행 SHA-256 b24342d44e8e80a995769e270c853ff65f297192180828dcb7e8554f4e7b3ed4 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_e3f37f8e5cb512ce stable_project_key prjtDef:231506:ESB project_definition 231506 first_region_code ESB manual_source_format false project_name 154kV 동구미개폐소 건설사업 project_name_list 154kV 동구미개폐소 건설사업 purpose 구미 대용량 고객선로 계통 보강 project_region_detail Gumi City, North Gyeongsang Province project_period_raw 2025.08~2029.09 project_scale_raw 154KV EGIS 10CCT(1.5차단 개폐소) responsible_office_raw 남부건설본부/대구경북건설지사 equipment_type 변전 headquarters 남부건설본부 office 대구경북건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_e3f37f8e5cb512ce
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_e3f37f8e5cb512ce
Sources EV-89c4656b266477e6efbb080a Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 f6c72489c2d4b78e845f425a4e951af33eca3d5f36c9d2e26a8aeb4628d83228 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-b573edca0534f031f850fb12
Detailed source fields Original source field Published value or condition stable_project_id kproj_5dc13235c4597d7f stable_project_key prjtDef:231426:ESB project_definition 231426 first_region_code ESB manual_source_format false project_name 154kV 동구지S/S 건설사업 project_name_list 154kV 동구지S/S 건설사업 purpose 변전설비 적기확충으로 안정적 전력공급 project_region_detail 대구광역시 달성군 project_period_raw 2026.01~2027.12 project_scale_raw 154KV M.TR(60MVA)×2BANK,170KV GIS×12CCT 등 responsible_office_raw 남부건설본부/대구경북건설지사 equipment_type 변전 headquarters 남부건설본부 office 대구경북건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_5dc13235c4597d7f
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_5dc13235c4597d7f
Sources EV-b573edca0534f031f850fb12 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 9a6052f865ab1810ec2f894849907dcd09b1985c3086f20473ccf80bea58a48a Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2026-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231426|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d32ef44120453817
Sources EV-fa53444285ce9d33ba8ca2df Evidence SHA-256 fa27fbd8145a1d5c8573257fa215af8d7a6e2c736cc29691a9a4e79e6a2f427e 행 SHA-256 d543359e2a76b8d192a13eb8a9f6fa9b43dda4c1f8f8c41cdbe66a87cc556cd6 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2026-07 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231426|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d32ef44120453817
Sources EV-fa53444285ce9d33ba8ca2df Evidence SHA-256 fa27fbd8145a1d5c8573257fa215af8d7a6e2c736cc29691a9a4e79e6a2f427e 행 SHA-256 d543359e2a76b8d192a13eb8a9f6fa9b43dda4c1f8f8c41cdbe66a87cc556cd6 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2019-11 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231426|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d32ef44120453817
Sources EV-fa53444285ce9d33ba8ca2df Evidence SHA-256 fa27fbd8145a1d5c8573257fa215af8d7a6e2c736cc29691a9a4e79e6a2f427e 행 SHA-256 d543359e2a76b8d192a13eb8a9f6fa9b43dda4c1f8f8c41cdbe66a87cc556cd6 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2024-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231426|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d32ef44120453817
Sources EV-fa53444285ce9d33ba8ca2df Evidence SHA-256 fa27fbd8145a1d5c8573257fa215af8d7a6e2c736cc29691a9a4e79e6a2f427e 행 SHA-256 d543359e2a76b8d192a13eb8a9f6fa9b43dda4c1f8f8c41cdbe66a87cc556cd6 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type energization date 2027-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231426|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d32ef44120453817
Sources EV-fa53444285ce9d33ba8ca2df Evidence SHA-256 fa27fbd8145a1d5c8573257fa215af8d7a6e2c736cc29691a9a4e79e6a2f427e 행 SHA-256 d543359e2a76b8d192a13eb8a9f6fa9b43dda4c1f8f8c41cdbe66a87cc556cd6 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2027-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231426|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d32ef44120453817
Sources EV-fa53444285ce9d33ba8ca2df Evidence SHA-256 fa27fbd8145a1d5c8573257fa215af8d7a6e2c736cc29691a9a4e79e6a2f427e 행 SHA-256 d543359e2a76b8d192a13eb8a9f6fa9b43dda4c1f8f8c41cdbe66a87cc556cd6 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2026-01 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231426|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d32ef44120453817
Sources EV-fa53444285ce9d33ba8ca2df Evidence SHA-256 fa27fbd8145a1d5c8573257fa215af8d7a6e2c736cc29691a9a4e79e6a2f427e 행 SHA-256 d543359e2a76b8d192a13eb8a9f6fa9b43dda4c1f8f8c41cdbe66a87cc556cd6 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2018-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231426|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d32ef44120453817
Sources EV-fa53444285ce9d33ba8ca2df Evidence SHA-256 fa27fbd8145a1d5c8573257fa215af8d7a6e2c736cc29691a9a4e79e6a2f427e 행 SHA-256 d543359e2a76b8d192a13eb8a9f6fa9b43dda4c1f8f8c41cdbe66a87cc556cd6 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2027-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231426|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d32ef44120453817
Sources EV-fa53444285ce9d33ba8ca2df Evidence SHA-256 fa27fbd8145a1d5c8573257fa215af8d7a6e2c736cc29691a9a4e79e6a2f427e 행 SHA-256 d543359e2a76b8d192a13eb8a9f6fa9b43dda4c1f8f8c41cdbe66a87cc556cd6 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2027-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231426|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d32ef44120453817
Sources EV-fa53444285ce9d33ba8ca2df Evidence SHA-256 fa27fbd8145a1d5c8573257fa215af8d7a6e2c736cc29691a9a4e79e6a2f427e 행 SHA-256 d543359e2a76b8d192a13eb8a9f6fa9b43dda4c1f8f8c41cdbe66a87cc556cd6 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2015-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231426|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d32ef44120453817
Sources EV-fa53444285ce9d33ba8ca2df Evidence SHA-256 fa27fbd8145a1d5c8573257fa215af8d7a6e2c736cc29691a9a4e79e6a2f427e 행 SHA-256 d543359e2a76b8d192a13eb8a9f6fa9b43dda4c1f8f8c41cdbe66a87cc556cd6 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2020-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231426|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d32ef44120453817
Sources EV-fa53444285ce9d33ba8ca2df Evidence SHA-256 fa27fbd8145a1d5c8573257fa215af8d7a6e2c736cc29691a9a4e79e6a2f427e 행 SHA-256 d543359e2a76b8d192a13eb8a9f6fa9b43dda4c1f8f8c41cdbe66a87cc556cd6 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_d32ef44120453817 stable_project_id kproj_5dc13235c4597d7f source_key 202609|231426|ESB basic_ym 202609 source_stage_raw 사업승인-공사착수전 project_name_list 154kV 동구지S/S 건설사업 project_name_detail 154kV 동구지S/S 건설사업 region_summary_raw 대구광역시 달성군등 1 지역 equipment_type_raw 변전 headquarters_raw 남부건설본부 office_raw 대구경북건설지사 section_fields 사업 규모 154KV M.TR(60MVA)×2BANK,170KV GIS×12CCT 등 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 기본설계: 실시설계: 설계담당자: [redacted] 1. 진행경과 □ '15.10 : 제7차 장기 송변전설비계획에 따른 신규사업 반영 □ '18.10 : 154kV 동구지(舊, 구지#3)변전소 입지확정 보고 □ '19.11 : 변전소 부지면적 변경 협조요청(1.5CB방식적용) □ '20.05 : 용지매수 의뢰 □ '24.12 : 동구지 변전소 준공목표 변경 알림('26.12 → '27.12) 2.향후계획 □ '26.07 : 공사 착공 □ '27.12 : 준공 및 가압 future_plan_redacted □ 향후계획 1. 진행경과 □ '15.10 : 제7차 장기 송변전설비계획에 따른 신규사업 반영 □ '18.10 : 154kV 동구지(舊, 구지#3)변전소 입지확정 보고 □ '19.11 : 변전소 부지면적 변경 협조요청(1.5CB방식적용) □ '20.05 : 용지매수 의뢰 □ '24.12 : 동구지 변전소 준공목표 변경 알림('26.12 → '27.12) 2.향후계획 □ '26.07 : 공사 착공 □ '27.12 : 준공 및 가압 attachment_count 0 source_detail_sha256 fa27fbd8145a1d5c8573257fa215af8d7a6e2c736cc29691a9a4e79e6a2f427e first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231426|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d32ef44120453817
Sources EV-fa53444285ce9d33ba8ca2df Evidence SHA-256 fa27fbd8145a1d5c8573257fa215af8d7a6e2c736cc29691a9a4e79e6a2f427e 행 SHA-256 d543359e2a76b8d192a13eb8a9f6fa9b43dda4c1f8f8c41cdbe66a87cc556cd6 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_5dc13235c4597d7f stable_project_key prjtDef:231426:ESB project_definition 231426 first_region_code ESB manual_source_format false project_name 154kV 동구지S/S 건설사업 project_name_list 154kV 동구지S/S 건설사업 purpose 변전설비 적기확충으로 안정적 전력공급 project_region_detail 대구광역시 달성군 project_period_raw 2026.01~2027.12 project_scale_raw 154KV M.TR(60MVA)×2BANK,170KV GIS×12CCT 등 responsible_office_raw 남부건설본부/대구경북건설지사 equipment_type 변전 headquarters 남부건설본부 office 대구경북건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_5dc13235c4597d7f
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_5dc13235c4597d7f
Sources EV-b573edca0534f031f850fb12 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 9a6052f865ab1810ec2f894849907dcd09b1985c3086f20473ccf80bea58a48a Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-7243050ba16f577406adb11a
Detailed source fields Original source field Published value or condition stable_project_id kproj_707eb51cfd2d873f stable_project_key prjtDef:233529:ESB project_definition 233529 first_region_code ESB manual_source_format false project_name 154kV 동구지분기 지중T/L 건설사업 project_name_list 154kV 동구지분기 지중T/L 건설사업 purpose 154KV 서구지S/S 단일계통 공급해소 project_region_detail 대구광역시 달성군 project_period_raw 2025.06~2027.12 project_scale_raw 154KV XLPE 2000㎟×4C×0.1㎞ responsible_office_raw 남부건설본부/대구경북건설지사 equipment_type 지중송전 headquarters 남부건설본부 office 대구경북건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_707eb51cfd2d873f
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_707eb51cfd2d873f
Sources EV-7243050ba16f577406adb11a Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 343f7936643943d8f9d8ba23d99ffabc968e4dec281d68587b939b57c3bbf8f6 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2027-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233529|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_257eb80b1da77c77
Sources EV-8a83368d8d09f7093a1b241a Evidence SHA-256 545b0baa30d34599599a6493d83cc2ed029b637232d2f537c22c4717c61df41b 행 SHA-256 fd843c57186f545c58dcd08d46f0e39dcebffc5f2f23b5b5727f52b213524b66 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2025-06 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233529|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_257eb80b1da77c77
Sources EV-8a83368d8d09f7093a1b241a Evidence SHA-256 545b0baa30d34599599a6493d83cc2ed029b637232d2f537c22c4717c61df41b 행 SHA-256 fd843c57186f545c58dcd08d46f0e39dcebffc5f2f23b5b5727f52b213524b66 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_257eb80b1da77c77 stable_project_id kproj_707eb51cfd2d873f source_key 202609|233529|ESB basic_ym 202609 source_stage_raw 사업승인-공사착수전 project_name_list 154kV 동구지분기 지중T/L 건설사업 project_name_detail 154kV 동구지분기 지중T/L 건설사업 region_summary_raw 대구광역시 달성군등 1 지역 equipment_type_raw 지중송전 headquarters_raw 남부건설본부 office_raw 대구경북건설지사 section_fields 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 기본설계: 2026.06 ~ 2026.09 실시설계: 2026.10 ~ 2027.02 설계담당자: [redacted] -'26.09 : 기본설계 완료 -'27.02 : 실시설계 완료 -'27.06 : 지중공사 착공 -'27.12 : 지중공사 준공 future_plan_redacted □ 향후계획 -'26.09 : 기본설계 완료 -'27.02 : 실시설계 완료 -'27.06 : 지중공사 착공 -'27.12 : 지중공사 준공 attachment_count 0 source_detail_sha256 545b0baa30d34599599a6493d83cc2ed029b637232d2f537c22c4717c61df41b first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|233529|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_257eb80b1da77c77
Sources EV-8a83368d8d09f7093a1b241a Evidence SHA-256 545b0baa30d34599599a6493d83cc2ed029b637232d2f537c22c4717c61df41b 행 SHA-256 fd843c57186f545c58dcd08d46f0e39dcebffc5f2f23b5b5727f52b213524b66 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_707eb51cfd2d873f stable_project_key prjtDef:233529:ESB project_definition 233529 first_region_code ESB manual_source_format false project_name 154kV 동구지분기 지중T/L 건설사업 project_name_list 154kV 동구지분기 지중T/L 건설사업 purpose 154KV 서구지S/S 단일계통 공급해소 project_region_detail 대구광역시 달성군 project_period_raw 2025.06~2027.12 project_scale_raw 154KV XLPE 2000㎟×4C×0.1㎞ responsible_office_raw 남부건설본부/대구경북건설지사 equipment_type 지중송전 headquarters 남부건설본부 office 대구경북건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_707eb51cfd2d873f
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_707eb51cfd2d873f
Sources EV-7243050ba16f577406adb11a Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 343f7936643943d8f9d8ba23d99ffabc968e4dec281d68587b939b57c3bbf8f6 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-55f97cc0d7d2992111b324d5
Detailed source fields Original source field Published value or condition stable_project_id kproj_82d39daa5e07ad6f stable_project_key prjtDef:231459:ESB project_definition 231459 first_region_code ESB manual_source_format false project_name 154kV 동면S/S 건설사업 project_name_list 154KV 동면변전소 건설사업 purpose 변전설비 적기확충으로 안정적 전력공급 project_region_detail 강원특별자치도 춘천시 project_period_raw 2018.10~2027.10 project_scale_raw 154/23KV 60MVA * 2BANK responsible_office_raw 중부건설본부/충북강원건설지사 equipment_type 변전 headquarters 중부건설본부 office 충북강원건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_82d39daa5e07ad6f
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_82d39daa5e07ad6f
Sources EV-55f97cc0d7d2992111b324d5 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 62b6fecc86ced3025968a5807cecc44049b576709064c8751ef08608775d7569 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2018-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231459|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_75447d633b910437
Sources EV-b9c38b9b832312c6df098370 Evidence SHA-256 ef02ef26d5fe65171bad305762252b3e86b40b83045b53433ff94d87de3759cd 행 SHA-256 bc71605478966fb2cd7f2c3fa548fc6d9e129e48117e620ce64ac56695aa7de2 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type implementation_plan_approval date 2023-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231459|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_75447d633b910437
Sources EV-b9c38b9b832312c6df098370 Evidence SHA-256 ef02ef26d5fe65171bad305762252b3e86b40b83045b53433ff94d87de3759cd 행 SHA-256 bc71605478966fb2cd7f2c3fa548fc6d9e129e48117e620ce64ac56695aa7de2 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-08 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231459|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_75447d633b910437
Sources EV-b9c38b9b832312c6df098370 Evidence SHA-256 ef02ef26d5fe65171bad305762252b3e86b40b83045b53433ff94d87de3759cd 행 SHA-256 bc71605478966fb2cd7f2c3fa548fc6d9e129e48117e620ce64ac56695aa7de2 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2026-09 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231459|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_75447d633b910437
Sources EV-b9c38b9b832312c6df098370 Evidence SHA-256 ef02ef26d5fe65171bad305762252b3e86b40b83045b53433ff94d87de3759cd 행 SHA-256 bc71605478966fb2cd7f2c3fa548fc6d9e129e48117e620ce64ac56695aa7de2 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2023-11 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231459|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_75447d633b910437
Sources EV-b9c38b9b832312c6df098370 Evidence SHA-256 ef02ef26d5fe65171bad305762252b3e86b40b83045b53433ff94d87de3759cd 행 SHA-256 bc71605478966fb2cd7f2c3fa548fc6d9e129e48117e620ce64ac56695aa7de2 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2018-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231459|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_75447d633b910437
Sources EV-b9c38b9b832312c6df098370 Evidence SHA-256 ef02ef26d5fe65171bad305762252b3e86b40b83045b53433ff94d87de3759cd 행 SHA-256 bc71605478966fb2cd7f2c3fa548fc6d9e129e48117e620ce64ac56695aa7de2 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2027-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231459|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_75447d633b910437
Sources EV-b9c38b9b832312c6df098370 Evidence SHA-256 ef02ef26d5fe65171bad305762252b3e86b40b83045b53433ff94d87de3759cd 행 SHA-256 bc71605478966fb2cd7f2c3fa548fc6d9e129e48117e620ce64ac56695aa7de2 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231459|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_75447d633b910437
Sources EV-b9c38b9b832312c6df098370 Evidence SHA-256 ef02ef26d5fe65171bad305762252b3e86b40b83045b53433ff94d87de3759cd 행 SHA-256 bc71605478966fb2cd7f2c3fa548fc6d9e129e48117e620ce64ac56695aa7de2 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2023-11 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231459|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_75447d633b910437
Sources EV-b9c38b9b832312c6df098370 Evidence SHA-256 ef02ef26d5fe65171bad305762252b3e86b40b83045b53433ff94d87de3759cd 행 SHA-256 bc71605478966fb2cd7f2c3fa548fc6d9e129e48117e620ce64ac56695aa7de2 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2028-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231459|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_75447d633b910437
Sources EV-b9c38b9b832312c6df098370 Evidence SHA-256 ef02ef26d5fe65171bad305762252b3e86b40b83045b53433ff94d87de3759cd 행 SHA-256 bc71605478966fb2cd7f2c3fa548fc6d9e129e48117e620ce64ac56695aa7de2 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_75447d633b910437 stable_project_id kproj_82d39daa5e07ad6f source_key 202609|231459|ESB basic_ym 202609 source_stage_raw 사업승인-공사착수전 project_name_list 154KV 동면변전소 건설사업 project_name_detail 154kV 동면S/S 건설사업 region_summary_raw 강원특별자치도 춘천시등 1 지역 equipment_type_raw 변전 headquarters_raw 중부건설본부 office_raw 충북강원건설지사 section_fields 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 2023.11 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 기본설계: 실시설계: 설계담당자: [redacted] ○‘18.06 : 제8차 전력수급기본계획 반영 ○‘23.05 : 강원 수열에너지 융복합 클러스터 실시계획 승인 고시(산단 내 변전소 반영) ○‘23.11 : 부지 확정 ○‘25.08 : 기본설계 확정 ○‘25.12 : 용지매수 완료 [향후계획] ○‘26.09 : 변전공사 착공 ○‘28.10 : 변전공사 준공 future_plan_redacted □ 향후계획 ○‘18.06 : 제8차 전력수급기본계획 반영 ○‘23.05 : 강원 수열에너지 융복합 클러스터 실시계획 승인 고시(산단 내 변전소 반영) ○‘23.11 : 부지 확정 ○‘25.08 : 기본설계 확정 ○‘25.12 : 용지매수 완료 [향후계획] ○‘26.09 : 변전공사 착공 ○‘28.10 : 변전공사 준공 attachment_count 0 source_detail_sha256 ef02ef26d5fe65171bad305762252b3e86b40b83045b53433ff94d87de3759cd first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231459|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_75447d633b910437
Sources EV-b9c38b9b832312c6df098370 Evidence SHA-256 ef02ef26d5fe65171bad305762252b3e86b40b83045b53433ff94d87de3759cd 행 SHA-256 bc71605478966fb2cd7f2c3fa548fc6d9e129e48117e620ce64ac56695aa7de2 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_82d39daa5e07ad6f stable_project_key prjtDef:231459:ESB project_definition 231459 first_region_code ESB manual_source_format false project_name 154kV 동면S/S 건설사업 project_name_list 154KV 동면변전소 건설사업 purpose 변전설비 적기확충으로 안정적 전력공급 project_region_detail 강원특별자치도 춘천시 project_period_raw 2018.10~2027.10 project_scale_raw 154/23KV 60MVA * 2BANK responsible_office_raw 중부건설본부/충북강원건설지사 equipment_type 변전 headquarters 중부건설본부 office 충북강원건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_82d39daa5e07ad6f
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_82d39daa5e07ad6f
Sources EV-55f97cc0d7d2992111b324d5 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 62b6fecc86ced3025968a5807cecc44049b576709064c8751ef08608775d7569 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-e8f7e40548ee0ffc203140c2
Detailed source fields Original source field Published value or condition stable_project_id kproj_86656cb445fe8fce stable_project_key prjtDef:232556:ESB project_definition 232556 first_region_code ESB manual_source_format false project_name 154kV 동면분기T/L 건설사업 project_name_list 154kV 동면분기 송전선로 건설사업 purpose 수열에너지 융복합 클러스터 단지 전력공급 project_region_detail 강원특별자치도 춘천시 project_period_raw 2018.06~2027.10 project_scale_raw ACSR 330㎟×S×2C/4C, 1.5KM responsible_office_raw 중부건설본부/충북강원건설지사 equipment_type 가공송전 headquarters 중부건설본부 office 충북강원건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_86656cb445fe8fce
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_86656cb445fe8fce
Sources EV-e8f7e40548ee0ffc203140c2 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 f2f7d7f4be3489bbbb4c98945d09691498dc101378d8faae06838091b0f9d1c1 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2027-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232556|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_56c5c8dae31cad85
Sources EV-2257579cafe05c9b9befa86a Evidence SHA-256 71e7e47624bdbdc9b6ac7047951c2652b7a6049e2efe44953163bd3d5fea9b79 행 SHA-256 03fe236f60c94e378e1f988f4a4e4a24f5cd471e6dc8b0f3413f3656c9b720bf Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-06 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232556|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_56c5c8dae31cad85
Sources EV-2257579cafe05c9b9befa86a Evidence SHA-256 71e7e47624bdbdc9b6ac7047951c2652b7a6049e2efe44953163bd3d5fea9b79 행 SHA-256 03fe236f60c94e378e1f988f4a4e4a24f5cd471e6dc8b0f3413f3656c9b720bf Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-09 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232556|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_56c5c8dae31cad85
Sources EV-2257579cafe05c9b9befa86a Evidence SHA-256 71e7e47624bdbdc9b6ac7047951c2652b7a6049e2efe44953163bd3d5fea9b79 행 SHA-256 03fe236f60c94e378e1f988f4a4e4a24f5cd471e6dc8b0f3413f3656c9b720bf Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-03 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232556|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_56c5c8dae31cad85
Sources EV-2257579cafe05c9b9befa86a Evidence SHA-256 71e7e47624bdbdc9b6ac7047951c2652b7a6049e2efe44953163bd3d5fea9b79 행 SHA-256 03fe236f60c94e378e1f988f4a4e4a24f5cd471e6dc8b0f3413f3656c9b720bf Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-01 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232556|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_56c5c8dae31cad85
Sources EV-2257579cafe05c9b9befa86a Evidence SHA-256 71e7e47624bdbdc9b6ac7047951c2652b7a6049e2efe44953163bd3d5fea9b79 행 SHA-256 03fe236f60c94e378e1f988f4a4e4a24f5cd471e6dc8b0f3413f3656c9b720bf Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-03 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232556|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_56c5c8dae31cad85
Sources EV-2257579cafe05c9b9befa86a Evidence SHA-256 71e7e47624bdbdc9b6ac7047951c2652b7a6049e2efe44953163bd3d5fea9b79 행 SHA-256 03fe236f60c94e378e1f988f4a4e4a24f5cd471e6dc8b0f3413f3656c9b720bf Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-03 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232556|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_56c5c8dae31cad85
Sources EV-2257579cafe05c9b9befa86a Evidence SHA-256 71e7e47624bdbdc9b6ac7047951c2652b7a6049e2efe44953163bd3d5fea9b79 행 SHA-256 03fe236f60c94e378e1f988f4a4e4a24f5cd471e6dc8b0f3413f3656c9b720bf Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2025-05 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232556|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_56c5c8dae31cad85
Sources EV-2257579cafe05c9b9befa86a Evidence SHA-256 71e7e47624bdbdc9b6ac7047951c2652b7a6049e2efe44953163bd3d5fea9b79 행 SHA-256 03fe236f60c94e378e1f988f4a4e4a24f5cd471e6dc8b0f3413f3656c9b720bf Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232556|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_56c5c8dae31cad85
Sources EV-2257579cafe05c9b9befa86a Evidence SHA-256 71e7e47624bdbdc9b6ac7047951c2652b7a6049e2efe44953163bd3d5fea9b79 행 SHA-256 03fe236f60c94e378e1f988f4a4e4a24f5cd471e6dc8b0f3413f3656c9b720bf Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-09 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232556|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_56c5c8dae31cad85
Sources EV-2257579cafe05c9b9befa86a Evidence SHA-256 71e7e47624bdbdc9b6ac7047951c2652b7a6049e2efe44953163bd3d5fea9b79 행 SHA-256 03fe236f60c94e378e1f988f4a4e4a24f5cd471e6dc8b0f3413f3656c9b720bf Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232556|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_56c5c8dae31cad85
Sources EV-2257579cafe05c9b9befa86a Evidence SHA-256 71e7e47624bdbdc9b6ac7047951c2652b7a6049e2efe44953163bd3d5fea9b79 행 SHA-256 03fe236f60c94e378e1f988f4a4e4a24f5cd471e6dc8b0f3413f3656c9b720bf Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-01 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232556|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_56c5c8dae31cad85
Sources EV-2257579cafe05c9b9befa86a Evidence SHA-256 71e7e47624bdbdc9b6ac7047951c2652b7a6049e2efe44953163bd3d5fea9b79 행 SHA-256 03fe236f60c94e378e1f988f4a4e4a24f5cd471e6dc8b0f3413f3656c9b720bf Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2018-06 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232556|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_56c5c8dae31cad85
Sources EV-2257579cafe05c9b9befa86a Evidence SHA-256 71e7e47624bdbdc9b6ac7047951c2652b7a6049e2efe44953163bd3d5fea9b79 행 SHA-256 03fe236f60c94e378e1f988f4a4e4a24f5cd471e6dc8b0f3413f3656c9b720bf Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-02 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232556|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_56c5c8dae31cad85
Sources EV-2257579cafe05c9b9befa86a Evidence SHA-256 71e7e47624bdbdc9b6ac7047951c2652b7a6049e2efe44953163bd3d5fea9b79 행 SHA-256 03fe236f60c94e378e1f988f4a4e4a24f5cd471e6dc8b0f3413f3656c9b720bf Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-03 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232556|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_56c5c8dae31cad85
Sources EV-2257579cafe05c9b9befa86a Evidence SHA-256 71e7e47624bdbdc9b6ac7047951c2652b7a6049e2efe44953163bd3d5fea9b79 행 SHA-256 03fe236f60c94e378e1f988f4a4e4a24f5cd471e6dc8b0f3413f3656c9b720bf Observations for this power asset History for this project Previous Next