POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 14items · current page 1–14 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 도고분기T/L C/T 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-4b93727e4bf5947b0c5a3643
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_bfeac01936d4d32f
stable_project_keyprjtDef:232685:ESB
project_definition232685
first_region_codeESB
manual_source_formatfalse
project_name154kV 도고분기T/L C/T 건설사업
project_name_list154kV 도고분기 송전선로 건설사업
purpose신규부하 급증에 따른 공급능력 확보
project_region_detailAsan City, South Chungcheong Province
project_period_raw2024.07~2030.12
project_scale_rawACSR 410㎟ × S × 4C, 1.0KM
responsible_office_raw중부건설본부/직할
equipment_type가공송전
headquarters중부건설본부
office직할
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_6a93cb1be74926f4
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_bfeac01936d4d32f

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_bfeac01936d4d32f

Sources EV-4b93727e4bf5947b0c5a3643
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 b984b87738053e0ba5c3d6e281706a80cb9569da347e6b915044b3bfb90a8e9c
Source schedule candidates · KOR · kepco_planned

154kV 도고분기T/L C/T 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-06
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232685|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6a93cb1be74926f4

Sources EV-8870f51caa24fda6653cbb7d
Evidence SHA-256 c0faadcd901acbb013c1d7cd992466352086ba7a5e6d8801b0d046c28407bb00
행 SHA-256 f0a4f18ced5f14fd7c08ffe8e1667705fd0f2beb51c5c23434a67c6a3f25fd33
Source schedule candidates · KOR · kepco_planned

154kV 도고분기T/L C/T 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2030-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232685|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6a93cb1be74926f4

Sources EV-8870f51caa24fda6653cbb7d
Evidence SHA-256 c0faadcd901acbb013c1d7cd992466352086ba7a5e6d8801b0d046c28407bb00
행 SHA-256 f0a4f18ced5f14fd7c08ffe8e1667705fd0f2beb51c5c23434a67c6a3f25fd33
Source schedule candidates · KOR · kepco_planned

154kV 도고분기T/L C/T 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-04
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232685|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6a93cb1be74926f4

Sources EV-8870f51caa24fda6653cbb7d
Evidence SHA-256 c0faadcd901acbb013c1d7cd992466352086ba7a5e6d8801b0d046c28407bb00
행 SHA-256 f0a4f18ced5f14fd7c08ffe8e1667705fd0f2beb51c5c23434a67c6a3f25fd33
Source schedule candidates · KOR · kepco_planned

154kV 도고분기T/L C/T 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-11
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232685|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6a93cb1be74926f4

Sources EV-8870f51caa24fda6653cbb7d
Evidence SHA-256 c0faadcd901acbb013c1d7cd992466352086ba7a5e6d8801b0d046c28407bb00
행 SHA-256 f0a4f18ced5f14fd7c08ffe8e1667705fd0f2beb51c5c23434a67c6a3f25fd33
Source schedule candidates · KOR · kepco_planned

154kV 도고분기T/L C/T 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-12
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232685|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6a93cb1be74926f4

Sources EV-8870f51caa24fda6653cbb7d
Evidence SHA-256 c0faadcd901acbb013c1d7cd992466352086ba7a5e6d8801b0d046c28407bb00
행 SHA-256 f0a4f18ced5f14fd7c08ffe8e1667705fd0f2beb51c5c23434a67c6a3f25fd33
Source schedule candidates · KOR · kepco_planned

154kV 도고분기T/L C/T 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-06
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232685|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6a93cb1be74926f4

Sources EV-8870f51caa24fda6653cbb7d
Evidence SHA-256 c0faadcd901acbb013c1d7cd992466352086ba7a5e6d8801b0d046c28407bb00
행 SHA-256 f0a4f18ced5f14fd7c08ffe8e1667705fd0f2beb51c5c23434a67c6a3f25fd33
Source schedule candidates · KOR · kepco_planned

154kV 도고분기T/L C/T 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-12
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232685|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6a93cb1be74926f4

Sources EV-8870f51caa24fda6653cbb7d
Evidence SHA-256 c0faadcd901acbb013c1d7cd992466352086ba7a5e6d8801b0d046c28407bb00
행 SHA-256 f0a4f18ced5f14fd7c08ffe8e1667705fd0f2beb51c5c23434a67c6a3f25fd33
Source schedule candidates · KOR · kepco_planned

154kV 도고분기T/L C/T 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-05
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232685|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6a93cb1be74926f4

Sources EV-8870f51caa24fda6653cbb7d
Evidence SHA-256 c0faadcd901acbb013c1d7cd992466352086ba7a5e6d8801b0d046c28407bb00
행 SHA-256 f0a4f18ced5f14fd7c08ffe8e1667705fd0f2beb51c5c23434a67c6a3f25fd33
Source schedule candidates · KOR · kepco_planned

154kV 도고분기T/L C/T 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2024-07
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232685|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6a93cb1be74926f4

Sources EV-8870f51caa24fda6653cbb7d
Evidence SHA-256 c0faadcd901acbb013c1d7cd992466352086ba7a5e6d8801b0d046c28407bb00
행 SHA-256 f0a4f18ced5f14fd7c08ffe8e1667705fd0f2beb51c5c23434a67c6a3f25fd33
Source schedule candidates · KOR · kepco_planned

154kV 도고분기T/L C/T 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2025-02
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232685|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6a93cb1be74926f4

Sources EV-8870f51caa24fda6653cbb7d
Evidence SHA-256 c0faadcd901acbb013c1d7cd992466352086ba7a5e6d8801b0d046c28407bb00
행 SHA-256 f0a4f18ced5f14fd7c08ffe8e1667705fd0f2beb51c5c23434a67c6a3f25fd33
Source schedule candidates · KOR · kepco_planned

154kV 도고분기T/L C/T 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232685|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6a93cb1be74926f4

Sources EV-8870f51caa24fda6653cbb7d
Evidence SHA-256 c0faadcd901acbb013c1d7cd992466352086ba7a5e6d8801b0d046c28407bb00
행 SHA-256 f0a4f18ced5f14fd7c08ffe8e1667705fd0f2beb51c5c23434a67c6a3f25fd33
Source snapshots by date · KOR · kepco_planned

154kV 도고분기T/L C/T 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_6a93cb1be74926f4
stable_project_idkproj_bfeac01936d4d32f
source_key202609|232685|ESB
basic_ym202609
source_stage_raw계획확정-사업승인전
project_name_list154kV 도고분기 송전선로 건설사업
project_name_detail154kV 도고분기T/L C/T 건설사업
region_summary_raw충청남도 아산시등 1 지역
equipment_type_raw가공송전
headquarters_raw중부건설본부
office_raw직할
section_fields
Project purpose
  • 신규부하 급증에 따른 공급능력 확보
Project region
  • Asan City, South Chungcheong Province
Project period
  • 2024.07~2030.12
사업 규모
  • ACSR 410㎟ × S × 4C, 1.0KM
담당 사업소
  • 중부건설본부/직할
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 2025.02 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
  • line [진행경과] □ '23.05 : 제10차 송변전설비계획 사업 반영 □ '24.12 : 전력영향평가 용역 발주 □ '25.04 : 전력영향평가 용역 착수회의 □ '25.06 : 전력영향평가 대역 변경 관계자회의 □ '25.11 : 계통 연계점 변경 계통검토 요청(아산-예산 → 아산-합덕) □ '25.12 : 도고변전소 입지선정실무위원회 시행 □ '26.06 : 도고변전소 입지확정위원회 시
[향후계획] □ '26.09 : 전력입지영향평가 용역 재개
future_plan_redacted□ 향후계획 [향후계획] □ '26.09 : 전력입지영향평가 용역 재개
attachment_count0
source_detail_sha256c0faadcd901acbb013c1d7cd992466352086ba7a5e6d8801b0d046c28407bb00
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|232685|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6a93cb1be74926f4

Sources EV-8870f51caa24fda6653cbb7d
Evidence SHA-256 c0faadcd901acbb013c1d7cd992466352086ba7a5e6d8801b0d046c28407bb00
행 SHA-256 f0a4f18ced5f14fd7c08ffe8e1667705fd0f2beb51c5c23434a67c6a3f25fd33
Source snapshots by date · KOR · kepco_planned

154kV 도고분기T/L C/T 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_bfeac01936d4d32f
stable_project_keyprjtDef:232685:ESB
project_definition232685
first_region_codeESB
manual_source_formatfalse
project_name154kV 도고분기T/L C/T 건설사업
project_name_list154kV 도고분기 송전선로 건설사업
purpose신규부하 급증에 따른 공급능력 확보
project_region_detailAsan City, South Chungcheong Province
project_period_raw2024.07~2030.12
project_scale_rawACSR 410㎟ × S × 4C, 1.0KM
responsible_office_raw중부건설본부/직할
equipment_type가공송전
headquarters중부건설본부
office직할
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_6a93cb1be74926f4
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_bfeac01936d4d32f

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_bfeac01936d4d32f

Sources EV-4b93727e4bf5947b0c5a3643
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 b984b87738053e0ba5c3d6e281706a80cb9569da347e6b915044b3bfb90a8e9c

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel