POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 12items · current page 1–12 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-431475b5a5fd0b8a85411d50
Detailed source fields Original source field Published value or condition stable_project_id kproj_5f4da17fccc1f832 stable_project_key prjtDef:234572:ESB project_definition 234572 first_region_code ESB manual_source_format false project_name 154kV 델타분기 전력구 건설사업 project_name_list 부산 강서지역 전기공급시설 전력구공사(델타분기) purpose 에코델타시티 개발에 따른 전력공급 위한 전력구공사 project_region_detail 부산광역시 강서구 project_period_raw 2020.03~2030.04 project_scale_raw SHIELD-TBM 2,026M, 전력구 1,970M, 수직구 1개소 responsible_office_raw 남부건설본부/직할 equipment_type 전력구 headquarters 남부건설본부 office 직할 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_5f4da17fccc1f832
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_5f4da17fccc1f832
Sources EV-431475b5a5fd0b8a85411d50 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 997531832b542ff549be4eb0bf04c526b9a58228681a71e05db06e9aa20e2a4f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2020-09 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|234572|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b27669106d385753
Sources EV-78659abfcd752f9e18c4e9ec Evidence SHA-256 3ef5a635fc086120a0b26b550796544df7d8823ac8e335c7a225748ee78c5f98 행 SHA-256 b947e5377cc92a1c2581b934062caeda37dc00af04e62f833d8f1ba7e9c0a449 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2030-04 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234572|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b27669106d385753
Sources EV-78659abfcd752f9e18c4e9ec Evidence SHA-256 3ef5a635fc086120a0b26b550796544df7d8823ac8e335c7a225748ee78c5f98 행 SHA-256 b947e5377cc92a1c2581b934062caeda37dc00af04e62f833d8f1ba7e9c0a449 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-11 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|234572|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b27669106d385753
Sources EV-78659abfcd752f9e18c4e9ec Evidence SHA-256 3ef5a635fc086120a0b26b550796544df7d8823ac8e335c7a225748ee78c5f98 행 SHA-256 b947e5377cc92a1c2581b934062caeda37dc00af04e62f833d8f1ba7e9c0a449 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-09 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|234572|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b27669106d385753
Sources EV-78659abfcd752f9e18c4e9ec Evidence SHA-256 3ef5a635fc086120a0b26b550796544df7d8823ac8e335c7a225748ee78c5f98 행 SHA-256 b947e5377cc92a1c2581b934062caeda37dc00af04e62f833d8f1ba7e9c0a449 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-03 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|234572|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b27669106d385753
Sources EV-78659abfcd752f9e18c4e9ec Evidence SHA-256 3ef5a635fc086120a0b26b550796544df7d8823ac8e335c7a225748ee78c5f98 행 SHA-256 b947e5377cc92a1c2581b934062caeda37dc00af04e62f833d8f1ba7e9c0a449 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-01 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|234572|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b27669106d385753
Sources EV-78659abfcd752f9e18c4e9ec Evidence SHA-256 3ef5a635fc086120a0b26b550796544df7d8823ac8e335c7a225748ee78c5f98 행 SHA-256 b947e5377cc92a1c2581b934062caeda37dc00af04e62f833d8f1ba7e9c0a449 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-07 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|234572|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b27669106d385753
Sources EV-78659abfcd752f9e18c4e9ec Evidence SHA-256 3ef5a635fc086120a0b26b550796544df7d8823ac8e335c7a225748ee78c5f98 행 SHA-256 b947e5377cc92a1c2581b934062caeda37dc00af04e62f833d8f1ba7e9c0a449 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2020-03 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234572|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b27669106d385753
Sources EV-78659abfcd752f9e18c4e9ec Evidence SHA-256 3ef5a635fc086120a0b26b550796544df7d8823ac8e335c7a225748ee78c5f98 행 SHA-256 b947e5377cc92a1c2581b934062caeda37dc00af04e62f833d8f1ba7e9c0a449 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2020-09 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|234572|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b27669106d385753
Sources EV-78659abfcd752f9e18c4e9ec Evidence SHA-256 3ef5a635fc086120a0b26b550796544df7d8823ac8e335c7a225748ee78c5f98 행 SHA-256 b947e5377cc92a1c2581b934062caeda37dc00af04e62f833d8f1ba7e9c0a449 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_b27669106d385753 stable_project_id kproj_5f4da17fccc1f832 source_key 202609|234572|ESB basic_ym 202609 source_stage_raw 사업승인-공사착수전 project_name_list 부산 강서지역 전기공급시설 전력구공사(델타분기) project_name_detail 154kV 델타분기 전력구 건설사업 region_summary_raw 부산광역시 강서구등 1 지역 equipment_type_raw 전력구 headquarters_raw 남부건설본부 office_raw 직할 section_fields Project purpose 에코델타시티 개발에 따른 전력공급 위한 전력구공사 사업 규모 SHIELD-TBM 2,026M, 전력구 1,970M, 수직구 1개소 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 2020.09 ~ 2024.11 기본설계: 2020.09 ~ 2024.01 실시설계: 2024.07 ~ 설계담당자: [redacted] □ '26.09 : 기본, 실시설계 통합심의 시행 예정 future_plan_redacted □ 향후계획 □ '26.09 : 기본, 실시설계 통합심의 시행 예정 attachment_count 0 source_detail_sha256 3ef5a635fc086120a0b26b550796544df7d8823ac8e335c7a225748ee78c5f98 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|234572|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b27669106d385753
Sources EV-78659abfcd752f9e18c4e9ec Evidence SHA-256 3ef5a635fc086120a0b26b550796544df7d8823ac8e335c7a225748ee78c5f98 행 SHA-256 b947e5377cc92a1c2581b934062caeda37dc00af04e62f833d8f1ba7e9c0a449 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_5f4da17fccc1f832 stable_project_key prjtDef:234572:ESB project_definition 234572 first_region_code ESB manual_source_format false project_name 154kV 델타분기 전력구 건설사업 project_name_list 부산 강서지역 전기공급시설 전력구공사(델타분기) purpose 에코델타시티 개발에 따른 전력공급 위한 전력구공사 project_region_detail 부산광역시 강서구 project_period_raw 2020.03~2030.04 project_scale_raw SHIELD-TBM 2,026M, 전력구 1,970M, 수직구 1개소 responsible_office_raw 남부건설본부/직할 equipment_type 전력구 headquarters 남부건설본부 office 직할 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_5f4da17fccc1f832
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_5f4da17fccc1f832
Sources EV-431475b5a5fd0b8a85411d50 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 997531832b542ff549be4eb0bf04c526b9a58228681a71e05db06e9aa20e2a4f Observations for this power asset History for this project